Date: 27-05-2011
Presented By
Flow of Presentation
Company & Plant Profile Plant Performance Indices System Approach Case Study Results
Confidential
Slide 2
1800 mw for HPGCL Commissioned 600 mw for R-power commissioned 4400 mw for R-power under commissioning
Confidential Slide 3
First 250 MW sets in the Country Indigenous technology Coastal power plant far away from Coal Mines Annual requirements Total Coal Indian coal Imported coal 2.75 Million tons 2.0 Million tons 0.75 Million tons
Sea Water Open Cycle cooling system (M3/Hr.) 84,000 Nearby Surya River dam (32 kms). Sweet Water (M3/Hr.) 300
Confidential
Slide
102.33
101.00
2006-07
2007-08
2008-09
2009-10
2010-11
Confidential
Slide
96.79
96.7
96.31
97.18
96.48
2006-07
2007-08
2008-09
2009-10
2010-11
Confidential
Slide
2279
2300 2278 2288 2282
2006-07
2007-08
2008-09
2009-10
2010-11
Confidential
Slide
7.64
7.67
7.71
7.6 7.38
2006-07
2007-08
2008-09
2009-10
2010-11
Confidential
Slide
System Approach
ISO 9001:2008
BS EN 16001:2009
ISO 14001:2004
DTPS
SA 8000 OHSAS 18001:2007
ISO 27001:2005
Continual improvement is ensured through improvement plans like Quality Improvement Plan, Safety Improvement Plan Environment Management Plan, Energy Management Plan
Confidential Slide
Turbine-Generator (TG) Heat Rate (Kcal/kwh) Boiler Efficiency (%) Auxiliary Power Consumption (%)
Confidential
Slide 10
Case Study On
Confidential
Slide
DEA
ECO
CONDENSER
BFP 9 mw CEP 0.625 mw CWP 5.04 mw
APH
4.70 mw
ESP
ID Fan 3.5 mw
Slide
PA Fan
1.45 mw
Confidential
Slide 13
CHP 0.11% AHP 0.11% CWPH 0.78% Net Generation 92.40% APC 7.60% Main Plant 6.43% ESP 0.1%
2009-2010
Confidential Slide 14
Technology
Confidential
Slide 15
ACW pump
Compressors
Blending
Mgt
@4000kcal/kg
Excess Air
Excess air
optimization Air ingress measurement at
Maximizing
Generation
various location
Confidential
1.8 km duct
Loading Factor
17.98
11.21
9.49 4.1
2007 2008
Confidential
2008 2009
2009 2010
2010 2011
Operational Control
Condens er Unit # 1 Condens er Unit # 2
20750 m3/hr
Cooling channel
TC T+2 C @T
2.6 mtr - 1.8 km duct
After filling the sea water above the duct area the rise in temperature
GCV kcal/kg
4300
4000
820 780
Boiler Auxiliaries
Coal Mills, ID Fans, PA Fans, FD Fans
Maintenance Control
Performance Performance based Liner reversal, grinding
Coal Mill
Boiler
Maint
Leakages
opportunity
Confidential
Slide
Maintenance Control
7568 7404
7264
7057 6803 6912
BFP-1B
BFP-1A
BFP-2A
Confidential
Slide 21
Maintenance Control
Mn Liner
Hi-Cr Liner
1472 1185
1478 1196
1398
1430 1162
1395
1113
1135
MILL -1AB
MILL -1CD
MILL -1EF
MILL -2CD
MILL -2EF
Confidential
Slide 22
Maintenance Control
APC reduction Through Arresting Air & Flue gas Duct Leakages during Every Opportunity
670
283 260
ID Fan
PA Fan
FD Fan
Maintenance Control
Reduction In Forced Outages through
From Overhaul to Overhaul average Boiler tube leakage per Unit is 2 Radiography of old erection joints 20% completed
Confidential Slide 24
Wind ventilators
is under study
Solar lights Solar lighting (1050 W) Solar water heaters & water heaters, LED lights
IFC air
controller at service air compressor Intelligent Flow
(1100 Liters/day)
Confidential
Slide
OCST
PT
PT
CD-58 DM-2
TO DEAERATOR
PT TT
PT
TT
CD-37
PT
CD-34 CD-33
CD-30
LPH - 1
CD-31
TT TT
DM-4
CONDENSER
LPH - 3
CD-36 CD-35
LPH - 2
CD-32
DRAIN COOLER
MIN. RECIRCULATION
TT PT
TT
CEP-B VA-6
CEP-A VA-5
PT
CD-29
TT
PT
CD-14 CD-17
CD-53 CD-19
CD-3
FT TT PT
100%
0%
Confidential
Confidential
Slide 27
Nos 1 2 3 4 5 6 7 8 Coal Mill Seal Air Fan CEP-1B CEP-2A ACW Pump Ash SILO LDO Pump CDWP Sevice Water Pump 12 2 2 2 2 2 2 1
Nos 4 1 1 1 1 1 1 1
Rs in Lakhs 30.55 106.09 90.50 4.50 6.50 2.00 5.00 2.00 247
Slide 28
622
Operational Control
Maintenance Control
Energy Management
2006-07 2007-08
7.64
7.67
7.71
2008-09
Technology
Improvement plans / CA / PA MIS
Continual Process
Confidential Slide 29
PCR-2
Process parameter
Compressor Room
Process parameter
4-20 mA
24+16 channel SCANNER RS485
4-20 mA
24+16 channel SCANNER RS485 RS485 16 channel SCANNER 4-20 mA
RS485
ELAN SERVER
Continual Improvement
ELAN VIEW Single Login RS485 RS485
Online monitoring.
