HYBRID AUTOMATIC TRANSFER SWITCHES (ATS)

A3.18.1. INTRODUCTION a. This RFI docum contains questions to determ com ent ine pliance w a specific set of ith requirem ents. b. A full detailed description of the system specification! proposed in the solution is enclosed. It is understood that the vendor may have alternative solutions available for the same functions or may provide the function or feature on a different schedule than as anticipated in the RFI. Value adding features are expected and highly encouraged. These points should be noted in the proposal. They will be reviewed and scored according be design optimality. A3.18.2. SPECIFICATION This document describes the minimum requirements and specifications of the automatic transfer a. This document is applicable and is to be used to manufacture ATS system. switch.

b. This equipment is to be robust and weatherproof enclosure capable of withstanding harsh weather conditions with minimum maintenance requirement. c. The ATS is to be supplied capable of automatically activating the site's main standby generator, plus provisioned for the addition of a second generator (if required is to be installed later). The to include timer for cycling between two generators at 12 run hours each. Where only one generator is installed, the timer is to be de-activated but left fitted. A3.18.3. CABINET AND LABELLING a. An outdoor steel cabinet, referred to as "ATS command cabinet". This will contain incoming and outgoing protection switchgear, Automatic Transfer Switch (ATS), Generator set stop start/ control and elements with integral cooling fan, mobile connection and shelter distribution section c. The cabinet must be IP55 (to comply to IEC 60529), weatherproof and sun UV resistance. It must be manufactured with the following d. e. External dimension: 890mm x 1200mm x 300mm The cabinet shall be of zinc coated min 3CR12 steel sheet metal with epoxy polyester paint. IP 55 with polyurethane sealing gasket. The cabinet must be corrosive resistance and weather protected to last for a minimum of 10 years without any degradation ATS

f. g. h. i.

The colour should be RAL 7032 Grey. Studs and fasteners on the door and body shall be made of stainless steel. Removable gland plate provided at the bottom of the box The cabinet must be firmly secured onto a frame. The frame must be painted with 2 layers of red oxide and a top coat of anti- rust painted coloured black. It expected that the frame must not degrade or rust within 5 years. It should be noted that mounting of the cabinet must not damage its IP protection.

j. k. I.

The frame must be provided with stainless steel raw bolts for bolting onto the ground The cabinet must designed with slanting roof to avoid rain collecting at any part of the cabinet The system must be installed with the following safety conditions (in compliance to IEEE C2):

m. Each cable phase must be colour coded for easy identification. n. o. Cable through panel must have appropriate glands. A live danger sign cabinet p. Label is required on the inner control and the external door reading Consider Panel Live at all Times". This should be written in white engraved text with a red background. The label size be 300mm x 25mm. q. r. s. t. u. Mobile switch label on the front face showing: OFF, Mobile and normal. Earth strap from the box to the frame is required with appropriate earth labels, As build label drawing of single line diagram on the inside of the door The cabinet must be equipped with a padlock latch to suit MTN specific 40mm padlock The cabinet must secured with a suitable anti-theft lock should (DANGER FLASH)of about 150mm size must be attached at the external

A3.18.4. ELECTRICAL COMPONENT INSTALLATION a. The cabinet must be installed with two automatic mains failure controller (AMF) as shown in Figure 1. The AMF must have features outlined in Table A3- 5. The AMF must be installed sealed to IP55, weatherproof, and sun UV resistance.

14 ' E E

Figure A3-12: Pictorial Representation of ATS Front Cover


b. The cabinet must be equipped with modular Class 2 surge protection device mounted on a din rail (for example DEHN). c. The ATS system must be installed with the following electrical components, in line with wiring diagram shown in Figure A3-16 Control breakers Duty Cycle Timer Remote switching device (relays) Electro-Mechanical Contactor Distribution breakers and connectors Cable trunks E b ath ar Male Industrial plug outlet (for emergency or mobile generator connection) d. All installation must be connected with the following consideations: All cable routing must be passed through the cable trunk There must be no loosely connected wires, and wires must be cut to length. Dangling wire are not acceptable.

All cabling to be correctly terminated by lugged and crimp terminals with the appropriate tooling

Table A3-1: Features of Controller


Functions Number of binary inputs/outputs Number of analogy inputs AMF function Input configuration Output configuration Voltage measurement generator/mams Current measurement KW and KWh measurement GCB/MCB control with feedback Extension units Communication interfaces Modem support Battery charging alternator circuit Required Values 7/7

Required Required Required


3ph / 3ph , 3 Phase to Phase/Phase to Neutral 3ph, IDMT overcurrent

Required Required
*IGL-RAi5, 'IG-IOM, IGS-PTM RS131

Required Required

A3.18.5. Functional Requirement of Triple Input ATS


Each site will be fitted with an "ATS Command Cabinet", the wiring diagrams is shown in Figure The main requirement of the ATS is outlined as follows: 2.

a.

The diesel generator sets is expected to perform and the following features are also expected to be monitored through the ATS.

b.

