Your Organization Name


Your Project Name
Change Management Plan

Prepared By: Revision: Date: Date

Your Name Your Revision Your Release

Document ID: Your ID Number

Your Organization Name


Your Project Name
logo) (replace with your

Change Management Plan

Proprietary Notice

This document template is the property of ITProjectTemplates.com, which retains full copyright protection. The template may not be reproduced for resale. This document template is released for the sole use of the purchasing client and their delegates to modify for their own environment. It may be copied or distributed as required within the purchasers organization only.

Disclaimer

This content of this document is based on the input of consultants, IT practitioners, and subject matter experts whose expertise draws on learning and work experience from many knowledge sources, both public and proprietary. Any resemblance to proprietary work is purely coincidental. Knowledge sources, both public and proprietary, may be cited from time to time as a reference to the reader for independent research. These written references in no way imply an endorsement of, or an association with, the cited reference. Because this document is intended to be modified by the user, ITProjectTemplates.com makes no representation or warranty, either expressed or implied, with respect to the sufficiency, accuracy, or utility of the document contents as completed by the user and shall not be held liable for any damages incurred as a result of its use. The user assumes full responsibility for project progress, completion and success.

Version: 0.1 i

Your Organization Name


(replace with your logo)

Your Project Name

Change Management Plan

Revision History

Version # 1.0

Release Notes Initial Draft

Issue Date

Approval Signatures

Project Sponsor: Project Manager:

Name Name

Signature: _____________________ Signature: _____________________ Signature: _____________________ Signature: _____________________ Signature: _____________________

Client Representative: Name Quality Assurance: Author: Name Name

ii Version: 0.1

Your Organization Name


Your Project Name
logo) (replace with your

Change Management Plan

Instructions to the Author of this Document

Text in light blue italics, such as this paragraph, contains instructions and information that is intended to give you guidance on what to insert as content. It is not meant to be part of the content itself. Delete the italicized lines before submitting the deliverable as final. Non-italicized text may be used verbatim at your discretion. The deliverable author is to complete each section with the required information, as instructed in the italicized text. The cover page graphics, color motifs, and header and footer layouts are provided for convenience; they are fully editable. It is recommended that you insert your logo, if you have one, on the cover page where indicated. Also, it is recommended that you replace our ITProjectTemplates graphic on the page headers with your own, or delete the insertion. Remove this page before submitting your final version of this deliverable.

Version: 0.1 iii

Your Organization Name


(replace with your logo)

Your Project Name

Change Management Plan

Table of Contents
Table of Contents.......................................iv

Introduction
1.1 Purpose...........................................................................................................................................5 1.2 Audience..........................................................................................................................................5

Change Management Overview


1.3 Change Management Approach......................................................................................................6 1.4 Change Management Cycle............................................................................................................6 1.5 Sources of Change..........................................................................................................................7 1.6 Roles and Responsibilities...............................................................................................................8

Change Management Procedures


1.7 Raise Change Request....................................................................................................................9 1.8 Asses Change Request...................................................................................................................9 1.9 Approve/Reject Change Request.....................................................................................................9 1.10 Implement Change.........................................................................................................................9 1.11 Close Change Request................................................................................................................10

Scope Change Management


1.12 Scope Change Categories...........................................................................................................11

iv Version: 0.1

Your Organization Name


Your Project Name
logo) (replace with your

Change Management Plan

Introduction
1.1 Purpose
The purpose of this Change Management Plan is to set out the methods and procedures to handle all changes affecting this projects: Resources, costs, and timing as set out in the Project Plan Deliverable, product and process Quality Changes in Product Scope are drawn from the sources identified in section 2.3 and follow the specified Change Request path through Change Management. Such changes also affect Project Scope, but are typically value-added and usually result in an increase in scope. Changes in Project Scope are drawn from problems, issues, or executive decisions involving key project dimensions, specifically time, cost, and/or quality. Such changes usually result in a decrease in Scope to accommodate changes in the projects duration, budget, or quality demands.

