Sei sulla pagina 1di 116

Detail Rate Analysis

Name of the Work : Construction of Adraja Residential Township at Yendada under rajiv Swagruha Scheme
Sub Datas
1. Task Code : - Cement Mortar (1 : 1)
Cement Mortar (1 : 1) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 5.55 2079.40 1440.000 1.050 7987.56 2183.37

Manpower
CSSR-M-087 Light mazdoor day 215 0.200 43.00

Over Heads : 14.00 Per 1 Cum

10213.92 10219.94

0.14 1

1429.95 10219.94

2. Task Code : - Cement Mortar (1 : 1.5)


Cement Mortar (1 : 1.5) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 5.55 2079.40 960.000 1.050 5325.04 2183.37

Manpower
CSSR-M-087 Light mazdoor day 215 0.200 43.00

Over Heads : 14.00 Per 1 Cum

7551.41 7557.43

0.14 1

1057.20 7557.43

3. Task Code : - Cement Mortar (1 : 2)


Cement Mortar (1 : 2) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 5.55 2079.40 720.000 1.050 3993.78 2183.37

Manpower
CSSR-M-087 Light mazdoor day 215 0.200 43.00

Over Heads : 14.00 Per 1 Cum

6220.15 6226.17

0.14 1

870.82 6226.17

Detail RA

Page 1 of 116

4. Task Code : - Cement Mortar (1 : 3)


Cement Mortar (1 : 3) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 5.55 2079.40 480.000 1.050 2662.52 2183.37

Manpower
CSSR-M-087 Light mazdoor day 215 0.200 43.00

Over Heads : 14.00 Per 1 Cum

4888.89 4894.91

0.14 1

684.44 4894.91

5. Task Code : - Cement Mortar (1 : 4)


Cement Mortar (1 : 4) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 5.55 2079.40 360.000 1.050 1996.89 2183.37

Manpower
CSSR-M-087 Light mazdoor day 215 0.200 43.00

Over Heads : 14.00 Per 1 Cum

4223.26 4229.28

0.14 1

591.26 4229.28

6. Task Code : - Cement Mortar (1 : 5)


Cement Mortar (1 : 5) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 5.55 2079.40 288.000 1.050 1597.51 2183.37

Manpower
CSSR-M-087 Light mazdoor day 215 0.200 43.00

Over Heads : 14.00 Per 1 Cum

3823.88 3829.90

0.14 1

535.34 3829.90

7. Task Code : - Cement Mortar (1 : 6)


Cement Mortar (1 : 6) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 5.55 2079.40 240.000 1.050 1331.26 2183.37

Detail RA

Page 2 of 116

Manpower
CSSR-M-087 Light mazdoor day 215 0.200 43.00

Over Heads : 14.00 Per 1 Cum

3557.63 3563.65

0.14 1

498.07 3563.65

8. Task Code : - Cement Mortar (1 : 8)


Cement Mortar (1 : 8) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 5.55 2079.40 180.000 1.050 998.44 2183.37

Manpower
CSSR-M-087 Light mazdoor day 215 0.200 43.00

Over Heads : 14.00 Per 1 Cum

3224.81 3230.83

0.14 1

451.47 3230.83

9. Task Code : - Aggregate 20mm grade HBG


Aggregate 20mm grade HBG Code Unit Rate Coefficient Amount

Material
M-053 M-052 M-051 M-050 Aggregates 20 mm nominal size Aggregates 13.2/12.5 mm nominal size Aggregates 10 mm nominal size Aggregates 6 mm nominal size cum cum cum cum 1379.62 1184.62 1024.62 859.62 0.600 0.150 0.150 0.100 827.77 177.69 153.69 85.96

Over Heads : 14.00 Per 1 Cum

1245.12 1245.12

0.14 1

174.32 1245.12

10. Task Code : - Aggregate 12mm grade HBG


Aggregate 12mm grade HBG Code Unit Rate Coefficient Amount

Material
M-052 M-051 M-050 Aggregates 13.2/12.5 mm nominal size Aggregates 10 mm nominal size Aggregates 6 mm nominal size cum cum cum 1184.62 1024.62 859.62 0.600 0.200 0.200 710.77 204.92 171.92

Over Heads : 14.00 Per 1 Cum

1087.62 1087.62

0.14 1

152.27 1087.62

Detail RA

Page 3 of 116

Mortars
1. Task Code BLD-CSTN-1-1: - CM 1:1 Cellar - (1(G))
Cement Mortar (1:1) for:-CM 1:1 Cellar - (1(G)) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 5.55 2079.40 1440.000 1.050 7987.56 2183.37

Manpower
CSSR-M-087 Light mazdoor Add LA chrges day 40.00 % 215 43.00 0.200 0.400 43.00 17.20

Over Heads : 14.00 Total per 1.00 cum

10231.12 11663.48

0.14 1

1432.36 11663.48

2. Task Code BLD-CSTN-1-3: - CM 1:2 Cellar - (1(G))


Cement Mortar (1 : 2) for:-CM 1:2 Cellar - (1(G)) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 5.55 2079.40 720.000 1.050 3993.78 2183.37

Manpower
CSSR-M-087 Light mazdoor Add LA chrges day 40.00 % 215 43.00 0.200 0.400 43.00 17.20

Over Heads : 14.00 Total per 1.00 cum

6237.35 7110.57

0.14 1

873.23 7110.57

3. Task Code BLD-CSTN-1-4: - CM 1:3 Cellar - (1(G))


Cement Mortar (1 : 3) for:-CM 1:3 Cellar - (1(G)) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 5.55 2079.40 480.000 1.050 2662.52 2183.37

Manpower
CSSR-M-087 Light mazdoor Add LA chrges day 40.00 % 215 43.00 0.200 0.400 43.00 17.20

Over Heads : 14.00 Total per 1.00 cum

4906.09 5592.94

0.14 1

686.85 5592.94

Detail RA

Page 4 of 116

4. Task Code BLD-CSTN-1-5: - CM 1:4 Cellar - (1(G))


Cement Mortar (1 : 4) for:-CM 1:4 Cellar - (1(G)) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 5.55 2079.40 360.000 1.050 1996.89 2183.37

Manpower
CSSR-M-087 Light mazdoor Add LA chrges day 40.00 % 215 43.00 0.200 0.400 43.00 17.20

Over Heads : 14.00 Total per 1.00 cum

4240.46 4834.12

0.14 1

593.66 4834.12

5. Task Code BLD-CSTN-1-6: - CM 1:5 Cellar - (1(G))


Cement Mortar (1 : 5) for:-CM 1:5 Cellar - (1(G)) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 5.55 2079.40 288.000 1.050 1597.51 2183.37

Manpower
CSSR-M-087 Light mazdoor Add LA chrges day 40.00 % 215 43.00 0.200 0.400 43.00 17.20

Over Heads : 14.00 Total per 1.00 cum

3841.08 4378.83

0.14 1

537.75 4378.83

6. Task Code BLD-CSTN-1-7: - CM 1:6 Cellar - (1(G))


Cement Mortar (1 : 6) for:-CM 1:6 Cellar - (1(G)) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 5.55 2079.40 240.000 1.050 1331.26 2183.37

Manpower
CSSR-M-087 Light mazdoor Add LA chrges day 40.00 % 215 43.00 0.200 0.400 43.00 17.20

Over Heads : 14.00 Total per 1.00 cum

3574.83 4075.30

0.14 1

500.48 4075.30

Detail RA

Page 5 of 116

7. Task Code BLD-CSTN-1-8: - CM 1:8 Cellar - (1(G))


Cement Mortar (1 : 8) for:-CM 1:8 Cellar - (1(G)) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 5.55 2079.40 180.000 1.050 998.44 2183.37

Manpower
CSSR-M-087 Light mazdoor Add LA chrges day 40.00 % 215 43.00 0.200 0.400 43.00 17.20

Over Heads : 14.00 Total per 1.00 cum

3242.01 3695.89

0.14 1

453.88 3695.89

Excavation
8. Task Code BLD-CSTN-2-1: - Ordinary soil-Manual up to 3.0 M Cellar - (1(G))
Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges in Ordinary Soil-Manual Means-Up to 3M depth etc as per SS 20B (ApSS 308) for:-Ordinary soil-Manual up to 3.0 M Cellar - (1(G)) Code Unit Rate Coefficient Amount

Manpower
CSSR-M-087 Light mazdoor Add LA chrges day 40.00 % 215 78.26 0.364 0.400 78.26 31.30

Excavation Method
Trial pits Up to 2 Metres depth 25.00% Seigniorage Charger 25.00 % 109.56 22.00 0.250 1 27.39 22.00

Over Heads : 14.00 Total per 1.00 cum

158.96 181.21

0.14 1

22.25 181.21

9. Task Code BLD-CSTN-2-1: - Ordinary soil-Manual up to 3.0 M Cellar - (1(G))


Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges in Ordinary Soil-Manual Means-Up to 3M depth etc as per SS 20B (ApSS 308) for:-Ordinary soil-Manual up to 3.0 M Cellar - (1(G)) Code Unit Rate Coefficient Amount

Manpower
CSSR-M-087 Light mazdoor Add LA chrges day 40.00 % 215 78.26 0.364 0.400 78.26 31.30

Excavation Method
Trial pits 2 Metres to 4 Metres depth 50.00% Seigniorage Charger 50.00 % 109.56 22.00 0.500 1 54.78 22.00

Over Heads : 14.00

186.35

0.14

26.09

Detail RA

Page 6 of 116

Total per 1.00 cum

212.43

212.43

10. Task Code BLD-CSTN-2-1: - Ordinary soil-Manual up to 3.0 M Cellar - (1(G))


Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges in Ordinary Soil-Manual Means-Up to 3M depth etc as per SS 20B (ApSS 308) for:-Ordinary soil-Manual up to 3.0 M Cellar - (1(G)) Code Unit Rate Coefficient Amount

Manpower
CSSR-M-087 Light mazdoor Add LA chrges day 40.00 % 215 78.26 0.364 0.400 78.26 31.30

Excavation Method
Foundation of Buildings 75.00% Seigniorage Charger 75.00 % 109.56 22.00 0.750 1 82.17 22.00

Over Heads : 14.00 Total per 1.00 cum

213.74 243.66

0.14 1

29.92 243.66

Concrete
11. Task Code BLD-CSTN-3-14:33.A: - Foundations-Design Mix : M 30(Weigh Batch) Centering with Steel upto 3.66 Cellar - (1(G))
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for FOUNDATIONS, PLINTH, PEDESTALS for:-Foundations-Design Mix : M 30(Weigh Batch) Centering with Steel upto 3.66 Cellar - (1(G)) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 Batching plant 0.5 cum Add LA chrges on Crew Charges Hour 40.000 % 364.8 284.46 1.333 0.400 486.28 113.78

Manpower
CSSR-M-011 CSSR-M-041 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Welder / Gas Cutter Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day day 40.00 % 285 285 260 215 1476.23 0.133 1.333 0.267 4.600 0.400 37.90 379.90 69.42 989.00 590.49

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Footing Fl 1 per 1 cum 389 1 389

Detail RA

Page 7 of 116

Add LA chrges on Labour

40.00 %

330

0.400

132.00

Over Heads : 14.00 Total per 1.00 cum

7326.81 8352.56

0.14 1

1025.75 8352.56

12. Task Code BLD-CSTN-3-14:33.A: - Plinth-Design Mix : M 30(Weigh Batch) Centering with Steel upto 3.66 Cellar - (1(G))
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for FOUNDATIONS, PLINTH, PEDESTALS for:-Plinth-Design Mix : M 30(Weigh Batch) Centering with Steel upto 3.66 Cellar - (1(G)) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1096.32 0.133 0.267 4.600 0.400 37.90 69.42 989.00 438.53

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Plinth Beam Fl 1 Add LA chrges on Labour per 1 cum 40.00 % 1788 795 1 0.400 1788 318.00

Over Heads : 14.00 Total per 1.00 cum

8594.82 9798.10

0.14 1

1203.27 9798.10

Detail RA

Page 8 of 116

13. Task Code BLD-CSTN-3-14:33.A: - Pedestals-Design Mix : M 30(Weigh Batch) Centering with Steel upto 3.66 Cellar - (1(G))
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for FOUNDATIONS, PLINTH, PEDESTALS for:-Pedestals-Design Mix : M 30(Weigh Batch) Centering with Steel upto 3.66 Cellar - (1(G)) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1096.32 0.133 0.267 4.600 0.400 37.90 69.42 989.00 438.53

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Pedestal Fl 1 Add LA chrges on Labour per 1 cum 40.00 % 594 524 1 0.400 594 209.60

Over Heads : 14.00 Total per 1.00 cum

7292.42 8313.36

0.14 1

1020.94 8313.36

14. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl- 1 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) Floor - 1 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Kg. cum KL 5.55 2079.40 77 400.000 0.400 1.200 2218.77 831.76 92.40

Detail RA

Page 9 of 116

BLD-CSTN-1-9

Aggregate 20mm grade HBG

Cum

1245.12

0.800

996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum Floor-1 Add LA chrges on Labour 40.00 % 1075 1 1075

948

0.400

379.20

Over Heads : 14.00 Total per 1.00 cum

8221.19 9372.15

0.14 1

1150.97 9372.15

15. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl-1 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) F-1 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Detail RA

Page 10 of 116

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 1 Add LA chrges on Labour 40.00 % 1075 1 1075

948

0.400

379.20

Over Heads : 14.00 Total per 1.00 cum

8221.19 9372.15

0.14 1

1150.97 9372.15

16. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl-2 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) F-2 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 2 Add LA chrges on Labour Lift Charges Floor - 2 Add LA chrges 40.00 % cum 40.00 % 1170 1 1170

1043 489.74 226.61

0.400 1 0.400

417.20 489.74 90.64

Over Heads : 14.00 Total per 1.00 cum

8934.57 10185.41

0.14 1

1250.84 10185.41

Detail RA

Page 11 of 116

17. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl-3 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) F-3 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 3 Add LA chrges on Labour Lift Charges Floor - 3 Add LA chrges 40.00 % cum 40.00 % 1265 1 1265

1138 538.72 249.27

0.400 1 0.400

455.20 538.72 99.71

Over Heads : 14.00 Total per 1.00 cum

9125.61 10403.20

0.14 1

1277.59 10403.20

18. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl-4 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) F-4 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 Cement 43 Gr (including loading charges) Kg. 5.55 400.000 2218.77

