Sei sulla pagina 1di 5

Sammie D. Dunn 1508A Kilgore Rd, Baytown, TX 77520 Home 281-837-2014 Cell 281-413-5283 sd138ea92@westpost.

net

PROFESSIONAL INTEREST I am seeking a position with an engineering/inspection firm and or strong contra cting group with Up or Downstream projects developing Petrochemic al Plants and/or Power Plants. Brief Overvi ew Over 30 years in national and international Projects related in heavy industrial construction, engineering, QA/QC, HUC inspection and maintenance. Emphasis on executing corporate Quality Control and Assurance programs with major oil compan ies in all areas of instrumentation, electrical, power, vendor packaged equipmen t and industrial process control systems. Provided support to engineering, desi gn, construction and craft groups from initial design, purchasing, construction into completion. Have worked in all preliminary phases including estimating, pu rchasing, planning, forecasting, staffing and commissioning followed into final start up. Preparation of documentation as client representative for vendor pack ages, construction into systems for final client startup acceptances and turnove r. Employment S can Sr. Quantity I&EC Advisor International, Houston, Texas Dec. 2007 to Jan, 2011 xxonMobil, GP-LNG Sabine Pass, TX LNG Regasification Fircroft E

* EPC Grassroots, working LNG Regasification project with Chicago Bridge and Iro n (CB&I) and their subcontractors executing ExxonMobil, EMDC- QA/QC program. Per forming Inspection and sign off of Telecomm, Instrumentation, Electrical, Power distribution and Control Systems. * Full support after Hurricane IKE. First responder and recovery. Evaluation and assessments of field installed equipment, warehouse equipment and equipment wai ting installation. Currently working on scheduling and reinstating on fast track . Project Commissioning Turnover Coordinator ton, TX. December 2006 to Nov. 2007 lips, Freeport, TX LNG Regasification Saipem America INC Hous ConocoPhil

* Initial responsibility for assembling of project Commissioning ITR's (Inspecti on Test Record) from ITP (Inspection Test Plans) and assigning to System and Sub systems and overseeing assembly of Final Packages. * Supporting Construction to Commissioning and Commissioning to Client Final (M C) Mechanical Completion and acceptances into Startup and Final Turnover. * Supporting all phase of project from FERC, Engineering, Planning, Training, QA /QC, Scheduling, Forecasting and Project Completion Reports.

Sub-Sea I&E Supervisor gineering, Houston, TX. June 2006 to December 2006 rse Project GOM

Mustang En BP Thunder Ho

* Temporary Contract with Initial responsibility, Supervising and Overseeing Sub Contractors assembling and installation of several Drilling and Sub-Sea Systems . Review of project scope for Permitting, scheduling, inventorying, ordering and reporting. * Supporting various Vendor with checkout, Commissioning into operations and tu rnover. Sr. QA/QC Instrument & Electrical Lead Instrument Commissioning Engineer Project ECP-1A Nigeria December 2005 to May 2006 Amazon Velosi Limited, Houston, TX ExxonMobil, East Area

* Execution of ExxonMobil, EMDC-PMT QA/QC program, completed project inspection, HUC, turned over to startup and operation teams. Lead Instrument QA/QC Inspector SGS International, Okpo, South Korea May 2004 to November 2005 Chevr onTexaco Compliance Tower - Benguela Belize Project * Initial responsibility includes staffing with local and international Instrume nt QA/QC Inspectors to interface with DSME (Daewoo Ship Marine Engineering) QA/Q C inspection, Engineering, HUC teams and construction group for final completion in Angola, South Africa. Lead QA/QC Instrument & Electrical Commissioning Inspector Trispec Offshore Corp., Houston, TX May 2002 to May 2004 ExxonMobil, FPSO - Kizomba A & B Projects * Initial responsible Client Representative Execution of ExxonMobil (EMDC) QA/QC program both internal and external for Instrumentation, Electrical, Power and C ontrol System related to all packaged equipment. Lead Instrument & Control Commissioning Engineer Chapdelaine & Associates, Inc. Dallas, TX Jan. 2002 to April 2002 Petrobras, Re-P owering - Camargo Correa Piratininga Project, Brazil * Initial responsibility with an EPC Project 2 months behind. Overseeing I & C related plant construction of the BOP into Simple Cycle mode. Instrumentation and ezuela, S.A., Jose, Venezuela Commissioning Supervisor Venezuela, Kvaerner E&C - Sulfur Complex Project Aug. 2001 to Dec. 2001 MMR Group Ven Sincor of

* Staffed, Loop checked all, pre-commissioned by sub systems, and commissioned i nto systems while supporting operations in client turnover and put unit on stand by for construction completion of other units.

