TAIKO MERGERS SDN BHDEmail : taiko.m999@yahoo.

com

(974976-D)

NO. 9 Jalan Anggerik 42, Taman Johor Jaya, 81100 Johor Bahru, Johor. Tel/Fax : 07-3543617

DATE : 19/3/2012 TO : Attn : RE : PROFICIENT RESOURCES SDN BHD No.10-2, Jalan 3/1A, Taman Kepong Indah, 51200 Kuala Lumpur. Muhammad Taufik Abdullah MITC MELAKA PROJECT

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT YANG MENGANDUNGI 161 BILIK, DEWAN BANQUET & RESTORAN DI LOT PT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL TRADE CENTRE 75450 AYER KEROH MELAKA UNTUK TETUAN INTELEK EDARAN SDN BHD SUMMARY OF MECHANICAL SERVICES BIL 1 2 3 LIFT SERVICES FIRE PROTECTION SERVICES AIR CONDITIONING & VENTILATION SYSTEM AIR COOLED INVERTER MULTI SPLIT UNIT SYSTEM AIR COOLED SPLIT UNIT SYSTEM EXHAUST AND VENTILATION FANS & GENERAL WORKS PRELIMINARIES COLD WATER AND SANITARY PLUMBING WORKS DESCRIPTION RM RM RM AMOUNT ( RM )

618,744.00 1,189,263.00 1,284,700.00 367,775.00 423,500.00 36,000.00 1,289,010.00

4 5 6 7

RM RM RM RM

GRAND TOTAL TO BE CARRIED TO MAIN CONTRACT

RM

5,208,992.00

Taiko Mergers Sdn Bhd

Acknowledgement :-

------------------------------------------Joe Ho 016-7113877

------------------------------------------Chop & Signature Name : Dated :

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT YANG MENGANDUNGI 161 BILIK, DEWAN BANQUET & RESTORAN DI LOT PT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL TRADE CENTRE 75450 AYER KEROH MELAKA UNTUK TETUAN INTELEK EDARAN SDN BHD

SUMMARY OF MECHANICAL SERVICES


BIL DESCRIPTION AMOUNT ( RM )

LIFT SERVICES

RM

618,744.00

GRAND TOTAL TO BE CARRIED TO MAIN CONTRACT

RM

618,744.00

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT YANG MENGANDUNGI 161 BILIK, DEWAN BANQUET & RESTORAN DI LOT PT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL TRADE CENTRE 75450 AYER KEROH MELAKA UNTUK TETUAN INTELEK EDARAN SDN BHD

SUMMARY OF MECHANICAL SERVICES


BIL DESCRIPTION AMOUNT ( RM )