Elimination of human error Measurable outputs Compares and identifies the efficient processes & equipment Different type of reports like daily, monthly, quarterly or yearly can be generated automatically Report generation and archiving is possible.
Confidential
Slide
Confidential
32
Slide 32
Confidential
33
Slide 33
Online Reports
Feeder name
Confidential
Slide 34
With Installation of Online monitoring system ,the Energy consumption of the equipments are classified in to following
Base value (PG test / Design) Operating value (Process variation from 1 yrs data) Operational Control Maintenance Control
Base value Kwh Operating Value kwh < 7350 Operational Control kwh 7350 - 7450 Maintenance Control Kwh > 7450
Equipment
7100
Slide
Confidential
Slide 36
System Approach
Equipment wise standardization of Operating & Control limits Review of report in Daily Plant Meeting Energy deviated for three consecutive days above control limit, FIR to be raised
FIR
Against Energy
Deviation
Maintenanc
Online / Offline Maintenance work will be carried out against FIR
Operational Control
Study & rectification of the problem & process optimization Any defect observed notification is raised through SAP
e Control
Confidential
Slide
Scheduled changeover of Equipments as per Most energy efficient equipment run for Predictive maintenance
energy deviation
maximum time
Confidential
Slide
18 19
13 12 11 10
21
2008-09
2009-10
2010-11
Mill Changeover
55
Unit-1
33 22
33 24
Unit-2
Station Linear (Station)
15
18
14
10
APC Loss per Mill changeover = 1.5 Mw & Generation Loss =11 Mw (Approx.)
2008-09
2009-10
2010-11
Confidential
Slide 39
Unit-1
1+1 2 3 4 5 6 7 8 9 10
Confidential
BFP-1B CEP-1A 1+1 CEP-1B ECW-1A ECW-1B ECW-1C COAL MILL-1AB COAL MILL-1CD COAL MILL-1EF 2+1 2+1
2 2 1 1 3 2 1 2 3
BFP-1A
7010
APC
Benefits
Confidential
Slide 41
Saving : 16 Mwh per year Total Saving : 441 Mwh per year
Total Installation : 14 Nos
Results
Auxiliary Power Consumption (%)
7.64
7.67
7.71
7.6
7.38
2006-07
2007-08
2008-09
2009-10
2010-11
6.20
Apr/10
Jun/10
Oct/10
Dec/10 Average
Feb/11
Apr/10
Jun/10
Aug/10
Oct/10
Dec/10 Average
Feb/11
Confidential
Slide 43
Mission
Auxiliary Power consumption %
7.64 7.67 7.71 7.6
7.38
Target
2006-07
2007-08
2008-09
2009-10
2010-11
Forward Path
Confidential
DTPS Journey..
1998 ISO 9001 1999 ISO 14001 1999 QIP/SIP/EMP 2000 RAMCO ERP Package implmentation 2001 ISO Up gradation 6-I Mercer, CII 6-II OHSAS SA8000
BS EN 16001
BSC
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Confidential Slide 45
1 Unit Saved
3 Units Generated
Confidential
Slide
Thank you