Sei sulla pagina 1di 4

Caution

CAUTION! For customer-supplied external batteries, over-current protection and a disconnecting device for the battery circuits must be provided by the customer. Ensure that the unit is in its final location prior to installation.

2 AC Input, AC Output, and Ground Cable Landings


CAUTION! Ensure clockwise phase rotation and neutral location.
Caution

Symmetra PX 10-40 kW 400 V


Installation Sheet IMPORTANT SAFETY INTRUCTIONS SAVE THESE INSTRUCTIONS

1 Cable Entry
Rear Cable Entry

CAUTION! Power terminal lug diameter is 8 mm. Torque value is 6 Nm.


Caution
2

3 4

Loosen screws to remove plate. Punch holes as required and reinstall panel before mounting wiring hardware.

Bottom Cable Entry


ALL safety instructions in the Safety Sheet must be read, understood and followed when installing the UPS system. Failure to do so could result in equipment damage, serious injury, or death. WARNING! The UPS system has no built-in disconnection devices for AC output and DC input. An AC output over-current protection and AC output disconnect must be provided by the customer. After the UPS has been electrically wired, do not start it up. Start-up is commisioned to APC-authorized personnel only.

Emergency Power OFF Switch Keep EPO wire routing isolated and use separate EPO conduit

AC DC Input Output (Optional XR)

AC Input

Connect power input and output wiring to terminate. Route input and output in separate grommets.

Warning

Warning

Loosen screws to remove plate. Punch holes as required and reinstall panel before mounting wiring hardware.
Symmetra PX 10-40 kW 400 V Installation Sheet

Warning

990-4149D

*990-4149D*

11/2006

Emergency shut-down with internal supply N/O EPO Control N/C EPO Control
INTELL IGENCE MODUL E

INTELL IGENCE MODUL E

4 3/2 1

Ground Relay Coil 1 Internal Power +24V Supply

8 7/6 5

Ground Relay Coil 2 Internal Power +24V Supply


J6
?

Input/Output Wiring of Ancillary Equipment


Emergency Power OFF Switch Keep EPO wire routing isolated and use separate EPO conduit AC DC Input Output (Optional XR) AC Input
1/2

Battery Breaker present Ext. battery fuse/Battery Breaker 1 (N/O position) Ext. battery fuse/Battery Breaker 2 (N/O position) Temp. sensor, ext. battery Temp. sensor, ext. battery present Iso. trafo temp. switch (N/C position) Iso. trafo temp. switch present
EPO Control for PSX PDU

3/4

5/6

J6 2 4
1

1 3

7/8 9/10 11/12

Internal Power +24V Supply Relay Coil 1 Ground

2/3 4

Emergency Power OFF Switch Keep EPO wire routing isolated and use separate EPO conduit

XR Commun ications

AC DC Input Output (Optional XR)

AC Input
DOCU MENT STOR AGE

13/14

Make ground connections.

EPO Switch Wiring


The UPS must be connected to either a dry contact or a 24 VDC Emergency Power Off (EPO) Switch. The EPO circuit is considered SELV (Safety Extra Low Voltage). A SELV circuit is isolated from primary circuitry through an isolating transformer and designed so that, under normal conditions, the voltage is limited to 42.4 VAC peak or 60 VDC. SELV circuits must be isolated from all primary circuitry. Do not connect any circuit to the EPO terminal block unless it can be confirmed that the circuit is SELV. EPO switch wiring must comply with local and national electrical wiring rules.

Communication Cables
Side panel removal
WARNING! Ensure Total Power Off before removing side panel (see Total Power Off procedure). Use 20-foot standard Cat 5 data cable (supplied). If cable length is inadequate, a longer Cat 5 cable, or couplers, can be used (not supplied). If bottom routing is required, follow steps 1 to 5 below to gain access to the communication cables. If not, proceed to Connecting communication cables.

Warning

Unlock right-side panel using key. Depress latches. Pull out panel. Lift panel at an angle away from the enclosure. Route communication cables through front holes of enclosures. Exit enclosures from bottom or top as required. If your UPS has been installed between devices and side panels cannot be removed the Bypass Static Switch Module can be removed to gain access.

Connecting communication cables


ly r Supp Powe System
ote Rem View r Powe puter Com ce Interfa

y Displa

Disp

lay /

Com

pute

r Inte

rface
Status

X/TX Link-R

10Base

-T

Reset
Port Port 1 2

r apte k Ad twor et Ne werN 06 Po AP96

XR Co mmun icatio ns

Batte

ry M

onito

Connect Network Communication Cable. Connect XR Communication Cable.

Symmetra PX 10-40 kW 400 V Installation Sheet

Symmetra PX 10-40 kW 400 V Installation Sheet

Refer to guide supplied with Battery Enclosure for further details on connecting communication cables between UPS and XR Battery Enclosures.

SYMSBP40KHC1M1 ISX TYPE B UTILITY SOURCE PROVIDED BY OTHERS 3 X 400/230V, 50 Hz TN-S, TN-C, TT, IT 400V SYMMETRA PX UPS
BYPASS SSW

L1 L2 L3
Q1 160A 3P

Input PE L1 L2 L3

5 Installation and wiring of optional APC Maintenance


Bypass Panel
Warning

Q1 100A 4P

Q2 100A 4P

Output

L1 L2 L3
63A LOAD TEST PORT OPTIONAL

WARNING! This procedure is only applicable to the installation of the APC stand-alone Maintenance Bypass Panel.