FIRE FIGHTING SYSTEM & ADDRESSABLE FIRE ALARM SYSTEM

RM

1,189,263.00

GRAND TOTAL TO BE CARRIED TO MAIN CONTRACT

RM

1,189,263.00

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT MENGANDUNGI 161 BILIK DEWAN BANKUET DAN RESTORAN DI LOT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL TRADE CENTRE, 75450 AYER KEROH, MELAKA UNTUK TETUAN INTELEK EDARAN (M) SDN BHD
We, hereby agree to submit the shop drawing during pre-construction and as built drawing after completion and the equipments should be given warranty period. The contractor also required to follow up submission with all the related authorities. Where any item has been left blank in the Schedule of Prices, the cost of which shall be deemed to have been included is in the prices or lump sum of other items. The Schedule of Prices shall include for all necessary hacking, cutting of structural hole openings, chases, and making good to original state. The total amount indicated for the supply, installation, connection, testing and commisioning of all works inclusive of government duties, sales tax, surtax administration costs and profits are broken down as follows:3.0 AIR CONDITIONING & VENTILATION SYSTEM 3.1 AIR COOLED INVERTER MULTI SPLIT UNIT SYSTEM ITEM NO 3.1.1 DESCRIPTION CONDENSER (OUTDOOR UNIT) Inverter Multi Split Complete Condenser Units c/w condensers coils, condenser fan motors, compressors, inverter(s), filter driers, slight glass, valves, heaters, accumulators, header refridgerant pipe, controller cards, concrete plinths, drier, accumulato a) b) c) d) e) 3.1.2 CU-BH1 CU-BH2 CU-1 CU-2 CU-3 EVAPORATORS (INDOOR UNITS) Complete indoor units including wired remote control for each indoor unit, power wiring to indoor unit, insulated drawin pipes, drain water pump for the cassette type indoor: SUB_BASEMENT a b c d e f g h i FCU-SB/1 & SB/2 FCU-SB/3 FCU-SB/4 FCU-SB/5 FCU-SB/6 FCU-SB/7 FCU-SB/8 To SB/11 FCU-SB/12 FCU-SB/13 GROUND a b c d e FCU-G/1 To G/3 FCU-G/4 FCU-G/5 FCU-G/6 FCU-G/7 1ST FLOOR a b c d e f g h i j k l FCU-1/BH1 To BH4 FCU-1/BH5 TO BH8 FCU-1/K1 To 1/K2 FCU-1/1 FCU-1/2 & 1/3 FCU-1/4 & 1/5 FCU-1/6 & 1/7 FCU-1/8 FCU-1/9 FCU-1/10 & 11 FCU-1/12 FCU-1/13 Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos 4 4 2 1 2 2 2 1 1 2 1 1 2,400.00 7,550.00 7,550.00 1,800.00 1,850.00 7,550.00 1,850.00 1,850.00 30,200.00 30,200.00 3,600.00 1,850.00 15,100.00 3,700.00 3,700.00 3,450.00 2,400.00 4,800.00 1,850.00 1,850.00 Nos Nos Nos Nos Nos 3 1 1 1 1 7,550.00 22,650.00 2,400.00 1,850.00 1,050.00 1,050.00 Nos Nos Nos Nos Nos Nos Nos Nos Nos 2 1 1 1 1 3 4 1 1 800.00 1,300.00 1,300.00 2,600.00 920.00 920.00 920.00 2,400.00 2,400.00 5,200.00 1,850.00 1,850.00 Nos Nos Nos Nos Nos 1 1 1 1 1 88,400.00 88,400.00 90,000.00 100,500.00 65,800.00 UNIT QTY RATE (RM) AMOUNT (RM)

CARRIED FORWARD

583,860.00

3.0AIR CONDITIONING & VENTILATION SYSTEM (CONTINUED) 3.1 AIR COOLED INVERTER MULTI SPLIT UNIT SYSTEM ITEM NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

Brought forward from

583,860.00

2ND FLOOR a b c d e f g FCU-2/D1 to 2/D4 FCU-2/D5 to 2/D6 FCU-2/D7 FCU-2/OF1 to 2/OF2 FCU-2/OF3 to 2/OF4 FCU-2/OF5 FCU-2/OF6 Nos Nos Nos Nos Nos Nos Nos 4 2 1 2 2 1 1 1,050.00 920.00 2,450.00 2,400.00 9,800.00 4,800.00 1,050.00 2,100.00 1,840.00 1,300.00 1,300.00

3RD FLOOR TO 11TH FLOOR a FCU-T/L2 Nos 9 1,850.00 16,650.00

3.1.3

VRF REFRIGERANT PIPING Refrigerant piping of various sizes from outdoor units to indoor units lay in GI Trunking c;/w special elbow recommend by manufacturer and 1" insulation

i ii iii iv v

CU-BH1 Group piping CU-BH2 Group piping CU-1 Group piping CU-2 Group piping CU-3 Group piping

Lot Lot Lot Lot Lot

85,000.00 85,000.00 90,000.00 105,000.00 63,000.00

3.1.4 a)

Power/Control Wiring of VRF Units Control wiring in GI conduit from various indoor units to outdoor controller card including installation of remote central start for all units

Lot 20,000.00

b)

Power wiring only from socket outlets furnished by electrical contractors to indoor units

Lot

18,000.00

3.1.5 a) b)

Power Wiring PVC/SWA/PVC power cable from air conditioning distribution board to compressor units c/w cable tray conduit etc. Inverter multi split unit system DB as per specification c/w MCCBs, ELCBs, ELR, indication light, power factor meter, ammeter and volt meter

Lot Lot

20,000.00

2,000.00

3.1.6 a)

Electrical works Air Conditioning main switchboard c/w test certificate, control wiring, starter, trunking, cable tray and conduit for the complete operation of the system

Lot 60,000.00

3.1.7 a) b)

