Sei sulla pagina 1di 6

S.H.Thusitha Senaviratha.Sri-Lanka.

Contact Nos : Email : Skype ID:

009472-3294724,0094777-212472 (Mobile)
globalsena@yahoo.com/oracal.thusi@yahoo.com

thusithusi32

10th Jan 2012


Dear Sir/Madam,

Application for the post of Electrical Engineer


I am tendering herewith my resume for your perusal in relation to the above post requirement. Further, I have gained experience in Electrical Inspector, Electrical Supervisor & Electrical Engineer (Maintenance, petro chemical industry & power plant.)during my twelve years stint with-David Piers Engineering Co (Sri-Lanka) Eswaralli Eng. (Pvt.) ltd (Sri-Lanka)-- Novello Engineering &Contracting -- Jordan ERAM / Iberdrolla /Orxy/Qatalum -- Qatar At present in Qatar where I work as an Electrical Engineer In addition, I am a fully qualified Advanced diploma in Electrical Engineering.

Therefore, I am confident enough and positive minded to take up the duties & responsibilities in the Electrical field to the entire satisfaction of the Management concerned. Thanking You, Yours Faithfully

S.H.Thusitha Senaviratha

OBJECTIVE To be a dynamic, hard & smart working individual who would be capable of meeting high demanding challenges in the organization where my ideas will be encouraged and nurtured.

PROFESSIONAL EXPERIENCE FROM Aug2010 June 2008 May 2007 Aug 2002 Feb 2000 TO Present Jul 2010 May 2008 May 2005 Aug 2002 COMPANY Jinasena Engineering Co. ERAM / Iberdrolla /Orxy/Qatalum Novello Engineering &Contracting David Pieris Engineering Co. Eswaralli Eng. (Pvt.) ltd Country Sri Lanka Qatar Jordan Sri Lanka Sri Lanka DESIGNATION Sr. Engineer (EL,I&C, HVac) Electrical Engineer Electrical Engineer Electrical Engineer Electrical Engineer

Supervising all type of maintenance in electrical distribution and A/C Cable laying and termination works (power and control cables) Internal and external lighting of industrial buildings and switchgears. Any kind of pneumatic and steam machine maintenance. Water treatment plant installation, maintenance and troubleshooting. DC, signal phase 3phaze inverter maintenance and repair 30Amp to 3000Amp. Repair and maintenance of washing plant (3phaze motors, single phase motors dc motors gears motors, inverter motors, server motors) Erection of substation equipments i.e. current transformer, capacitor voltage transformer, isolator, capacitor bank, grounding transformer, neutral grounding resistor etc. Cable laying activities (power and control). Cable termination activities(power and control) Making special lighting circuit e.g. Internal, security, ring, jack- tail, two-way, intermediate, bet room, etc. Troubleshoot and repair all kind of electrical and A/C equipment, motors and blowers etc. Design and execution of accelerated power development scheme of overhead line and underground cable system. Grounding works in 220,110kv substations. Supervising maintains and repair central plant, chillers e.t.c. Responsible for the overall maintains of this company electrical facilities, such as lightings, electrical equipment ups, medium and low voltage switchgears, transformers and generators Installation of industrial electrical (single phase/3phaze) control panel, E F R, changeover, DC inverter, PLC panel and wiring,

All electrical troubleshooting and understanding all wiring and circuit diagram Preparation of basic design and detailed engineering including procurement, supervision and execution of projects. Preparation of method statement, and material submittal for approval. Preparing project progress report. Maintaining quality and progress of projects as per schedule. Manpower planning, coordination with client representative. Repairing fault in the system and operation. Coordinating with plant operation, design office, vendors and project management team and safety department. Weekly monitoring site progress program with consultant & client. Provide technical guidance and advice team on construction technique. Supervising the assembling and commissioning of the control panel Coordinating activities regularly and keep them informed on the working status of control panel to head of department. Supervising the fire protection and alarming system. Supervising the installation of Street Light Supervising the cable laying for street light Supervising the installation of feeder pillar Supervising the cable lying of feeder pillar. Supervising the cable lying of feeder pillar to sub station. Preparing monthly report and weekly report Coordinating with client, consultants and other contractor Preparing project materials quantity Supervising the HV cable laying Supervision to ensure that all infrastructure services are functioning adequately and there is no hindrance to tenants Prepared and submitted activity report done on site by the Contractor to the Assistant Resident Engineer Checked and supervised in the laying of Ducts and Cables, Checked and supervised in the excavation of trenches for telephone lines, Involved in the Checking all Electrical Materials submittal and approving as per specification. Involved in the Checking all Electrical Drawing and approving as per our Construction Drawing. Construction of Telecommunication system network which include the manhole construction Supervision of street lighting system Coordinate with Client Development team to provide as built informations and site data whenever required. Coordinate with Client facility management team to facilitate them on customer complaints on infrastructure issue Supervision to ensure that all infrastructure services are functioning adequately and there is no hindrance to tenants. Material testing: cable checking, all Electrical tools and Material checking as per Standard. Construction of electricity supply substation high voltage net work cable laying LV network from substation to distribution feeder pillars

Construction of Telecommunication system network which include ducting for fiber optical cables Supervision of Installation of pumping Station Repairing Fault in the system and Operation HVAC Ducting in house. Lighting & Power System. Repairing all is breakdown. Repairing and maintains of central plant chillers room a/c. Internal and external lighting of industrial buildings switch grads. Panel erection at 220,110kv substation.

PROFESSIONAL QUALIFICATION 1999-Advanced Diploma in Electrical Engineering. (German Tec in Sri-Lanka) EXTRA CURRICULUM ACTIVIES -1 Oct Sep 2003 May 2004 Certificate of Electro Mechanical 2003-March 2004 Diploma in quality Management.-SLSI

March 2005 City & Guilds Certificate in Electrical Installation. March 2005 City & Guilds Certificate in Ref and A/C. Sep1995-May 1996Certificate in Auto Electronic 2004-Advance Diploma in computer studies. Oct 2007-March 2008 Diploma in Digital Electronics. Oct 2007-Feb 2008 Computer hardware Engineering. EXTRA CURRICULUM ACTIVIES -2 (2000-2010)

2000-Rick taking behavior at work-Institute for occupation Health & Safety. Training workshop in Colombo. 2002-Intagation of ISO 9000 & ISO 14000 System- training workshop in Colombo (SLSI).

2004-ISO 9001-2000. Training workshop in Colombo. 2009-2011 successfully completed PTW Level-1 training in Qatar 2008-2009 Hydrogen Sulphide(H2s-Ba) Training in Qatar Basic Fire fighting ID.2008-20011. training workshop in Qatar HUET & SEA survival training. training workshop in Qatar

2008-Quality training for insulation quality inspector training workshop in RASGAS onshore expansion project phase II (RGS RGXII) Qatar 2008 work safety @ height.-Marin & offshore global(p v t)ltd training workshop in Qatar

EDUCATIONAL QUALIFICATION Pass G.C.E O/L LANGUAGE SKILLS Fluent in Sinhala and English

PERSONAL DETAILS
Date of Birth: Age: Gender: Marital States: Contact No: 1976.09.27 35 Male Single. 009472-3294724, 0094777-212472

I declare that a particular furnished in this application is true and correct to the best of my knowledge. Thanking you for anticipation. Sincerely, S.H.Thusitha Senaviratha

Potrebbero piacerti anche