Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
, LTD
Address: No.17, laijiang road, Liyang, Jiangsu, China Tel: 0086-519-88325792; Fax : 0086-519- 88325792 Attn: Sam Jiang; Mobile:0086-151 95074707; MSN:samjiang1029@hotmail.com, Skype: samjiang1029 E-mail: samjiang@lyyljx.cn; Http://www.lyyljx .cn
QUOTATION LIST
No.:LYYL-J-20110112-1 For: 0.5-1T/H Compact Feed Pellet Mill Plant According to PROCESS FLOW DIAGRAM Capacity: 0.5-1T/H of Compound Feed, Pelleted 4mm) Depending on steam addition and good Formula (
SUMMARY
CONSISTING OF: GROUP 1: Mechanical Equipment GROUP 2: Electronic Controlled System GROUP 3: Miscellaneous GROUP 4: Production Building and Accessories Local Supply By Customer GROUP 5: SERVICE TOTAL AMOUNT: Total EX-WORK Port: 39500 7000 8500 0
Item Description & Model No. Qty KW Unit Price Total Price GROUP 1: Mechanical Equipment Remark: The follow machine pictures is just for your reference, the actual style maybe a little difference. 101 Hammer Mill, SFSP50 1 11.00 3000 3000 Consist of: 1. Machine Body 1) Adustable heavy welded motor base 2) Wear lining Plate 3) With cyclone 2. Rotor The rotor can rotate clockwise and counterclockwise and feed bi-directionally. 3.Hammer Two kinds of gap between hammer and screen for use in coarse and find granding 4. Pressing Screen and screen system 1) Screens of different meshes are available for selection 2) Simple and convenient pressing screen system 5. Motor: 11kw 102
Accessories for intake channel 1)With steel frame, grids and outlet flange 2) The channel made of reinforced concrete It is to be provided by customer. Elevator, TDTG 36/13 With elevator foot incl. belt pulley, inlet, belt, buckets shafts, elevator head, and drive 1.5KW
500
500
103
1.50
3000
3000
104
Ribbon Mixer, SLHY0.6 1)Capacity: 250kg/B 2)mixing time: 3-5min/B 3)drive 5.5kw
5.50
5000
5000
105
Bin Following Mixer 1) in steel sheet construction 2) with cover and connecting flanges. Screw Conveyer, TLSS18 With trough and final outlet end plates with anti-friction bearings, tubular shaft incl. solid thread, and drive 1.5KW
500
500
106
1.5
2000
2000
107
Elevator TDTG36/13 With elevator foot including belt pulley, inlet, belt buckets shafts, elevator head and drive 2.2kw Three-way Valve,TBDQ2*20/30
2.20
3200
3200
108 109
1 2
400 500
400 1000
Prebin for pellet mill 1)in steel sheet construction 2)with cover and connecting flanges.
Pellet Mill(press), SZLH250 Consisit of 1. Screw Feeder 1) Through screws with full face paddle and shaft made of stainless steel. 2) Power drive: conversion speed-adjusting motor of 0.75KW infinitely variable from 8-80 rpm. 3) One piece feeder screw control.
110
17.75
12000
12000
4) Safety magnet. 5) It is mounted in the middle transition section of feeder discharging opening. 6) The magnetic field intensity is more than 1800GS 2. Bloc Press. 1) Gearbox With pinion shaft, main gear, main shaft, quill shaft, gearbox body, manual lubrication system and overload protection system. 2) Coupling assembly and cover etc. 3) One set of roller assembly---two roller system. 4) One die made of alloy steel, special design for low bulk density pelleting----4 mm holes. 5) Door made of stainless steel with two knife assembly. 6) Feed chute made of stainless steel. External discharging can be carrried out by pulling out the external discharging lever arm of feed chute to prevent feed from entering the pellet chamber for the convenience of trial run and breakdown removal. 7) Mill base and three-phase main motor of 15KW. 3. Conditioner
1)housing and adjustable paddles made of stainless steel, shafts made of stainless steel. 2) three inspection doors in the conditioner. 3)steam connection and molasses connection. 4) power drive---three-phase motor of 2.2KW transmission direct B-belts.