Ductwork system Whole ductwork system c/w diffusers and grilles including the supply and installation of the return air duct and grilles for the required area Fresh air supply ducting c/w all accessories for all ceiling cassette type

Lot Lot

112,000.00 2,000.00

TOTAL CARRIED FORWARD TO MECHANICAL SUMMARY

1,284,700.00

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT MENGANDUNGI 161 BILIK DEWAN BANKUET DAN RESTORAN DI LOT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL TRADE CENTRE, 75450 AYER KEROH, MELAKA UNTUK TETUAN INTELEK EDARAN (M) SDN BHD
We, hereby agree to submit the shop drawing during pre-construction and as built drawing after completion and the equipments should be given warranty period. The contractor also required to follow up submission with all the related authorities. Where any item has been left blank in the Schedule of Prices, the cost of which shall be deemed to have been included is in the prices or lump sum of other items. The Schedule of Prices shall include for all necessary hacking, cutting of structural hole openings, chases, and making good to original state. The total amount indicated for the supply, installation, connection, testing and commisioning of all works inclusive of government duties, sales tax, surtax administration costs and profits are broken down as follows:3.0 AIR CONDITIONING & VENTILATION SYSTEM 3.2 AIR COOLED SPLIT UNIT SYSTEM ITEM NO 3.2.1 DESCRIPTION WALL MOUNTED AIR COOLED SPLIT UNIT Supply and install Complete set of DX-Wall Mounted Air cooled split unit air conditioner c/w refrigerent pipings, pipe insulation, wiring, trunking, drainpipe, wired controllers, DOL starters c/w interface to AC control panel and all accessories as per dr (all pipes to be concealed/laid in trunking) a) 9,000 Btu/h b) 12,000 Btu/h c) 13,000 Btu/h d) 16,000 Btu/h Nos Nos Nos Nos 1 1 159 12 2,025.00 3,334.00 1,550.00 2,250.00 321,975.00 40,000.00 UNIT QTY RATE (RM) AMOUNT (RM)

3.2.2

ELECTRICAL WORKS Air Conditioning main switchboard c/w test certificate, control wiring, starter, trunking, cable tray and conduit for the complete operation of the system 2,000.00 Lot 173

3.2.3

OTHER ITEMS Other items not described above but shown in the drawing or described in the specification or required by authority or obviously necessary for completion of the system. If none, please write 'NIL', otherwise full details to be given. Please specify: a) b) c) d) e)

TOTAL CARRIED FORWARD TO SUMMARY OF TENDER AT SUMMARY PAGE

367,775.00

We, hereby agree to submit the shop drawing during pre-construction and as built drawing after completion and the equipments should be given warranty period. The contractor also required to follow up submission with all the related authorities. Where any item has been left blank in the Schedule of Prices, the cost of which shall be deemed to have been included is in the prices or lump sum of other items. The Schedule of Prices shall include for all necessary hacking, cutting of structural hole openings, chases, and making good to original state. The total amount indicated for the supply, installation, connection, testing and commisioning of all works inclusive of government duties, sales tax, surtax administration costs and profits are broken down as follow:AIR CONDITIONING & VENTILATION SYSTEM 4.0 PRELIMINARIES ITEM NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

4.1

Preparation of 6 copies of Contract Documents c/w hard cover binding

LS

3,000.00

4.2

6 sets of Handing Over Documents (inluding Operation Manuals) which includes as-built drawings (hardcopy and softcopy in CD autocad version) Mobilization supervision coordination

LS

3,000.00

4.3

LS 30,000.00

TOTAL CARRIED FORWARD TO SUMMARY OF TENDER AT SUMMARY PAGE

36,000.00

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT MENGANDUNGI 161 BILIK DEWAN BANKUET DAN RESTORAN DI LOT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL TRADE CENTRE, 75450 AYER KEROH, MELAKA UNTUK TETUAN INTELEK EDARAN (M) SDN BHD