Detail RA

Page 12 of 116

M-005 M-189 BLD-CSTN-1-9

Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG

cum KL Cum

2079.40 77 1245.12

0.400 1.200 0.800

831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 4 Add LA chrges on Labour Lift Charges Floor - 4 Add LA chrges 40.00 % cum 40.00 % 1359 1 1359

1232 587.69 271.93

0.400 1 0.400

492.80 587.69 108.77

Over Heads : 14.00 Total per 1.00 cum

9315.25 10619.39

0.14 1

1304.14 10619.39

19. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl-5 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) F-5 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II day day 285 260 0.167 0.167 47.60 43.42 Page 13 of 116

Detail RA

CSSR-M-087

Light mazdoor Add LA chrges

day 40.00 %

215 1295.02

5.600 0.400

1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 5 Add LA chrges on Labour Lift Charges Floor - 5 Add LA chrges 40.00 % cum 40.00 % 1454 1 1454

1327 636.67 294.59

0.400 1 0.400

530.80 636.67 117.84

Over Heads : 14.00 Total per 1.00 cum

9506.29 10837.17

0.14 1

1330.88 10837.17

20. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl-6 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) F-6 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 6 Add LA chrges on Labour Lift Charges Floor - 6 Add LA chrges 40.00 % cum 40.00 % 1549 1 1549

1422 685.64 317.25

0.400 1 0.400

568.80 685.64 126.90

Over Heads : 14.00

9697.33

0.14

1357.63

Detail RA

Page 14 of 116

Total per 1.00 cum

11054.96

11054.96

21. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl-7 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) F-7 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 7 Add LA chrges on Labour Lift Charges Floor - 7 Add LA chrges 40.00 % cum 40.00 % 1644 1 1644

1517 734.62 339.92

0.400 1 0.400

606.80 734.62 135.97

Over Heads : 14.00 Total per 1.00 cum

9888.37 11272.74

0.14 1

1384.37 11272.74

Detail RA

Page 15 of 116

22. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl-8 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) F-8 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 8 Add LA chrges on Labour Lift Charges Floor - 8 Add LA chrges 40.00 % cum 40.00 % 1739 1 1739

1612 783.59 362.58

0.400 1 0.400

644.80 783.59 145.03

Over Heads : 14.00 Total per 1.00 cum

10079.41 11490.52

0.14 1

1411.12 11490.52

23. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl-9 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) F-9 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 Cement 43 Gr (including loading charges) Kg. 5.55 400.000 2218.77

Detail RA

Page 16 of 116

M-005 M-189 BLD-CSTN-1-9

Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG

cum KL Cum

2079.40 77 1245.12

0.400 1.200 0.800

831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 9 Add LA chrges on Labour Lift Charges Floor - 9 Add LA chrges 40.00 % cum 40.00 % 1833 1 1833

1706 832.57 385.24

0.400 1 0.400

682.40 832.57 154.09

Over Heads : 14.00 Total per 1.00 cum

10269.05 11706.71

0.14 1

1437.67 11706.71

24. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl-10 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) F-10 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II day day 285 260 0.167 0.167 47.60 43.42 Page 17 of 116

Detail RA

CSSR-M-087

Light mazdoor Add LA chrges

day 40.00 %

215 1295.02

5.600 0.400

1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 10 Add LA chrges on Labour Lift Charges Floor - 10 Add LA chrges 40.00 % cum 40.00 % 1928 1 1928

1801 881.54 407.90

0.400 1 0.400

720.40 881.54 163.16

Over Heads : 14.00 Total per 1.00 cum

10460.09 11924.50

0.14 1

1464.41 11924.50

25. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl-11 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) F-11 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 11 Add LA chrges on Labour Lift Charges Floor - 11 Add LA chrges 40.00 % cum 40.00 % 2023 1 2023

1896 930.51 430.56

0.400 1 0.400

758.40 930.51 172.22

Over Heads : 14.00

10651.12

0.14

1491.16

Detail RA

Page 18 of 116

Total per 1.00 cum

12142.28

12142.28

26. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl-12 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) F-12 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 12 Add LA chrges on Labour Lift Charges Floor - 12 Add LA chrges 40.00 % cum 40.00 % 2118 1 2118

1991 979.49 453.22

0.400 1 0.400

796.40 979.49 181.29

Over Heads : 14.00 Total per 1.00 cum

10842.16 12360.07

0.14 1

1517.90 12360.07

Detail RA

Page 19 of 116

27. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl-13 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) F-13 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 13 Add LA chrges on Labour Lift Charges Floor - 13 Add LA chrges 40.00 % cum 40.00 % 2213 1 2213

2086 1028.46 475.88

0.400 1 0.400

834.40 1028.46 190.35

Over Heads : 14.00 Total per 1.00 cum

11033.20 12577.85

0.14 1

1544.65 12577.85

28. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl-14 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) F-14 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 Cement 43 Gr (including loading charges) Kg. 5.55 400.000 2218.77

Detail RA

Page 20 of 116

M-005 M-189 BLD-CSTN-1-9

Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG

cum KL Cum

2079.40 77 1245.12

0.400 1.200 0.800

831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 14 Add LA chrges on Labour Lift Charges Floor - 14 Add LA chrges 40.00 % cum 40.00 % 2307 1 2307

2180 1077.44 498.54

0.400 1 0.400

872.00 1077.44 199.42

Over Heads : 14.00 Total per 1.00 cum

11222.84 12794.04

0.14 1

1571.20 12794.04

29. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl-15 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) F-15 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II day day 285 260 0.167 0.167 47.60 43.42 Page 21 of 116

Detail RA

CSSR-M-087

Light mazdoor Add LA chrges

day 40.00 %

215 1295.02

5.600 0.400

1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 15 Add LA chrges on Labour Lift Charges Floor - 15 Add LA chrges 40.00 % cum 40.00 % 2402 1 2402

2275 1126.41 521.20

0.400 1 0.400

910.00 1126.41 208.48

Over Heads : 14.00 Total per 1.00 cum

11413.88 13011.82

0.14 1

1597.94 13011.82

30. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl-16 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) F-16 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 16 Add LA chrges on Labour Lift Charges Floor - 16 Add LA chrges 40.00 % cum 40.00 % 2497 1 2497

2370 1175.39 543.86

0.400 1 0.400

948.00 1175.39 217.55

Over Heads : 14.00

11604.92

0.14

1624.69

Detail RA

Page 22 of 116

Total per 1.00 cum

13229.61

13229.61

31. Task Code BLD-CSTN-3-14:33.B: - Columns-Design Mix : M 30(Weigh Batch) Fl-17 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Columns-Design Mix : M 30(Weigh Batch) F-17 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 17 Add LA chrges on Labour Lift Charges Floor - 17 Add LA chrges 40.00 % cum 40.00 % 2592 1 2592

2465 1224.36 566.52

0.400 1 0.400

986.00 1224.36 226.61

Over Heads : 14.00 Total per 1.00 cum

11795.96 13447.39

0.14 1

1651.43 13447.39

Detail RA

Page 23 of 116

32. Task Code BLD-CSTN-3-14:32.B: - Lintels-Design Mix : M 25(Weigh Batch) Fl-1 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Lintels-Design Mix : M 25(Weigh Batch) F-1 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 380.000 0.400 1.200 0.800 2107.83 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for LINTELS floor- 1 Add LA chrges on Labour per 1 cum 40.00 % 1518 1 1518

675

0.400

270.00

Over Heads : 14.00 Total per 1.00 cum

8444.05 9626.21

0.14 1

1182.17 9626.21

33. Task Code BLD-CSTN-3-14:32.B: - Lintels-Design Mix : M 25(Weigh Batch) Fl-2 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Lintels-Design Mix : M 25(Weigh Batch) F-2 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Detail RA Kg. cum KL 5.55 2079.40 77 380.000 0.400 1.200 2107.83 831.76 92.40 Page 24 of 116

BLD-CSTN-1-9

Aggregate 20mm grade HBG

Cum

1245.12

0.800

996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for LINTELS floor- 2 Add LA chrges on Labour Lift Charges Floor - 2 Add LA chrges per 1 cum 40.00 % cum 40.00 % 1585 1 1585

742 489.74 226.61

0.400 1 0.400

296.80 489.74 90.64

Over Heads : 14.00 Total per 1.00 cum

9118.24 10394.79

0.14 1

1276.55 10394.79

34. Task Code BLD-CSTN-3-14:32.B: - Lintels-Design Mix : M 25(Weigh Batch) Fl-3 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Lintels-Design Mix : M 25(Weigh Batch) F-3 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 380.000 0.400 1.200 0.800 2107.83 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Detail RA

Page 25 of 116

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for LINTELS floor- 3 Add LA chrges on Labour Lift Charges Floor - 3 Add LA chrges per 1 cum 40.00 % cum 40.00 % 1653 1 1653

810 538.72 249.27

0.400 1 0.400

324.00 538.72 99.71

Over Heads : 14.00 Total per 1.00 cum

9271.48 10569.48

0.14 1

1298.01 10569.48

35. Task Code BLD-CSTN-3-14:32.B: - Lintels-Design Mix : M 25(Weigh Batch) Fl-4 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Lintels-Design Mix : M 25(Weigh Batch) F-4 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 380.000 0.400 1.200 0.800 2107.83 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for LINTELS floor- 4 Add LA chrges on Labour Lift Charges Floor - 4 Add LA chrges per 1 cum 40.00 % cum 40.00 % 1721 1 1721

878 587.69 271.93

0.400 1 0.400

351.20 587.69 108.77

Over Heads : 14.00 Total per 1.00 cum

9424.71 10744.17

0.14 1

1319.46 10744.17

Detail RA

Page 26 of 116

36. Task Code BLD-CSTN-3-14:32.B: - Lintels-Design Mix : M 25(Weigh Batch) Fl-5 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Lintels-Design Mix : M 25(Weigh Batch) F-5 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 380.000 0.400 1.200 0.800 2107.83 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for LINTELS floor- 5 Add LA chrges on Labour Lift Charges Floor - 5 Add LA chrges per 1 cum 40.00 % cum 40.00 % 1788 1 1788

945 636.67 294.59

0.400 1 0.400

378.00 636.67 117.84

Over Heads : 14.00 Total per 1.00 cum

9576.55 10917.27

0.14 1

1340.72 10917.27

37. Task Code BLD-CSTN-3-14:32.B: - Lintels-Design Mix : M 25(Weigh Batch) Fl-6 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Lintels-Design Mix : M 25(Weigh Batch) F-6 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 Cement 43 Gr (including loading charges) Kg. 5.55 380.000 2107.83

Detail RA

Page 27 of 116

M-005 M-189 BLD-CSTN-1-9

Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG

cum KL Cum

2079.40 77 1245.12

0.400 1.200 0.800

831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for LINTELS floor- 6 Add LA chrges on Labour Lift Charges Floor - 6 Add LA chrges per 1 cum 40.00 % cum 40.00 % 1855 1 1855

1012 685.64 317.25

0.400 1 0.400

404.80 685.64 126.90

Over Heads : 14.00 Total per 1.00 cum

9728.39 11090.37

0.14 1

1361.97 11090.37

38. Task Code BLD-CSTN-3-14:32.B: - Lintels-Design Mix : M 25(Weigh Batch) Fl-7 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Lintels-Design Mix : M 25(Weigh Batch) F-7 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 380.000 0.400 1.200 0.800 2107.83 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II day day 285 260 0.167 0.167 47.60 43.42 Page 28 of 116

Detail RA

CSSR-M-087

Light mazdoor Add LA chrges

day 40.00 %

215 1295.02

5.600 0.400

1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for LINTELS floor- 7 Add LA chrges on Labour Lift Charges Floor - 7 Add LA chrges per 1 cum 40.00 % cum 40.00 % 1923 1 1923

1080 734.62 339.92

0.400 1 0.400

432.00 734.62 135.97

Over Heads : 14.00 Total per 1.00 cum

9881.63 11265.06

0.14 1

1383.43 11265.06

39. Task Code BLD-CSTN-3-14:32.B: - Lintels-Design Mix : M 25(Weigh Batch) Fl-8 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Lintels-Design Mix : M 25(Weigh Batch) F-8 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 380.000 0.400 1.200 0.800 2107.83 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for LINTELS floor- 8 Add LA chrges on Labour Lift Charges Floor - 8 Add LA chrges per 1 cum 40.00 % cum 40.00 % 1991 1 1991

1148 783.59 362.58

0.400 1 0.400

459.20 783.59 145.03

Over Heads : 14.00

10034.87

0.14

1404.88

Detail RA

Page 29 of 116

Total per 1.00 cum

11439.75

11439.75

40. Task Code BLD-CSTN-3-14:32.B: - Lintels-Design Mix : M 25(Weigh Batch) Fl-9 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Lintels-Design Mix : M 25(Weigh Batch) F-9 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 380.000 0.400 1.200 0.800 2107.83 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for LINTELS floor- 9 Add LA chrges on Labour Lift Charges Floor - 9 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2058 1 2058

1215 832.57 385.24

0.400 1 0.400

486.00 832.57 154.09

Over Heads : 14.00 Total per 1.00 cum

10186.71 11612.85

0.14 1

1426.14 11612.85

Detail RA

Page 30 of 116

41. Task Code BLD-CSTN-3-14:32.B: - Lintels-Design Mix : M 25(Weigh Batch) Fl-10 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Lintels-Design Mix : M 25(Weigh Batch) F-10 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 380.000 0.400 1.200 0.800 2107.83 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for LINTELS floor- 10 Add LA chrges on Labour Lift Charges Floor - 10 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2125 1 2125

1282 881.54 407.90

0.400 1 0.400

512.80 881.54 163.16

Over Heads : 14.00 Total per 1.00 cum

10338.55 11785.94

0.14 1

1447.40 11785.94

42. Task Code BLD-CSTN-3-14:32.B: - Lintels-Design Mix : M 25(Weigh Batch) Fl-11 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Lintels-Design Mix : M 25(Weigh Batch) F-11 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 Cement 43 Gr (including loading charges) Kg. 5.55 380.000 2107.83

Detail RA

Page 31 of 116

M-005 M-189 BLD-CSTN-1-9

Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG

cum KL Cum

2079.40 77 1245.12

0.400 1.200 0.800

831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for LINTELS floor- 11 Add LA chrges on Labour Lift Charges Floor - 11 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2193 1 2193

