Outline R.J.

Brown Lecture MMS-VIV


Factors effecting VIV. Evolution of strakes for dampening VIV. Range of uses. Early observations of pipeline instabilities and solutions for determining forces on pipelines Offshore pipeline installation methods and procedures. Offshore riser installation methods and procedures. Typical pre installations of strakes on pipelines and risers. Typical post installation of strakes on pipeline spans in the VIV range Methods of trenching to avoid VIV.

Factors effecting VIV.

Marine Pipeline Stabilization Systems


Spoilers

In Bottom

Sand Bottom Jetted

Clay Bottom Jetted

Artifical Seaweed

Sand Bottom Plowed Snow Fence

Clay Bottom Plowed

On Bottom

i.e. Concrete

Extra Weight Anchors

Saddles, Mattresses, River Weights

Various Types of Backfill; Rock, Rip Rap, Slag, etc

Concrete Blocks

Above Bottom

Strakes
Spans, SCR's, Top Tensioned Risers, Pipeline Bridges, Control of Span Length

Fairings
Risers Only

Vortex Shedding
As a flow stream passes an obstacle such as a cylinder or a pipe in its path, vortices are formed behind the obstacle. As the flow speed increases, vortices are alternately shed on each side. A flag that waves in the wind is a good example of vortex shedding.
The flagpole is the obstacle. As the wind passes it is shed into vortices that make the flag wave.
flagpole flag

wind vortices

Factors Effecting VIV


Pipe diameter and wall thickness Pipe surface roughness Residual tension in pipe Span lengths Current velocities

Evolution of strakes for dampening VIV. Range of uses.

Non Oilfield use of Strakes


Submarine Periscopes (WW2) Smoke Stacks (1960s) Bridges Antennas

Non Oilfield use of Strakes


Submarine Periscopes (WW2) Smoke Stacks (1960s) Bridges Antennas

Oilfield application of Strakes


Drilling Risers Pipelines SCR,s Jumpers Spars Flare Booms Production Top Tensioned Risers

Oilfield application of Strakes


Drilling Risers Pipelines SCR,s Jumpers Spars Flare Booms Production Top Tensioned Risers

Oilfield application of Strakes


Drilling Risers Pipelines SCR,s Jumpers Spars Flare Booms Production Top Tensioned Risers

Oilfield application of Strakes


Drilling Risers Pipelines SCR,s Jumpers Spars Flare Booms Production Top Tensioned Risers

Oilfield application of Strakes


Drilling Risers Pipelines SCR,s Jumpers Spars Flare Booms Production Top Tensioned Risers

Hoover-Diana Project

Hoover-Diana Project

SPAR

Hoover-Diana Project

SCR's

Hoover-Diana Project

Pipeline Span Strake

Mississippi
Mobile

Louisiana Texas
Houston Beaumont New Orleans

Port Lavaca

x x x

North

Gulf

of

Mexico

120 feet of strakes

Early observations of pipeline instabilities and solutions for determining forces on pipelines

IRAQ KUWAIT IRAN Persian Gulf SAUDIA ARABIA

QATAR

GANAVEH

VACINITY KHARKU
North

Strong Currents

KHARK
RJBD

PLAN

KHARKU

GANAVEH

PROFILE

American Society of Civil Engineers Journal of the Pipeline Division


Proceedings Vol.93 No.PL1 Mar.1967 Hydrodynamic Forces on a Submarine Pipeline
By Robert J. Brown M. ASCE

Shell Goepfert Patent

substantially eliminate or minimize substantially eliminate or minimize the underwater forces tending to displace the the underwater forces tending to displace the pipeline from its original laid position. pipeline from its original laid position.

Offshore pipeline installation methods and procedures.

S Lay

000 100 200 300 400 500 600 700 800 900 1000

Reeling

J Lay

Tow

Houston

Sabine Pass
NO RT H

LA
Cameron

New Orleans Morgan City Buras Venice

TX
Freeport Bay City Port Lavaca Port O'Conner Corpus Christi Matagorda Island Area
9 6 0 20 40 60 Nau ti cal Mil es

Galveston
2 9

Fourchon

G ulf of Mexico
80 1 00

Enserch MC441
KRJB

Makeup Site

28

Garden Banks Area

Flextrend GB117

Placid GC29

Mississippi Canyon Area

BP Troika GC200 Bald Plate GB260 Green Canyon Area


92 9 1 90

East Breaks Area


95 9 4

Enserch GB388
93

Pan Arctic 250

0
Mobi l Statfjord A 500

Esso Australia Kingfis h A 250 Esso Australia Kingfis h B 250 Esso Australia Cobia 250 Esso Australia Flounder 300

Esso Australia Bream B 200

Esso Australia West Tuna 200

1000

Flextrend 1,470 Ens erch MC 441 2,800 Ens erch GB 387 3,300

Penn State 1,650

2000 Esso Australia


Fortisc ue 250 Esso Australia Halibut 250

Plac id 2,350

3000

BP Troika 3,300

4000

Designed Installed

5000

6000 1975

1980

1985

1990

1995

2000

Bullwinkle GC-65 (Water depth 1350')


18"x10" Catenary Risers

A1 7 miles B1 7 miles Mid-line tie-in Jumpers


(Water depth 1850')

24"x10" Bundles A2 7 miles B2 7 miles

GC-200
Troika Manifold
(Water depth 2750')

Troika
Kvaerner R J Brown
a division of Kvaerner Earl and Wright, Inc.

Manifold tie-in Jumpers

PENN STATE DEVELOPMENT INSULATED FLOWLINE SYSTEM


3 1- Trailing sled 2- Midline sled 3- Riser

3 2

2
SUB SEA WELL

1 1
SUB SEA WELL

SUB SEA WELL

2,310,0

2,320,0

2,330,0

2,340,0

2,350,0

2,370,0

2,380,0

1,10 0'
1,2 00 '

2,360,0

000 200 30000 50000 100 4 6 Scale in feet

800 1000 900

NORTH

Bullwinkle Platform

Step 18 Once the bundle target position is


T = 167t, H= 105t Riser end height = 185' Cable out = 10' Pendants ( )

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

2,320,000

V3 0
x

confirmed the riser deployment procedure is initiated as described on CP007 and the large scale procedure drawing.
1,30 0'
T = 167t, H= 105t

RISER INSTALLATION
See CP103 Procedure Report

Scale in 1,000's of Feet

H.D.Distance to T.D. = 4849' Bundle off bottom = 2874'

TD 3

Riser end height = 214' Cable out = 10' Pendants ( )

64

65

DW

V2 8
X
2,327,189 10,111,471
1,400'

71 2R 2
T = 167t, H= 105t Riser end height = 185' Cable out = 10' Pendants ( )

H.D.Distance to T.D. = 5031' Bundle off bottom = 3072'

66
Debris (12)

67 111
Step 14 The tow vessel passes through vessel positions

68 112
10,120,000

69 113 KRJB
10,120,000 2,390,000

2,390,0

70 114
10,120,000

108 109
Tow Vessel H force T Cable out Top of Riser Riser Survey Vessel

H.D.Distance to T.D. = 4849' Bundle off bottom = 2874'

TD 2

,000
riser End of

V2 9
x

110
T = 170t, H= 105t Riser end height = 323' Cable out = 10' Pendants ( )

Step 17 Once all positioning and control systems


H force T.D.