111 Bucket Elevator TDTG36/13 With elevator foot including belt pulley, inlet, belt, buckets shafts, elevator head, and drive 1.5 KW 1 1.50 3000 3000
112
Counter flow Cooler & Sifter, SLFJ 1.5 1)with inlet lock with drive, product distributor, 2)Suction hood made of stainless steel, cooling case level indicators, slide discharge, lower grid adjusting device, outlet hopper stationary trestle, and drive 0.75+1.5KW.
2.25
4500
4500
113
Fan, 4-72 No. 3.6A with case incl. base, impeller wheel and drive 4KW
4.00
500
500
114
Cyclone 800 1 1)With top part including inlet sleeve for dust-laden air and outlet flange for clean air, bottom part with cleaning flap, and lock fitting piece. 47
900
900
Group Sum:
39500
201 202
Control Panel Electric Installation Auxiliary Materials Consist of armoured KVV cable, wire, trunking, wiring box, bridge support and other materials The applicable power for motors of the above equipment is 3 Phase, 380V, 50Hz
1 set 1 set
4500 2500
4500 2500
203
Group Sum: GROUP 3: Miscellaneous(Or By Owener) 301 Boiler and Pipeline System. ---- Local supply by customer --Steam generating capacity: 250 kg/h(Pressure: 0.4-0.6Mpa) 302 Seel structureSupports and Frame For whole Feed Mill With other auxiliaries ,such as spouts, fittings Paint: for all equipment and the auxiliary parts of the whole plant. 1 Set 7500
7000
7500
303
1000
1000
8500
401
We supply the dimension of the workshop building to customer, so customer had better to prepare the corresponding factory building. Customer have to provide the dimension to us If they have already had the factory building, we will make a design according to their factory; If the dimension is too small, we will contact with customer soonest. We will provide the drawing of the silo to customers If they ask to put some equipments under the floor.
Group Sum: 0
402
403
GROUP 5: Service 501 Assembly supervision and commissioning price for 1 man/week-----500USD 1)Assembly: Scope of services: Placing at the disposal of experts for assembly supervision of the following parts for the estimated duration of assembly as specified below: 1 expert 4 weeks Total 4 weeks 2) Commissioning: Scope of services: Placing at the disposal of experts for commissioning for the estimated duration as specified below: 1 commissioning engineers 1 week Total 1 week The costs specified refer to the indicated periods of time and comprise wage costs based on a working day of 8 hours and a working week of 6 days. The following costs are not included: 1Local transport costs
2Costs for board and lodging and air tickets 3Levies due to authorities, taxes etc. 4) For YONGLI personnel: *1 interpreter and coordinator * telephone and fax connection to China and internal free of charge These costs are to be borne by the CUSTOMER. The same applies to the placing at the disposal of assembly personnel, tools etc. 502 Assembly The assembly works including start-up will be executed by a local contractor. This company will have to provide for the following services: 1) All personnel 2) Tools and hoists 3) Preparation of assembly site including rooms to be locked and sanitary facilities. 4) Power supply (electricity) to site 5) Water supply The total period of assembly mainly depends on local conditions, for eg.: personnel, conditions on site etc. The dates mentined in the assembly time schedule are based on our experience. 503 Training of local personnel The following personnel is to be trained and educated free of charge: 1) Mechanical engineer for maintenance 2) Electrical engineer for maintenance Place of training: At site during assembly and start-up Group Sum: CONDITIONS:
1. Price Validity: The prices only valid in 30 days. 2. Terms of Supply: Our liability is only applicable if original spare and wear parts are used and inspection of assembly and start-up of plant has been executed by our specialists. 3. Leadtime: 2 months after receipt of deposit and all techcinal and commercial details have been agreed upon. 4. Delivery terms: EX-WORK 5. Transportation Insurance: At the expense of the consignee. Insurance will be effected at your explicit request only. 6. Payment Terms: T/T in advance(30% by deposit after signing the PI, the balance be paid 7 days before delivery) 7. Warranty: 12 months(Calculated from the goods arrvied the destination port.)
2500
www.lyyljx.cn
Flow Diagram