Item Description
Proposal in DPR
Basic Cold Store Design consideration i).Commodity Storage Requirement Potato Type of produce 2 to 4 deg. C. Temp. in 0 C 90% & Above. Humidity in RH% 40 CMH/MT Air Circulation (CMH/MT)
85 CMH/MT OK
CO2
range(PPM) Produce cooling rate (0C/day)
Accepted
OK
Freezing point 0C Daily loading rate Special Provision CIPC : MA/Eth. Control etc. ii). Fresh air Ventilation system ii) Fresh air & ventilation system
OK. OK
Ventilation
Capacity (Max Air Changes/Day): 21000 CFM Design Considerations for Energy Recovery and Preventing Wetting
2 to 6 air change/day OK
OK.
iii). Cold store Chamber size & capacity iv) Anti Room & Process Area
of Produce: Heat recovery wheel 21.00 x 17.50 x 13.30 (m) for 1437MT X 4 Rooms. Total capacity 5748 MT. (5 floors ) 35.69x 3.65 x 13.30 m ht: Anteroom has been shown to have 25 deg C. Processing area :Sorting & Grading Area ( Ground floor) 46.47 X 15.00 X 5.00 M Loading/ unloading dock. As per site requirement Sorting & grading area has shown to have 30 Deg.C
As per 3.4 cu.m / MT, capacity is OK. OK. Give stair case in ante room for entrance in cold chambers at least on alternate floors OK Accepted OK
OK. Pl. give dimensions & this should be under proper shed. OK. OK OK OK OK. OK. Provide proper strength & proper waterproofing. OK Please mention. .
M/c room : 15.23 m x 9.14 m x 4.88 m ht Office: 11.00 x 4.00 x 4.00. Toilets & changing rooms: 4.00 x 3.00 x 4.00.
External
& Internal Walls: 230 mm brick wall Type of roof /ceiling. RCC slab. Internal Structure given as RCC Columns & RCC beams. Mezzanine grating: Not mentioned
treated for termites.Wooden rack & column, beam strength material maurang, gitti, cement, ratio 1:2:3 OK
Material: - EPS. Thickness 150 mm.for external walls, ceiling 75 mm for internal walls. & 125 mm for floor. Density: - 15 kg. /cu. mt. overall Water adsorption % by mass:-IS - 4671 Vapour barrier: - Al. foil of 50 microns for external / internal walls & ceiling and polythene sheet of 250 micron for floor. Cladding: For External walls, Internal walls & Ceiling: FRP Sheet. For floor Tar felt &
OK. OK OK. OK. But it should be as per BIS standard. OK. BIS standard code -4671 OK
YES
OK
PCC 4 viii). C old Store Doors & Air curtains i) 12 doors with strip curtains. ii)Air curtains also mentioned. OK. For ante room entrance & process area extra insulated doors should be provided. Strip curtains to be used for cold room doors & air curtains to be used for ante room door & process area door. OK. OK YES OK
ix). Material Handling x). Grading, Sorting, washing & packing line(optional) Heat load calculations
Careers Manual
Cooling design
system
Summer dry bulb temp.:-40 Deg. C. Total refrigeration load:-399.124 KW. in peak period. (C.S.capacity 5748 MT.) Cooling system configuration i) Type of system given as Ammonia Over feed Type of comp.:Reciprocating. Type of capa. control:Automatic in steps Type of cond.:- atmospheric. Type of CT: N.A. Type of cooling coil: Ceiling suspended Type of defrosting:- Air /Water Humidification system & control: - Control on lower TD. ii)Comp. details Comp. capacity:- 295.19 KW. at (-) 2/ 38 Deg. C. (1 no. KC-4) & 226 KW. at (-) 2/ 38 Deg. C. ( 1 no KC-3.) iii) Condenser capacity:526.5 KW v) Air cooling units:- 39.92 KW at 2 Deg. C. SST. No of ACUS:- 12 Nos. Air flow given at free air flow conditions: 30600 CMH./unit
OK. OK.
OK. But make provision for stand by compressor during pull down / loading Suggested to go for 50% capacity x 3 nos as per standard OK. OK.TD should not be more than 4 Deg C. OK. Air flow should be given at specific static pressure drop. external static pressure. should be minimum 10 mm of water gauge. The CMH capacity is not adequate for 85CMH / MT. OK. OK. OK
TD 40 C. OK
Fin spacing :- 6.4.0 mm. E Electrical installation Transformer:-250 KVA D. G. Set :- 160 KVA
Safety provisions
Mentioned.
G H I J
Codes & standard Energy saving equipments. Operation & maintenance. Estimated performance parameters
Mentioned. VFD for fans / comp.:- For Compressor Mentioned. COP :- Not mentioned.
OK. Ammonia masks &emergencies handling instructions to be display at prominent place in the machine room. Water shower to be provided over receiver. OK. VFD for fans also to be provided. OK. Pl. Mention
Accepted
OK
Elect.CostRs./day/ton:mentioned
Not
Pl. Mention
General: Data furnished is OK. Subject to they are giving revised compressor details & electrical cost / day / MT The proposal can be considered for LOI subject to other criteria as per NHB requirements being met. Drawing to be submitted to NHB, duly signed by registered architect, clearly showing plan & sectional views, with stair case in ante room. Condenser tank should be as close to plant room as possible.