1350 930.51 430.56

0.400 1 0.400

540.00 930.51 172.22

Over Heads : 14.00 Total per 1.00 cum

10491.79 11960.64

0.14 1

1468.85 11960.64

43. Task Code BLD-CSTN-3-14:32.B: - Lintels-Design Mix : M 25(Weigh Batch) Fl-12 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Lintels-Design Mix : M 25(Weigh Batch) F-12 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 380.000 0.400 1.200 0.800 2107.83 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II day day 285 260 0.167 0.167 47.60 43.42 Page 32 of 116

Detail RA

CSSR-M-087

Light mazdoor Add LA chrges

day 40.00 %

215 1295.02

5.600 0.400

1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for LINTELS floor- 12 Add LA chrges on Labour Lift Charges Floor - 12 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2261 1 2261

1418 979.49 453.22

0.400 1 0.400

567.20 979.49 181.29

Over Heads : 14.00 Total per 1.00 cum

10645.02 12135.33

0.14 1

1490.30 12135.33

44. Task Code BLD-CSTN-3-14:32.B: - Lintels-Design Mix : M 25(Weigh Batch) Fl-13 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Lintels-Design Mix : M 25(Weigh Batch) F-13 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 380.000 0.400 1.200 0.800 2107.83 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for LINTELS floor- 13 Add LA chrges on Labour Lift Charges Floor - 13 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2328 1 2328

1485 1028.46 475.88

0.400 1 0.400

594.00 1028.46 190.35

Over Heads : 14.00

10796.86

0.14

1511.56

Detail RA

Page 33 of 116

Total per 1.00 cum

12308.42

12308.42

45. Task Code BLD-CSTN-3-14:32.B: - Lintels-Design Mix : M 25(Weigh Batch) Fl-14 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Lintels-Design Mix : M 25(Weigh Batch) F-14 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 380.000 0.400 1.200 0.800 2107.83 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for LINTELS floor- 14 Add LA chrges on Labour Lift Charges Floor - 14 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2395 1 2395

1552 1077.44 498.54

0.400 1 0.400

620.80 1077.44 199.42

Over Heads : 14.00 Total per 1.00 cum

10948.70 12481.52

0.14 1

1532.82 12481.52

Detail RA

Page 34 of 116

46. Task Code BLD-CSTN-3-14:32.B: - Lintels-Design Mix : M 25(Weigh Batch) Fl-15 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Lintels-Design Mix : M 25(Weigh Batch) F-15 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 380.000 0.400 1.200 0.800 2107.83 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for LINTELS floor- 15 Add LA chrges on Labour Lift Charges Floor - 15 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2463 1 2463

1620 1126.41 521.20

0.400 1 0.400

648.00 1126.41 208.48

Over Heads : 14.00 Total per 1.00 cum

11101.94 12656.21

0.14 1

1554.27 12656.21

47. Task Code BLD-CSTN-3-14:32.B: - Lintels-Design Mix : M 25(Weigh Batch) Fl-16 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Lintels-Design Mix : M 25(Weigh Batch) F-16 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 Cement 43 Gr (including loading charges) Kg. 5.55 380.000 2107.83

Detail RA

Page 35 of 116

M-005 M-189 BLD-CSTN-1-9

Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG

cum KL Cum

2079.40 77 1245.12

0.400 1.200 0.800

831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for LINTELS floor- 16 Add LA chrges on Labour Lift Charges Floor - 16 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2531 1 2531

1688 1175.39 543.86

0.400 1 0.400

675.20 1175.39 217.55

Over Heads : 14.00 Total per 1.00 cum

11255.18 12830.90

0.14 1

1575.73 12830.90

48. Task Code BLD-CSTN-3-14:32.B: - Lintels-Design Mix : M 25(Weigh Batch) Fl-17 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-25 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-Lintels-Design Mix : M 25(Weigh Batch) F-17 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 380.000 0.400 1.200 0.800 2107.83 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II day day 285 260 0.167 0.167 47.60 43.42 Page 36 of 116

Detail RA

CSSR-M-087

Light mazdoor Add LA chrges

day 40.00 %

215 1295.02

5.600 0.400

1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for LINTELS floor- 17 Add LA chrges on Labour Lift Charges Floor - 17 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2598 1 2598

1755 1224.36 566.52

0.400 1 0.400

702.00 1224.36 226.61

Over Heads : 14.00 Total per 1.00 cum

11407.02 13004.00

0.14 1

1596.98 13004.00

49. Task Code BLD-CSTN-3-14:33.B: - RCC Walls-Design Mix : M 30(Weigh Batch) Fl-1 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-RCC Walls-Design Mix : M 30(Weigh Batch) F-1 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 1 Add LA chrges on Labour 40.00 % 1075 1 1075

948

0.400

379.20

Over Heads : 14.00 Total per 1.00 cum

8221.19 9372.15

0.14 1

1150.97 9372.15

Detail RA

Page 37 of 116

50. Task Code BLD-CSTN-3-14:33.B: - RCC Walls-Design Mix : M 30(Weigh Batch) Fl-2 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-RCC Walls-Design Mix : M 30(Weigh Batch) F-2 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 2 Add LA chrges on Labour Lift Charges Floor - 2 Add LA chrges 40.00 % cum 40.00 % 1170 1 1170

1043 489.74 226.61

0.400 1 0.400

417.20 489.74 90.64

Over Heads : 14.00 Total per 1.00 cum

8934.57 10185.41

0.14 1

1250.84 10185.41

51. Task Code BLD-CSTN-3-14:33.B: - RCC Walls-Design Mix : M 30(Weigh Batch) Fl-3 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-RCC Walls-Design Mix : M 30(Weigh Batch) F-3 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 Cement 43 Gr (including loading charges) Kg. 5.55 400.000 2218.77

Detail RA

Page 38 of 116

M-005 M-189 BLD-CSTN-1-9

Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG

cum KL Cum

2079.40 77 1245.12

0.400 1.200 0.800

831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 3 Add LA chrges on Labour Lift Charges Floor - 3 Add LA chrges 40.00 % cum 40.00 % 1265 1 1265

1138 538.72 249.27

0.400 1 0.400

455.20 538.72 99.71

Over Heads : 14.00 Total per 1.00 cum

9125.61 10403.20

0.14 1

1277.59 10403.20

52. Task Code BLD-CSTN-3-14:33.B: - RCC Walls-Design Mix : M 30(Weigh Batch) Fl-4 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-RCC Walls-Design Mix : M 30(Weigh Batch) F-4 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II day day 285 260 0.167 0.167 47.60 43.42 Page 39 of 116

Detail RA

CSSR-M-087

Light mazdoor Add LA chrges

day 40.00 %

215 1295.02

5.600 0.400

1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 4 Add LA chrges on Labour Lift Charges Floor - 4 Add LA chrges 40.00 % cum 40.00 % 1359 1 1359

1232 587.69 271.93

0.400 1 0.400

492.80 587.69 108.77

Over Heads : 14.00 Total per 1.00 cum

9315.25 10619.39

0.14 1

1304.14 10619.39

53. Task Code BLD-CSTN-3-14:33.B: - RCC Walls-Design Mix : M 30(Weigh Batch) Fl-5 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-RCC Walls-Design Mix : M 30(Weigh Batch) F-5 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 5 Add LA chrges on Labour Lift Charges Floor - 5 Add LA chrges 40.00 % cum 40.00 % 1454 1 1454

1327 636.67 294.59

0.400 1 0.400

530.80 636.67 117.84

Over Heads : 14.00

9506.29

0.14

1330.88

Detail RA

Page 40 of 116

Total per 1.00 cum

10837.17

10837.17

54. Task Code BLD-CSTN-3-14:33.B: - RCC Walls-Design Mix : M 30(Weigh Batch) Fl-6 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-RCC Walls-Design Mix : M 30(Weigh Batch) F-6 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 6 Add LA chrges on Labour Lift Charges Floor - 6 Add LA chrges 40.00 % cum 40.00 % 1549 1 1549

1422 685.64 317.25

0.400 1 0.400

568.80 685.64 126.90

Over Heads : 14.00 Total per 1.00 cum

9697.33 11054.96

0.14 1

1357.63 11054.96

Detail RA

Page 41 of 116

55. Task Code BLD-CSTN-3-14:33.B: - RCC Walls-Design Mix : M 30(Weigh Batch) Fl-7 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-RCC Walls-Design Mix : M 30(Weigh Batch) F-7 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 7 Add LA chrges on Labour Lift Charges Floor - 7 Add LA chrges 40.00 % cum 40.00 % 1644 1 1644

1517 734.62 339.92

0.400 1 0.400

606.80 734.62 135.97

Over Heads : 14.00 Total per 1.00 cum

9888.37 11272.74

0.14 1

1384.37 11272.74

56. Task Code BLD-CSTN-3-14:33.B: - RCC Walls-Design Mix : M 30(Weigh Batch) Fl-8 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-RCC Walls-Design Mix : M 30(Weigh Batch) F-8 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 Cement 43 Gr (including loading charges) Kg. 5.55 400.000 2218.77

Detail RA

Page 42 of 116

M-005 M-189 BLD-CSTN-1-9

Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG

cum KL Cum

2079.40 77 1245.12

0.400 1.200 0.800

831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 8 Add LA chrges on Labour Lift Charges Floor - 8 Add LA chrges 40.00 % cum 40.00 % 1739 1 1739

1612 783.59 362.58

0.400 1 0.400

644.80 783.59 145.03

Over Heads : 14.00 Total per 1.00 cum

10079.41 11490.52

0.14 1

1411.12 11490.52

57. Task Code BLD-CSTN-3-14:33.B: - RCC Walls-Design Mix : M 30(Weigh Batch) Fl-9 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-RCC Walls-Design Mix : M 30(Weigh Batch) F-9 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II day day 285 260 0.167 0.167 47.60 43.42 Page 43 of 116

Detail RA

CSSR-M-087

Light mazdoor Add LA chrges

day 40.00 %

215 1295.02

5.600 0.400

1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 9 Add LA chrges on Labour Lift Charges Floor - 9 Add LA chrges 40.00 % cum 40.00 % 1833 1 1833

1706 832.57 385.24

0.400 1 0.400

682.40 832.57 154.09

Over Heads : 14.00 Total per 1.00 cum

10269.05 11706.71

0.14 1

1437.67 11706.71

58. Task Code BLD-CSTN-3-14:33.B: - RCC Walls-Design Mix : M 30(Weigh Batch) Fl-10 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-RCC Walls-Design Mix : M 30(Weigh Batch) F-10 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 10 Add LA chrges on Labour Lift Charges Floor - 10 Add LA chrges 40.00 % cum 40.00 % 1928 1 1928

1801 881.54 407.90

0.400 1 0.400

720.40 881.54 163.16

Over Heads : 14.00

10460.09

0.14

1464.41

Detail RA

Page 44 of 116

Total per 1.00 cum

11924.50

11924.50

59. Task Code BLD-CSTN-3-14:33.B: - RCC Walls-Design Mix : M 30(Weigh Batch) Fl-11 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-RCC Walls-Design Mix : M 30(Weigh Batch) F-11 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 11 Add LA chrges on Labour Lift Charges Floor - 11 Add LA chrges 40.00 % cum 40.00 % 2023 1 2023

1896 930.51 430.56

0.400 1 0.400

758.40 930.51 172.22

Over Heads : 14.00 Total per 1.00 cum

10651.12 12142.28

0.14 1

1491.16 12142.28

Detail RA

Page 45 of 116

60. Task Code BLD-CSTN-3-14:33.B: - RCC Walls-Design Mix : M 30(Weigh Batch) Fl-12 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-RCC Walls-Design Mix : M 30(Weigh Batch) F-12 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 12 Add LA chrges on Labour Lift Charges Floor - 12 Add LA chrges 40.00 % cum 40.00 % 2118 1 2118

1991 979.49 453.22

0.400 1 0.400

796.40 979.49 181.29

Over Heads : 14.00 Total per 1.00 cum

10842.16 12360.07

0.14 1

1517.90 12360.07

61. Task Code BLD-CSTN-3-14:33.B: - RCC Walls-Design Mix : M 30(Weigh Batch) Fl-13 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-RCC Walls-Design Mix : M 30(Weigh Batch) F-13 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 Cement 43 Gr (including loading charges) Kg. 5.55 400.000 2218.77

Detail RA

Page 46 of 116

M-005 M-189 BLD-CSTN-1-9

Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG

cum KL Cum

2079.40 77 1245.12

0.400 1.200 0.800

831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 13 Add LA chrges on Labour Lift Charges Floor - 13 Add LA chrges 40.00 % cum 40.00 % 2213 1 2213

2086 1028.46 475.88

0.400 1 0.400

834.40 1028.46 190.35

Over Heads : 14.00 Total per 1.00 cum

11033.20 12577.85

0.14 1

1544.65 12577.85

62. Task Code BLD-CSTN-3-14:33.B: - RCC Walls-Design Mix : M 30(Weigh Batch) Fl-14 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-RCC Walls-Design Mix : M 30(Weigh Batch) F-14 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II day day 285 260 0.167 0.167 47.60 43.42 Page 47 of 116

Detail RA

CSSR-M-087

Light mazdoor Add LA chrges

day 40.00 %

215 1295.02

5.600 0.400

1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 14 Add LA chrges on Labour Lift Charges Floor - 14 Add LA chrges 40.00 % cum 40.00 % 2307 1 2307

2180 1077.44 498.54

0.400 1 0.400

872.00 1077.44 199.42

Over Heads : 14.00 Total per 1.00 cum

11222.84 12794.04

0.14 1

1571.20 12794.04

63. Task Code BLD-CSTN-3-14:33.B: - RCC Walls-Design Mix : M 30(Weigh Batch) Fl-15 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-RCC Walls-Design Mix : M 30(Weigh Batch) F-15 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 15 Add LA chrges on Labour Lift Charges Floor - 15 Add LA chrges 40.00 % cum 40.00 % 2402 1 2402

2275 1126.41 521.20

0.400 1 0.400

910.00 1126.41 208.48

Over Heads : 14.00

11413.88

0.14

1597.94

Detail RA

Page 48 of 116

Total per 1.00 cum

13011.82

13011.82

64. Task Code BLD-CSTN-3-14:33.B: - RCC Walls-Design Mix : M 30(Weigh Batch) Fl-16 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-RCC Walls-Design Mix : M 30(Weigh Batch) F-16 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 16 Add LA chrges on Labour Lift Charges Floor - 16 Add LA chrges 40.00 % cum 40.00 % 2497 1 2497