3.0 AIR CONDITIONING & VENTILATION SYSTEM 3.3 EXHAUST AND VENTILATION FANS & GENERAL WORKS ITEM NO 3.3.1 DESCRIPTION TOILET EXHAUST FAN (COMMON AREAS) Supply and install Complete set Toilet Exhaust Fan inclusive wiring and controls as per drawing and specifications. (TEF SB/1-SB/4, G/1-G/2, 1/1-1/4) 400CFM, 1"wg, 1kW Cabinet in-line c/w automatic louvres TOILET EXHAUST FAN (CENTRALISED SYSTEM FOR ROOMS) Supply and install centralised toilet exhaust fan system inclusive of all ducting, weatherproof grille, support, wiring and controls as per drawings and specifications and all other necessary assessories:a b c d TEF-9/1 1,600 CFM, 2"wg, 2kW Axial fan TEF-R/1 & R/2 c/w ducting and weatherproof grill 1,800 CFM, 2"wg, 2kW Axial fan TEF-10/1, 10/2 & R/3 c/w ducting and weatherproof grill 2,000 CFM, 2"wg, 2kW Axial fan TEF-10/3 & 10/4 c/w ducting and weatherproof grill 100 CFM, 0.5"wg, 0.2kW Axial fan Set Set Set Set 1 2 3 2 25,000.00 25,000.00 2,000.00 25,000.00 50,000.00 75,000.00 4,000.00 UNIT QTY RATE (RM) AMOUNT (RM)

a 3.3.2

Nos

10

3,000.00

30,000.00

3.3.3

EXHAUST FAN (TNB SUBSTATION) Supply and install Complete set TNB Exhaust Fan inclusive wiring and controls as per drawing and specifications.

EF-TNB 2,200 CFM, FAD, 0.8kW Propeller fan

Set

5,500.00

3.3.4

CARPARK EXHAUST FAN SYSTEM Supply and install Carpark exhaust fan system inclusive of all ducting, weatherproof grille, support, wiring and controls, control panels as per drawings and specifications and all other necessary assessories:-

EF-SB/1 30,000CFM/15,000CFM, 3/0.75"wg, 25HP/6.25HP Smoke Spill Van Axial fan located in the Fan Room c/w ducting, fire dampers, exhaust air grilles, control panels, electrical wiring and all other necessary assessories. FAF-SB/1 at Gridline 9-10/L 10,500CFM, 2.2"wg, 5.5HP Fresh air fan c/w ducting, fire dampers, weatherproof fresh air grilles, control panels, electrical wiring and all other necessary assessories. JF-SB/1 to SB/6 3,800CFM/1,900CFM, 1HP/0.25HP Jet fan located at the subbasement ceiling c/w electrical wiring and all other necessary assessories. OTHER ITEMS Other items not described above but shown in the drawing or described in the specification or required by authority or obviously necessary for completion of the system. If none, please write 'NIL', otherwise full details to be given. Please specify: a) b) c)

Set

65,000.00

Set

34,000.00

Sets

56,000.00

3.3.5

CARRIED FORWARD

344,500.00

3.3 EXHAUST AND VENTILATION FANS & GENERAL WORKS ITEM NO DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)

Brought forward from 344,500.00 3.3.6 TESTING AND COMMISSIONING Testing and commissioning of the whole ACMV System 3.3.7 MAINTENANCE WORK Maintenance for the works as mentioned in this Bill for a period of 18 months from the date of Certificate of Practical Completion. 3.3.8 a TRAINING To provide training for the ACMV systems The tenderer shall provide training for the end users to ensure the end users are competent enough to use the systems and all fetures provided. This shall include field training with demonstration on operation, maintenance and trouble shooting. Instructor b c Performance witness test at factory. Installation inclusive of coring, hacking, punching of holes in walls and floors, etc and making good, etc. Painting of the complete installation system Piping schematic diagram c/w frame (A1 size) OTHER ITEMS Other items not described above but shown in the drawing or described in the specification or required by authority or obviously necessary for completion of the system. If none, please write 'NIL', otherwise full details to be given. Please specify: a) ... b) c) d) e) LS LS included 3,000.00 L.Sum 3,000.00 L.Sum 27,000.00 Set 1 20,000.00

d e 3.3.9

LS LS

25,000.00 1,000.00

TOTAL CARRIED FORWARD TO MECHANICAL SUMMARY

423,500.00

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT YANG MENGANDUNGI 161 BILIK, DEWAN BANQUET & RESTORAN DI LOT PT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL TRADE CENTRE 75450 AYER KEROH MELAKA UNTUK TETUAN INTELEK EDARAN SDN BHD

