TheDesignoftheGlenSite Transforming thePatientHospital Experience Accessing theGlenSite

Site GLEN Site

RobertHamilton
SeniorDirector MUHCGlenCampusDevelopment

Site GLEN Site

GLEN Site
TheNewMUHC

View from Decarie

Constructioncomplete:Fall 2014 Firstpatients:Spring/Summer 2015


Site GLEN Site

GLEN Site
TheNewMUHC
Site GLEN Site

Site GLEN Site

AneasyPATIENTEXPERIENCE

Easyairportstyledropoffzones atallpublicentrances Colourcodedwayfinding signs Clearnetworkofinteriorstreets


Site GLEN Site

AneasyPATIENTEXPERIENCE

Galleria mainstreet

Separatehallwaysandelevators forinpatients forvisitorsandoutpatients ensuringmoreintimacyforpatients

Site GLEN Site

CarefullyplannedAROUNDTHEPATIENT

Childpatientroom

ThefirstinQuebectounitepediatricandadultspecialties underoneroof,offeringcontinuouscarethroughoutour patients lives

Site GLEN Site

CarefullyplannedAROUNDTHEPATIENT

Adult patientroom

500individualpatientroomswithprivatebathrooms,air conditioningandroomforlovedonestostaythenight
Site GLEN Site

10

AttheforefrontofINNOVATION
Thelateststateoftheartequipment,puttingthe Glenattheforefrontoftechnology,thushelping reducewaittimesfortreatment 1PETMRI(Magneticresonanceimaging)tobetter screenanddiagnosecancerpatients 7MRIs,morethandoublingtheMUHCs imaging capacity 8linearaccelerators,includingthreespecialty accelerators,allowingustotreatthemostcomplex cancercases

Site GLEN Site

11

AttheforefrontofINNOVATION
Someofthemostmodern operatingroomsinNorthAmerica All20operatingroomsand21 interventionroomswillbe clustered Increasedefficiencyand optimizationofresourcesmeaning fasterandmoreeffectivecarefor patients Adjacenttokeydepartments

Interventional platform

Site GLEN Site

12

AttheforefrontofINNOVATION
Two EmergencyDepartments:one adult,onepediatric Canbeexpandedorcontracted, likeanaccordion,toallow flexibility Separatepatientsfromstaff, creatingprivacyforpatients 100%singlepatientrooms,even intheemergencydepartments

Site GLEN Site

13

Emergengy Department Plan

DesignedforGROUNDBREAKINGRESEARCH
TheCentreforInnovative MedicineandtheCentrefor TranslationalBiologywillbe uniqueinCanada,helping movediscoveriesfromthelab benchtothebedside Researcherswillhaveanedge overthecompetitionwith directaccesstocliniciansand patients

Research Instituteat night

Site GLEN Site

Designedtobe GREEN
Fouratriathroughoutthehospital complex Acresofgreenspace,includinga park,achildrensplayground,azen gardenandwalkingpathsonsite
Atriumat adult hospitals Atriumat adult hospitals/cafeteria

Willadheretostringent environmentalstandards (LEED Silvercertificationand BOMABESt)

Site GLEN Site

15

GLEN Site
TheNewMUHC

View from Decarie

Constructioncomplete:Fall 2014 Firstpatients:Spring/Summer 2015


Site GLEN Site

PierreMajor
InterimDirector,Redevelopment,PlanningandRealEstateManagement

Site GLEN Site

17

Plandesite/SitePlan

Site GLEN Site

18

Accesstothesiteviapublictransit: LINKSTOVENDME

GlenSitefrom Vendome station TheonlyhospitalinQuebectohaveadirectlinktoanintermodalstation (metro,bus,train) Thedistancebetweentheplanned2nd metrolinkandthehospital: Site GLEN Site 230feet lessthanthedistancebetweenDrummondandStanley!

Accessingbycar:FROMDECARIE
(publicentrance)

Site GLEN Site

20

Accessingbycar:FROMDECARIE
(publicentrance)

SouthentranceoffDecarie

EntranceoffDecarieat Crowley Distancebetween Decarieandtheentrance: 295feet thedistancebetween StanleyandPeel!