2370 1175.39 543.86

0.400 1 0.400

948.00 1175.39 217.55

Over Heads : 14.00 Total per 1.00 cum

11604.92 13229.61

0.14 1

1624.69 13229.61

Detail RA

Page 49 of 116

65. Task Code BLD-CSTN-3-14:33.B: - RCC Walls-Design Mix : M 30(Weigh Batch) Fl-17 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS for:-RCC Walls-Design Mix : M 30(Weigh Batch) F-17 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 420.43 1.333 1.333 0.400 486.28 160.49 168.17

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 1295.02 0.167 0.167 5.600 0.400 47.60 43.42 1204.00 518.01

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 Unsupported Height - Steel upto 3.66 for COLUMNS cum floor- 17 Add LA chrges on Labour Lift Charges Floor - 17 Add LA chrges 40.00 % cum 40.00 % 2592 1 2592

2465 1224.36 566.52

0.400 1 0.400

986.00 1224.36 226.61

Over Heads : 14.00 Total per 1.00 cum

11795.96 13447.39

0.14 1

1651.43 13447.39

66. Task Code BLD-CSTN-3-14:33.C: - Beams-Design Mix : M 30(Weigh Batch) Fl-1 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Beams-Design Mix : M 30(Weigh Batch) F-1 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 Cement 43 Gr (including loading charges) Kg. 5.55 400.000 2218.77

Detail RA

Page 50 of 116

M-005 M-189 BLD-CSTN-1-9

Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG

cum KL Cum

2079.40 77 1245.12

0.400 1.200 0.800

831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 97.14 0.308 0.308 0.400 112.36 37.08 38.86

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 715.23 0.067 0.133 3.077 0.400 19.10 34.58 661.56 286.09

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for BEAMS floor- 1 Add LA chrges on Labour per 1 cum 40.00 % 2071 1 2071

795

0.400

318.00

Over Heads : 14.00 Total per 1.00 cum

7717.64 8798.11

0.14 1

1080.47 8798.11

67. Task Code BLD-CSTN-3-14:33.C: - Beams-Design Mix : M 30(Weigh Batch) Fl-2 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Beams-Design Mix : M 30(Weigh Batch) F-2 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 97.14 0.308 0.308 0.400 112.36 37.08 38.86

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor day day day 285 260 215 0.067 0.133 3.077 19.10 34.58 661.56

Detail RA

Page 51 of 116

Add LA chrges

40.00 %

715.23

0.400

286.09

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for BEAMS floor- 2 Add LA chrges on Labour Lift Charges Floor - 2 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2150 1 2150

874 98.10 45.39

0.400 1 0.400

349.60 98.10 18.16

Over Heads : 14.00 Total per 1.00 cum

7944.50 9056.72

0.14 1

1112.23 9056.72

68. Task Code BLD-CSTN-3-14:33.C: - Beams-Design Mix : M 30(Weigh Batch) Fl-3 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Beams-Design Mix : M 30(Weigh Batch) F-3 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 97.14 0.308 0.308 0.400 112.36 37.08 38.86

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 715.23 0.067 0.133 3.077 0.400 19.10 34.58 661.56 286.09

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for BEAMS floor- 3 Add LA chrges on Labour Lift Charges Floor - 3 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2230 1 2230

954 107.91 49.93

0.400 1 0.400

381.60 107.91 19.97

Over Heads : 14.00

8068.12

0.14

1129.54

Detail RA

Page 52 of 116

Total per 1.00 cum

9197.66

9197.66

69. Task Code BLD-CSTN-3-14:33.C: - Beams-Design Mix : M 30(Weigh Batch) Fl-4 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Beams-Design Mix : M 30(Weigh Batch) F-4 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 97.14 0.308 0.308 0.400 112.36 37.08 38.86

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 715.23 0.067 0.133 3.077 0.400 19.10 34.58 661.56 286.09

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for BEAMS floor- 4 Add LA chrges on Labour Lift Charges Floor - 4 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2310 1 2310

1034 117.71 54.47

0.400 1 0.400

413.60 117.71 21.79

Over Heads : 14.00 Total per 1.00 cum

8191.75 9338.59

0.14 1

1146.84 9338.59

Detail RA

Page 53 of 116

70. Task Code BLD-CSTN-3-14:33.C: - Beams-Design Mix : M 30(Weigh Batch) Fl-5 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Beams-Design Mix : M 30(Weigh Batch) F-5 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 97.14 0.308 0.308 0.400 112.36 37.08 38.86

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 715.23 0.067 0.133 3.077 0.400 19.10 34.58 661.56 286.09

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for BEAMS floor- 5 Add LA chrges on Labour Lift Charges Floor - 5 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2389 1 2389

1113 127.52 59.01

0.400 1 0.400

445.20 127.52 23.60

Over Heads : 14.00 Total per 1.00 cum

8313.97 9477.93

0.14 1

1163.96 9477.93

71. Task Code BLD-CSTN-3-14:33.C: - Beams-Design Mix : M 30(Weigh Batch) Fl-6 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Beams-Design Mix : M 30(Weigh Batch) F-6 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 Cement 43 Gr (including loading charges) Kg. 5.55 400.000 2218.77

Detail RA

Page 54 of 116

M-005 M-189 BLD-CSTN-1-9

Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG

cum KL Cum

2079.40 77 1245.12

0.400 1.200 0.800

831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 97.14 0.308 0.308 0.400 112.36 37.08 38.86

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 715.23 0.067 0.133 3.077 0.400 19.10 34.58 661.56 286.09

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for BEAMS floor- 6 Add LA chrges on Labour Lift Charges Floor - 6 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2468 1 2468

1192 137.33 63.55

0.400 1 0.400

476.80 137.33 25.42

Over Heads : 14.00 Total per 1.00 cum

8436.20 9617.26

0.14 1

1181.07 9617.26

72. Task Code BLD-CSTN-3-14:33.C: - Beams-Design Mix : M 30(Weigh Batch) Fl-7 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Beams-Design Mix : M 30(Weigh Batch) F-7 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 97.14 0.308 0.308 0.400 112.36 37.08 38.86

Manpower
CSSR-M-011 CSSR-M-077 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II day day 285 260 0.067 0.133 19.10 34.58 Page 55 of 116

Detail RA

CSSR-M-087

Light mazdoor Add LA chrges

day 40.00 %

215 715.23

3.077 0.400

661.56 286.09

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for BEAMS floor- 7 Add LA chrges on Labour Lift Charges Floor - 7 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2548 1 2548

1272 147.14 68.08

0.400 1 0.400

508.80 147.14 27.23

Over Heads : 14.00 Total per 1.00 cum

8559.82 9758.20

0.14 1

1198.37 9758.20

73. Task Code BLD-CSTN-3-14:33.C: - Beams-Design Mix : M 30(Weigh Batch) Fl-8 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Beams-Design Mix : M 30(Weigh Batch) F-8 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 97.14 0.308 0.308 0.400 112.36 37.08 38.86

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 715.23 0.067 0.133 3.077 0.400 19.10 34.58 661.56 286.09

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for BEAMS floor- 8 Add LA chrges on Labour Lift Charges Floor - 8 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2628 1 2628

1352 156.95 72.62

0.400 1 0.400

540.80 156.95 29.05

Over Heads : 14.00

8683.45

0.14

1215.68

Detail RA

Page 56 of 116

Total per 1.00 cum

9899.13

9899.13

74. Task Code BLD-CSTN-3-14:33.C: - Beams-Design Mix : M 30(Weigh Batch) Fl-9 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Beams-Design Mix : M 30(Weigh Batch) F-9 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 97.14 0.308 0.308 0.400 112.36 37.08 38.86

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 715.23 0.067 0.133 3.077 0.400 19.10 34.58 661.56 286.09

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for BEAMS floor- 9 Add LA chrges on Labour Lift Charges Floor - 9 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2707 1 2707

1431 166.76 77.16

0.400 1 0.400

572.40 166.76 30.87

Over Heads : 14.00 Total per 1.00 cum

8805.67 10038.47

0.14 1

1232.79 10038.47

Detail RA

Page 57 of 116

75. Task Code BLD-CSTN-3-14:33.C: - Beams-Design Mix : M 30(Weigh Batch) Fl-10 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Beams-Design Mix : M 30(Weigh Batch) F-10 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 97.14 0.308 0.308 0.400 112.36 37.08 38.86

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 715.23 0.067 0.133 3.077 0.400 19.10 34.58 661.56 286.09

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for BEAMS floor- 10 Add LA chrges on Labour Lift Charges Floor - 10 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2786 1 2786

1510 176.57 81.70

0.400 1 0.400

604.00 176.57 32.68

Over Heads : 14.00 Total per 1.00 cum

8927.90 10177.80

0.14 1

1249.91 10177.80

76. Task Code BLD-CSTN-3-14:33.C: - Beams-Design Mix : M 30(Weigh Batch) Fl-11 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Beams-Design Mix : M 30(Weigh Batch) F-11 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 Cement 43 Gr (including loading charges) Kg. 5.55 400.000 2218.77

Detail RA

Page 58 of 116

M-005 M-189 BLD-CSTN-1-9

Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG

cum KL Cum

2079.40 77 1245.12

0.400 1.200 0.800

831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 97.14 0.308 0.308 0.400 112.36 37.08 38.86

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 715.23 0.067 0.133 3.077 0.400 19.10 34.58 661.56 286.09

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for BEAMS floor- 11 Add LA chrges on Labour Lift Charges Floor - 11 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2866 1 2866

1590 186.38 86.24

0.400 1 0.400

636.00 186.38 34.50

Over Heads : 14.00 Total per 1.00 cum

9051.52 10318.73

0.14 1

1267.21 10318.73

77. Task Code BLD-CSTN-3-14:33.C: - Beams-Design Mix : M 30(Weigh Batch) Fl-12 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Beams-Design Mix : M 30(Weigh Batch) F-12 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 97.14 0.308 0.308 0.400 112.36 37.08 38.86

Manpower
CSSR-M-011 CSSR-M-077 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II day day 285 260 0.067 0.133 19.10 34.58 Page 59 of 116

Detail RA

CSSR-M-087

Light mazdoor Add LA chrges

day 40.00 %

215 715.23

3.077 0.400

661.56 286.09

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for BEAMS floor- 12 Add LA chrges on Labour Lift Charges Floor - 12 Add LA chrges per 1 cum 40.00 % cum 40.00 % 2946 1 2946

1670 196.19 90.78

0.400 1 0.400

668.00 196.19 36.31

Over Heads : 14.00 Total per 1.00 cum

9175.15 10459.67

0.14 1

1284.52 10459.67

78. Task Code BLD-CSTN-3-14:33.C: - Beams-Design Mix : M 30(Weigh Batch) Fl-13 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Beams-Design Mix : M 30(Weigh Batch) F-13 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 97.14 0.308 0.308 0.400 112.36 37.08 38.86

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 715.23 0.067 0.133 3.077 0.400 19.10 34.58 661.56 286.09

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for BEAMS floor- 13 Add LA chrges on Labour Lift Charges Floor - 13 Add LA chrges per 1 cum 40.00 % cum 40.00 % 3025 1 3025

1749 206.00 95.32

0.400 1 0.400

699.60 206.00 38.13

Over Heads : 14.00

9297.37

0.14

1301.63

Detail RA

Page 60 of 116

Total per 1.00 cum

10599.00

10599.00

79. Task Code BLD-CSTN-3-14:33.C: - Beams-Design Mix : M 30(Weigh Batch) Fl-14 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Beams-Design Mix : M 30(Weigh Batch) F-14 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 97.14 0.308 0.308 0.400 112.36 37.08 38.86

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 715.23 0.067 0.133 3.077 0.400 19.10 34.58 661.56 286.09

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for BEAMS floor- 14 Add LA chrges on Labour Lift Charges Floor - 14 Add LA chrges per 1 cum 40.00 % cum 40.00 % 3104 1 3104

1828 215.81 99.86

0.400 1 0.400

731.20 215.81 39.94

Over Heads : 14.00 Total per 1.00 cum

9419.60 10738.34

0.14 1

1318.74 10738.34

Detail RA

Page 61 of 116

80. Task Code BLD-CSTN-3-14:33.C: - Beams-Design Mix : M 30(Weigh Batch) Fl-15 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Beams-Design Mix : M 30(Weigh Batch) F-15 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 97.14 0.308 0.308 0.400 112.36 37.08 38.86

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 715.23 0.067 0.133 3.077 0.400 19.10 34.58 661.56 286.09

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for BEAMS floor- 15 Add LA chrges on Labour Lift Charges Floor - 15 Add LA chrges per 1 cum 40.00 % cum 40.00 % 3184 1 3184

1908 225.62 104.40

0.400 1 0.400

763.20 225.62 41.76

Over Heads : 14.00 Total per 1.00 cum

9543.22 10879.27

0.14 1

1336.05 10879.27

81. Task Code BLD-CSTN-3-14:33.C: - Beams-Design Mix : M 30(Weigh Batch) Fl-16 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Beams-Design Mix : M 30(Weigh Batch) F-16 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 Cement 43 Gr (including loading charges) Kg. 5.55 400.000 2218.77

Detail RA

Page 62 of 116

M-005 M-189 BLD-CSTN-1-9

Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG

cum KL Cum

2079.40 77 1245.12

0.400 1.200 0.800

831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 97.14 0.308 0.308 0.400 112.36 37.08 38.86

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 715.23 0.067 0.133 3.077 0.400 19.10 34.58 661.56 286.09

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for BEAMS floor- 16 Add LA chrges on Labour Lift Charges Floor - 16 Add LA chrges per 1 cum 40.00 % cum 40.00 % 3264 1 3264

1988 235.43 108.94

0.400 1 0.400

795.20 235.43 43.57

Over Heads : 14.00 Total per 1.00 cum

9666.85 11020.21

0.14 1

1353.36 11020.21

82. Task Code BLD-CSTN-3-14:33.C: - Beams-Design Mix : M 30(Weigh Batch) Fl-17 Centering with Steel upto 3.66 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Beams-Design Mix : M 30(Weigh Batch) F-17 Centering with Steel upto 3.66 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 400.000 0.400 1.200 0.800 2218.77 831.76 92.40 996.10

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 97.14 0.308 0.308 0.400 112.36 37.08 38.86

Manpower
CSSR-M-011 CSSR-M-077 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II day day 285 260 0.067 0.133 19.10 34.58 Page 63 of 116

