Sei sulla pagina 1di 5

C.K.

Suresh Doss, Flat No: 4A, IVth Floor, Divya Block, Sri Mahalakshmi Utsav, Doshi Housing Limited, No.339, Konnur High Road, Ayanavaram, Chennai-600 023. Tamil Nadu, India. Phone: 044-26742546 Mobile: 09940340032 E-mail: ck.sureshdoss.com cksdoss2003.com OBJECTIVE To lead the team facing key and competitive challenge where in my skill and experience coupled with the application of team's knowledge in effective manner would help in development of the organization and its function. PROFESSIONAL QUALIFICATION B.E -Bachelor of Engineering - Mechanical G.D.M.M -Graduate Diploma in Materials Management D.P.M -Diploma in Production Management C.C.C.P -Certificate Course in Computer Programming PROFESSIONAL EXPERIENCE: OVERALL 25 Years in ENGINEERING AND CONSTRUCTION. INLAND 5 Years with Kirloskar Construction and Engineers Ltd since 2003 OVERSEAS 7 Years at INDONESIA with TEXMACO EPC Group. INLAND 13 Years at INDIA with LARSEN & TOUBRO Ltd - ECC Group. MAJOR PROJECTS HANDLED: POWER PLANTS REFINERIES AND PETRO CHEMICAL PLANTS INTERGRATED STEEL PLANTS FERTILIZER PLANTS POLYCHIP AND POLYFIBRE PLANTS HEAVY ENGINEERING AND AUTOMOBILE PLANTS TEXTILE PLANTS AND BUILDINGS CROSS COUNTRY PIPE LINES CIVIL & STRUCTURAL INFRASTRUCTURE PROJECTS

DETAILS OF PROFICIENCY

1. Having expertise in executing various Major Construction Projects with complete Planning, Resourcing and Coordination till successful completion and handing over to the entire satisfaction of the client. 2. Having long years of Experience in guiding Team of Engineers in executing major Structural Steel works such as Fabrication and Erection of Structural Steel, High Pressure Boiler Components& Critical Piping, Plant, Offsite & UG Piping, Ducting and Installation & Commissioning of Equipments such as pumps, compressors, DG sets etc., and execution of major Machine / Building Civil Foundations with Super Structure and Finishing Works etc,. 3. Adequately experienced in devising 'Management Planning & Control Systems (MPCS) with complete backup of Network Planning Schedules, Resource Management Schedules, Cash inflow and outflow charts with Profitability and ROI. 4. Experienced in preparing Tenders, Estimates and Budgets for complete Construction Projects. 5. Handled multi projects simultaneously with complete Budgeting, Costing, Billing, Large Scale Accounts and Minimizing the cost by effective cost control measures. 6. Successfully developed and implemented the complete systems and procedures for grass root level controls for effective utilization of Construction Materials & Resources. 7. Capable of facilitating seminars on 'Organization and Development Topics' and 'Training personnel'. 8. Proficient in operating Computer Software viz., Windows XP, Microsoft Office 2007,Microsoft Project ,PRIMAVERA , SAP and FoxPro etc,. 9. Familiar in operating Network based software with Resource Management. 10. Conversant with other user friendly packages viz., Structural Steel Monitoring System (SSMS), Piping Material Monitoring System PMMS), Stores Material Monitoring System (SMMS) etc. EMPLOYMENT DETAILS Present Employer: KIRLOSKAR CONSTRUCTIONS AND ENGINEERS LTD, CHENNAI, INDIA (Since 2003- 5 Years) Present Position: GENERAL MANAGER Previous Employer: TEXMACO EPC GROUP- PT.DEVRINDO WIDYA, INDONESIA. Last Position Held: SENIOR PROJECT MANAGER Period of Service : JUNE 1996 - MAR 2003 ( 7 Years ) Previous Employer: LARSEN & TOUBRO Ltd - ECC Construction Group , INDIA Last Position Held : RESIDENT ENGINEER Period of Service JULY 1983 - MAY 1996 (13 years)