T = 169t, H= 105t Riser end height = 255' Cable out = 10' Pendants ( )

Bundle Bottom End of riser Ht. Horiz. dist. to T.D.

are confirmed operative the vessel increases power to start the bundle movement and advances from V29 to V30 with the ROV using Mesotech for stopping the bundle within the acceptable target nearTD30 on the sea bed.
1,450 '

TD 2

Legend

H.D.Distance to T.D. = 5332' Bundle off bottom = 3378'

1,5

V2 700'
T = 170t, H= 105t Riser end height = 289' Cable out = 10'

H.D.Distance to T.D. = 5718'

V2 5 '
00 1,5
T = 170t, H= 105t Riser end height = 323' Cable out = 10' Pendants ( )

V24 toV29 with the survey vessel tracking the appropriate transponder on the bundle confirming proper positioning along the route. Should excessive variations in the bottom bundle position be observed the tow is stopped and new tow vessel surface positions are established prior to continuing the tow. Step 13 Once the riser end is confirmed in its proper

TD

Ele ctri ca l

Bundle off bottom = 3790'

Um bili ca

Step 16 The survey vessel then repositions itself


' 00 1,5

Pendants (

TD 2

above the on bottom bundle stop target position, deploys the ROV, and confirms all systems are operative .

H.D.Distance to T.D. = 5528' Bundle off bottom = 3588'

V2 6 '
00 1,5

H.D.Distance to T.D. = 5718' Bundle off bottom = 3790' Hy dra ulic Um bili ca l

V2 4

towing position on the stern of the vessel the power is increased getting the bundle under way up to but not exceeding 3 knots. The survey vessel tracks the appropriate transponder on the bundle confirming proper positioning.
Tow Vessel H force T T = 170t, H= 105t Riser end height = 323' Cable out Top of Riser Riser Survey Vessel 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000

Debris (11) 2,328,399

End of

10,115,379 Step 15 The tow is stopped at position V29 and the survey vessel confirms that the position of the bundle is within acceptable limits.

Cable out = 10'

Bundle Bottom End of riser Ht. Horiz. dist. to T.D. T.D. force H

A1 Tow-in Route

Pendants (

H.D.Distance to T.D. = 5718' Bundle off bottom = 3790'

Legend

000
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 Scale in 1,000's of Feet

' Ex 1,700 isti ng Pip elin e

65 70 ' to

TD 2

1,6 00 '

T = 171t, H= 105t Riser end height = 361' Cable out = 10' Pendants ( )

1,6 00 '

V2 2
0'

2,350,000

A1

TD

V2 3

Scale in 1,000's of Feet

NOTE: These procedures are for guide purpose only and will require modifications in the field during the final tow-in

riser

10,108,845 Rockey Sub Sea Well

2,360,000

2,320,000

2,330,000

2,310,000

T = 104t, H= 90t Riser end height = 22' A1 Sled Cable out = 5000'

Step 11 A supply vessel with at least 9000 HP is attached to the 24" pontoon end and positions itself in a NE direction and the temporary buoyancy is removed and the buoyancy prepared for tow to the temporary TBD pontoon storage area. During this period an adequatly equiped safety vessel with at least 4000 hp capacity, is attached to the bow of the towing vessel for the tow into the Bullwinkle platform.
e rory storag to tempe

B1 Sled

B1-Midline Tie-in x

PT A2
B2 Sled A2 Sled

x x x A1-A2 Midline Jumper Tie-in Pendants ( ) H.D.Distance to T.D. = 7966' Bundle off bottom = 912'

V1 6 V1 8
2400' Pontoon

2,370,000

along the route.

V17 V18 V19 V20 V21 V22 V23 V24 V25

2,349,750 2,351,080 2,354,710 2,350,320 2,349,410 2,342,050 2,336,640

2,380,000

152 153

A2- B2 Vessel

le Bund

oute -in R To w
PC
A2

TD 2

n isti Ex

2,328,853

g bil Um l ica

10,110,000
Step 10 The tow vessel continues tow at approximately 2 to 3 knots with 5000' of cable out and tracks along the green vessel tow route stopping at V17and thenbacks down to V18 , placing the entire bundle and riser on the seabed. The survey vessel monitors the appropriate transponder on the bundle confirming proper
T = 103t, H= 90t

10,110,000

Coordinates X (Ft) V1 V2 V3 V4 V5 V6 V7 V8 V9 V10 V11 V12 V13 V14 V15 2,314,820 2,320,350 2,320,890 2,326,780 2,334,860 2,342,280 2,351,560 2,357,330 2,362,360 2,364,840 2,366,160 2,366,670 2,366,050 2,363,020 2,358,710 2,351,940

Coordinates Y (Ft) 10,088,750 10,081,400 10,080,610 10,072,780 10,061,980 10,059,960 10,061,080 10,064,200 10,068,810 10,073,610 10,077,020 10,081,180 10,086,590 10,094,090 10,099,060 10,102,640 10,103,360 10,102,370 10,100,940 10,102,940 10,103,190 10,108,060 10,111,610 10,116,020 10,117,160 10,118,330 TD1 TD2 TD3 TD4 TD5 TD6 TD7 TD8 TD9 TD10 TD11 TD12 TD13 TD14 TD15

Coordinates X (Ft) 2,310,250 2,315,050 2,315,540 2,321,040 2,328,810 2,333,790 2,341,540 2,347,480 2,353,380 2,357,360 2,359,850 2,362,050 2,363,970 2,364,290 2,362,460

Coordinates Y (Ft) 10,094,860 10,088,410 10,087,780 10,080,410 10,070,050 10,065,480 10,062,600 10,062,610 10,064,410 10,067,080 10,069,620 10,072,800 10,077,690 10,085,200 10,091,320 10,097,210 10,098,640 10,102,220 10,095,550 10,098,640 10,099,180 10,104,670 10,108,480 10,112,780 10,113,910 10,115,210 1,880,000 10,116,534 10,118,576 10,120,150 10,121,561 10,122,196 10,122,871 10,123,235

10,110,000

H.D.Distance to T.D. = 5933'

X
x

Bundle off bottom = 984'

' 00 1,7

PT B2

PC

B2

Step 12 Upon approval to proceed the tow vessel comes up to 50% of towing power and spools in the tow wire raising the riser end of the riser to the stern of the vessel at V19 and applies sufficient power to start the bundle mov ing . The survey vessel tracks the appropriate transponder on the bundle confirming proper positioning

1,600

'

Ele ctr ica Hy lU dra mb ulic Um ilical bili ca l


25,
23, 000 'R

1,70

0' 1,80

2,344,871 10,106,646 Debris (9)

positioning along the route.