Detail RA

CSSR-M-087

Light mazdoor Add LA chrges

day 40.00 %

215 715.23

3.077 0.400

661.56 286.09

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for BEAMS floor- 17 Add LA chrges on Labour Lift Charges Floor - 17 Add LA chrges per 1 cum 40.00 % cum 40.00 % 3343 1 3343

2067 245.24 113.48

0.400 1 0.400

826.80 245.24 45.39

Over Heads : 14.00 Total per 1.00 cum

9789.07 11159.54

0.14 1

1370.47 11159.54

83. Task Code BLD-CSTN-3-14:33.C: - Slabs-Design Mix : M 30(Weigh Batch) Fl-1 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Slabs-Design Mix : M 30(Weigh Batch) F-1 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 46.000 0.046 0.138 0.092 255.16 95.65 10.63 114.55

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 11.17 0.035 0.035 0.400 12.92 4.26 4.47

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 82.25 0.008 0.015 0.354 0.400 2.20 3.98 76.08 32.90

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for SLABS Up to 150 mm thick floor- 1 Add LA chrges on Labour per 1 sqm 232 1 232

40.00 %

89

0.400

35.60

with Thickness 115.00 Over Heads : 14.00

880.39 880.39

1 0.14

880.39 123.26

Detail RA

Page 64 of 116

Total per 1.00 sqm

1003.65

1003.65

84. Task Code BLD-CSTN-3-14:33.C: - Slabs-Design Mix : M 30(Weigh Batch) Fl-2 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Slabs-Design Mix : M 30(Weigh Batch) F-2 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 46.000 0.046 0.138 0.092 255.16 95.65 10.63 114.55

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 11.17 0.035 0.035 0.400 12.92 4.26 4.47

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 82.25 0.008 0.015 0.354 0.400 2.20 3.98 76.08 32.90

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for SLABS Up to 150 mm thick floor- 2 Add LA chrges on Labour Lift Charges Floor - 2 Add LA chrges per 1 sqm 241 1 241

40.00 % sqm 40.00 %

98 11.28 5.22

0.400 1 0.400

39.20 11.28 2.09

with Thickness 115.00 Over Heads : 14.00 Total per 1.00 sqm

906.36 906.36 1033.25

1 0.14 1

906.36 126.89 1033.25

Detail RA

Page 65 of 116

85. Task Code BLD-CSTN-3-14:33.C: - Slabs-Design Mix : M 30(Weigh Batch) Fl-3 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Slabs-Design Mix : M 30(Weigh Batch) F-3 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 46.000 0.046 0.138 0.092 255.16 95.65 10.63 114.55

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 11.17 0.035 0.035 0.400 12.92 4.26 4.47

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 82.25 0.008 0.015 0.354 0.400 2.20 3.98 76.08 32.90

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for SLABS Up to 150 mm thick floor- 3 Add LA chrges on Labour Lift Charges Floor - 3 Add LA chrges per 1 sqm 250 1 250

40.00 % sqm 40.00 %

107 12.41 5.74

0.400 1 0.400

42.80 12.41 2.30

with Thickness 115.00 Over Heads : 14.00 Total per 1.00 sqm

920.30 920.30 1049.14

1 0.14 1

920.30 128.84 1049.14

Detail RA

Page 66 of 116

86. Task Code BLD-CSTN-3-14:33.C: - Slabs-Design Mix : M 30(Weigh Batch) Fl-4 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Slabs-Design Mix : M 30(Weigh Batch) F-4 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 46.000 0.046 0.138 0.092 255.16 95.65 10.63 114.55

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 11.17 0.035 0.035 0.400 12.92 4.26 4.47

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 82.25 0.008 0.015 0.354 0.400 2.20 3.98 76.08 32.90

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for SLABS Up to 150 mm thick floor- 4 Add LA chrges on Labour Lift Charges Floor - 4 Add LA chrges per 1 sqm 259 1 259

40.00 % sqm 40.00 %

116 13.54 6.26

0.400 1 0.400

46.40 13.54 2.51

with Thickness 115.00 Over Heads : 14.00 Total per 1.00 sqm

934.24 934.24 1065.03

1 0.14 1

934.24 130.79 1065.03

Detail RA

Page 67 of 116

87. Task Code BLD-CSTN-3-14:33.C: - Slabs-Design Mix : M 30(Weigh Batch) Fl-5 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Slabs-Design Mix : M 30(Weigh Batch) F-5 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 46.000 0.046 0.138 0.092 255.16 95.65 10.63 114.55

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 11.17 0.035 0.035 0.400 12.92 4.26 4.47

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 82.25 0.008 0.015 0.354 0.400 2.20 3.98 76.08 32.90

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for SLABS Up to 150 mm thick floor- 5 Add LA chrges on Labour Lift Charges Floor - 5 Add LA chrges per 1 sqm 268 1 268

40.00 % sqm 40.00 %

125 14.67 6.79

0.400 1 0.400

50.00 14.67 2.71

with Thickness 115.00 Over Heads : 14.00 Total per 1.00 sqm

948.17 948.17 1080.92

1 0.14 1

948.17 132.74 1080.92

Detail RA

Page 68 of 116

88. Task Code BLD-CSTN-3-14:33.C: - Slabs-Design Mix : M 30(Weigh Batch) Fl-6 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Slabs-Design Mix : M 30(Weigh Batch) F-6 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 46.000 0.046 0.138 0.092 255.16 95.65 10.63 114.55

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 11.17 0.035 0.035 0.400 12.92 4.26 4.47

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 82.25 0.008 0.015 0.354 0.400 2.20 3.98 76.08 32.90

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for SLABS Up to 150 mm thick floor- 6 Add LA chrges on Labour Lift Charges Floor - 6 Add LA chrges per 1 sqm 277 1 277

40.00 % sqm 40.00 %

134 15.79 7.31

0.400 1 0.400

53.60 15.79 2.92

with Thickness 115.00 Over Heads : 14.00 Total per 1.00 sqm

962.11 962.11 1096.81

1 0.14 1

962.11 134.70 1096.81

Detail RA

Page 69 of 116

89. Task Code BLD-CSTN-3-14:33.C: - Slabs-Design Mix : M 30(Weigh Batch) Fl-7 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Slabs-Design Mix : M 30(Weigh Batch) F-7 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 46.000 0.046 0.138 0.092 255.16 95.65 10.63 114.55

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 11.17 0.035 0.035 0.400 12.92 4.26 4.47

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 82.25 0.008 0.015 0.354 0.400 2.20 3.98 76.08 32.90

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for SLABS Up to 150 mm thick floor- 7 Add LA chrges on Labour Lift Charges Floor - 7 Add LA chrges per 1 sqm 285 1 285

40.00 % sqm 40.00 %

142 16.92 7.83

0.400 1 0.400

56.80 16.92 3.13

with Thickness 115.00 Over Heads : 14.00 Total per 1.00 sqm

974.65 974.65 1111.10

1 0.14 1

974.65 136.45 1111.10

Detail RA

Page 70 of 116

90. Task Code BLD-CSTN-3-14:33.C: - Slabs-Design Mix : M 30(Weigh Batch) Fl-8 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Slabs-Design Mix : M 30(Weigh Batch) F-8 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 46.000 0.046 0.138 0.092 255.16 95.65 10.63 114.55

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 11.17 0.035 0.035 0.400 12.92 4.26 4.47

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 82.25 0.008 0.015 0.354 0.400 2.20 3.98 76.08 32.90

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for SLABS Up to 150 mm thick floor- 8 Add LA chrges on Labour Lift Charges Floor - 8 Add LA chrges per 1 sqm 294 1 294

40.00 % sqm 40.00 %

151 18.05 8.35

0.400 1 0.400

60.40 18.05 3.34

with Thickness 115.00 Over Heads : 14.00 Total per 1.00 sqm

988.58 988.58 1126.99

1 0.14 1

988.58 138.40 1126.99

Detail RA

Page 71 of 116

91. Task Code BLD-CSTN-3-14:33.C: - Slabs-Design Mix : M 30(Weigh Batch) Fl-9 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Slabs-Design Mix : M 30(Weigh Batch) F-9 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 46.000 0.046 0.138 0.092 255.16 95.65 10.63 114.55

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 11.17 0.035 0.035 0.400 12.92 4.26 4.47

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 82.25 0.008 0.015 0.354 0.400 2.20 3.98 76.08 32.90

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for SLABS Up to 150 mm thick floor- 9 Add LA chrges on Labour Lift Charges Floor - 9 Add LA chrges per 1 sqm 303 1 303

40.00 % sqm 40.00 %

160 19.18 8.87

0.400 1 0.400

64.00 19.18 3.55

with Thickness 115.00 Over Heads : 14.00 Total per 1.00 sqm

1002.52 1002.52 1142.87

1 0.14 1

1002.52 140.35 1142.87

Detail RA

Page 72 of 116

92. Task Code BLD-CSTN-3-14:33.C: - Slabs-Design Mix : M 30(Weigh Batch) Fl-10 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Slabs-Design Mix : M 30(Weigh Batch) F-10 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 46.000 0.046 0.138 0.092 255.16 95.65 10.63 114.55

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 11.17 0.035 0.035 0.400 12.92 4.26 4.47

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 82.25 0.008 0.015 0.354 0.400 2.20 3.98 76.08 32.90

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for SLABS Up to 150 mm thick floor- 10 Add LA chrges on Labour Lift Charges Floor - 10 Add LA chrges per 1 sqm 312 1 312

40.00 % sqm 40.00 %

169 20.31 9.40

0.400 1 0.400

67.60 20.31 3.76

with Thickness 115.00 Over Heads : 14.00 Total per 1.00 sqm

1016.46 1016.46 1158.76

1 0.14 1

1016.46 142.30 1158.76

Detail RA

Page 73 of 116

93. Task Code BLD-CSTN-3-14:33.C: - Slabs-Design Mix : M 30(Weigh Batch) Fl-11 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Slabs-Design Mix : M 30(Weigh Batch) F-11 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 46.000 0.046 0.138 0.092 255.16 95.65 10.63 114.55

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 11.17 0.035 0.035 0.400 12.92 4.26 4.47

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 82.25 0.008 0.015 0.354 0.400 2.20 3.98 76.08 32.90

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for SLABS Up to 150 mm thick floor- 11 Add LA chrges on Labour Lift Charges Floor - 11 Add LA chrges per 1 sqm 321 1 321

40.00 % sqm 40.00 %

178 21.43 9.92

0.400 1 0.400

71.20 21.43 3.97

with Thickness 115.00 Over Heads : 14.00 Total per 1.00 sqm

1030.39 1030.39 1174.65

1 0.14 1

1030.39 144.26 1174.65

Detail RA

Page 74 of 116

94. Task Code BLD-CSTN-3-14:33.C: - Slabs-Design Mix : M 30(Weigh Batch) Fl-12 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Slabs-Design Mix : M 30(Weigh Batch) F-12 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 46.000 0.046 0.138 0.092 255.16 95.65 10.63 114.55

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 11.17 0.035 0.035 0.400 12.92 4.26 4.47

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 82.25 0.008 0.015 0.354 0.400 2.20 3.98 76.08 32.90

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for SLABS Up to 150 mm thick floor- 12 Add LA chrges on Labour Lift Charges Floor - 12 Add LA chrges per 1 sqm 330 1 330

40.00 % sqm 40.00 %

187 22.56 10.44

0.400 1 0.400

74.80 22.56 4.18

with Thickness 115.00 Over Heads : 14.00 Total per 1.00 sqm

1044.33 1044.33 1190.54

1 0.14 1

1044.33 146.21 1190.54

Detail RA

Page 75 of 116

95. Task Code BLD-CSTN-3-14:33.C: - Slabs-Design Mix : M 30(Weigh Batch) Fl-13 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Slabs-Design Mix : M 30(Weigh Batch) F-13 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 46.000 0.046 0.138 0.092 255.16 95.65 10.63 114.55

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 11.17 0.035 0.035 0.400 12.92 4.26 4.47

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 82.25 0.008 0.015 0.354 0.400 2.20 3.98 76.08 32.90

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for SLABS Up to 150 mm thick floor- 13 Add LA chrges on Labour Lift Charges Floor - 13 Add LA chrges per 1 sqm 339 1 339

40.00 % sqm 40.00 %

196 23.69 10.96

0.400 1 0.400

78.40 23.69 4.38

with Thickness 115.00 Over Heads : 14.00 Total per 1.00 sqm

1058.27 1058.27 1206.43

1 0.14 1

1058.27 148.16 1206.43

Detail RA

Page 76 of 116

96. Task Code BLD-CSTN-3-14:33.C: - Slabs-Design Mix : M 30(Weigh Batch) Fl-14 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Slabs-Design Mix : M 30(Weigh Batch) F-14 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 46.000 0.046 0.138 0.092 255.16 95.65 10.63 114.55

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 11.17 0.035 0.035 0.400 12.92 4.26 4.47

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 82.25 0.008 0.015 0.354 0.400 2.20 3.98 76.08 32.90

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for SLABS Up to 150 mm thick floor- 14 Add LA chrges on Labour Lift Charges Floor - 14 Add LA chrges per 1 sqm 348 1 348

40.00 % sqm 40.00 %

205 24.82 11.48

0.400 1 0.400

82.00 24.82 4.59

with Thickness 115.00 Over Heads : 14.00 Total per 1.00 sqm

1072.21 1072.21 1222.31

1 0.14 1

1072.21 150.11 1222.31

Detail RA

Page 77 of 116

97. Task Code BLD-CSTN-3-14:33.C: - Slabs-Design Mix : M 30(Weigh Batch) Fl-15 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Slabs-Design Mix : M 30(Weigh Batch) F-15 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 46.000 0.046 0.138 0.092 255.16 95.65 10.63 114.55

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 11.17 0.035 0.035 0.400 12.92 4.26 4.47

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 82.25 0.008 0.015 0.354 0.400 2.20 3.98 76.08 32.90

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for SLABS Up to 150 mm thick floor- 15 Add LA chrges on Labour Lift Charges Floor - 15 Add LA chrges per 1 sqm 357 1 357

40.00 % sqm 40.00 %

214 25.95 12.01

0.400 1 0.400

85.60 25.95 4.80

with Thickness 115.00 Over Heads : 14.00 Total per 1.00 sqm

1086.14 1086.14 1238.20

1 0.14 1

1086.14 152.06 1238.20

Detail RA

Page 78 of 116

98. Task Code BLD-CSTN-3-14:33.C: - Slabs-Design Mix : M 30(Weigh Batch) Fl-16 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Slabs-Design Mix : M 30(Weigh Batch) F-16 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 46.000 0.046 0.138 0.092 255.16 95.65 10.63 114.55