DETAILS OF EXPERIENCE (A) INLAND EXPERIENCE AFTER OVERSEAS ASSIGNMENT 2008-07 Corporate Planning and Systems Implementation from KCEL-Head Office for 30 Major Civil and Mechanical Infrastructure Projects including implementation of IMS, Primavera and SAP. 2007-06 Business Development and Execution and Monitoring of Plant Piping and

Equipment Installation Works for M/s National Aluminium Company Limited (NALCO), Damanjodi, Orissa, India a Metallurgical Projects in consultation with M/s Engineers India Limited (EIL) India. 2006-05 Execution Coordination for Construction of Cross Country Pipeline 12X158Km between Sidhpur-Sanganeer to Chiturgargh at Rajasthan including Civil, Electrical and communication facilities for Indian OilCorporation-Rajasthan. 2005-04 Engineering, Procurement and Construction for Project Sea Bird-Ship lifting yard with complete Mechanical and Electrical works for M/s Skanska Pvt. Ltd, in consultation with Redicon-Australia for Indian Navy, Karwar. 2004-03 GRP Pipe manufacturing and Installation of the same in Cross country Pipe line work 800mm Dia X 45 Km long for M/s Bharuch - Eco Aqua Infrastructures Ltd., Ankleshwar in consultation with Multi Mantech International Pvt Ltd, Ahmedabad, Gujarat, India jointly with technological partner-Hepworth,Dubai-UAE. (B) OVERSEAS EXPERIENCE 2003-02 Piling, excavation and construction of New Power Plant Building and Equipment foundation for 2 X 10.8 MW coal fired boiler for PT.Indo Bharat Rayon, Purwakarta, Indonesia in consultation with M/s BHEL, India Design-Engineers. 2002-01 Piling ,excavation and construction of Building and Equipment Foundations for 45000 T- Steel Melting Shop at Indonesia for PT.MASTER STEEL, Pulogadung, Indonesia in consultation with M/s Ogie Steel, Japan M/s.Hotaka-Steel,Japan. 2001-00 Piling, excavation and construction of Building and Equipment Foundations for Twisting Building / water tank and cooling tower for PT.Guna Kadota Manunggal, Karawang Timur, Indonesia in consultation with Texmacos EPC Group-PT.Devrindo Widya, Indonesia. 2000-99 Execution of Utilities & Infrastructure facilities for Polyfibre/ Poly chip units of PT.POLYSINDO EKA PERKASA, Karawang, Indonesia in consultation with Texmacos EPC Group-PT.Devrindo Widya, Indonesia. 1999-98 Execution of Utilities & Infrastructure facilities for Textile Units , Fabrication & Erection of Structural Steel Works of Fleece Expansion Projects for PT.TEXMACO JAYA,Karawang, Indonesia in consultation with Texmacos EPC Group-PT.Devrindo Widya, Indonesia. 1998-97 Execution of Fabrication & Erection of Structural Steel Works for Open Die Forge Shop, Closed Die Forge Shop, & Bar Rolling Mill units of Indobaja of PT.PERKASA INDOBAJA, Subang, Karawang, Indonesia in consultation with Texmacos EPC GroupPT.Devrindo Widya, Indonesia. 1997-96 Planning & Coordination for Civil, Structural Fabrication & Erection Works of an Integrated Heavy Automobile Industry at Subang, Indonesia for PT.PERKASA HEAVYNDO, Subang, Indonesia in consultation with Texmacos EPC Group- PT.Devrindo Widya, Indonesia.

