SCOPE :
The building has one vertical electric shafts. Through there rising mains will be run for normal and emergency loads. The A.H.U.s and distribution boards on any floor will be connected to rising main with suitable plug-in-units/breakers. The sizing of L.T. cables has been done using the fact that circuit breakers will interrupt fault current in 8 c.p.s ( I.e. 0.16 secs) and compensation required for temperature and bunching of cables in cable trays. The sizing of H.T cables is done on the basis of available data of fult level at site (500 MVA) The block diagram is given below :
INCOMER
A 33kV Cable
Owners VCB
84934617.xls
84934617.xls
2.1856 Ohms
0.0215 Ohms
0.0218 Ohms
84934617.xls
19
AHU RISING MAIN 400 A AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU AHU RISER RISER RISER RISER RISER RISER RISER RISER RISER RISER RISER RISER RISER RISER RISER RISER RISER RISER PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU PIU 1 AHU-GRA-DB 2 AHU-GRB-DB 3 AHU-BANK-DB 4 AHU-01A 5 AHU-01B 6 AHU-02A 7 AHU-02B 8 AHU-03A 9 AHU-03B 10 AHU-04A 11 AHU-04B 12 AHU-04-DB 13 AHU-05A 14 AHU-05B 15 AHU-06A 16 AHU-06B 17 AHU-07A 18 AHU-07B Gr-AHU Rm-A Gr-AHU Rm-B Gr-AHU Rm-Bank 01-AHU Rm-A 01-AHU Rm-B 02-AHU Rm-A 02-AHU Rm-B 03-AHU Rm-A 03-AHU Rm-B 04-AHU Rm-A 04-AHU Rm-B 04-Elect. Rm-01 05-AHU Rm-A 05-AHU Rm-B 06-AHU Rm-A 06-AHU Rm-B 07-AHU Rm-A 07-AHU Rm-B YFY YFY YFY YFY YFY YFY YFY YFY YFY YFY YFY YFY YFY YFY YFY YFY YFY YFY 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4C 4C 4C 4C 4C 4C 4C 4C 4C 4C 4C 4C 4C 4C 4C 4C 4C 4C X X X X X X X X X X X X X X X X X X 10 16 16 10 10 10 10 10 10 10 10 16 10 10 10 10 10 10
Sq.mm Sq.mm Sq.mm Sq.mm Sq.mm Sq.mm Sq.mm Sq.mm Sq.mm Sq.mm Sq.mm Sq.mm Sq.mm Sq.mm Sq.mm Sq.mm Sq.mm Sq.mm
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
SWG SWG SWG SWG SWG SWG SWG SWG SWG SWG SWG SWG SWG SWG SWG SWG SWG SWG