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 11.17 0.035 0.035 0.400 12.92 4.26 4.47

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 82.25 0.008 0.015 0.354 0.400 2.20 3.98 76.08 32.90

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for SLABS Up to 150 mm thick floor- 16 Add LA chrges on Labour Lift Charges Floor - 16 Add LA chrges per 1 sqm 365 1 365

40.00 % sqm 40.00 %

222 27.07 12.53

0.400 1 0.400

88.80 27.07 5.01

with Thickness 115.00 Over Heads : 14.00 Total per 1.00 sqm

1098.68 1098.68 1252.49

1 0.14 1

1098.68 153.82 1252.49

Detail RA

Page 79 of 116

99. Task Code BLD-CSTN-3-14:33.C: - Slabs-Design Mix : M 30(Weigh Batch) Fl-17 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery
Supply and placing of the M-30 Grade Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers approved by the department including pumping, cantering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for RCC SLABS, BEAMS for:-Slabs-Design Mix : M 30(Weigh Batch) F-17 Centering with Steel upto 3.66 Slab thk 115.00 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 46.000 0.046 0.138 0.092 255.16 95.65 10.63 114.55

Machinery
CSSR-X-110 CSSR-X-141 Batching plant 0.5 cum Needle vibrator 40 mm ( petrol ) Add LA chrges on Crew Charges Hour Hour 40.000 % 364.8 120.4 11.17 0.035 0.035 0.400 12.92 4.26 4.47

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 82.25 0.008 0.015 0.354 0.400 2.20 3.98 76.08 32.90

Miscellaneous
1 Hire Charges for Centering and Scaffolding Unsupported Height - Steel upto 3.66 for SLABS Up to 150 mm thick floor- 17 Add LA chrges on Labour Lift Charges Floor - 17 Add LA chrges per 1 sqm 374 1 374

40.00 % sqm 40.00 %

231 28.20 13.05

0.400 1 0.400

92.40 28.20 5.22

with Thickness 115.00 Over Heads : 14.00 Total per 1.00 sqm

1112.62 1112.62 1268.38

1 0.14 1

1112.62 155.77 1268.38

100. Task Code BLD-CSTN-3-14:33.C: - Sun Shade-Design Mix : M 30(Weigh Batch) Fl-1 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery
Slabs-Design Mix : M 30(Weigh Batch) for:-Sun Shade-Design Mix : M 30(Weigh Batch) F-1 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 25.00 0.025 0.075 0.050 138.67 51.98 5.78 62.26

Detail RA

Page 80 of 116

Machinery
CSSR-X-110 Batching plant 0.5 cum Add LA chrges on Crew Charges Hour 40.000 % 364.8 4.11 0.019 0.400 7.02 1.64

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 44.70 0.004 0.008 0.192 0.400 1.19 2.16 41.35 17.88

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 sqm Unsupported Height - Steel upto 3.66 for CHAJJAS SUN SHADES floor- 1 Add LA chrges on Labour 40.00 % 271 1 271

104

0.400

41.60

with Thickness 62.50 Over Heads : 14.00 Total per 1.00 sqm

642.54 642.54 732.49

1 0.14 1

642.54 89.96 732.49

101. Task Code BLD-CSTN-3-14:33.C: - Sun Shade-Design Mix : M 30(Weigh Batch) Fl-2 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery
Slabs-Design Mix : M 30(Weigh Batch) for:-Sun Shade-Design Mix : M 30(Weigh Batch) F-2 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 25.00 0.025 0.075 0.050 138.67 51.98 5.78 62.26

Machinery
CSSR-X-110 Batching plant 0.5 cum Add LA chrges on Crew Charges Hour 40.000 % 364.8 4.11 0.019 0.400 7.02 1.64

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 44.70 0.004 0.008 0.192 0.400 1.19 2.16 41.35 17.88

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 sqm Unsupported Height - Steel upto 3.66 for CHAJJAS SUN SHADES floor- 2 Add LA chrges on Labour Lift Charges Floor - 2 Add LA chrges 40.00 % sqm 40.00 % 281 1 281

114 6.13 2.84

0.400 1 0.400

45.60 6.13 1.13

with Thickness 62.50

663.80

663.80

Detail RA

Page 81 of 116

Over Heads : 14.00 Total per 1.00 sqm

663.80 756.74

0.14 1

92.93 756.74

102. Task Code BLD-CSTN-3-14:33.C: - Sun Shade-Design Mix : M 30(Weigh Batch) Fl-3 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery
Slabs-Design Mix : M 30(Weigh Batch) for:-Sun Shade-Design Mix : M 30(Weigh Batch) F-3 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 25.00 0.025 0.075 0.050 138.67 51.98 5.78 62.26

Machinery
CSSR-X-110 Batching plant 0.5 cum Add LA chrges on Crew Charges Hour 40.000 % 364.8 4.11 0.019 0.400 7.02 1.64

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 44.70 0.004 0.008 0.192 0.400 1.19 2.16 41.35 17.88

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 sqm Unsupported Height - Steel upto 3.66 for CHAJJAS SUN SHADES floor- 3 Add LA chrges on Labour Lift Charges Floor - 3 Add LA chrges 40.00 % sqm 40.00 % 292 1 292

125 6.74 3.12

0.400 1 0.400

50.00 6.74 1.25

with Thickness 62.50 Over Heads : 14.00 Total per 1.00 sqm

679.93 679.93 775.12

1 0.14 1

679.93 95.19 775.12

103. Task Code BLD-CSTN-3-14:33.C: - Sun Shade-Design Mix : M 30(Weigh Batch) Fl-4 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery
Slabs-Design Mix : M 30(Weigh Batch) for:-Sun Shade-Design Mix : M 30(Weigh Batch) F-4 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 25.00 0.025 0.075 0.050 138.67 51.98 5.78 62.26

Machinery
CSSR-X-110 Batching plant 0.5 cum Hour 364.8 0.019 7.02

Detail RA

Page 82 of 116

Add LA chrges on Crew Charges

40.000 %

4.11

0.400

1.64

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 44.70 0.004 0.008 0.192 0.400 1.19 2.16 41.35 17.88

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 sqm Unsupported Height - Steel upto 3.66 for CHAJJAS SUN SHADES floor- 4 Add LA chrges on Labour Lift Charges Floor - 4 Add LA chrges 40.00 % sqm 40.00 % 302 1 302

135 7.36 3.40

0.400 1 0.400

54.00 7.36 1.36

with Thickness 62.50 Over Heads : 14.00 Total per 1.00 sqm

694.66 694.66 791.91

1 0.14 1

694.66 97.25 791.91

104. Task Code BLD-CSTN-3-14:33.C: - Sun Shade-Design Mix : M 30(Weigh Batch) Fl-5 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery
Slabs-Design Mix : M 30(Weigh Batch) for:-Sun Shade-Design Mix : M 30(Weigh Batch) F-5 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 25.00 0.025 0.075 0.050 138.67 51.98 5.78 62.26

Machinery
CSSR-X-110 Batching plant 0.5 cum Add LA chrges on Crew Charges Hour 40.000 % 364.8 4.11 0.019 0.400 7.02 1.64

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 44.70 0.004 0.008 0.192 0.400 1.19 2.16 41.35 17.88

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 sqm Unsupported Height - Steel upto 3.66 for CHAJJAS SUN SHADES floor- 5 Add LA chrges on Labour Lift Charges Floor - 5 Add LA chrges 40.00 % sqm 40.00 % 313 1 313

146 7.97 3.69

0.400 1 0.400

58.40 7.97 1.48

with Thickness 62.50

710.78

710.78

Detail RA

Page 83 of 116

Over Heads : 14.00 Total per 1.00 sqm

710.78 810.29

0.14 1

99.51 810.29

105. Task Code BLD-CSTN-3-14:33.C: - Sun Shade-Design Mix : M 30(Weigh Batch) Fl-6 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery
Slabs-Design Mix : M 30(Weigh Batch) for:-Sun Shade-Design Mix : M 30(Weigh Batch) F-6 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 25.00 0.025 0.075 0.050 138.67 51.98 5.78 62.26

Machinery
CSSR-X-110 Batching plant 0.5 cum Add LA chrges on Crew Charges Hour 40.000 % 364.8 4.11 0.019 0.400 7.02 1.64

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 44.70 0.004 0.008 0.192 0.400 1.19 2.16 41.35 17.88

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 sqm Unsupported Height - Steel upto 3.66 for CHAJJAS SUN SHADES floor- 6 Add LA chrges on Labour Lift Charges Floor - 6 Add LA chrges 40.00 % sqm 40.00 % 323 1 323

156 8.58 3.97

0.400 1 0.400

62.40 8.58 1.59

with Thickness 62.50 Over Heads : 14.00 Total per 1.00 sqm

725.51 725.51 827.08

1 0.14 1

725.51 101.57 827.08

106. Task Code BLD-CSTN-3-14:33.C: - Sun Shade-Design Mix : M 30(Weigh Batch) Fl-7 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery
Slabs-Design Mix : M 30(Weigh Batch) for:-Sun Shade-Design Mix : M 30(Weigh Batch) F-7 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 25.00 0.025 0.075 0.050 138.67 51.98 5.78 62.26

Machinery
CSSR-X-110 Batching plant 0.5 cum Hour 364.8 0.019 7.02

Detail RA

Page 84 of 116

Add LA chrges on Crew Charges

40.000 %

4.11

0.400

1.64

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 44.70 0.004 0.008 0.192 0.400 1.19 2.16 41.35 17.88

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 sqm Unsupported Height - Steel upto 3.66 for CHAJJAS SUN SHADES floor- 7 Add LA chrges on Labour Lift Charges Floor - 7 Add LA chrges 40.00 % sqm 40.00 % 333 1 333

166 9.20 4.26

0.400 1 0.400

66.40 9.20 1.70

with Thickness 62.50 Over Heads : 14.00 Total per 1.00 sqm

740.24 740.24 843.87

1 0.14 1

740.24 103.63 843.87

107. Task Code BLD-CSTN-3-14:33.C: - Sun Shade-Design Mix : M 30(Weigh Batch) Fl-8 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery
Slabs-Design Mix : M 30(Weigh Batch) for:-Sun Shade-Design Mix : M 30(Weigh Batch) F-8 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 25.00 0.025 0.075 0.050 138.67 51.98 5.78 62.26

Machinery
CSSR-X-110 Batching plant 0.5 cum Add LA chrges on Crew Charges Hour 40.000 % 364.8 4.11 0.019 0.400 7.02 1.64

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 44.70 0.004 0.008 0.192 0.400 1.19 2.16 41.35 17.88

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 sqm Unsupported Height - Steel upto 3.66 for CHAJJAS SUN SHADES floor- 8 Add LA chrges on Labour Lift Charges Floor - 8 Add LA chrges 40.00 % sqm 40.00 % 344 1 344

177 9.81 4.54

0.400 1 0.400

70.80 9.81 1.82

with Thickness 62.50

756.36

756.36

Detail RA

Page 85 of 116

Over Heads : 14.00 Total per 1.00 sqm

756.36 862.25

0.14 1

105.89 862.25

108. Task Code BLD-CSTN-3-14:33.C: - Sun Shade-Design Mix : M 30(Weigh Batch) Fl-9 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery
Slabs-Design Mix : M 30(Weigh Batch) for:-Sun Shade-Design Mix : M 30(Weigh Batch) F-9 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 25.00 0.025 0.075 0.050 138.67 51.98 5.78 62.26

Machinery
CSSR-X-110 Batching plant 0.5 cum Add LA chrges on Crew Charges Hour 40.000 % 364.8 4.11 0.019 0.400 7.02 1.64

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 44.70 0.004 0.008 0.192 0.400 1.19 2.16 41.35 17.88

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 sqm Unsupported Height - Steel upto 3.66 for CHAJJAS SUN SHADES floor- 9 Add LA chrges on Labour Lift Charges Floor - 9 Add LA chrges 40.00 % sqm 40.00 % 354 1 354

187 10.42 4.82

0.400 1 0.400

74.80 10.42 1.93

with Thickness 62.50 Over Heads : 14.00 Total per 1.00 sqm

771.09 771.09 879.04

1 0.14 1

771.09 107.95 879.04

109. Task Code BLD-CSTN-3-14:33.C: - Sun Shade-Design Mix : M 30(Weigh Batch) Fl-10 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery
Slabs-Design Mix : M 30(Weigh Batch) for:-Sun Shade-Design Mix : M 30(Weigh Batch) F-10 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 25.00 0.025 0.075 0.050 138.67 51.98 5.78 62.26

Machinery
CSSR-X-110 Batching plant 0.5 cum Hour 364.8 0.019 7.02

Detail RA

Page 86 of 116

Add LA chrges on Crew Charges

40.000 %

4.11

0.400

1.64

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 44.70 0.004 0.008 0.192 0.400 1.19 2.16 41.35 17.88

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 sqm Unsupported Height - Steel upto 3.66 for CHAJJAS SUN SHADES floor- 10 Add LA chrges on Labour Lift Charges Floor - 10 Add LA chrges 40.00 % sqm 40.00 % 365 1 365

198 11.04 5.11

0.400 1 0.400

79.20 11.04 2.04

with Thickness 62.50 Over Heads : 14.00 Total per 1.00 sqm

787.22 787.22 897.43

1 0.14 1

787.22 110.21 897.43

110. Task Code BLD-CSTN-3-14:33.C: - Sun Shade-Design Mix : M 30(Weigh Batch) Fl-11 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery
Slabs-Design Mix : M 30(Weigh Batch) for:-Sun Shade-Design Mix : M 30(Weigh Batch) F-11 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 25.00 0.025 0.075 0.050 138.67 51.98 5.78 62.26

Machinery
CSSR-X-110 Batching plant 0.5 cum Add LA chrges on Crew Charges Hour 40.000 % 364.8 4.11 0.019 0.400 7.02 1.64

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 44.70 0.004 0.008 0.192 0.400 1.19 2.16 41.35 17.88

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 sqm Unsupported Height - Steel upto 3.66 for CHAJJAS SUN SHADES floor- 11 Add LA chrges on Labour Lift Charges Floor - 11 Add LA chrges 40.00 % sqm 40.00 % 375 1 375