Instrumentation and Commissioning Supervisor, Dallas, TX June 2001 to July 2001 t

Chapdelaine & Associates Inc., Barton Milow E & C Power - Willingford Energy Projec

* Preparation of all documentation; includes project tracking of union subcontra ctor in to commissioning turnover packages for startup and operational procedure s. Instrumentation and Commissioning Supervisor, MMR Group Venezuela, S.A., El Teje ro, Venezuela Nov. 2000 to May 2001 PDVSA o f Venezuela, Williams Energy Service, Wilpro * Directed installations of supporting instrumentation for the gas injection pro ject with eight Nuovo Pignone compressors driven with GE frame 5 Turbine with th ree stages compression for injection. Field Service Engineer, National Oilwell, Hitec Div., Houston, TX May 2000 to Nov. 2000 Petrobras of Brazil, Rig Modification * Received all I & E drawings for a land drilling rigs to be retrofitted with Al len Bradley I/O modules for control cabin control with local server for remote c ontrol operation with CCTV monitoring. Instrumentation and Commissioning Supervisor, MMR Group, Houston, TX June 1999 to May 2000 ExxonMobil DDCV - Diana Project * Preparation of all commissioning personal, documentation and including project tracking of progress, loop folders, etc. for final client acceptance. * Maintained all certified documentation on equipment and testing for tractabili ty to USCG and ABS rules and regulations for demonstration and approval of certi ficate.

Instrumentation Supervisor, MMR Group, Aransas Pass, TX May 1998 to June 1999 BP/Amoco Tension Leg Platform - Marlin Project * Staffed, tooled up and oversaw all loop functional checks and completed all sy stem commissioning and loop checks for client acceptance and approval and comple ted final documentation certification and transfer. Instrumentation & Electrical Supervisor H.C.S. Engineering Group, Houston, TX Oct. 1997 to May 1998 Bay shore Industrial, Poly-Plastic Extruding Processes Pro ject * Initialized design from preliminary P & ID's for power distribution and contro l systems networked by PLC to DCS operation. * Inspected, commissioned, and completed through start up.

Site Supervisor Schedule "A" Incorporated, Houston, TX March 1997 to Oct. 1997 Installation of Nitrogen Rejection by Cryogenic Proces s Project consisted of retrofitting five process skids in Houston, TX, and transpo rtation to job location for turn key installation and startup. Site Supervisor Schedule "A" Incorporated, Houston, TX

Delhi Gas Plant - Facility Upgrade * Duties included reconfiguration of power and control system, calibration and i nstallation of new and refurbished instruments. * Continued through Commissioning and Start Up with a hot cut over of all system s. Instrumentation Supervisor Bechtel International, Houston, TX Feb. 1996 to March 1997 Sonatrach, 48" Gas Pipeline - GME Project. Algeria. * Responsibilities included site start up, includes instrumentation, electrical and piping and comparison to existing purchase orders. Checked all inventories, order remaining material, and verified all shipments. Monitored and inspected c onstruction. * Completed one departure and one arrival terminal supported by analyzers and se nior meter run for custody transfer between governments over a 380-mile pipeline . QA/QC Supervisor April 1995 to Feb. 1996 M & I Electrical Inc., Houston, TX. Phillips Petroleum Co., Ethylene Furnace Project

* Duties included overseeing document control, purchasing, construction scheduli ng, field engineering changes, estimating project forecasting, and cost control. * Responsible for commissioning, start up and client turnover documentation. Instrumentation Supervisor Gulf States Inc. Clute, TX Jan. 1994 to April 1995 Dow Chemical - Power 8 (Destec) Project * Completed calibration of all instrumentation and supported installation, inspe ction, commissioning, and documentation. Completed construction through startup . * Converted construction documents into start up operational maintenance procedu res, PM programs and calibration schedules.

PROFESSIONAL COURSEWORK

PROFESSIONAL COURSEWORK Certificate, Aviation Engineering, xas Minor: Radio/TV Technology, 1974 Aero Technical Institute, Wichita Falls, Te

* Various courses, seminars, and studies covering engineering technologies, man agement and computer software usage. * Intensive manufacturing training in all fields of Automation Control on DCS a nd PLC systems to all major field devices in the process control industry. * Current Offshore Training 4/19/2010 * Current Helicopter Underwater Egress Training 4/19/2010 * Current Medical Certifications * IT Skills * Microsoft skills * 1975 1st class FCC license. * 1976 CET (Board Certified Electronic Technician in the state of Texas) * Speak some Spanish and Portuguese

Potrebbero piacerti anche