000

'R

- B2

Riser end height = 16' Cable out = 5000' Pendants ( )

TD 2

V1 7

NORTH

154

H.D.Distance to T.D. = 7838' Bundle off bottom = 772'

156

157

V16

TD16 TD17 TD18 TD19

2,357,950 2,356,200 2,351,295 2,359,590

158

TD20 TD21 TD22

2,356,200 2,355,470 2,347,140

T = 175t, H= 105t Riser end height = 554' Cable out = 10' Pendants ( )

TD 1

V2 1
T = 175t, H= 105t Riser end height = 554' Cable out = 10' Pendants ( )

1,879,000

PT B2

TD23 TD24 TD25 TD26

2,341,380 2,334,900 2,333,160 2,331,210 2,329,249 2,326,159 2,323,777

T = 14t, H= 0t Riser end height = 0'

2,330,000 2,328,230 2,326,440

PC

Cable out = 5000' A2 Pendants ( ) H.D.Distance to T.D. = 100' Bundle off bottom = 0'

T = 176t, H= 105t Riser end height = 634' Cable out = 10' Pendants ( )

H.D.Distance to T.D. = 6837' Bundle off bottom = 4975'

2,340,000

Riser

way route on Tow-a Ponto

PC
B2
23 ,0 00 'R

B1 H.D.Distance to T.D. = 7177' EOR Bundle off bottom = 5337'

V1 9
T = 105t, H= 90t Riser end height = 52'' Cable out = 5000' Pendants ( )

V26 V27 V28 V29 V30 V31 2,324,453 2,321,839 2,319,481 2,317,514 2,317,575 2,317,652 2,317,719 2,317,828 2,317,926 a b c 2,318,067

10,119,531 10,121,435 10,123,000

TD27 TD28 TD29

000

TD 1 2 T TD D1 0 72

V2 0

PC

10,124,298 10,124,249 10,124,197 10,124,151 10,124,082 10,123,855 10,023,780

TD30 TD31 TD32 TD33 TD34 TD35 TD36 a

2,321,656 2,320,673 2,319,656 2,319,084

1,700'

1,800'

1,600'

PC PT B2

B1

H.D.Distance to T.D. = 6837' Bundle off bottom = 4975'

PT A2 PT A1
20 0'

V1 5

10,100,000

10,100,000

V32 V33 V34 V35 V36 V36 V36

10,100,000

2,318,818 2,318,742 2,318,620

10,123,427 10,123,480 10,123,608 10,123,577 10,123,612

H.D.Distance to T.D. = 8411' Bundle off bottom = 1406' 2,318,215 2,318,290

10,023,823 10,023,921

TD36 TD36

b c

2,318,585 2,318,559

T 6 D1

KRJB
' 00 1,8

See Report CP009 Mid-line Tie-in Report

Step 9 The tow vessel continues tow at approximately 3 knots with 5000' of cable out and tracks along the green vessel tow route slowing to a speed of 2 knots at TD16, unless steerage becomes a problem. The survey vessel tracks the

MID-LINE TIE-IN LOCATION


1000 0 2000 3000 4000 5000 6000 7000 8000 9000 10000

1 TD 9

Line A2
x

appropriate transponder on the bundle confirming proper positioning along the route.
T = 106t, H= 90t Riser end height = 93' Cable out = 5000' Pendants ( )

0 TD 1

1,900'

Scale in 1,000's of Feet

' 00 1,9
' 00 2,0

V1 4
Step 8 The tow vessel continues tow at approximately 3 knots and spools-in 1000' of

H.D.Distance to T.D. = 8831' Bundle off bottom = 1877'

2,00

0'

0'

1 TD 5
PT A1

towing cable by TD14. The survey vessel tracks the appropriate transponder on the bundle confirming proper positioning along the route. X Debris (4) 2,366,831 2,369,899 10,091,452
Ele ctr

2,1 00 '

20

000
2,1 00 '

T = 103t, H= 90t Riser end height = 4' Cable out = 5000'

196
2,2 00 '

197
x

Pendants (

H.D.Distance to T.D. = 7467' Bundle off bottom = 367'

V0 1

Step 1 The tow vessel crosses the initial approach fix TD01at the 1,900' contour with 5,000' of cable out and the vessel position as shown at V01. The survey vessel tracks the appropriate transponder on the bundle confirming proper positioning along the route.

155 198 199

X
ica lU X Debris (5) m bil ica l

10,090,455 Debris (6)

c uli dra Hy

10,090,000
' 00 2,2

10,090,000

200 Line B2

2,368,458

10,089,897

201

ic bil Um

Coordinates for Rocky Pipeline X Y

Coordinates for Rocky Umbilical X Y

al

' 00 2,3

0 TD 0 2TD 3

x T = 108t, H= 90t Riser end height = 31' Cable out = 6000'

2325445, 10111258

2328853.6, 10108845.9 2328350.0, 10109577.0 2327724.0, 10110387.0 2327161.0, 10111154.0 2326911.0, 10111546.0 2326283.0, 10112120.0 2325563.0, 10112982.0 2324752.0, 10113980.0 2323847.0, 10115118.0 2323178.0, 10115989.0 2322538.0, 10116766.0 2321872.0, 10117648.0 2321266.0, 10118394.0 2320678.0, 10119140.0 2319805.0, 10120249.0

' 00 2,3
Tow Vessel force H Cable out Top of Riser
riser

Pendants (

V1 3
x 3
20 0'

2324326, 10112084 2323097, 10112967 2321977, 10113788


x 2

H.D.Distance to T.D. = 8979' Bundle off bottom = 1092'

Survey Vessel

Tow-in Route

' 00 2,4 2,5 00 '

End of

Step 2 The tow vessel continues tow at approximately 3 knots and spools out under tow to
T = 105t, H= 90t Riser end height = 71' Cable out = 5000' Pendants ( ) Bottom

Riser

TD1 4

2320754, 10114695 2319512, 10115645 2318604, 10116538 2317814, 10117662 2317306, 10118922 2317110, 10120410 2317273, 10121814
x 4

Line A2
PC B2

Bundle End of riser Ht. Horiz. dist. to T.D.