SUMMARY OF MECHANICAL SERVICES


BIL DESCRIPTION AMOUNT ( RM )

AIR CONDITIONING & VENTILATION SYSTEM AIR COOLED INVERTER MULTI SPLIT UNIT SYSTEM AIR COOLED SPLIT UNIT SYSTEM EXHAUST AND VENTILATION FANS & GENERAL WORKS

RM

1,284,700.00 367,775.00 423,500.00 36,000.00

2 3

RM RM

PRELIMINARIES

RM

GRAND TOTAL TO BE CARRIED TO MAIN CONTRACT

RM

2,111,975.00

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT MENGANDUNGI 161 BILIK DEWAN BANKUET DAN RESTORAN DI LOT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL TRADE CENTRE, 75450 AYER KEROH, MELAKA UNTUK TETUAN INTELEK EDARAN (M) SDN BHD We, hereby agree to submit the shop drawing during pre-construction and as built drawing after completion and the equipments should be given warranty period. The contractor also required to follow up submission with all the related authorities. Where any item has been left blank in the Schedule of Prices, the cost of which shall be deemed to have been included is in the prices or lump sum of other items. The Schedule of Prices shall include for all necessary hacking, cutting of structural hole openings, chases, and making good to original state. The total amount indicated for the supply, installation, connection, testing and commisioning of all works inclusive of government duties, sales tax, surtax administration costs and profits are broken down as follows:1.0 LIFT SERVICES ITEM NO 1

DESCRIPTION

UNIT

QTY

RATE (RM)

AMOUNT (RM)

LIFT SERVICES Supply, delivery, installation testing and commissioning, 1 year maintenance and training of complete passenger/bomba lift systems as per specification & drawings. 11 person bomba/passenger lift, speed 105mpm, motor-roomless type ACVV 13 stops / 13 Opening with duplex full collective. No. 1 199,752.00

1.1

1.2

11 person passenger lift, speed 105mpm, motor-roomless type ACVV 13 stops / 13 Opening with duplex full collective. 1025 kg (15 passenger) Service lift, speed 105 mpm, motor-roomless type 11 stops / 11 Opening with simplex full collective. ACVV Supply, delivery and installation of control panels c/w surge suppressor device and other accessories as per drawing and specification at lift car panel Supply, delivery and installation of lift pit cat ladders, lift shaft lighting and lift shaft ventilation fan c/w all necessary accessories

No.

166,460.00

1.3

No. Nos

1 3 10000

199,752.00 30,000.00

1.4

1.5

Nos

600

1,800.00

1.6 1.7

Supply, delivery and installation of angle iron sill support. Supply, delivery and installation of separator beams c/w L brackets, anchor bolts, etc. Signages as per authority requirements. LIFT BOMBA TIDAK DIBENARKAN MENGGUNAKAN LIF APABILA BERLAKU KEBAKARAN SILA GUNAKAN TANGGA. Supply, delivery and installation of surge protection devices for incoming electricity supply of lift switchboard c/w 3-way visual indication of protection status as per drawings and specification. Other items not described above but shown in the drawing or described in the specification or required by authority or obviously necessary for completion of the system. If none, please write 'NIL', otherwise full details to be given. Please specify: a) Intercom Cable To Keyphone. b) c) d)

Nos Nos

3 3

1600

2,560.00 INCLUDED

1.8 a. b.

No Nos

1 13

30

30.00 390.00

1.9

Sets

5000

15,000.00

1.10

3,000.00

CARRIED FORWARD TO MECHANICAL SUMMARY

618,744.00

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT YANG MENGANDUNGI 161 BILIK, DEWAN BANQUET & RESTORAN DI LOT PT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL TRADE CENTRE 75450 AYER KEROH MELAKA UNTUK TETUAN INTELEK EDARAN SDN BHD

SUMMARY OF COLD WATER SERVICES


BIL DESCRIPTION AMOUNT ( RM )

1 2 3 4 5 6 7 8 9 10

PAGE J/5/1/10 PAGE J/5/2/10 PAGE J/5/3/10 PAGE J/5/4/10 PAGE J/5/5/10 PAGE J/5/6/10 PAGE J/5/7/10 PAGE J/5/8/10 PAGE J/5/9/10 PAGE J/5/10/10