208 11.65 5.39

0.400 1 0.400

83.20 11.65 2.16

with Thickness 62.50

801.94

801.94

Detail RA

Page 87 of 116

Over Heads : 14.00 Total per 1.00 sqm

801.94 914.21

0.14 1

112.27 914.21

111. Task Code BLD-CSTN-3-14:33.C: - Sun Shade-Design Mix : M 30(Weigh Batch) Fl-12 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery
Slabs-Design Mix : M 30(Weigh Batch) for:-Sun Shade-Design Mix : M 30(Weigh Batch) F-12 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 25.00 0.025 0.075 0.050 138.67 51.98 5.78 62.26

Machinery
CSSR-X-110 Batching plant 0.5 cum Add LA chrges on Crew Charges Hour 40.000 % 364.8 4.11 0.019 0.400 7.02 1.64

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 44.70 0.004 0.008 0.192 0.400 1.19 2.16 41.35 17.88

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 sqm Unsupported Height - Steel upto 3.66 for CHAJJAS SUN SHADES floor- 12 Add LA chrges on Labour Lift Charges Floor - 12 Add LA chrges 40.00 % sqm 40.00 % 385 1 385

218 12.26 5.67

0.400 1 0.400

87.20 12.26 2.27

with Thickness 62.50 Over Heads : 14.00 Total per 1.00 sqm

816.67 816.67 931.00

1 0.14 1

816.67 114.33 931.00

112. Task Code BLD-CSTN-3-14:33.C: - Sun Shade-Design Mix : M 30(Weigh Batch) Fl-13 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery
Slabs-Design Mix : M 30(Weigh Batch) for:-Sun Shade-Design Mix : M 30(Weigh Batch) F-13 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 25.00 0.025 0.075 0.050 138.67 51.98 5.78 62.26

Machinery
CSSR-X-110 Batching plant 0.5 cum Hour 364.8 0.019 7.02

Detail RA

Page 88 of 116

Add LA chrges on Crew Charges

40.000 %

4.11

0.400

1.64

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 44.70 0.004 0.008 0.192 0.400 1.19 2.16 41.35 17.88

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 sqm Unsupported Height - Steel upto 3.66 for CHAJJAS SUN SHADES floor- 13 Add LA chrges on Labour Lift Charges Floor - 13 Add LA chrges 40.00 % sqm 40.00 % 396 1 396

229 12.88 5.96

0.400 1 0.400

91.60 12.88 2.38

with Thickness 62.50 Over Heads : 14.00 Total per 1.00 sqm

832.80 832.80 949.39

1 0.14 1

832.80 116.59 949.39

113. Task Code BLD-CSTN-3-14:33.C: - Sun Shade-Design Mix : M 30(Weigh Batch) Fl-14 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery
Slabs-Design Mix : M 30(Weigh Batch) for:-Sun Shade-Design Mix : M 30(Weigh Batch) F-14 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 25.00 0.025 0.075 0.050 138.67 51.98 5.78 62.26

Machinery
CSSR-X-110 Batching plant 0.5 cum Add LA chrges on Crew Charges Hour 40.000 % 364.8 4.11 0.019 0.400 7.02 1.64

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 44.70 0.004 0.008 0.192 0.400 1.19 2.16 41.35 17.88

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 sqm Unsupported Height - Steel upto 3.66 for CHAJJAS SUN SHADES floor- 14 Add LA chrges on Labour Lift Charges Floor - 14 Add LA chrges 40.00 % sqm 40.00 % 406 1 406

239 13.49 6.24

0.400 1 0.400

95.60 13.49 2.50

with Thickness 62.50

847.52

847.52

Detail RA

Page 89 of 116

Over Heads : 14.00 Total per 1.00 sqm

847.52 966.17

0.14 1

118.65 966.17

114. Task Code BLD-CSTN-3-14:33.C: - Sun Shade-Design Mix : M 30(Weigh Batch) Fl-15 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery
Slabs-Design Mix : M 30(Weigh Batch) for:-Sun Shade-Design Mix : M 30(Weigh Batch) F-15 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 25.00 0.025 0.075 0.050 138.67 51.98 5.78 62.26

Machinery
CSSR-X-110 Batching plant 0.5 cum Add LA chrges on Crew Charges Hour 40.000 % 364.8 4.11 0.019 0.400 7.02 1.64

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 44.70 0.004 0.008 0.192 0.400 1.19 2.16 41.35 17.88

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 sqm Unsupported Height - Steel upto 3.66 for CHAJJAS SUN SHADES floor- 15 Add LA chrges on Labour Lift Charges Floor - 15 Add LA chrges 40.00 % sqm 40.00 % 417 1 417

250 14.10 6.52

0.400 1 0.400

100.00 14.10 2.61

with Thickness 62.50 Over Heads : 14.00 Total per 1.00 sqm

863.65 863.65 984.56

1 0.14 1

863.65 120.91 984.56

115. Task Code BLD-CSTN-3-14:33.C: - Sun Shade-Design Mix : M 30(Weigh Batch) Fl-16 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery
Slabs-Design Mix : M 30(Weigh Batch) for:-Sun Shade-Design Mix : M 30(Weigh Batch) F-16 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 25.00 0.025 0.075 0.050 138.67 51.98 5.78 62.26

Machinery
CSSR-X-110 Batching plant 0.5 cum Hour 364.8 0.019 7.02

Detail RA

Page 90 of 116

Add LA chrges on Crew Charges

40.000 %

4.11

0.400

1.64

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 44.70 0.004 0.008 0.192 0.400 1.19 2.16 41.35 17.88

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 sqm Unsupported Height - Steel upto 3.66 for CHAJJAS SUN SHADES floor- 16 Add LA chrges on Labour Lift Charges Floor - 16 Add LA chrges 40.00 % sqm 40.00 % 427 1 427

260 14.71 6.81

0.400 1 0.400

104.00 14.71 2.72

with Thickness 62.50 Over Heads : 14.00 Total per 1.00 sqm

878.37 878.37 1001.35

1 0.14 1

878.37 122.97 1001.35

116. Task Code BLD-CSTN-3-14:33.C: - Sun Shade-Design Mix : M 30(Weigh Batch) Fl-17 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery
Slabs-Design Mix : M 30(Weigh Batch) for:-Sun Shade-Design Mix : M 30(Weigh Batch) F-17 Centering with Steel upto 3.66 Slab thk 62.50 Lift Machinery Code Unit Rate Coefficient Amount

Material
CSSR-A.05 M-005 M-189 BLD-CSTN-1-9 Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Water Aggregate 20mm grade HBG Kg. cum KL Cum 5.55 2079.40 77 1245.12 25.00 0.025 0.075 0.050 138.67 51.98 5.78 62.26

Machinery
CSSR-X-110 Batching plant 0.5 cum Add LA chrges on Crew Charges Hour 40.000 % 364.8 4.11 0.019 0.400 7.02 1.64

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 44.70 0.004 0.008 0.192 0.400 1.19 2.16 41.35 17.88

Miscellaneous
1 Hire Charges for Centering and Scaffolding per 1 sqm Unsupported Height - Steel upto 3.66 for CHAJJAS SUN SHADES floor- 17 Add LA chrges on Labour Lift Charges Floor - 17 Add LA chrges 40.00 % sqm 40.00 % 437 1 437

270 15.33 7.09

0.400 1 0.400

108.00 15.33 2.84

with Thickness 62.50

893.10

893.10

Detail RA

Page 91 of 116

Over Heads : 14.00 Total per 1.00 sqm

893.10 1018.14

0.14 1

125.03 1018.14

Brick Masonry
117. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-1 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-1 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 1 Add LA chrges on Labour per 1 sqm 40.00 % 183.47 159.96 1 0.400 183.47 63.98

Over Heads : 14.00 Total per 1.00 cum

3748.65 4273.46

0.14 1

524.81 4273.46

118. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-2 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-2 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Detail RA

Page 92 of 116

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 2 Add LA chrges on Labour Lift Charges Floor - 2 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 263.44 239.93 96.09 96.09 1 0.400 1 0.400 263.44 95.97 96.09 38.44

Over Heads : 14.00 Total per 1.00 cum

3995.14 4554.46

0.14 1

559.32 4554.46

119. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-3 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-3 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 3 Add LA chrges on Labour Lift Charges Floor - 3 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 343.42 319.91 192.18 192.18 1 0.400 1 0.400 343.42 127.96 192.18 76.87

Over Heads : 14.00 Total per 1.00 cum

4241.64 4835.47

0.14 1

593.83 4835.47

Detail RA

Page 93 of 116

120. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-4 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-4 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 4 Add LA chrges on Labour Lift Charges Floor - 4 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 423.40 399.89 288.27 288.27 1 0.400 1 0.400 423.40 159.96 288.27 115.31

Over Heads : 14.00 Total per 1.00 cum

4488.13 5116.47

0.14 1

628.34 5116.47

121. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-5 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-5 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 Mason Cl- I / Brick layer Cl- I day 285 0.420 119.70 Page 94 of 116

Detail RA

CSSR-M-077 CSSR-M-087

Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges

day day 40.00 %

260 215 960.90

0.920 2.800 0.400

239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 5 Add LA chrges on Labour Lift Charges Floor - 5 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 503.38 479.87 384.36 384.36 1 0.400 1 0.400 503.38 191.95 384.36 153.74

Over Heads : 14.00 Total per 1.00 cum

4734.63 5397.47

0.14 1

662.85 5397.47

122. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-6 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-6 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 6 Add LA chrges on Labour Lift Charges Floor - 6 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 583.36 559.84 480.45 480.45 1 0.400 1 0.400 583.36 223.94 480.45 192.18

Over Heads : 14.00 Total per 1.00 cum

4981.12 5678.48

0.14 1

697.36 5678.48

Detail RA

Page 95 of 116

123. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-7 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-7 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 7 Add LA chrges on Labour Lift Charges Floor - 7 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 663.33 639.82 576.54 576.54 1 0.400 1 0.400 663.33 255.93 576.54 230.62

Over Heads : 14.00 Total per 1.00 cum

5227.62 5959.48

0.14 1

731.87 5959.48

124. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-8 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-8 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 Mason Cl- I / Brick layer Cl- I day 285 0.420 119.70 Page 96 of 116

Detail RA

CSSR-M-077 CSSR-M-087

Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges

day day 40.00 %

260 215 960.90

0.920 2.800 0.400

239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 8 Add LA chrges on Labour Lift Charges Floor - 8 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 743.31 719.8 672.63 672.63 1 0.400 1 0.400 743.31 287.92 672.63 269.05

Over Heads : 14.00 Total per 1.00 cum

5474.11 6240.49

0.14 1

766.38 6240.49

125. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-9 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-9 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 9 Add LA chrges on Labour Lift Charges Floor - 9 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 823.29 799.78 768.72 768.72 1 0.400 1 0.400 823.29 319.91 768.72 307.49

Over Heads : 14.00 Total per 1.00 cum

5720.61 6521.49

0.14 1

800.88 6521.49

Detail RA

Page 97 of 116

126. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-10 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-10 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 10 Add LA chrges on Labour Lift Charges Floor - 10 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 903.27 879.76 864.81 864.81 1 0.400 1 0.400 903.27 351.90 864.81 345.92

Over Heads : 14.00 Total per 1.00 cum

5967.10 6802.50

0.14 1

835.39 6802.50

127. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-11 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-11 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 Mason Cl- I / Brick layer Cl- I day 285 0.420 119.70 Page 98 of 116

Detail RA

CSSR-M-077 CSSR-M-087

Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges

day day 40.00 %

260 215 960.90

0.920 2.800 0.400

239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 11 Add LA chrges on Labour Lift Charges Floor - 11 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 983.24 959.73 960.90 960.90 1 0.400 1 0.400 983.24 383.89 960.90 384.36

Over Heads : 14.00 Total per 1.00 cum

6213.60 7083.50

0.14 1

869.90 7083.50

128. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-12 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-12 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 12 Add LA chrges on Labour Lift Charges Floor - 12 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 1063.22 1039.71 1056.99 1056.99 1 0.400 1 0.400 1063.22 415.88 1056.99 422.80

Over Heads : 14.00 Total per 1.00 cum

6460.09 7364.50

0.14 1

904.41 7364.50

Detail RA

Page 99 of 116

129. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-13 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-13 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 13 Add LA chrges on Labour Lift Charges Floor - 13 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 1143.20 1119.69 1153.08 1153.08 1 0.400 1 0.400 1143.20 447.88 1153.08 461.23

Over Heads : 14.00 Total per 1.00 cum

6706.59 7645.51

0.14 1

938.92 7645.51

130. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-14 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-14 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 Mason Cl- I / Brick layer Cl- I day 285 0.420 119.70 Page 100 of 116

Detail RA

CSSR-M-077 CSSR-M-087

Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges

day day 40.00 %

260 215 960.90

0.920 2.800 0.400

239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 14 Add LA chrges on Labour Lift Charges Floor - 14 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 1223.18 1199.67 1249.17 1249.17 1 0.400 1 0.400 1223.18 479.87 1249.17 499.67

Over Heads : 14.00 Total per 1.00 cum

6953.08 7926.51

0.14 1

973.43 7926.51

131. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-15 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-15 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 15 Add LA chrges on Labour Lift Charges Floor - 15 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 1303.16 1279.64 1345.26 1345.26 1 0.400 1 0.400 1303.16 511.86 1345.26 538.10

Over Heads : 14.00 Total per 1.00 cum

7199.58 8207.52

0.14 1

1007.94 8207.52

Detail RA

Page 101 of 116

132. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-16 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-16 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 16 Add LA chrges on Labour Lift Charges Floor - 16 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 1383.13 1359.62 1441.35 1441.35 1 0.400 1 0.400 1383.13 543.85 1441.35 576.54

Over Heads : 14.00 Total per 1.00 cum

7446.07 8488.52

0.14 1

1042.45 8488.52

133. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-17 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-17 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 Mason Cl- I / Brick layer Cl- I day 285 0.420 119.70 Page 102 of 116

Detail RA

CSSR-M-077 CSSR-M-087

Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges

day day 40.00 %

260 215 960.90

0.920 2.800 0.400

239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 17 Add LA chrges on Labour Lift Charges Floor - 17 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 1463.11 1439.6 1537.44 1537.44 1 0.400 1 0.400 1463.11 575.84 1537.44 614.98