Voltage and frequency parameters (+/-10% programmable by operator) of the Electricity supply and the diesel alternators Sets (generator set).

c. d. e.

Oil pressure parameters (+/-10% programmable by operator) of the diesel generator sets. High temperature parameters (+10% programmable by operator) of the diesel generator sets Starting and stopping of the generator set, the control intelligence shall be such that if a program selected Generator set fails during a Electricity outage, then the load will be switched if the runtime is exceeded for that back to the remaining (idle or standby) generator set, even set, with regards to the balancing of engine hours.

f.

The autom control shall m provision for three consecutive stating attem atic ake pts, Thereafter the set must be switched off and the stat failure relay on the switchboard shall a visible and audible indication of the fault. The cank and rest period must be adjustable on site. give

g.

Connect the load to one of the above sources through interlocked contactor arrangements electricity.

h.

Provide potential free alarm contacts and a terminal marshalling section for the generator set sand other alarms.

i. j.

Provide a potential free contact for hybrid functionality. (A bypass switch must be fitted to switch the Contactor Failure) These m be designed in such a w that no sources can parallel, if m ust ay is-operated accidentally. The bypass switches must have "NORM AL" position, "BYPASS" position and "OFF" position. electricity supply directly to the load in the event of

k.

A 32Amp 3<}> five-pin 90 degrees angled industrial male connector of IP 67 protection rating Mounted on the side of the control Cabinet to enable a mobile generator to be connected to

the system in an emergency, through a manual change-over switch.

A3.18.6. Battery Charger


a. Whilst the set is stationary, the engine battery shall be charged via a battery charger mounted in the ATS. b. The charger shall be of the constant voltage, low current ripple type with the current limit set at am axim of six A ps. O um m utput voltage shall be kept w ithin i%of the load voltage for maximum battery life. The charger shall be suitably sized to constantly supply any standing load on the battery plus a charging current, which will recharge the battery to +/- 90% in less than 8 hours.

A3.18.7. Remote Alarms


Potential free contacts will be provided for the following alarms: a. Common alarm for each generator set b. Mains Failure Alarm c. Low bulk tank fuel level

d. Engine running for each set

A 3.18.8. H ybrid M ode In this mode the AC power will not be available for the site load rather the site load will powered by battery. The ATS panel should be able to take a potential free signal from the Hybrid power cabinet depending on the charge/ discharge status of the battery at a preset value in order to stat or put off the generating set. If electricity is available, it therefore takes priority, supply the site load and charge the battery.

Utility

A_S

7
Sjpp:>

Hybrid Cabinet

Telecom Equipmen

Suppy

ttt
Battery

Figure A3-13: ATS unit in Hybrid Mode A3.18.9. Plug and Play Configuration The control cable to be used here shall be terminated on a female plug and play connector as showr table below. The cable shall be of copper and of 2.5mm diameter. Table A3- 2: HYBRID-ENABLED ATS Plug and play configuation. i2vdc (+ve) i2vdc(-ve) Nil Stater (+ve) signal Fuel Solenoid(Stop) High Engine Temp. Pin6 Low Oil Pressure in the

P in

Pin2

Pin3

Pin4

Pins

Pin7

Appendix

1: Evaluation Criteria for ATS


Functional Performance

ID Is ATS hybid enable Electricity

Test description

Score

on output voltage

test electricity off gen auto stat test Gen on voltage output test Gen auto back test electricity back Gen off test Mobile set selector switch test electricity bypass test Failed to stat Gen test 10 11 Gen running test Ext. incorporated plug voltage test Gen fault test (oil pres., high ten etc 13
14

High voltage test Low voltage test High frequency test Low frequency test Phase sequence test Run time test (1000 hours) Auxiliaries voltage output test Voltage selector switch test

15 16 17 18 19

21
22

Switches, selectors, push-buton test Remote alarms contacts test

23 24

lamps test Is the panel comply with IP 55 Low water level switch test Static batery charger test installation of diesel mechanical loat Installation of diesel vent pipe installation of surge suppressor 3 atem stating test pts distibution panel test Code of Practice Test description Cabled going through panels and not passed through glands as Score

25 26
27 28

29
30 31

Section 2 ID

32

expected In consistency in the cabling numbeing, shown on top and not at the botom Mobile switch label on the front face showing: OFF, mobile, and

34

normal As build label drawing of single line diagram on the side door

35

Section 3 ID

Physical Condition Test description Surge protection provided is fully modular The equipment cabinet is IP ated Label to be fixed with machine screws 15 amp service socket to be inside the cabinet Paint gade of the cabinet needs to last for a minimum of 10 years Score

36
37 38

39
40

41
42

Load connection must be Interlocked Cabinet must be weather proof and sun resistance

Section 4 ID 43 44

Safety Test description Phases must be colour coded Big live danger sign at the extenal of the cabinet Label is required on the in the control panel and the external door Score

45 46 47 48 49

reading "Consider Panel live at all times in/out" Raw bolts for bolting on the ground Hole + label for the leg to connect protective eath to it Eath strap from box to stand is required Door to hang panel with pad lock similar to DB

Potrebbero piacerti anche