RM RM RM RM RM RM RM RM RM RM

103,100.00 192,990.00 294,600.00 268,300.00 71,570.00 40,900.00 12,000.00 233,950.00 58,600.00 13,000.00

GRAND TOTAL TO BE CARRIED TO MAIN CONTRACT

RM

1,289,010.00

CADANGAN TAMBAHAN SATU BANGUNAN 11 TINGKAT MENGANDUNGI 161 BILIK DEWAN BANKUET DAN RESTORAN DI LOT 17832, MUKIM BUKIT KATIL, JALAN FOOD CITY, MALACCA INTERNATIONAL TRADE CENTRE, 75450 AYER KEROH, MELAKA UNTUK TETUAN INTELEK EDARAN (M) SDN BHD We, hereby agree to submit the shop drawing during pre-construction and as built drawing after completion and the equipments should be given warranty period. The contractor also required to follow up submission with all the related authorities. Where any item has been left blank in the Schedule of Prices, the cost of which shall be deemed to have been included is in the prices or lump sum of other items. The Schedule of Prices shall include for all necessary hacking, cutting of structural hole openings, chases, and making good to original state. The total amount indicated for the supply, installation, connection, testing and commisioning of all works inclusive of government duties, sales tax, surtax administration costs and profits are broken down as follows:2.0 FIRE FIGHTING SYSTEM

ITEM NO 2.1 2.1.1 HOSE REEL SYSTEM

DESCRIPTION

UNIT

QTY

RATE (RM)

AMOUNT (RM)

Hose Reel electric end suction centrifugal inlined pumpset (duty/standby) c/w motor mounted on a based plate, valve, strainer, flexible connection, vibration isolater, label and all accessories as per drawings and specifications Hose Reel control panel c/w wiring using underground cable to the nearest main switchboard. Piping and all fittings on suction and discharge side of pumps up to the RC Hose Reel Tank c/w header, strainer, flexible joints, valves, fittings and necessary accessories Piping and all fittings from pump discharge to hose reels at each floor c/w pressure reducing valve, brackets, fittings, pressure gauge, pressure switch, painting and accessories. Hose Reel, Hose Drum (Swing Type) c/w 30m length, 25mm dia. hose, nozzle box, ball valves and all necessary accessories etc and painted to Bomba approval For the RC tank, all accessories including overflow pipe, warning scour pipe, access manholes, valves, level indicator c/w steel rope, ball valve, no-float electrodes, internal and external access ladders, vent pipe, mosquito net, tank labelling to bomba approval. Alarm bell outside pumproom Automatic air release valve Hose reel steel cabinet and lockset

Set

13,800.00

2.1.2

Set

6,000.00

2.1.3

Lot

4,000.00

2.1.4

Lot

28,280.00

2.1.5

LS

21,600.00

2.1.6

Lot

2,500.00

2.1.7 2.1.8 2.1.9

Lot LS LS

1 1 1

600.00 600.00 9,600.00

CARRIED FORWARD 86,980.00

2.0 - FIRE FIGHTING SYSTEM ITEM NO RATE (RM) AMOUNT (RM) 86,980.00 2.2 2.2.1 SPRINKLER SYSTEM To supply and install main electrical booster sprinkler pump (duty) end suction vertical centrifugal in line pump type c/w motor mounted on based plate, valve, strainer, flexible connection, vibration isolater and other accessories as per drawings and specifications. Set 1

DESCRIPTION

UNIT

QTY

Brought forward from

22,500.00 2.2.2 To supply and install main electrical booster sprinkler pump (duty) end suction vertical centrifugal in line pump type c/w motor mounted on based plate, valve, strainer, flexible connection, vibration isolater and other accessories as per drawings and specifications. Set 1

22,500.00 2.2.3 To supply and install electrical sprinkler jockey pump vertical multistage pump type c/w motor mounted on based plate, valve, strainer, flexible connection, vibration isolater and other accessories as per drawings and specifications. Sprinkler Pumps control panel c/w wiring using underground cable to the nearest main switchboard, surge arrestors, conduits, automatic controls, alarms, etc. For the RC tank, all accessories including overflow pipe, warning scour pipe, access manholes, valves, level indicator c/w steel rope, ball valve, no-float electrodes, internal and external access ladders, vent pipe, mosquito net, tank labelling to bomba approval. Set 1