H force T.D.

V0 2
T = 107t, H= 90t Riser end height = 20' Cable out = 6000' Pendants ( )

6000' of cable between TD02 and TD03 completing before V03.The survey vessel tracks the appropriate transponder on the bundle confirming proper positioning along the route.

Legend
2,4 ' 00

2317792, 10123160

H.D.Distance to T.D. = 8624'

2,600'

1 x PT B2

50 '

Bundle off bottom = 1646'

V0 3 10,080,000
2,500'
Tow Vessel H force T Cable out Top of Riser Riser Survey Vessel

2318943.0, 10121334.0 2318280.0, 10122149.0 2317700.0, 10122792.0 2317137.0, 10123207.0


'

Bundle

00
2,700 '

0 TD 4
2,800 '

50

H.D.Distance to T.D. = 8776' Bundle off bottom = 1144'

T = 110t, H= 90t Riser end height = 64' Cable out = 6000' Pendants ( )

H.D.Distance to T.D. = 9402' Bundle off bottom = 1569'

V1 2

10,080,000
x x

10,080,000

2317114.0, 10123497.0 2317664.0, 10123493.0 2318131.0, 10123805.0 2328853.55, 10108845.9

Step 7 The tow vessel continues tow at approximately 3 knots and starts spooling-in of the tow wire at TD13. The survey vessel tracks the appropriate transponder on the bundle confirming
Bundle force H T.D.

End of riser

A1- B1

2,900

'

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

Scale in 1,000's of Feet

2,700'

Step 6 The tow vessel continues tow at

240

241
0' 3,00
T = 107t, H= 90t Riser end height = 20' Cable out = 6000' Pendants ( )

242
Step 3 The tow vessel continues tow at approximately 3 knots and maintains constant heading to TD05 The survey vessel tracks the . appropriate transponder on the bundle confirming proper positioning along the route. PC
A1- B1

243

approximately 3 knots with 6000' of cable out and tracts along the green vessel tow route. The survey vessel tracts the appropriate transponder on the bundle confirming proper positioning along the route. 2,800'

244
2 TD 1
T = 111t, H= 90t Riser end height = 105' Cable out = 6000' Pendants ( )

2,370,000

2,380,000

A1 B1 Ve el ss Bu

Bottom

End of riser Ht. Horiz. dist. to T.D.

proper positioning along the route.


2,600'

Legend

TD1 3

T = 110t, H= 90t Riser end height = 83' Cable out = 6000' Pendants ( )

V1 1

x 5

H.D.Distance to T.D. = 9591' Bundle off bottom = 1786'

202 246
X
Debris (3) 2,381,684 10,072,217
0 1000 2000 3000 4000 5000 Scale in 1,000's of Feet 6000 7000 8000 9000 10000

V0 4 242

le nd w To -in Ro ut e
H.D.Distance to T.D. = 8776' Bundle off bottom = 1144'

245
x 6 7

V1 0

H.D.Distance to T.D. = 9776' Bundle off bottom = 2000'

2,379,585 10,072,095

Well (OCS-G-12209)

000

C F AU A OR T B ND T ION U S H : N U E A D B C L LE J A L D EC TEN VA ES T L IG TO AR UE Y S N IS CH S A CA FI AN RE LC N G P U A E R L LI A E A ZE S L T D T IM ED . H IN E A R

Debris (2)

10,070,000
2,900 '

3,10

0'

0 TD 5
Step 4 The tow vessel continues tow at approximately 3 knots with 6000' of cable out and
3,20 0'

TD 1
T = 111t, H= 90t Riser end height = 114' Cable out = 6000' Pendants ( )

10,070,000 V0 9

2,379,070 10,070,531

10,070,000

Step 5 The tow vessel continues tow at approximately 3 knots with 6000' of cable out and tracks along the green vessel tow route. The survey vessel tracks the appropriate transponder on the bundle confirming proper positioning along the route. 3,000'

H.D.Distance to T.D. = 9851' Bundle off bottom = 2090'

2,379,229 10,067,150

Shipwreck (1)

1 TD 0

tracks along the green vessel tow route. The survey vessel tracks the appropriate transponder on the bundle confirming proper positioning along the route.

2,340,000

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

TD 0

Cable out = 6000' Pendants ( )

Survey Vessel Tow Vessel force H Cable out Top of Riser Riser
riser

H.D.Distance to T.D. = 9851' Bundle off bottom = 2090'

T = 111t, H= 90t Riser end height = 128' Cable out = 6000' Pendants ( )

V0 5 242
3,200 '

3,10

0'
Bottom

Bundle End of riser Ht. Horiz. dist. to T.D. H force T.D.

H.D.Distance to T.D. = 9957' Bundle off bottom = 2210' T = 111t, H= 90t Riser end height = 128' Cable out = 6000' T = 111t, H= 90t Riser end height = 128' Cable out = 6000' Pendants ( )

00

2,320,000

2,330,000

2,310,000

2,360,000

,350,000

H.D.Distance to T.D. = 9957' Bundle off bottom = 2210'

V0 6 242

Pendants (

2,370,000

H.D.Distance to T.D. = 9957' Bundle off bottom = 2210'

V0 7 242

10,060,000

Legend

10,060,000

2,390,000 10,060,000
B A REV ENGINEERS SEAL RJB RJB BY 12/27/96 12/11/96 DATE RP RP APVD Revised per BPX Comments Initial Release DESCRIPTION

Riser end height = 114'

2,380,000

ndle A1- B1 Bu
TD0 8
TD0 7

-in Tow

Rou

te
T = 111t, H= 90t

Scale in 1,000's of Feet

' 00 3,1

0 TD 9

V0 8

End of

' 00 3,3

284

285

286

287

288

BPX / MARATHON / SHELL GC200 FIELD DEVELOPMENT: TROIKA PROJECT

JOB NO :

2130700

Kvaerner R.J.Brown
a division of Kvaerner Earl and Wright, Inc.