Over Heads : 14.00 Total per 1.00 cum

7692.57 8769.52

0.14 1

1076.96 8769.52

134. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-1 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-1 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 1 Add LA chrges on Labour per 1 sqm 40.00 % 183.47 159.96 1 0.400 183.47 63.98

Over Heads : 14.00 Total per 1.00 cum

3748.65 4273.46

0.14 1

524.81 4273.46

Detail RA

Page 103 of 116

135. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:6 (290x225x140) Fl-2 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement: sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140) F-2 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.10 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 225 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 16.50 110 1814.87

CSSR-A.05 M-005

5.55 2079.40

24.00 0.100

133.13 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 2 Add LA chrges on Labour Lift Charges Floor - 2 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 263.44 239.93 96.09 96.09 1 0.400 1 0.400 263.44 95.97 96.09 38.44

Over Heads : 14.00 Total per 1.00 cum

3995.14 4554.46

0.14 1

559.32 4554.46

136. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:4 (290x100x140) Fl-1 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement: sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140) F-1 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.13 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 112/100 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 8.00 220.00 1759.87

CSSR-A.05 M-005

5.55 2079.40

36.000 0.100

199.69 207.94

Manpower
CSSR-M-011 Mason Cl- I / Brick layer Cl- I day 285 0.420 119.70 Page 104 of 116

Detail RA

CSSR-M-077 CSSR-M-087

Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges

day day 40.00 %

260 215 960.90

0.920 2.800 0.400

239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 1 Add LA chrges on Labour per 1 sqm 40.00 % 183.47 159.96 1 0.400 183.47 63.98

Over Heads : 14.00 Total per 1.00 cum

3760.20 4286.63

0.14 1

526.43 4286.63

137. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:4 (290x100x140) Fl-2 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement: sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140) F-2 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.13 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 112/100 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 8.00 220.00 1759.87

CSSR-A.05 M-005

5.55 2079.40

36.000 0.100

199.69 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 2 Add LA chrges on Labour Lift Charges Floor - 2 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 263.44 239.93 96.09 96.09 1 0.400 1 0.400 263.44 95.97 96.09 38.44

Over Heads : 14.00 Total per 1.00 cum

4006.70 4567.64

0.14 1

560.94 4567.64

Detail RA

Page 105 of 116

138. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:4 (290x100x140) Fl-3 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement: sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140) F-3 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.13 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 112/100 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 8.00 220.00 1759.87

CSSR-A.05 M-005

5.55 2079.40

36.000 0.100

199.69 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 3 Add LA chrges on Labour Lift Charges Floor - 3 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 343.42 319.91 192.18 192.18 1 0.400 1 0.400 343.42 127.96 192.18 76.87

Over Heads : 14.00 Total per 1.00 cum

4253.19 4848.64

0.14 1

595.45 4848.64

139. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:4 (290x100x140) Fl-4 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement: sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140) F-4 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.13 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 112/100 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 8.00 220.00 1759.87

CSSR-A.05 M-005

5.55 2079.40

36.000 0.100

199.69 207.94

Manpower
CSSR-M-011 Mason Cl- I / Brick layer Cl- I day 285 0.420 119.70 Page 106 of 116

Detail RA

CSSR-M-077 CSSR-M-087

Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges

day day 40.00 %

260 215 960.90

0.920 2.800 0.400

239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 4 Add LA chrges on Labour Lift Charges Floor - 4 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 423.40 399.89 288.27 288.27 1 0.400 1 0.400 423.40 159.96 288.27 115.31

Over Heads : 14.00 Total per 1.00 cum

4499.69 5129.64

0.14 1

629.96 5129.64

140. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:4 (290x100x140) Fl-5 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement: sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140) F-5 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.13 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 112/100 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 8.00 220.00 1759.87

CSSR-A.05 M-005

5.55 2079.40

36.000 0.100

199.69 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 5 Add LA chrges on Labour Lift Charges Floor - 5 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 503.38 479.87 384.36 384.36 1 0.400 1 0.400 503.38 191.95 384.36 153.74

Over Heads : 14.00 Total per 1.00 cum

4746.18 5410.65

0.14 1

664.47 5410.65

Detail RA

Page 107 of 116

141. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:4 (290x100x140) Fl-6 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement: sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140) F-6 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.13 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 112/100 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 8.00 220.00 1759.87

CSSR-A.05 M-005

5.55 2079.40

36.000 0.100

199.69 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 6 Add LA chrges on Labour Lift Charges Floor - 6 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 583.36 559.84 480.45 480.45 1 0.400 1 0.400 583.36 223.94 480.45 192.18

Over Heads : 14.00 Total per 1.00 cum

4992.68 5691.65

0.14 1

698.97 5691.65

142. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:4 (290x100x140) Fl-7 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement: sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140) F-7 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.13 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 112/100 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 8.00 220.00 1759.87

CSSR-A.05 M-005

5.55 2079.40

36.000 0.100

199.69 207.94

Manpower
CSSR-M-011 Mason Cl- I / Brick layer Cl- I day 285 0.420 119.70 Page 108 of 116

Detail RA

CSSR-M-077 CSSR-M-087

Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges

day day 40.00 %

260 215 960.90

0.920 2.800 0.400

239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 7 Add LA chrges on Labour Lift Charges Floor - 7 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 663.33 639.82 576.54 576.54 1 0.400 1 0.400 663.33 255.93 576.54 230.62

Over Heads : 14.00 Total per 1.00 cum

5239.17 5972.66

0.14 1

733.48 5972.66

143. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:4 (290x100x140) Fl-8 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement: sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140) F-8 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.13 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 112/100 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 8.00 220.00 1759.87

CSSR-A.05 M-005

5.55 2079.40

36.000 0.100

199.69 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 8 Add LA chrges on Labour Lift Charges Floor - 8 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 743.31 719.8 672.63 672.63 1 0.400 1 0.400 743.31 287.92 672.63 269.05

Over Heads : 14.00 Total per 1.00 cum

5485.67 6253.66

0.14 1

767.99 6253.66

Detail RA

Page 109 of 116

144. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:4 (290x100x140) Fl-9 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement: sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140) F-9 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.13 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 112/100 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 8.00 220.00 1759.87

CSSR-A.05 M-005

5.55 2079.40

36.000 0.100

199.69 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 9 Add LA chrges on Labour Lift Charges Floor - 9 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 823.29 799.78 768.72 768.72 1 0.400 1 0.400 823.29 319.91 768.72 307.49

Over Heads : 14.00 Total per 1.00 cum

5732.16 6534.67

0.14 1

802.50 6534.67

145. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:4 (290x100x140) Fl-10 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement: sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140) F-10 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.13 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 112/100 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 8.00 220.00 1759.87

CSSR-A.05 M-005

5.55 2079.40

36.000 0.100

199.69 207.94

Manpower
CSSR-M-011 Mason Cl- I / Brick layer Cl- I day 285 0.420 119.70 Page 110 of 116

Detail RA

CSSR-M-077 CSSR-M-087

Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges

day day 40.00 %

260 215 960.90

0.920 2.800 0.400

239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 10 Add LA chrges on Labour Lift Charges Floor - 10 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 903.27 879.76 864.81 864.81 1 0.400 1 0.400 903.27 351.90 864.81 345.92

Over Heads : 14.00 Total per 1.00 cum

5978.66 6815.67

0.14 1

837.01 6815.67

146. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:4 (290x100x140) Fl-11 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement: sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140) F-11 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.13 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 112/100 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 8.00 220.00 1759.87

CSSR-A.05 M-005

5.55 2079.40

36.000 0.100

199.69 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 11 Add LA chrges on Labour Lift Charges Floor - 11 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 983.24 959.73 960.90 960.90 1 0.400 1 0.400 983.24 383.89 960.90 384.36

Over Heads : 14.00 Total per 1.00 cum

6225.15 7096.67

0.14 1

871.52 7096.67

Detail RA

Page 111 of 116

147. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:4 (290x100x140) Fl-12 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement: sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140) F-12 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.13 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 112/100 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 8.00 220.00 1759.87

CSSR-A.05 M-005

5.55 2079.40

36.000 0.100

199.69 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 12 Add LA chrges on Labour Lift Charges Floor - 12 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 1063.22 1039.71 1056.99 1056.99 1 0.400 1 0.400 1063.22 415.88 1056.99 422.80

Over Heads : 14.00 Total per 1.00 cum

6471.65 7377.68

0.14 1

906.03 7377.68

148. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:4 (290x100x140) Fl-13 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement: sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140) F-13 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.13 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 112/100 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 8.00 220.00 1759.87

CSSR-A.05 M-005

5.55 2079.40

36.000 0.100

199.69 207.94

Manpower
CSSR-M-011 Mason Cl- I / Brick layer Cl- I day 285 0.420 119.70 Page 112 of 116

Detail RA

CSSR-M-077 CSSR-M-087

Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges

day day 40.00 %

260 215 960.90

0.920 2.800 0.400

239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 13 Add LA chrges on Labour Lift Charges Floor - 13 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 1143.20 1119.69 1153.08 1153.08 1 0.400 1 0.400 1143.20 447.88 1153.08 461.23

Over Heads : 14.00 Total per 1.00 cum

6718.14 7658.68

0.14 1

940.54 7658.68

149. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:4 (290x100x140) Fl-14 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement: sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140) F-14 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.13 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 112/100 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 8.00 220.00 1759.87

CSSR-A.05 M-005

5.55 2079.40

36.000 0.100

199.69 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 14 Add LA chrges on Labour Lift Charges Floor - 14 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 1223.18 1199.67 1249.17 1249.17 1 0.400 1 0.400 1223.18 479.87 1249.17 499.67

Over Heads : 14.00 Total per 1.00 cum

6964.64 7939.69

0.14 1

975.05 7939.69

Detail RA

Page 113 of 116

150. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:4 (290x100x140) Fl-15 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement: sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140) F-15 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.13 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 112/100 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 8.00 220.00 1759.87

CSSR-A.05 M-005

5.55 2079.40

36.000 0.100

199.69 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 15 Add LA chrges on Labour Lift Charges Floor - 15 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 1303.16 1279.64 1345.26 1345.26 1 0.400 1 0.400 1303.16 511.86 1345.26 538.10

Over Heads : 14.00 Total per 1.00 cum

7211.13 8220.69

0.14 1

1009.56 8220.69

151. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:4 (290x100x140) Fl-16 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement: sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140) F-16 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.13 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 112/100 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 8.00 220.00 1759.87

CSSR-A.05 M-005

5.55 2079.40

36.000 0.100

199.69 207.94

Manpower
CSSR-M-011 Mason Cl- I / Brick layer Cl- I day 285 0.420 119.70 Page 114 of 116

Detail RA

CSSR-M-077 CSSR-M-087

Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges

day day 40.00 %

260 215 960.90

0.920 2.800 0.400

239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 16 Add LA chrges on Labour Lift Charges Floor - 16 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 1383.13 1359.62 1441.35 1441.35 1 0.400 1 0.400 1383.13 543.85 1441.35 576.54

Over Heads : 14.00 Total per 1.00 cum

7457.63 8501.69

0.14 1

1044.07 8501.69

152. Task Code BLD-CSTN-5-17: - Fly Ash Block Masonry in CM 1:4 (290x100x140) Fl-17 Centering with Steel upto 3.66 Lift Manual
Solid Fly-ash Block masonry panel walls in super structure, parapet walls with cement mortar (1:4) prop (Cement: sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of fly ash solid blocks using fly ash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:4 (290x100x140) F-17 Centering with Steel upto 3.66 Lift Manual Code Unit Rate Coefficient Amount

Material
BMT-A.13 Fly ash cement/ lime solid blocks with compressive Each strength of 50 kg/sq.cm - IS:12894-1990 - CLASS 5 (ex-quarry price - excluding cost of conveyance, loading & unloading) 290 x 112/100 x 140 mm Cement 43 Gr (including loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Kg. cum 8.00 220.00 1759.87

CSSR-A.05 M-005

5.55 2079.40

36.000 0.100

199.69 207.94

Manpower
CSSR-M-011 CSSR-M-077 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Mason Cl- ll / Brick layer Cl-II Light mazdoor Add LA chrges day day day 40.00 % 285 260 215 960.90 0.420 0.920 2.800 0.400 119.70 239.20 602.00 384.36

Miscellaneous
1 Scaffolding Charges for Brick Masonry / Stone Masonry internal floor- 17 Add LA chrges on Labour Lift Charges Floor - 17 Add LA chrges per 1 sqm 40.00 % cum 40.00 % 1463.11 1439.6 1537.44 1537.44 1 0.400 1 0.400 1463.11 575.84 1537.44 614.98

Over Heads : 14.00 Total per 1.00 cum

7704.12 8782.70

0.14 1

1078.58 8782.70

Detail RA

Page 115 of 116

Stone Masonry
153. Task Code BLD-CSTN-6-13: - RR Masonry in CM (1:8) Cellar - (1(G))
Random Rubble Stone masonry in CM (1:8) prop: (cement : sand) using hard Granite stones from approved quarry including cost and conveyance of all materials like cement, sand water, granite stones, etc., from approved quarry to site and including labour for cutting stones to required size and shape, mixing of cement, mortar, construction, scaffolding charges, curing etc., complete for finished item of work in foundation & basement. (APSS No. 615 & 601) for:-RR Masonry in CM (1:8) Cellar - (1(G)) Code Unit Rate Coefficient Amount

Material
CSSR-A.05 CSSR-A.14 CSSR-A.76 Cement 43 Gr (including loading charges) Coursed rubble stone 30 x 30 x 60 cm(including seigniorage charges) Through stones 25 x 25 x 45 to 60 cm long (including seigniorage charges and loading charges) Coarse sand for Mortar (Including Seigniorage Charges) Random Rubble Stone Kg. Each Each 5.55 537.96 1151.74 59.400 0.440 0.160 329.49 236.70 184.28

M-005 M-148

cum cum

2079.40 429.62

0.330 0.500

686.20 214.81

Manpower
CSSR-M-011 CSSR-M-087 Mason Cl- I / Brick layer Cl- I Light mazdoor Add LA chrges day day 40.00 % 285 215 772.00 1.200 2.000 0.400 342.00 430.00 308.80

Over Heads : 14.00 Total per 1.00 cum

2732.28 3114.80

0.14 1

382.52 3114.80

Detail RA

Page 116 of 116

Potrebbero piacerti anche