Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.1 Hardware Description - Rack Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.2 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.3 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.4 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.5 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.2 Site-Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9130 BSC Evolution Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.1 Before Going on Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2 Before You Start (On Arrival at the Site) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2.1 Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2.2 Required Knowledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3 Complete BSC Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.1 Install Boards in ATCA Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.2 Check Boards Position in LIU Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.3 Check the ATCA-LIU Ethernet Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.4 Check the JSXLIU Shelf Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.5 Connect PCM Cables to JSXLIU Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4 Hardware Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.1 Check the Equipment Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.2 Check the JAXPC Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.3 Check the JAXPC Address for Board Variant Before 3BK 27226 AACA . . . . . . 2.4.4 Check the JAXPC Address from Board Variant 3BK 27226 AACA On . . . . . . . 2.4.5 Check the JBXFAN Switch Position . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5 Powering Up the BSC Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.1 Check the Customer Power Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.2 Check Polarity of DC Cables on BSC Side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.3 Powering Up the BSC Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.4 Check Power Line Redundancy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.6 Check BIOS Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.7 Software Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.8 Check the Firmware Version . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9 Commissioning Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9.1 Option: LMT Installation (O1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9.2 Connect the LMT to the BSC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9.3 Option: Connect O&M cables from MFS to BSC (O2) . . . . . . . . . . . . . . . . . . . . . . 2.9.4 Perform the Rack Inventory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.10 Connect the OMC-R . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.11 Option: Check the Connection with the CBC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.11.1 Open a Telnet Session . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.11.2 Ping the CBC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.12 End of Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 7 8 8 12 12 12 13 14 14 14 15 16 16 16 17 19 20 20 20 20 21 21 25 27 29 30 31 31 31 31 33 34 35 35 35 37 38 40 41 41 41 41 42 43 44 44 45 45 46 46
3 / 46
Contents
4 / 46
Preface
Preface
Purpose
This document describes the configuration and verification procedures to be carried out when commissioning the 9130 BSC Evolution in release B10. In this document JBXTP stands for all TPGSM functional variants JBXTP and JBXTP3. Procedures specific to any variant should be mentioned explicitly.
Whats New
In Edition 07
Description improvement in Check Power Redundancy for ATCA Shelves (Section 2.5.4.1).
In Edition 06
Description improvement in the following sections: Hardware Description - Rack Configurations (Section 1.1.1) Site-Specific Information (Section 1.2.2) Check the JAXPC Address (Section 2.4.2) Check the JBXFAN Switch Position (Section 2.4.5) Check BIOS Settings (Section 2.6) Connect the OMC-R (Section 2.10). Section Check the Extraction Handles was removed.
In Edition 05
Description improvement in: Site-Specific Information (Section 1.2.2) Install Boards in ATCA Shelf (Section 2.3.1).
In Edition 04
Update with the new equipment naming.
In Edition 03
Update of system title.
5 / 46
Preface
In Edition 02
Section Check the Extraction Handles was added.
In Edition 01
First release of the document.
Audience
This document is addressing to the following: Site administrators Supervisors Project managers Field service technicians Occasional users
Assumed Knowledge
The personnel involved must be familiar with: Commissioning tools Personal Computers using the Windows 2000/XP environment Digitals UNIX operating system environment.
6 / 46
1 Overview
1 Overview
This Overview gives information needed by project managers and foremen, for presentation to the customer and for site planning.
7 / 46
1 Overview
1.1 Presentation
1.1.1 Hardware Description - Rack Configurations
The following figure shows the rack layout for an 9130 BSC Evolution in 1000 TRX configuration.
JSXPDU
CLOSED
OPEN
H/S OOS
CLOSED
OPEN
H/S OOS
CLOSED
OPEN
H/S OOS
CLOSED
OPEN
H/S OOS
Not Used
XLIU XLIU
4A
JBXOMCP
JBXOMCP
JBXSSW
JBXSSW
JBXCCP
JBXCCP
JBXCCP
2 3 4
XLIU XLIU XLIU
JBXCCP
5 6 7 8
XLIU XLIU XLIU XLIU
9 10 11 12 13 14 15 16 17 18 19 20 21
XLIU XMUX XMUX XLIU XLIU XLIU XLIU XLIU XLIU XPEM
LIU Shelf 1
JBXCCP
48 / 60 VDC
48 / 60 VDC
4A
8 / 46
Not Used
JBXCCP
JBXTP
JBXTP
ATCA Shelf 3
1 Overview
The following figure shows the rack layout for an 9130 BSC Evolution 1000 TRX configuration /9130 MFS Evolution 9 JBXGPU configuration in case of rack shared configuration.