CLIENT NO

CLIENT SIGN :

,1 10

, 25

0 00

1 0,

, 24

00 0

10

, 12

0 3,

, 10

0 , 00 2 12

,1 10

21

00 ,0

H T O N R

10

0, 1 , 2

0 00

10

0 ,0 0 19 ,1

, 10

,0 8 11
0 0 1 0

00

2 2, 3

9 32 2,

2,

2, 3

3 ,

3 2,

2, 3

3 2,

10

, 12

B RJ K

T D3 2

T D3 6 T D3 5a TD 35 TD 34

T D3 3

60 '

V 36 c

Bullwinkle VESSEL STERN Platform TRACK


V3 0 V3 1 V3 2 3 V3 4 V3
6 V3
b

TD 31

TD 29

TO W TO W S

P E N D A N T S A 1 & B 1

D R A W

I N G

D W -

1 ,5 0 0'

T D30

24 0, 1
x

30'

7 1

1 ,5 0

1 ,4

0 00 ,

T = 7 6 H=1 6 t , S=4 % 1 t, 0 0 Rise r e n h i g t = 1 7 2 d e h ' Ca b e o t = 1 0 ' l u Pe n a n (A, ,C) d ts B H.D.Dista n ce t T = 4 5 4 o .D. 6 ' Bu n l e o ff b o tt m = 2 6 9 ' d o 9

00 '

u te e A1 To w-i n Ro Ce n te r L i n

R EQ U I ED R PO SI T I N O V1
V2 V3 V4 V5 V6

0'

V2 9

T =1 1 t H=1 0 t , S=4 % 7 , 1 0 Ris e e n h e h = 1 1 ' r d ig t 8 Ca b e o u = 1 0 ' l t Pe n d n t (A,B, ) a s C H.D.Dis t n ce to T. . = 4 2 3 a D 6 ' Bu n d e o ff b tto = 2 6 9 ' l o m 9

V2 7

Aiming Po n t i 2,3 23,30 4 10,1 20,27 0

S I ZE, PE N D N T S A A (C H IN ) A
B C D
E F G H

7
x

c x xb x x a

u te x e B 1 T w -i n Ro o C e n te r L in

V36 a

2 1 ,4 2 ,3 8 9 1 0 2 ,4 8 ,1 3 2

Ba tte r

Targ et
Lin e
C o o rd i n a te s

B UN DLE S TOP PIN G TA RG ET PO SITIO N

L EN G TH O U T 5 00 0
5 00 0 6 00 0 6 00 0 6 00 0 6 00 0 6 00 0 6 00 0 6 00 0 6 00 0 6 00 0 6 00 0 6 00 0 5 00 0 5 00 0 5 00 0 5 00 0 5 00 0 5 00 0 4 00 0 2 00 0 2 00 0 2 00 0 10 10 10 10 10 10 10

PE N D N T S A A , B, C , D E ,
A , B, C , D E , A B , C, D , , F , E A B , C, D , , F , E A B , C, D , , F , E A B , C, D , , F , E A B , C, D , , F , E A B , C, D , , F , E A B , C, D , , F , E A B , C, D , , F , E A B , C, D , , F , E A B , C, D , , F , E A B , C, D , , F , E A , B, C , D E , A , B, C , D E , A , B, C , D E , A , B, C , D E , A , B, C , D E , A , B, C , D E , A , B, C , D E , A,BC,D , A,BC,D , A,BC,D , AB ,C , AB ,C , AB ,C , AB ,C , AB ,C , AB ,C , AB ,C ,

LE N T H G 3 0
6 0 1 5 00 2 0 00
2 0 00 1 5 00 20 0 0 24 0 0

N I CH 3
3 3 3
3 3 3 3

A C CU M 30
90 1 59 0 3 59 0
5 59 0 7 09 0 9 09 0 1 14 9 0

Ste p 14 T he t ow vessel pa sses thr ough vessel po si o ns V24 to V2 9 wit ti vessel tra cking the appr opr a te tr anspo nder on th e bun dle conf r ming pr i i positioning along the r oute . Should e xcessive var iations in the bo ttom b position b e obse rved the to w is stoppe d and new to w vessel sur face p o establishe d prio r to co ntinuin g the tow.

V3 5 a

C o o rd in a te s Y (Ft)
1 0 ,1 1 5 ,9 1 0 1 0 ,1 1 6 ,8 3 3 1 0 ,1 1 8 ,0 8 3 1 0 ,1 1 9 ,2 5 6 1 0 ,1 2 0 ,6 9 2 1 0 ,1 2 2 ,7 1 2 1 0 ,1 2 4 ,1 2 6
1 0 ,1 2 4 ,0 5 8 1 0 ,1 2 4 ,0 0 6 1 0 ,1 2 3 ,8 4 6 1 0 ,1 2 3 ,9 0 9 1 0 ,1 2 3 ,8 5 9

C o o rd i n a te s C o o rd i n a te s X ( Ft)
TD 2 4 TD 2 5 TD 2 6 TD 2 7 TD 2 8 TD 2 9 TD 3 0 TD 3 1 TD 3 2 TD 3 3 TD 3 4 TD 3 5 2 ,3 2 9 ,1 2 8 2 ,3 2 6 ,2 9 5 2 ,3 2 3 ,2 8 2 2 ,3 2 1 ,2 8 8
2 ,3 2 0 ,3 9 7 2 ,3 1 9 ,4 1 0 2 ,3 1 8 ,8 2 1 2 ,3 1 8 ,5 8 9 2 ,3 1 8 ,4 8 9

V7 V8 V9 V 10 V 11 V 12 V 13

0 0

1 0 0

2 0

3 0 0

4 0

5 0 0

6 0 0

7 0

8 0 0

9 0

1 0 0

Sa e i n e e c l f t

T = 0 1 H=2 t , S=7 5 1 t, 5 % Rise r e n h i g t = 0 ' d e h Ca b e o t = 1 0 ' l u Pe n a n (A, ,C) d ts B H.D.Dista n ce t T = 1 3 5 o .D. 0 ' Rise r o f b o m = 1 3 0 tto 8 '

V3 4

T =1 5 , H=4 7 , S=5 3 1 t t % R s e e n d h e g h t= 0 i r i ' C a leou = 1 ' b t 0 Pe n d n ts (A,B,C) a H . . s ta ce to T.D. = 1 5 1 ' DDi n 0 R s e o ff b o tt m = 2 1 4 ' i r o 6

V33

T = 3 t, H=1 6 , S= 4 % 9 t 8 Rise r e n h i g t = 0 ' d e h Ca b e o t = 1 0 ' l u Pe n a n (A, ,C) d ts B H.D.Di sta n ce t T = 8 5 ' o .D. 2 Rise r o f b o m = 1 1 0 tto 7 '

V3 5

Ste p 16 The survey ve ssel move s to th e final ta rget and r epositio ns itself ab ove th e on bo ttom bundle stop t arge t position . It th en de ploys the ROV, set s all har dware and confirm s that the sto pping systems a re o pera tive. T he tow- in per sonne l on the platfor m ar e con tacted to con firm th at the tow can be r estart ed to move t he bu ndle to its final sto pping p osition a t (Aiming Poin t 2 ,3 2 3,3 0 4 1 0 ,1 2 0 ,2 7 0 ). .

