DATE: 13/03/2012 PROJECT: PROJECT SITE: Ras-Al-Khiamah ATTENTION: SUB: Quotation for the PEB Building 61m x 61m x 6m

Dear Sir, We sincerely thank you for inviting us to be a part of your project. Our offer is exclusively based on the consultant drawings from the client. We hope that you will award this project and gain you as our precious customer.

MANAGING DIRECTOR Bin Salem Engineering

CONTENTS
PAGE NO.
3

NO
SECTION 01 SECTION 02 SECTION 03 SECTION 04 SECTION 05 SECTION 06 SECTION 07 SECTION 08 SECTION 09 SECTION 10

DESCRIPTION
SCOPE OF WORK

BUILDING DESCRIPTION

PANELS & TRIMS FOR ALL BUILDINGS

DESIGN AND LOADS

SURFACE PREPARATION & PAINT APPLICATION

MATERIAL SPECIFICATION

ASSUMPTIONS, EXCLUSIONS AND OMISSIONS

BASIC SUPPLY AND INSTALLATION PRICE

PAYMENT TERMS

10

CONTRACT CONDITIONS & AGREEMENT

11

P.O. Box: 33863, Ras-Al-Khaimah, United Arab Emirates (U.A.E.) Tel: +971 7 2444636 Fax: +971 7 2444637 E-mail: info@rakfab.com / www.rakfabrication.com

Section 01: Scope of Work Design, Supply, Fabrication and Installation of the Pre Engineered Building of the following dimentions. Section 02: Buildings Description Building No. : 1 Area No. : 1 No. of areas in this No. of Identical Areas. :bldg. :1 Building Usage: Ware House BUILDING SPECIFICATIONS Width (m) Length (m) Roof Slope Eave Height (m) from FFL Height from NGL(m) Ridid Frame Profile Interior Columns End Bearing Frames Exterior Columns Base Condition Interior Columns Base Condition Bay Spacing (m): From grid 1 Built Up Section Fabrication Sidewall girts framing End wall girts framing Roofing Purlins Maximum Purlin Spacing Roof Bracing Exterior Side Bracing Interior Side Bracing Roofing Accessories Wall Accessories Cladding Profile Eave Condition Ridge Condition Minimum Thickness of built up plates

60.69 o/o of Steel 60.69 o/o of Steel 1 in 20 6.00 0.00 Multi Span Two Beam and Post Type Pinned Pinned 1@8.73,6@8.70,1@8.73 Single Side Welding Z Purlin-2mm tk Z Purlin-2mm tk Z Purlin-2.5mm tk As per the design Diagonal (24mm rod Bracing) Diagonal (24mm rod Bracing) NA Excluded from our supply Sliding Doors-4m x 4m (3 No.s) Refer to Section 03 Eave Strut 0.5mm thick G.I. Ridge Sheet 4mm for web and 6mm for flange

ELEVATIONS Front Side Wall @ grid H 2.4m block work & balance sheeted P.O. Box: 33863, Ras-Al-Khaimah, United Arab Emirates (U.A.E.) Tel: +971 7 2444636 Fax: +971 7 2444637 Back Side Wall @ grid A 2.4m /block work & balance sheeted E-mail: info@rakfab.com www.rakfabrication.com Right End Wall @ grid 8 2.4m block work & balance sheeted

Left End Wall @ grid 1

2.4m block work & balance sheeted-3 sliding doors

Section 03: Panels & Trims for All Buildings ROOFING SHEET G.I. Single Skin Roofin g Sheet

Profile Thickness (mm) Material Finish Color

45-250 0.5 G.I. Polyester Painted Off White

Section 04: Design Loads, Design Codes & Deflection Limits 1 2 3 4 5 6 7 8 9 Design Dead Load (kN/m2) on roof Design Live Load (kN/m2) on roof Roof Collateral Load (kN/m2) Roof Snow Load (kN/m2) Wind Speed Seismic Load Temperature Load Rainfall Intensity (cm/hr) Load combination 0.10 0.60 0.00 None 162 kmph, Exposure B None None 15 As per MBMA-2002.

Design Codes: Structural Design for the building for the above mentioned loads have been done as per the following codes Design of Hot rolled sections and built up sections: Manual of Steel Construction, 1989 Edition AISC American Institute of Steel Construction 1 East Wacker Drive, Suite 3100, Chicago, Illinois 60601-2001 Design of Cold formed components:

Cold Formed Steel Design Manual, 2002 Edition AISI American Iron and Steel Institute P.O. Box: 33863, Ras-Al-Khaimah, UnitedNW, Washington, DC 20036 2444636 Fax: +971 7 2444637 1000 16th Street, Arab Emirates (U.A.E.) Tel: +971 7
E-mail: info@rakfab.com / www.rakfabrication.com

Structural Welding Code Steel Manual:

Structural Welding Code D1.1.06 Steel Manual, 2006 Edition AWS American Welding Society 550 N.W. Lejeune Road, P.O. Box 351040, Miami, F1 33135

Section 05: Surface Preparation & Paint Specifications 4.1 Secondary Structural Members Secondary steel members such as purlins, girts, eave struts, base angles and gable angles are made of pre-galvanized steel coils which are roll formed or press bent. 4.2 Primary Structural Members 4.2.1 Surface Preparation The surface preparation of primary members for this job is shot blasting according to SA 2.0 4.2.2 Paint Application All the primary structural members will be coated as per the below specification Primary Coating-Red Oxide Primer-100 Microns Secondary Coating-Enamel Paint-125 Microns

P.O. Box: 33863, Ras-Al-Khaimah, United Arab Emirates (U.A.E.) Tel: +971 7 2444636 Fax: +971 7 2444637 E-mail: info@rakfab.com / www.rakfabrication.com