Site GLEN Site

AccessingbyBICYCLEandBYFOOT
CityofMontreals bikepath onDecarie

GlenRoad

Bicyclepathcircling thecomplex,linked totheCityof Montrealsbikepath andWestmountvia theGlenRoad Pedestrianlinksonall foursidesofthesite Bikeracksand showersonsitefor employeeswhocycle towork
Site GLEN Site

AccessfromtheSouth:FROMTHESUDOUEST
Employee parking

Vehicleaccessfor ambulances, employeesand servicevehicles Pedestrianaccess

Site GLEN Site

AccessfromtheSouth:FROMTHESUDOUEST

Pedestrianaccess severaloptions

Site GLEN Site

Information
muhc.ca/construction OurProjectOffice CrowleyArtsCenter 5325Crowleyavenue,2nd floor Montreal(Quebec)H4A2C6 BusinessHours: Thursday:9a.m.to7:30p.m. Friday:9a.m.to4:30p.m. Orbyappointmentbycalling5149348317 5149348317 construction@muhc.mcgill.ca twitter.com/CampusGlen www.facebook.com/CUSM.MUHC GoodNeighbourly RelationsCommittee Meets every 68weeks

Site GLEN Site

25

MUHCs Glen Campus PUBLIC INFORMATION SESSION


Groupe immobilier sant McGill JANUARY 24, 2012

CONSTRUCTION UPDATE

Aerial View MUHCs Glen Campus

Construction Timeline

Construction Update

Construction Update
Buildings BlockA BlockB BlockC BlockD BlockE BlockF BlockG Level Reached Ground Floor N3 N4 N6 Penthouse Excavation Foundations andP2

Construction Work for 2012


TypeofWork Excavation: Concrete: BlocksA,B,C&D: BlockF: BlockG: Electromechanics: BuildingEnvelope Interior Design Infrastructure: Drainage,acqueduct,electrical conducts,etc. BlockF EndinJune 2012 EndinJanuary 2013 EndinDecember 2012 Ventilation,plumbing,fire protection

Water retention basin

Acqueduct Storm Sewer Sanitary Sewer Combined Sewer Connection to the municipal network

Infrastructures on St-Jacques

WE CARE embodies SNC-Lavalins key corporate values and beliefs. It is the cornerstone of everything we do as a company. Health and safety, employees, the environment, communities and quality: these values all influence the decisions we make every day. And importantly, they guide us in how we serve our clients and therefore affect how we are perceived by our external partners. WE CARE is integral to the way we perform on a daily basis. It is both a responsibility and a source of satisfaction and pride by providing such important standards to all we do.

WE CARE about the health and safety of our employees, of those who work under our care, and of the people our projects serve.

WE CARE about our employees, their personal growth, career development and general wellbeing.

WE CARE about the communities where we live and work and their sustainable development, and we commit to fulfilling our responsibilities as a global citizen.

WE CARE about the environment and about conducting our business in an environmentally responsible manner.

WE CARE about the quality of our work.

Presentation of Ministre des Transports Work


Access to MUHC

By: Mr. Alain Dub January 24, 2012

Background
Project initiated by the Qubec Ministre des Transports and the MUHC aimed at constructing a permanent service road to the MUHC from the Rue Saint-Jacques, as agreed upon in the memorandum of understanding signed in 2011. Coordinating MTQ work with work on the MUHC site, maximizing the speed of implementation and limiting impacts to traffic and the population.

37

Work planned for 2012


Roadwork Schedule

(MTQ and MUHC)


Detour

Autoroute 20 West, exit From mid-February Angrignon. From Saint-Jacques exit ramp 2012 Boulevard Angrignon, take to September 2012 Rue Pullman and then Rue Saint-Jacques. Excavation Overpass and retaining walls Access road to MUHC Massif de la CSEM

From mid-February 2012 to November 2012

38

Saint-Jacques exit ramp


Saint-Jacques exit ramp

Future site of MUHC Glen Campus

s t-Jacque Rue Sain

tSain Rue

illo Car Rue

Rue Pullman

i Rm

39

Saint-Jacques exit ramp


Saint-Jacques exit ramp

Future site of MUHC Glen Campus

s t-Jacque Rue Sain

tSain Rue

Rue Pullman
illo Car Rue

i Rm

Closure of the Saint-Jacques exit from Autoroute 720 West From the beginning of February to September 2012
40

Saint-Jacques exit ramp


Bretelle sortie Saint-Jacques

teain ue dS v var Belle ule Bo ne-de An

Futur site du t-Jacqu CUSMes Rue Sain campus Glen


llman Rue Pu

Boulevard Angrignon

Angrignon exit

41

Pedestrian access
Within the scope of the Turcot project, new pedestrian walkways will improve the links between the Village des tanneries and the MUHC site. Sidewalks on Saint-Jacques Sidewalks along the access road to the MUHC Sidewalks integrated into the landscaping between the escarpment and the Rue Saint-Jacques/Boulevard Dcarie intersection Stairs connecting the future Boulevard Pullman to Rue Saint-Jacques

Pedestrian access

Pedestrian access

Pedestrian access

Pedestrian access

Pedestrian access

MUHC access road

MUHC access road

48

MCG2 Mandatory route for trucks

Future site of MUHC Glen Campus


s t-Jacque Rue Sain

tSain Rue

illo Car Rue

Rue Pullman

i Rm

Turcot yard

49

Slide 49 MCG2 It's not just one road--it's which roads they'll have to take to get there (based on the arrows on the map)
mcgingras, 23/01/2012