7,600.00 Set 1 23,000.00 Set 1

2.2.4

2.2.5

2,500.00 2.2.6 2.2.7 4 way breeching inlet c/w box and related pipings to sprinkler tank Sprinkler distribution and range pipes and fittings from RC tank to sprinklers c/w fittings, hangers, air vent, breeching inlet, control valves, flow switches, pressure switches, pressure gauges, pressure reducing valves and all accessories to complete the system in accordance with requirement of Jabatan Bomba Malaysia as per specification and drawing. Sprinkler installation valves c/w header and accessories Automatic Air Release Valve Set L.Sum 1 1 3,600.00

452,380.00 L.Sum L.Sum L.Sum L.Sum 1 1 1 1 29,000.00 17,500.00 70,953.00 4,000.00

2.2.8 2.2.9

2.2.10 Sprinkler heads upright and pendant 2.2.11 Earthing and Transient Overvoltage Protection

CARRIED FORWARD

742,513.00

2.0 - FIRE FIGHTING SYSTEM ITEM NO 2.3 2.3.1 WET RISER SYSTEM To supply and install main electrical wet riser pumps (duty & standby) end suction vertical centrifugal in line pump type c/w motor mounted on based plate, valve, strainer, flexible connection, vibration isolater and other accessories as per drawings and specifications. Set 2 DESCRIPTION RATE (RM) Brought forward from UNIT QTY AMOUNT (RM) 742,513.00

35,600.00 2.3.2 Pipework, fittings and accessories for wet riser system LS 1

72,000.00

2.3.3

Landing valves, canvas hoses, nozzles, cradle, piping and all accessories Wet riser control panel including all wiring and surge protector and all accessories.

LS

1 12,350.00

2.3.4

Set

1 18,000.00

2.4

CLEAN AGENT SYSTEM FOR MSB & GENSET ROOM Supply and install all NAP-S125 system including panel, NAP-S125 cylinder alarm bell, heat/smoke detectors, wiring and accessories as per specifications and drawings.

2.4.1 2.4.2 2.4.3

NAP-S125 alarm panel c/w battery and charger Manual key switch, flashing light, fire curtain, alarm bell. Wiring for all detectors, bell key switch, solenoid, MAAP flashing light using 2 x 2.5mm2 PVC cable in G.I. conduit. 84 kg. NAP-S125 cylinder and pilot cylinder c/w solenoid, cage and accessories for MSB room 78 kg. NAP-S125 cylinder and pilot cylinder c/w solenoid, cage and accessories for Genset room. 1/2" discharge Nozzle Schedule 40 pipes c/w elbows, tees, bush and other accessories Smoke Detectors Heat Detectors

Set Set Set

2 2 2

2,500.00 4,000.00

4,200.00

2.4.4

Nos

26,000.00

2.4.5

Nos Nos Set Set Set

1 5 2 1 1

25,300.00 600.00 5,600.00 450.00 300.00

2.4.6 2.4.7 2.4.8 2.4.9

CARRIED FORWARD 949,413.00

2.0 - FIRE FIGHTING SYSTEM ITEM NO RATE DESCRIPTION UNIT QTY (RM) Brought forward from 949,413.00 2.5 CLEAN AGENT SYSTEM FOR TNB SUBSTATION Supply and install all NAP-S125 system including panel, NAP-S125 cylinder alarm bell, heat/smoke detectors, wiring and accessories as per specifications and drawings. NAP-S125 alarm panel c/w battery and charger Manual key switch, flashing light, fire curtain, alarm bell. Wiring for all detectors, bell key switch, solenoid, MAAP flashing light using 2 x 2.5mm2 PVC cable in G.I. conduit. 60 kg. NAP-S125 cylinder and pilot cylinder c/w solenoid, cage and 1/2" discharge Nozzle Schedule 40 pipes c/w elbows, tees, bush and other accessories Smoke Detectors Heat Detectors WET CHEMICAL SYSTEM FOR KITCHEN AREAS Supply & install WET CHEMICAL system including panel, alarm bell, heat & smoke detectors, wiring, piping and accessories as per drawings. 2.6.1 Alarm panel c/w battery and charger as per drawing and specification 2.6.2 2.6.3 Manual key switch, flashing light, fire curtain, flashing light, alarm bell. Wiring for all detectors, bell key switch, solenoid, MAAP flashing light using 2 x 2.5mm2 PVC cable in G.I. conduit. Wet Chemical Cylinder c/w solenoid, cage and accessories. Gas discharge Nozzle Schedule 40 pipes c/w elbows, tees, bush and other accessories. Complete wiring in concealed G.I. conduit from Wet Chemical Panel at Kitchen to Main Fire Alarm Panel (MFAP) FIRE EXTINGUISHER Portable fire extinguisher complete with mounting accessories as specified:9kg ABC dry powder portable fire extinguisher c/w bracket 2kg CO2 fire extinguisher c/w bracket. LS LS 1 1 5,600.00 720.00 LS LS LS 1 1 1 (RM) AMOUNT

