MASTER PLAN
To produce a proposal which will studied furthermore in the FEASIBILTY STUDY in regards in the technology applied, regulation, economic, social and enviroment aspec
LICENSING
To gain any licence from the technology applied
LICENSING
To gain any licence from the technology applied
ENGINEERING
T To figure out technical issues and estimate rough investment cost
PROCUREMENT
To provide the procurement of materials within the Working Budget of projects, production progress control after order, and quality control of inspections and transportations to sites according to a project schedule
CONSTRUCTION
Plant construction starts with site survey, water reservation, land formation, camp construction to prepare for full-scale operation. Then construction processes follow ranging from underground and aboveground structure framing, piping and equipment installation, electric and instrument system setup, to painting and insulation, etc
COMMISSIONING
commissioning is performed before commercial operation after completion of construction of the plant. Commissioning activity is to verify if the equipment in plant operates in accordance with design and project specification, so to speak, to breathe a new life into the plant