X (Ft)
V2 4 V2 5 V2 6 V2 7 V2 8 V2 9 V3 0 V3 1 V3 2 2 ,3 2 9 ,7 6 4 2 ,3 2 8 ,2 7 6 2 ,3 2 6 ,4 7 4 2 ,3 2 4 ,6 4 7 2 ,3 2 2 ,4 2 3 2 ,3 1 9 ,3 5 9 2 ,3 1 7 ,4 0 6
2 ,3 1 7 ,4 3 6 2 ,3 1 7 ,5 1 9 2 ,3 1 7 ,5 9 9 2 ,3 1 7 ,7 2 9 2 ,3 1 7 ,8 0 4

Y (Ft)

A& R1 A& R2
K E EL H A U L M E SS EN G ER S # 1 # # 2 3

1 50 0 3 50 0

2. 2 5 2. 2 5

1 0 00 1 0 00 1 0 00

2 2 2

1 0 ,1 1 6 ,3 3 3 1 0 ,1 1 8 ,1 9 9 1 0 ,1 2 0 ,1 9 9 1 0 ,1 2 1 ,5 2 5
1 0 ,1 2 2 ,0 9 0 1 0 ,1 2 2 ,6 6 7 1 0 ,1 2 3 ,1 0 3 1 0 ,1 2 3 ,3 3 3 1 0 ,1 2 3 ,4 0 0
1 0 ,1 2 3 ,4 1 4 1 0 ,1 2 3 ,4 6 6 1 0 ,1 2 3 ,4 7 8

V 14 V 15 V 16 V 17 V 18 V 19 V 20 V 21 V 22

Step 13 Afte r the riser buoya ncy is re moved and a ll the con ditions fo r tow contin uance are co nfirm ed th e tow vesse l comes up on power to ap proxim 80% of t owing po w r (1 34 to ns) a nd spo ols the r iser's top end to the surfa e final ch eck with the platfo rm is m ade and th e vessel g ets un der wa y at 2 t knots. Th e sur vey vessel tr acks the appr opr a te tr anspon der on the bun i confir ming p rope r po si o ning. ti
Co o rd n a s fo r i te Ro ck y Pi p e n li e X Y 2 3 5 4 5 ,1 0 1 1 5 8 2 4 1 2 2 3 4 3 6 ,1 0 1 2 0 4 2 2 1 8 2 3 3 0 7 ,1 0 1 2 9 7 2 9 1 6 2 3 1 9 7 ,1 0 1 3 7 8 2 7 1 8 2 3 0 7 4 ,1 0 1 4 6 5 2 5 1 9 2 3 9 5 2 ,1 0 1 5 6 5 1 1 1 4 2 3 8 6 4 ,1 0 1 6 5 8 1 0 1 3 2 3 7 8 4 ,1 0 1 7 6 2 1 1 1 6 2 3 7 3 6 ,1 0 1 8 9 2 1 0 1 2 2 3 7 1 0 ,1 0 1 0 4 0 1 1 2 1 2 3 7 2 3 ,1 0 1 1 8 4 1 7 2 1 2 3 7 7 2 ,1 0 1 3 1 0 1 9 2 6 Co o in te s fo rd a r Ro ck y Um b l c a l i i X Y 2 3 2 8 5 .6 1 0 0 8 4 5 8 3 , 1 8 .9 2 3 2 3 5 .0 1 0 0 9 7 7 8 0 , 1 5 .0 2 3 2 7 2 .0 1 0 1 0 8 7 7 4 , 1 3 .0 2 3 2 1 6 .0 1 0 1 1 4 .0 7 1 , 1 1 5 2 3 2 9 1 .0 1 0 1 5 6 .0 6 1 , 1 1 4 2 3 2 2 8 .0 1 0 1 2 2 0 6 3 , 1 1 .0 2 3 2 5 6 .0 1 0 1 2 8 2 5 3 , 1 9 .0 2 3 2 7 5 .0 1 0 1 3 8 0 4 2 , 1 9 .0 2 3 2 8 4 .0 1 0 1 5 1 .0 3 7 , 1 1 8 2 3 2 1 7 .0 1 0 1 5 8 9 3 8 , 1 9 .0 2 3 2 5 3 .0 1 0 1 6 6 6 2 8 , 1 7 .0 2 3 2 8 7 .0 1 0 1 7 4 8 1 2 , 1 6 .0 2 3 2 2 6 .0 1 0 1 8 9 4 1 6 , 1 3 .0 2 3 2 6 7 .0 1 0 1 9 4 0 0 8 , 1 1 .0 2 3 1 8 0 .0 1 0 2 0 4 9 9 5 , 1 2 .0 2 3 1 9 4 .0 1 0 2 1 3 4 8 3 , 1 3 .0 2 3 1 2 8 .0 1 0 2 2 4 9 8 0 , 1 1 .0 2 3 1 7 0 .0 1 0 2 2 9 2 7 0 , 1 7 .0 2 3 1 1 3 .0 1 0 2 3 0 7 7 7 , 1 2 .0 2 3 1 1 4 .0 1 0 2 3 9 7 7 1 , 1 4 .0 2 3 1 6 6 .0 1 0 2 3 9 3 7 4 , 1 4 .0 2 3 1 1 3 .0 1 0 2 3 0 5 8 1 , 1 8 .0 2 3 2 8 5 .5 , 1 1 0 8 4 .9 8 3 5 0 8 5

T =1 8 t, H = 1 t , S=4 0 3 1 3 % Rise r e d h e g h t = 1 6 ' n i 7 Ca b e o u t = 1 0 l ' Pe d a ts (A,B,C) n n H.D.Di sta n e to T = 4 6 7 ' c .D. 3 Bu d e o f b o m = 2 9 9 n l tto 6 '

V30

T = 9 t, H=1 2 , S=8 8 % 8 t Rise r e n h i g t = 0 ' d e h Ca b e o t = 1 0 ' l u Pe n a n (A, ,C) d ts B H.D.Di sta n ce t T = 7 6 ' o .D. 1 Rise r o f b o m = 1 6 0 tto 6 '

0 0

1 0

2 0 0

3 0 0

4 0

5 0 0

6 0

7 0 0

8 0 0

9 0

1 0 0

Um bil

Sa e i n e e t c l f

V3 5a

ic al

V3 3 V3 4 V3 5

V 23 V 24 V 25 V 26 V 27 V 28 V 29 V 30

V29
0

V 3 5 a 2 ,3 1 7 ,8 6 9 V3 6 a 2 ,3 1 7 ,9 8 1

V3 6 b V3 6 c

2 ,3 1 8 ,0 8 1 2 ,3 1 8 ,2 1 5

1 0 ,1 2 3 ,8 2 2 T D3 5 a 2 ,3 1 8 ,4 7 0 1 0 ,1 2 3 ,8 7 4 TD 3 6 a 2 ,3 1 8 ,4 1 2 1 0 ,1 2 3 ,9 6 5 TD 3 6 b 2 ,3 1 8 ,4 2 1

