Eric B _EBAKPM_ * _COMPLEX PROGRAM MANAGEMENT _ * _PROGRAM MANAGEMENT _ * _PROJECT MANAGEMENT _ * _NATIONAL personnel selection, mentoring and management;

Strategic and Tactical Initiatives; scope and cost development; project planning methodologies; financial modeling and justifications; project management documentation and controls; risk management; line/executive/client management relationships and reporting; contract negotiations; solution/contract expectations, implementation and feedback. _ _EMPLOYMENT HISTORY_ * _Oct 2010-Present, Independent Project Management Consultant / Contractor, EBAKPM_ * _Mar 2010-Sept 2010, Contractor Office Operations Supervisor IT Operations, US CENSUS_ * _July 2009 Dec 2009, Director of Transitions, ACS_ * _Feb 1989- Jun 2009, Line Mgr and Executive Program Mgr, IBM_ * _Jan 1987-Feb 1989, Exec VP Operations, National Programs Mgr, CDC CFS DESCO_ * _Jun 1972-Jan 1987, Regional General Mgr, Mgr CDC Middle East, Program Mgr, CDC_ _GENERAL INFORMATION_ * _Advanced Masters Certificate Applied Project Management, Villanova University_ * _Project Management Professional, PMP_ * _IBM Certified Executive Program Manager _

* _IBM Confirmed Project Executive_ _Previously held state General, Electrical and Construction Management licenses in the following states. Each license required examinations, both written and oral. _ _Alaska Tennessee Virginia_ _ California North Dakota Idaho_ _ New Mexico Missouri Texas_ _ North Carolina Arkansas South Carolina _ * _Advanced Certificates in Strategic Project Management, Team Effectiveness, Organizational Leadership, Villanova University _ _EXPERIENCE AND ACCOMPLISHMENTS - SELECTED EXAMPLES OF COMPLEX PROGRAM MANAGEMENT _ * _TD BANK, TORONTO, CANADA. __Executive Program Manager and Trusted Advisor for a $259 CDN New Data Center and Migration Program. Design and construction of a new Greenfield 150SKF Tier 3+ data center and the transition / migration of Legacy and Distributed Active / Active applications. _ * _CHEVRON. __Program Manager and Principal Consultant for the development of Chevronas 10 Year IT and Data Center Strategy and Construction Specifications. Strategy aRoad Mapa was based upon the need to consolidate the 150 existing world wide Data Centers down to four major HUB data centers and multiple feeder data centers in world wide locations. Analysis of twenty five existing world wide data centers for operational reliability. _ * _ADP. __Program Manager for migration of seventeen data centers into two new ADP data centers and four new command centers. Assumed the additional position of temporary ADP Mgr for BRS / DR Planning and Implementation._ * _BP. __Project Executive for evaluation of existing data centers for Level Four compliance, concept and design for new facilities and data infrastructures, initial planning for server migration / consolidation, and analysis of new USF concepts. Multiple IBM Operations and BP Data Centers involved. Managed the consolidation / migration / transition of 2,700 servers._ * _WAL-MART. __Program Manager-Transitions for data migration, operations migration and systems relocation for three data centers into a single new hardened data center._ *

_ING. __Program Manager for server consolidation, migration and relocation of multiple data centers into IBMas Boulder Managed Operations Center._ * _CHIRON. __Transition Program Manager for migration and relocation of multiple campus wide data centers into a new single Chiron data center and into a remote Managed Operations Center._ * _QWEST. __Executive Program Manager for definition of requirements, concept development, location analysis, design and build of eight 66 KSF Hosting centers through out the US with follow on implementation planning for transition / migrations of hosting center cliental. _ * _RPP. __Executive Program Manager for transition / migration planning and implementation of a totally new infrastructure environment for the US, Europe and Asia. Primary and back up data center planning, data and server migrations and implementation, directly responsible to CIO._ * _HOME DEPOT. __ Program Manager for Implementation of a fourteen hundred store POS rollout._ * _SHELL. __Program Management Consultant for POS Program evaluation, planning and implementation consulting for South American Operations._ * _EEA CAIRO, EGYPT. __Country Manager and Executive Program Manager for consulting, design / build and implementation of new country wide electrical grid and centralized command / data center operations center._ * _SONATRACH, ALGERIA. __Middle East Country Manager and Executive Manager for data center operations consultant, data center design / build consultant, consolidation consulting, migration planning and overall program manager for transition from existing to new. Principal systems consultant to the Countries Office of Technology. _ * _DOD, NORAD CHEYENNE MOUNTAIN. __Executive Program Manager for design build of SPADOC 4, Zone 4 specification compliance and testing, data systems compliance testing for Zone 4, TEMPEST and SCIF, migration planning and implementation. Single point of contact for GSA, CoE, Space Command, NORAD Operations, Ford Aerospace._ * _PRATT & WHITNEY. __Program Manager and principal automation engineer for the planning, automation and implementation of a totally automated investment casting facility, meeting all FAA manufacturing traceability regulations. Designed and managed the building of automated manufacturing systems obtained from firms located throughout the US and Europe._

* _PEROT SYSTEMS. __Program Manager for operations analysis, facility concept / design / build migration planning and transition / migration implementation of a Computing Services Center._ * _DFW AIRPORT. __Program Management of the specifications development, conceptual design, systems design, physical installation, testing and FAA Acceptance of an Air Port wide security system._ _PUBLICATIONS - SELECTED_ * _Managing Successful Automation and Telecommunications Projects_ * _Marketing of Professional Services to High-tech Facility Users_ * _CPM for Project Managers_ * _Project Management Cost Controls_ * _Project Management Control Systems_ * _Co-Authored aPM4PEa _ _REFERENCES_ _Available upon request._ _AVAILABILITY_ _Available for contract or fulltime employment._ _(RESUME E Kihl 010711a)_