(C) INLAND EXPERIENCE PRIOR TO OVERSEAS ASSIGNMENT 1996-95 Execution of Under Ground Piping & Plant Piping, Equipment Erection works of New Ammonia Plant, Fabrication and Erection works of New Ammonia Plant for M/s Madras Fertilizers Limited, Revamp Project MFL Chennai, in consultation with M/s FACT Engineering and Design-Organization(FEDO)Cochin-India. 1995-94 Execution of Fabrication & Erection of CCR Fired Heaters of Plat former & Circular Type , Reactor / Regenerator Structures , Reactor Internals etc,. For M/s Mangalore Refineries and Petrochemicals Ltd., MRPL Project, Mangalore, India in consultation with M/S Toyo Engineers India Ltd and M/s Toyo Engineers, Japan. 1995-94 Execution of Fabrication & Erection of Four numbers of UOP & Non UOP Fired heaters of Circular & Plat former Type and One Number of Visbreaker Heater of Plat former Type at Mangalore Refineries and Petrochemicals Limited., MRPL Project , Mangalore, India in consultation with M/s Davy Power Gas and M/s UDHE India Ltd., India. 1995-94 Planning & Coordination for Mechanical & Piping works of CDU/VDU/NSU/AWS/ STU/BBU units & Flare Stack for M/s.Mangalore Refineries and Petrochemicals Ltd., MRPL Project, Mangalore, India in consultation with M/s Engineers India Limited (EIL) India. 1995-94 Planning & Coordination for Mechanical & Piping works of Visbreaker Unit for M/s.Mangalore Refineries and Petrochemicals Ltd., MRPL Project, Mangalore, India in consultation with M/s UDHE India Limited,India. 1995-94 Planning & Coordination for Fabrication & Erection of Tanks Floating Roof (Four Nos.) Cone Roof (Three Nos.) for M/s.Mangalore Refineries and Petrochemicals Limited, MRPL Project, Mangalore, India in consultation with M/S Engineers India Limited. (EIL) India. 1995-94 Planning & Coordination for Fabrication & Erection of Cogeneration Plant of 22.5 MW X 2 Units for M/s. Mangalore Refineries and Petrochemicals Limited, MRPL Project, Mangalore, India in consultation with Larsen & Toubro Limited, Group-II, India. 1994-92 Planning & Co-ordination for Fabrication & Erection of 120,000 TPA Capacity BLAST FURNACE ,Technological Structures ,Equipment Installations & Fabrication/Erection of Industrial Structural Steel Buildings for Foundry Unit of M/s Kirloskar Ferrous Industries Limited, KFIL Project, Hospet, Karnataka, India, with basic design by M/s TATA - KORF & Consultants by STUP Consultants Limited India. 1992-91 Planning & Co-ordination for Mechanical & Piping works of Crude Distillation Unit(CDU), Flare system including Unit / Offsite Piping for M/s Madras Refineries Limited, MRL - CBCDU, MRL Project, Nagapattinam, India, in consultation with M/s.Engineers India Limited,EIL-India. 1991-88 Planning & Co-ordination for Erection of Boilers & Critical Piping works for 4 X 210MW Thermal Power Station of M/s Neyveli Lignite Corporation, T.S.II, Neyveli, India in consultation with M/s Bharat Heavy ElectricalsLimited,(BHEL),Trichy,India.

1988-86 Execution of Critical Piping works, between Boilers & Turbines using CS / AS & X20 Alloy Materials for 3 X 210MW Boilers of M/s Neyveli Lignite Corporation, T.S.II Project, Neyveli, India in consultation with M/s Trans Electro-Hungary. 1986-84 Execution of Preassembly & Erection of Pressure Parts / Boiler Components / Critical / Trim Piping for 3X210 MW Boilers for M/s Neyveli Lignite Corporation, T.S.II, Project, Neyveli, India in consultation with M/s Trans-Electro-Hungary. 1984-83 Execution of Preassembly & Erection Main Boiler Structures, Auxiliary Structures ,Galleries & Staircases including Heavy Lifts for 3 X 210 MW Boilers of M/s Neyveli Lignite Corporation, T.S.II Project,, Neyveli, India in consultation with M/s.TransElectro-Hungary. PERSONAL AND PASSPORT DETAILS: Name as per Passport : CHINNI KRISHNA SURESH DOSS Father's name : B.Chinnikrishna Das Nationality : Indian Gender & Date of Birth : Male & 28-02-1963 Marital Status : Married and surviving with Wife and one Son. Languages known : English, Tamil, Telugu and Bhasha Indonesia. Passport Number : F 8360443 Place of Issue : Chennai Date of Issue : 10-07-2006 Date of Expiry : 09-07-2016