Section 06: Standard Materials Specifications Following are the specification of the materials used for this quotation. Structural Components Built Up Sections Pipes 2 Hot Rolled Sections

No. 1

Material Specifications BS EN 10025 S355 JR BS EN 10025 S275 JR

Grade Fy = 34.5 kN/cm2 Fy = 275 N/mm2 Fy = 275 N/mm2 Fy = 275 N/mm2 Fu = 44.5 kN/cm2 Fy = 275 N/mm2 Fy = 34.5 kN/cm2 Ft=26.40 kN/ cm2 Ft=26.40 kN/ cm2

Angles BS EN 10025 S275 JR Channel BS EN 10025 S275 JR s

3 4 5 7 8

Anchor Bolts Bracing (Rod)

Grade 4.6-Hot Dip Galvanised,J Shaped. BS EN 10025 S275 JR

Cold Formed ASTM A653 M Grade SS:340 G 90 Secondary Members Class 1 Galvanized Primary Connection Bolts Secondary Bolts Grade 8.8 Grade 8.8

P.O. Box: 33863, Ras-Al-Khaimah, United Arab Emirates (U.A.E.) Tel: +971 7 2444636 Fax: +971 7 2444637 E-mail: info@rakfab.com / www.rakfabrication.com

Section 07: Assumptions, Exclusions and Omissions Bin Salem has prepared the quotation based on the client drawings specification and requirement. However we have excluded the following from our supply.1. Designing and detailing of any other structural component or architectural feature other than mentioned here in our quotation. 2. The design of MEP (Mechanical, Electrical and Plumbing) services and the support of MEP equipment not considered in the design. 3. The supply & application of site applied paint.

4. Doors, windows or any other works not specifically mentioned in this proposal are excluded from our scope. 5. scope. 6. 7. 8. All civil, mechanical and electrical works are excluded from our Non-shrink epoxy grouting under steel members. Any maintenance works is excluded from this quote Allowances for gate passes (if any).

9. Design, detail, coordinate or build any sub-structure supporting system. 10. 11. 12. Any Wall Accessories & Roof Accessories. Fire Proof paint. Crane Bridges, Crane rails and monorails.

P.O. Box: 33863, Ras-Al-Khaimah, United Arab Emirates (U.A.E.) Tel: +971 7 2444636 Fax: +971 7 2444637 E-mail: info@rakfab.com / www.rakfabrication.com

Section 08: BASIC SUPPLY AND INSTALLATION PRICE The following specification is as per the sections 2-7. Job Site Location: Ras-Al-Khaimah

SL No.

Description The total offer price for our scope of work as per Section: 01 which states the design, supply, fabrication and installation of M.S. Steel( S 355 JR) with G.I. Single Skin Roofing Sheet.

Total Amount (In A.E.D.) 595,000.0 0

OFFER PRICE

595,000. 00

Amount in words: Five Hundred And Ninety Five Thousand Dirhams Only.

Note: Within the GCC Countries, prices are exclusive of border clearance fees, custom duties etc. Outside the GCC countries, prices exclude import countrys border clearance fees, custom duties etc. The fabricated materials will be delivered to the site and the unloading of the material will be Bin Salems Responsibility. The above mentioned offer price is valid for only 14 days.
P.O. Box: 33863, Ras-Al-Khaimah, United Arab Emirates (U.A.E.) Tel: +971 7 2444636 Fax: +971 7 2444637 E-mail: info@rakfab.com / www.rakfabrication.com

Section 09: Payment Terms Payment Terms: 25% Advance payment of the value of the contract is being paid by Current Dated Check after signing the contract. 25% of the value of the contract value paid by check, payable within 7 days from the date of the approval of the drawings. 25% of the contract value paid by 30 Days- PDC, upon supply of materials to the work site (for all supplying of the materials). The balance 25% upon the completion of the erection procedures.

P.O. Box: 33863, Ras-Al-Khaimah, United Arab Emirates (U.A.E.) Tel: +971 7 2444636 Fax: +971 7 2444637 E-mail: info@rakfab.com / www.rakfabrication.com

Section 10: Contract Conditions & Agreement Contract Conditions o Bin Salem will send the erection drawings & bills of material (BOM) to the Customer. Shipping (Packing) list of materials of individual trailers will be emailed to Customer at the time of shipment advice. o If under any circumstances, the contract gets cancelled, customer must agrees to pay Bin Salem a cancellation charge of 10 % of contract price or actual costs incurred up to the time of cancellation. Cancellation charges include the procurement of job specific materials. o Any changes made by the Customer after the job is entered in our job order register, wherein, it will be analyzed for impact on price and dispatch schedule. And in case there are price variations, the price variation order will be quoted and the work will resume only after singed acceptance letter from the client. o Upon the completion of the erection, Bin Salem will conduct a comprehensive water test against roof leakage. o The foundation and the civil works must be ready prior to commencement of erection to enable us to immediately start the erection works upon the supply of the fabricated materials to the site. o Bin Salem warrants its products for a period of 12 months from date of its dispatch from factory. o The contract shall be construed and enforced in accordance with the laws of U.A.E. Contract Agreement For Bin Salem Engineering L.L.C.

P.O. Box: 33863, Ras-Al-Khaimah, United Arab Emirates (U.A.E.) Tel: +971 7 2444636 Fax: +971 7 2444637 Managing Director E-mail: info@rakfab.com / www.rakfabrication.com Signature

_____________________________________

Date _____________________________________ For the Client, Managing Director Signature _____________________________________ Date _____________________________________

P.O. Box: 33863, Ras-Al-Khaimah, United Arab Emirates (U.A.E.) Tel: +971 7 2444636 Fax: +971 7 2444637 E-mail: info@rakfab.com / www.rakfabrication.com