Summer 2012

Future site of MUHC Glen Campus


s t-Jacque Rue Sain

Rue Pullman
Rue ntSai i Rm

Work on connecting the drainage system


Restricted traffic on Rue Saint-Jacques near Rue Saint-Rmi Summer 2012 2 weekends Complete westbound closure Closure of one eastbound lane
50

Coordination of actions
In light of the scope and the number of work sites in this sector:
Continuous coordination of actions with all players in the sector: city, boroughs, Transports Qubec, MUHC, STM and AMT

Various working committees:


Technical committee on the mobility of people and goods in the Montral region Technical sub-committee on the mobility of people and goods in the Montral region for the downtown sector (Turcot interchange, MUHC, downtown arterial road network, Autoroute Bonaventure, Champlain Bridge)

Other actions in 2012

Work requiring the long-term closure of one of the two lanes in five exits Complete closure of many exits at night Weekend closure of exits

52

Communication tools implemented, as needed, depending on the traffic restrictions and the impact
Meetings and interactions with various partners Interactions with traffic reporters Advertisement in local newspapers Press releases Qubec 511 Radio Circulation Variable message signs Notice to shoreline property owners Twitter feed

For information: quebec511.info/en

Municipal works planned for 2012


January 24, 2012

Municipal works

Objectives
Present municipal works planned for Glen site vicinity in 2012:
- Reconstruction of infrastructures on west side of Boulevard Dcarie and new railway bridge - Upcoming improvements to sewer system north of Boulevard De Maisonneuve - Improvements to infrastructures on Rue Saint-Jacques

Review links and means of communication


2

Finishing and Avenue Construction of a new railway Connection of beautification of Redevelopment of the Phasing of municipal work required to prepare the bridge on Dcarie sewer combined the CP tracks De Boulevard Chemin UpperCrowley tocollector and the intersection of Boulevard Glen site for the new MUHC Lachine Maisonneuve Rue Saint-Jacques intersection Development of the remaining Summer 2011 (Fall 2013 Work completed Spring 2010 space on Chemin Upper Summer 2011) Work completed Lachine 2012 Summer 2013 (Summer 2009 Summer Winter
2010) Winter 2013 Spring 2014

Municipal works

Upcoming work around the Glen site in 2012

Municipal works

Reconstruction of infrastructures on the west side of Boulevard Dcarie and construction of a new railway bridge
Work area on Dcarie:
1. CSM, west side : January to February 2. Sewers and water main, west side : February to May 3. Railway bridge : summer 2012 to summer 2013

Municipal works

Upgrading of the sewer system north of Boulevard De Maisonneuve


Work area on De Maisonneuve:
1. Phase 1 : June to August 2012 2. Phase 2 : July to December 2012 3. Phase 3 : July to December 2012 4. Phase 4 : to be determined

Municipal works

Improvements to infrastructures on Rue SaintJacques


Work area on Saint-Jacques:
1. GISM, connection of collector sewer: February to May 2012 2. MTQ, preparatory work Turcot and ramp: February to September 2012 3. Infrastructure improvement work : fall 2012

Municipal works

Communication channels
Contact us:
- By telephone:
514-872-3777 from 8:30 a.m. to 4:30 p.m. Monday to Friday (Info-Travaux line) 311 on evenings and weekends

- By e-mail: info-travaux@ville.montreal.qc.ca

Reaching you:
- News bulletins at start of major phases - Notices to residents and merchants distributed regularly - Notices informing traffic columnists of major obstructions - Notices in local newspapers - Website: ville.montreal.qc.ca/chantiers - Information signs

PROJECT FOR CONNECTING GLEN CAMPUS TO VENDME MTRO AND COMMUTER TRAIN STATIONS

Guylaine Di Tomaso, STM Nicolas Tanguay, AMT


January 24, 2012

Project objective
In partnership with the STM-MUHC-AMT:
Develop a solution to ensure universal access by public transit to the MUHC site.

63

Common goal
Accessibility to MUHC future hospital is an important concern for all, considering: the actual hospital clientle the intermodal nature of Vendme mtro and the commuter train station the commitment to reduce the use of private cars (employees, visitors and patients)

64

Stations neighbourhood map

65

Project description
dicule et tunnel actuel 5100, bd De Maisonneuve Zone pour un 2e dicule et nouveau tunnel

Prolongement du tunnel

Campus Glen

66

Guidelines to meet for selected solution


Universal access Improvement on the evacuation response time in the station Public transit service within the area Larger station capacity to respond to ridership increase Easy transfers between commuter train and mtro stations

67

Next steps
Complete pre-feasibility studies Structural, architectural technical studies etc. Concept completion Project cost estimates Research project financing

Finally, we can assure you that we are all working together towards a common goal in this project.

68

Available bus service near Vendme mtro station

69

Questions ?
Site GLEN Site

Potrebbero piacerti anche