1 0 ,1 2 4 ,0 5 1

TD 3 6 c

2 ,3 1 8 ,4 2 9

1 0 ,1 2 3 ,4 8 2

1, 55

0'

V28

T D2 8

TD 27

TD 36 TD3 5 TD34

TD3 2

TD33

TD 31

TD3 0

TD2 9

TD2 8

T ow Ves sel

S ur ve y Ve sse l

R JB

7 /1 /9 7

RP

Ap p ro v e d fo r c o s tru c ti o n n

N OT E: T hese p rocedures are for guide purpose only and will require modificatio ns in the field during the fin al tow-in

H f or e c

A
RE V
of r i ser

R JB
BY

5 /2 3 /9 7
D AT E 213 07 00 :

R P In iti l R e e a s e a l
AP V D D ES C R I T I N P O

C ab e o ut l
T op of R se r i

n d

R se r i

B un dl e B ot t om
E nd of r se r H t . i H or z . di st . t o T. D . i

H T. D .

o f r ce

BPX / MARA THON / SH ELL GC 200 F IELD DEVELO PMENT: TROI KA P ROJEC T FLOWLINE BU NDLE

ENGINEE S EAL RS

JO B N 0 . : C LI EN T N O

Kv ae rne r - R.J.B ro
a d v s o n o Kva e rn r Ea rl a n Wri h i i i f e d g

C LI EN T S I G N : P R J MGR O
P R O JE N G LE A D E N G

:
: :

Legend

RP J. . . . C
R. . B R. . B G F. . M AC 12- M A Y- 96

B UNDLE B -1 RIS ER P LAC

D E SI G N ED B Y: C H EC K E D B Y : D R AF TS M A N :

SI Z E

TD2 7

2, 3

1 32 2,

3 2,

, 32

, 30

31

0 8,

00 , 26

, 22

20

24

10

00 ,0

T =1 0 t, H=8 5 , S= 0 % 5 t 4 R s e endhe h = 7 ' i r ig t 7 C a le o u = 1 ' b t 0 Pe n d n ts (A,B,C) a H . . s ta ce to T.D. = 3 5 4 ' DDi n 6 Bu n d e o b tto = 1 6 6 ' l ff o m 6

00 , 18 0
00 6,

0 5, 2

St ep 17 Onc e all posi tioning and c ont rol sy st em s are c onf irm ed operat ive the v ess el increases power to s tart t he bundle mov em ent and advances from V 29 to V 30 wit h the ROV us ing Mesotec h for stopping t he bundle within t he ac ceptable t arget at TD30 on t he sea bed.
2, 0 8, 31 0 0
35 V

00 9, 0

0 00 7,

0 00

00

0 0 ,0

0 0 ,0

23 2, 3

0 00

0 0 ,0
O N RT

00

2 0 0

3 0

4 0

5 0 0

6 0

7 0 0

8 0 0

9 0

1 0 0

0 00 ,

Sc a e n f e t l i e

Step 1 5 Th e vessel sto ps the bund e at po sition TD2 9 . T he sur vey vesse l l mo ves to th e yellow ta rget area and la unche s its ROV w the M esote ch and ith place s the a ppro priate hard ware o n the pipe a nd sea bed. Then a ser ies of star ts and stops a re exe cuted to judg e the accura cy of sto pping a t the final par king po sition for the final tow- n V3 0 po si o n. Once comp e te an d the i ti l han dling cha racte ristics are estab i sh ed go to Step 16. l T = 7 0 H=9 t 1 t, 5

B RJ K

, S=4 0 % Rise r e d h i g t = 1 9 1 n e h ' Ca b o t = 1 0 ' le u Pe n a n (A, ,C) d ts B H.D.Dista n e to T = 4 9 0 c .D. 5 ' Bu n l e o ff b o t o m = 2 6 9 ' d 9

T =1 6 t H=1 5 t , S=4 % 8 , 0 0 Ris e e n h e g h = 2 0 3 r d i t ' Ca b e o u = 1 0 ' l t Pe n d n t (A,B, ) a s C H.D.Di s t n ce to T = 4 5 9 a .D. 6 ' Bu n d o ff b o tt m = 2 7 0 ' le o 9

V26

T =1 6 t, H=1 0 5 , S=4 0 % 7 t Ri e re n d h e g h t = 3 2 ' s i 3 Ca le o u t = 1 0 b ' Pe d a ts (A,B,C) n n H.D.Di ta c e to T.D. = 5 7 1 ' s n 8 Bu d e o b o m = 3 9 0 n l ff tto 7 '

V25

T =1 7 t, H=1 0 t , S 6 5 Ri s e e n h e h = 3 r d ig t 6 Ca b e o u = 1 ' l t 0 Pe n d n t (A,B, ) a s C H.D.Di s t n ce to T. . a D Bu n d e o ff b tto = 4 l o m

elin e P ip
0
35 k
T =8 6 H=9 , S= 2 % t, t 9 Ri se r e d h e g h t = 0 ' n i Ca b e o u t = 1 0 l ' Pe d a ts-5 0 0 n n (A,B,C) H.D.Di sta n e to T = 6 0 8 c .D. ' Ri se r o b tto = 1 6 1 ' ff o m 0

5 k 0

V31

V36

V28
Stop ping Se que n c e Th e to w v e s se l c o n ti u e s th e to w fro m0 V 2 9 a t 2 to 3 Kn o ts s to p p n g th e b u n d le a p r o im a te l y 2 0 0 ' fro m th e n i p x -5 0 ri se r s fi n a l p o si ti o n ta rg e t o n th e s e a b e d b e twe e n th e TD2 9 a n d TD 3 0 . Th e Su rv e y v e s s e l d e p l o y s th e R OV a n d p s itio n s i ts e l f n a r th e ta rg e t fo r th e s to p p n g s e q u e n c e . A fte th e R O V is co n fi rm e d i n p s i tio n th To w o e i r o e ve s s e l co n tin u e s t s to w a t a p p ro x i m a te y 1 k n o t, sto p p i n g a t se v e ra l p o s t io n s a s th e ta rg e t o n th e b u n d e i l i l a p p ro a ch e s th e s to p i n g p o s t i o n . Th e RO V w i th th e Me s o te c h so n a r m o n ito rs a n d co u n ts d o wn th e p i d s ta n c e to th e s to p p i n g p o sitio n a t th e " B undle s toppin g ta rge t p os ition 1 0 ,1 2 0 ,2 7 0 a n d 2 ,3 2 3 ,3 0 4 . Th e i -1 0 0 0 to w v e s se l ' s a p p ro x i m a te sto p p in g p o s t i o n i s a t V 3 0 -1 0 ,1 2 ,1 0 3 a n d 2 ,3 1 7 ,3 5 9 . In th is c a e th e b u n d l e i 4 s sto p i s c o n o l e d b y th e " B undle s toppin g ta rge t p os ition" . Th e stre s s l e ve l d u ri n g th e to -i n is 4 0 % o f tr w yi e l d .