2.5.1 2.5.2 2.5.3

Set Set Set

1 1 1

1,250.00 2,000.00

4,500.00 Nos Nos Set Set Set 2 2 1 1 1 32,850.00 200.00 4,000.00 450.00 300.00

2.5.4 2.5.6 2.5.7 2.5.8 2.5.9 2.6

2.6.4 2.6.5 2.6.6 2.6.7

LS LS LS LS

1 1 1 1

2.7

2.7.1 2.7.2

CARRIED FORWARD 1,001,283.00

2.0 FIRE FIGHTING SYSTEM ITEM NO RATE (RM) AMOUNT (RM) 1,001,283.00

DESCRIPTION

UNIT

QTY

Brought forward from 2.8 2.8.1 ADDRESSABLE FIRE ALARM SYSTEM Supply and install addressable type of main fire alarm panel c/w mimic diagram, lightning surge arrestor, relays, wiring, hose reel and lift indication as per drawing and specifications. All incoming underground cable shall be protected by Electronic system protection. Set 1

32,800.00

2.8.2

All electrical wiring c/w concealed conduit and from main fire alarm panel LS to various mechanical equipment panels inclusive digital input and output modules. Back-up Ni-Cd battery (min 20AH) c/w battery chargers LS

1 92,220.00 1

2.8.3

960.00

2.8.4

Manual Call Points (Break glass) incl. 30 spare glass for maintenance.

LS

1 10,800.00

2.8.5

Alarm Bells

LS

1,800.00

2.8.6

Addressable Smoke Detectors

LS

20,100.00

2.8.7

Addressable Heat Detectors

LS

2.8.8

Glass framed circuit diagram and valve indicator

LS

3,500.00

2.8.9

Earthing and Transient Overvoltage Protection

LS

8,000.00

2.8.10 Connection from the Main Fire Alarm Panel at Bilik Kawalan to BOMBA (CMS) 2.9

LS

1 4,800.00

SIGNAGES "Bilik ini mengandungi Sistem CO2. Sila kosongkan bilik ini jika Sistem CO2 diaktifkan. " - located at Main switch room and Generator set room. LS 1 1,000.00

2.9.1

2.10

GENERAL WORKS

2.10.1 Installation inclusive of hacking, punching, coring of holes in RC walls, walls and floors, hacking wall and column for concealed conduit all electrical wiring etc. and making good 2.10.2 Painting and labelling

LS

1 1,000.00

LS

1,000.00

CARRIED FORWARD 1,179,263.00

2.0 FIRE FIGHTING SYSTEM

ITEM NO

DESCRIPTION

UNIT

QTY

RATE (RM)

AMOUNT (RM) 1,179,263.00

Brought forward from 2.11 TESTING AND COMMISSIONING

2.11.1 Testing and commissioning of the whole system inclusive of any acceptance test required by the BOMBA.

Set

2000

2.12

MAINTENANCE WORK

2.12.1 Maintenance for the works as mentioned in this Bill for a period of 18 months from the date of Certificate of Practical Completion. 2.13 TRAINING

L.Sum

3000

2.13.1 To provide training for the systems mentioned in this Bill. The tenderer shall provide training for the end users to ensure the end users are competent enough to use the systems and all fetures provided. 2.14 OTHER ITEMS

L.Sum

5000

2.14.1 Other items not described above but shown in the drawing or described in the specification or required by authority or obviously necessary for a) ... b) c) d) e)

TOTAL CARRIED FORWARD TO MECHANICAL SUMMARY

1,189,263.00