Sei sulla pagina 1di 2

Performance Review of Thermal Power Stations 2006-07

SECTION/ ANNEXURE

CONTENTS Objectives Overview Performance Highlights Definition Abbreviation used in the Book Scope of the Review New units Synchronised during 2005-06 and 2006-07 and considered in the review New units Synchronised during 2006-07 but not considered in the review Units not considered in the review due to retirement Units uprated / derated and considered in the review 2006-07 Details of different make of Units Considered in the review Overall performance & Plant Load Factor Operating Availability Planned Maintenance Details of Planned Maintenance Forced Outages Region wise break-up of frequency of outages/ tripping of equipment Duration Pattern of forced outages Details of Long duration forced outages Capacity group wise performance Partial unavailability and non-utilization of energy due to system load variation. All India partial loss of generation in MU due to various long & short duration constraints Region-wise partial loss of generation in MU due to various long & short duration constraints Cause-wise partial unavailability of major capacity group Effect of outages on generation reliability Mean time between failure of thermal units Coal supply to various power stations Specific Coal Consumption of Thermal Power Station

PAGE I II III IV XI XIII 1.1 1.3 1.4 1.5 1.6 1.7 2.1 3.1 4.1 4.6 5.1 5.9 5.11 5.17 6.1 7.1 7.6 7.8 7.16 8.1 8.4 9.1 9.4

SECTION 1 Annexure 1.1 Annexure 1.2. Annexure 1.3. Annexure 1.4 Annexure 1.5 SECTION 2 SECTION 3 SECTION 4 Annexure 4.1 SECTION 5 Annexure 5.1 Annexure 5.2 Annexure 5.3 SECTION 6 SECTION 7 Annexure 7.1 Annexure 7.2 Annexure 7.3 SECTION 8 Annexure 8.1 SECTION 9 Annexure 9.1

Performance Review of Thermal Power Stations 2006-07

SECTION/ CONTENTS ANNEXURE Annexure 9.2 Yearwise coal linkages, receipts and consumption Annexure 9.3 Gas consumed at gas based power stations Annexure 9.4 Generation loss due to shortage of gas Annexure 9.5 Station wise specific secondary fuel oil consumption SECTION 10 Overview Gas Turbines SECTION 11 Auxiliary Power consumption in Thermal Power Stations. Annexure 11.1 Station wise Auxiliary Power consumption SECTION 12 Station operation under disturbed grid/frequency conditions Annexure 12.1 Grid disturbances. Annexure 12.2 Region-wise frequency profile SECTION 13 Efficiency of coal/lignite based stations Annexure 13.1 Operating station heat rate of thermal power stations. SECTION 14 Environmental aspects in Power Sector Annexure 14.1 Suspended particulate matter emission at stacks of various units of thermal power plants Annexure 14.2 Thermal power plants: Emission standards Annexure 14.3 Thermal power plants: Standards for liquid effluents Annexure 14.4 Temperature limit for discharge of condenser cooling water from thermal power plant Annexure 14.5 National Ambient air quality standards Annexure 14.6 Environmental Standards for gas / Naptha based thermal power plants SECTION 15 Energy Conservation and Audit SECTION 16 Renovation and Modernization of Thermal Power Plants Annexure 16.1 Comparison Of Performance of PIE Stations

PAGE 9.8 9.16 9.18 9.20 10.1 11.1 11.4 12.1 12.2 12.5 13.1 13.6 14.1 14.11 14.23 14.24 14.25 14.26 14.27 15.1 16.1 16.6

Potrebbero piacerti anche