V27

V26

-5 0 0

T =1 7 t H=6 8 , S=4 4 3 , t % Ri s e e n h e h = 7 ' r d ig t Ca b e o u = 1 0 ' l t 2, Pe n d n t (A,B, ) C 3 1 a s 7 0 ,0 a H.D.Di s0 t n ce to T. . = 2 7 0 D 2 ' Bu n d e o ff b tto = 4 4 ' l o m 5

V32
x

-1 0 0 0 210 k
1 9k 6
9 k 4 13 k 7

-1 0 0 0

20 k

-1 5 0 0

-1 5 0 0
BU ND LE STO PP ING TAR GE T P OS ITIO N

-1 5 0 0

D WG N . o

D W-7 1

D R AW I G N o. N

R E FE R EN C E D R AW I G S N

D WG D AT E

S C AL E

F I LE N O .

CAUTION: This procedure is a very intense operation and interference or distraction of Riggers and or Positioning Master can be detremental to a successful installation. Based on site conditions wind, waves and currents) the Positioning Masters control and ability to reposition the primary vessel, add or remove other vessels is absolutely essental o minimize the risk during this procedure.

TOW VESSEL ALLOWABLE EXCURSION

Erect Riser
10 ,1 2 00 ,0 4

V36c

TD13

Tow head lay down position

TD09

Scale (ft)

V34

TD11

Riser

TD16

TD17
x

V15

TD07

V13

TD05

x xb

TD03

x x

x
H RT NO

V35

Riser

Step Cable Load Stress V No. out (ft) (kips) (%yield)

TD15 TD-35a TD-36

V3 6

TD36c1 TD35a1

3500

3000

V3
HD to touchdown Riser off bottom
JB KR

5a

a V36 V35a 1
Um bil ica l

Head off HD to Riser off bottom touchdown bottom (ft) (ft) (ft) 4 20 50 95 152 220 297 381 472 564 657 752 850 952 1057 1165 1274 1365 1365 1365 1365 3288 2789 2377 2060 1819 1636 1494 1383 1294 1225 1174 1136 1103 1074 1047 1021 996 973 1035 825 610 140 240 340 440 540 640 740 840 940 1035 1135 1235 1335 1435 1535 1635 1735 1835 1830 1710 1610

2500

2000

Head off bottom


1500

1000

Cable out Load Note: It is of prime importance that the vessel's stern follows the track shown on the procedure above The heading of the vessel during the yawing process is a function of the vessel yawing power, control, wind, sea state and currents. The vessel captian is the sole judge of the vessel heading during the backin maneuver.

500

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 34 35 36

3470 2908 2245 2082 1796 1564 1369 1200 1048 915 791 675 560 446 332 218 104 11 10 10 10

105 104 104 106 108 112 116 122 128 134 140 147 153 160 167 174 180 189 189 172 160

20 33 41 46 48 49 50 51 53 55 56 56 55 56 58 60 63 64 64 84 105

Distance in Feet

0 1 3 5 7 9 11 13 15 19 17 21

Vessel Position

2 RJB 1 RJB 0 RJB


REV BY

8/28/97 8/7/97 7/2/97


DATE 2130700 :

RP Revised scaling and TD coordinates / J.C. RP Revised vessel and TD coordinates / J.C. RP Approved for construction
APVD DESCRIPTION

TD-35

TD-34

TD01

TD18
x

x x x

Riser

V36c1

2, 31 0 8, 00

Vessel
V 13 V30 2,317,612 10,124,239 V 15 2,317,68 2 10,124, 193 V31 2,317,684 10,124,213 V3 4 2,317, 936 10,124, 025 V32 2,317,747 10,124,147 V3 5 2,31 8,011 10,12 3,975 V33 2,317,818 10,124,101 V35a 2,318,10 7 10,123,91 2 V34 2,317,936 10,124,025 V35a1 2,318, 357 10,123, 746 V35 2,318,011 10,123,975 V36a 2,318, 143 10,12 3,962 V35a 2,318,107 10,123,913 V36b 2,318, 187 10,124,0 13 V35a1 2,318,357 10,123,746 V36c 2,318, 240 10,12 4,059 V36a 2,318,143 10,123,962 V36c1 2,318, 511 10,123, 879 V36b 2,318,187 10,124,013 V36c 2,318,240 10,124,059 Vb 2,318,203 10,123,678 V36c1 2,318,511 10,123,879 Vc 2,318,267 10,123,747 Vd 2,318,385 10,123,830

Touch Down
Touch X X

XDown Y X Y Y 2,317, 476Y 10,124, 331

Vessel

VESSEL VESSEL STERN STERN TRACK TRACK


600

2,3 18,387 10,12 3,725 2,321,508 10,121,659 2,318,552 10,123,617 2,318,798 10,123,456 2,318,697 10,123,519 2,318,620 10,123,426 2,318,799 10,123,453 2,318,699 10,123,519 2,318,619 10,123,425 2,318,624 10,123,422 2,318,507 10,123,646 2,318,62 5 10,123, 419 2,318,620 10,123,581 2,318,513 10,123,654

Bullwinkle
Excursion Limits

400

100

200

300

500

BPX / MARATHON / SHELL GC200 FIELD DEVELOPMENT: TROIKA PROJECT FLOW LINE BUNDLE

Pipelin

e
ENGINEERS SEAL

JOB NO.: CLIENT NO

Kvaerner - R.J.Brown
a division of Kvaerner Earl and Wright, Inc.

CLIENT SIGN : PROJ MGR PROJ ENG LEAD ENG : : : R.P. J.C. R.B. R.B.

BUNDLE A-1 RISER PLACEMEN

DESIGNED BY:

Recent Project - BP
Troika, Gulf of Mexico

EEX 12 OIL

EEX 12 OIL

EEX 12 GAS

AMERADA HESS 12

Shell 12 Gas West Shell 12 Gas East

Shell 16 Gas

Shell 16 Oil

Amerada Hess 12

EP 12 Gas

EP 12 Oil

EEX 12 GAS EEX 12 GAS

EEX 12 OIL EEX 12 GAS

EEX 12 OIL