63A

TO THE LOAD DISTRIBUTION PANEL

Mount the APC Maintenance Bypass Panel (MBP) on a wall adjacent to the UPS:
475 mm
26,9 mm

Connect control wires between the UPS and the Maintenance Bypass Panel.
Symmetra PX Maintanance Bypass Interface SYMSBP40KHC1M1 X010

Maintenance Bypass Panel wiring checklist Ensure that the DC Breaker and the System Enable Switch are in the OFF or STAND-BY positions. Torque terminal screws to 1.6-1.8 Nm and terminal bolts to 6 Nm. Verify wires in terminal block X010. Wires 1-10 connect to equipment interface 1-10. Apply power to system input of Maintenance Bypass Panel and measure voltages at input terminal block (X001). Measure and record voltages between: L1 and Neutral:________ L2 and Neutral:____________ L3 and Neutral:__________ Measured voltages must be between 200 and 250. If not, STOP! Verify correct wiring from the power source to the input wiring connections and repeat the procedure. Ensure that the phase rotation is correct. Ensure that the wiring is correct. Switch on Q001 and Q002. Measure and record voltages between input and output points on the Symmetra PX L1 input and L1 output:__________ L2 input and L2 output:_______ L3 input and L3 output:__________ Measured voltages must be 0 Volt +/- 2 Volts. If not, STOP! Verify correct wiring from Maintenance Bypass Panel to the UPS. Successful completion of steps 1 through 7 indicates that the Maintenance Bypass Panel is properly installed and functioning correctly. Turn off breakers and switches and shut down input power to the system.

804 mm 850 mm

6 Specifications
Caution

CAUTION! All electrical power and power control wiring must be installed by a qualified electrician, and must comply with local and national regulations for maximum power rating. All current values are based on a 40 kW maximum configuration of the UPS.

598 mm

Connect the power cables between the MBP and the UPS.

Input Input voltage 380 V Input current (nominal, per phase) Input voltage 400 V Input current (nominal, per phase) Input voltage 415 V Input current (nominal, per phase) Maximum bypass current (continuous, at nominal load) Input frequency Input voltage range for mains operation 60 A 100 A *note 4 40-70 Hz 304-477 V Maximum input current (continuous, at minimum mains voltage)88 A 62 A 66 A

Symmetra PX 10-40 kW 400 V Installation Sheet

Symmetra PX 10-40 kW 400 V Installation Sheet

Output Output voltage (on line) 380 V Output current (nominal, per phase) Neutral output current (with 100% switch mode load) Output voltage (on line) 400 V Output current (nominal, per phase) Neutral output current (with 100% switch mode load) Output voltage (on line) 415 V Output current (nominal, per phase) Neutral output current (with 100% switch mode load) Maximum output current at 400 V (in bypass only at 125% overload, per phase) Output current protection (external to UPS, not supplied) Output frequency (on line, in bypass) Output frequency (on battery) Overcurrent device and disconnect switch for external safety DC bus voltage DC voltage rating of the battery supply Maximum available battery supply fault current +/- 192 V 250 V 10 KA 56 A 96 A *note 7 72 A 63 A *note 5 Synchronized to Input 50/60 Hz 58 A 100 A *note 7 61 A 106 A *note 7
Warning

WARNING! This is a Class A UPS product. In a domestic environment, this product may cause radio interference, in which case, the user may be required to take additional measures.

7 Checklist
Do not install power or battery modules.

Notes
Recommended source connection Input electricity to be provided from a dedicated, grounded 4-wire star (WYE) power supply source with a grounded neutral. If a grounded 3-wire power supply source is present, a Delta to star (WYE) isolation transformer on UPS input is required. Ensure clockwise voltage phase rotation (L1,L2,L3 or RST). Recommended current protection Input: 100 Amp. gL fuse. Output: 63 Amp. 3-pole AC circuit breaker or a 63 A gL fuse with 30 kAIC. Recommended wiring for a 40oC temperature environment
2 2 Input cables: 35 mm . Output cables: 16 mm . External PE cable: 16 mm2. Refer to local electrical regulations. Neutral Output Wires: rate for 173% of output phase current if feeding all Switch Mode Power Supply loads without power factor correction.

Ensure all power wiring is torqued to a minimum of 6 Nm. Ensure that the System Enable Switch and the DC Breaker are in the OFF or STAND-BY position. Apply power to the system input and measure the voltage at the input terminal block. Record voltages between: L1 and N:______________ L2 and N:_____________ L3 and N:_______________ Measured voltage must be between 200 and 250. If not, STOP! Verify correct wiring (correct location of N) from the power source to the input wiring connections. Repeat Step 3. Verify clockwise phase rotation using a phase rotation meter. Turn on System Enable Switch. Wait 1 minute for system to self test. Ignore display warning (fault light will be on). Test the EPO switch. The System Enable Switch should trip to the STAND-BY position, and the system should shut down completely. If not, check the connections and the EPO switch to ensure that they are installed and functioning correctly. Successful completion of steps 1 through 6 indicates that the UPS wiring is properly installed and functioning correctly. Turn off breakers and switches and shut down utility power to the system input. See Total Power Off procedure. Reinstall all wiring access panels on the UPS.

8 Contact Information

For local, country-specific centers: go to www.apc.com/support/contact or see the rear cover of the Operation Manual for phone numbers.

Power supply loads without power factor correction


2 Maximum cable sizes: 120 mm .

Symmetra PX 10-40 kW 400 V Installation Sheet

Symmetra PX 10-40 kW 400 V Installation Sheet

Potrebbero piacerti anche