1.2 Audience
This Change Management Plan is intended for the Project Board, key stakeholders, and the core project team.

Version: 0.1 5

Your Organization Name


(replace with your logo)

Your Project Name

Change Management Plan

Change Management Overview


The following sub-sections contain boilerplate text. Use it as is, or modify it to suit your project situation.

1.3 Change Management Approach


This Change Management Plan employs an industry standard cyclical approach to: Ensure standardized methods, processes and procedures are used for all project changes Facilitate efficient and prompt handling of all changes Maintain a proper balance between the benefits of change and the detrimental impact of change on the Project Plan.

1.4 Change Management Cycle


The Change Management Cycle is comprised of the following events: Raise and record Change Request (CR) Assess impact and value of change Present assessment results and obtain approval Implement change and re-baseline plan Close CR The diagram on the next page represents the flow of change management events.

6 Version: 0.1

Your Organization Name


Your Project Name
logo) (replace with your

Change Management Plan

Raise CR
No

Large CR?
Yes

More $

Assess CR

Old Plan

No

Yes

New Plan

Accept CR?

Implement Change

Close

1.5 Sources of Change


All project changes must enter the Change Management cycle in the format of a Change Request. Legitimate changes to the product/project may stem from: Responses to problems internal to the project Externally imposed requirements Change in business requirements or strategy Proactive changes to improve performance or benefit

Version: 0.1 7

Your Organization Name


(replace with your logo)

Your Project Name

Change Management Plan

1.6 Roles and Responsibilities


The following list outlines the key responsibilities of personnel involved in the Change Management process: Project Manager - assigned full responsibility for facilitating or executing the change management process to officially provide new requirements, scope, schedule and resources Project Sponsor responsible for reviewing, authorizing and funding changes Project Coordinator assists with estimating and scheduling change against existing baseline Configuration Manager/Change Manager accept, log and track CRs Change Advisory Board comprised of Sponsor, Technical and User representatives, responsible for accepting or rejecting CR implementation

8 Version: 0.1

Your Organization Name


Your Project Name
logo) (replace with your

Change Management Plan

Change Management Procedures


The following sub-sections contain boilerplate text. Use it as is, or modify it to suit your project situation.

1.7 Raise Change Request


The change initiator communicates the details of the change to any project authority, such as the Project Manager, Project Sponsor, or any other member of the Change Advisory Board or Project Board. This constitutes the initial informal change communication. At this point, the project authority may direct the initiator to prepare a Change Request, or that duty may be delegated to the Project Manager or Change Manager (if one exists for the project). Once the details of the change have been recorded on a Change Request form, it is submitted to the Configuration Manager or Change Manager to log into the Change Log.

1.8 Asses Change Request


The Change Request is escalated to the project core team for evaluation. A high level assessment is first performed by the Project Manager to determine if the CR is of sufficient magnitude to require independent funding for detailed assessment. If so, the Project Manager requests additional funding to carry out the extra assessment tasks. The CR is assessed for its impact on the project plan (resources, costs and schedule) by the Project Manager and Project Coordinator. A separate timeline is built for later incorporation into the master plan, if and when the CR is approved. The Project Manager completes a brief Business Case with the assistance of the Project Board members (technical and user representatives).

1.9 Approve/Reject Change Request


The results of the CR assessment are presented to the Change Advisory Board and/or the Project Board. Based on the value judgment passed on the CR, it is accepted or rejected. If accepted, sign-off represents a new agreement on the updated Project Plan. The new timeline, Scope, costs and schedule are baselined.

1.10 Implement Change


The new work required by the change is undertaken and completed according to the new Project Plan. Success criteria or testing for the change are applied to the CR work. Completion is assessed at the appropriate milestone.

Version: 0.1 9

Your Organization Name


(replace with your logo)

Your Project Name

Change Management Plan

1.11 Close Change Request


Following successful implementation and testing of the CR work, the Configuration Manager makes a closing entry in the Change Management Log.

10 Version: 0.1

Your Organization Name


Your Project Name
logo) (replace with your

Change Management Plan

Scope Change Management


1.12 Scope Change Categories
and more detail follows. See the Change Management Plan under the Project Management document listings for the complete deliverable.

Version: 0.1 11