JSXPDU
CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS
JBXOMCP
JBXOMCP
Not Used
JBXOMCP
JBXOMCP
JBXSSW
JBXSSW
JBXGPU
JBXGPU
JBXGPU
JBXGPU
JBXGPU
JBXGPU
JBXGPU
JBXGPU
JBXGPU
XLIU XLIU XPEM
48 / 60 VDC 4A
5 6 7 8
XLIU XLIU
9 10 11 12 13 14 15 16 17 18 19 20 21
XLIU XMUX XMUX XLIU XLIU XLIU XLIU XLIU XLIU
LIU Shelf 2
XPEM
XLIU
XLIU
XLIU
XLIU
48 / 60 VDC
4A
2 3 4
XLIU XLIU XLIU
5 6 7 8
XLIU XLIU XLIU XLIU
9 10 11 12 13 14 15 16 17 18 19 20 21
XLIU XMUX XMUX XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XPEM
LIU Shelf 1
XPEM
48 / 60 VDC
48 / 60 VDC
4A 4A
JBXGPU
ATCA Shelf 3
Not Used
JBXSSW
JBXSSW
JBXCCP
JBXCCP
JBXCCP
JBXCCP
JBXCCP
JBXCCP
JBXTP
JBXTP
ATCA Shelf 4
9 / 46
1 Overview
The following figure shows the rack layout in case of rack shared by two 9130 BSC Evolution 1000 TRX configuration.
JSXPDU
CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS
JBXOMCP
JBXOMCP
JBXOMCP
JBXOMCP
5 6 7 8
XLIU XLIU
9 10 11 12 13 14 15 16 17 18 19 20 21
XLIU XMUX XMUX XLIU XLIU XLIU XLIU XLIU XLIU
XPEM
XLIU
XLIU
XLIU
XLIU
XPEM
LIU Shelf 2
48 / 60 VDC 4A
1
XPEM
2 3 4
XLIU XLIU XLIU
5 6 7 8
XLIU XLIU XLIU XLIU
9 10 11 12 13 14 15 16 17 18 19 20 21
XLIU XMUX XMUX XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XPEM
LIU Shelf 1
48 / 60 VDC 48 / 60 VDC 4A 4A
Figure 3: Example of Two 9130 BSC Evolution Rack Layout - Front View
10 / 46
Not Used
JBXSSW
JBXSSW
JBXCCP
JBXCCP
JBXCCP
JBXCCP
JBXCCP
JBXCCP
JBXTP
JBXTP
ATCA Shelf 3
Not Used
JBXSSW
JBXSSW
JBXCCP
JBXCCP
JBXCCP
JBXCCP
JBXCCP
JBXCCP
JBXTP
JBXTP
ATCA Shelf 4
1 Overview
The following figure shows the back rack layout for an 9130 BSC Evolution in any configuration.
JAXSMM
JAXSMM
JAXSMM
OOS OK ACT
JAXPC JAXPC
JBXPS
(POWER)
JBXPS
(POWER)
JBXPS JBXPS
(POWER) (POWER)
JBXPS
(POWER)
JBXPS
(POWER)
JAXPC
JAXPC
OK ACT
OOS
OOS OK ACT
Alarm/ Reset H/S
GND
+(RETURN)
OK
OOS OK ACT
JAXPC JAXPC
JAXPC JAXPC
GND
+(RETURN)
+(RETURN)
+(RETURN)
+(RETURN)
Closed Open
Closed Open
OOS
OOS OK
H/S
+(RETURN)
Handle
Handle
H/S
H/S
H/S
11 / 46
1 Overview
1.1.2 Cases
None.
1.1.3 Options
The following options apply: O1: Install LMT O2: Connect O&M cables from MFS to BSC, in rack shared configuration
1.1.4 Restrictions
None.
12 / 46
1 Overview
Boards installation
Hardware check
Power up rack
Commisioning test
End commissioning
13 / 46
1 Overview
1.2 Preparation
1.2.1 Prerequisites
The following prerequisites apply: The site must conform to the "Safety rules" (see B10 BSS Methods Handbook). The site must conform to SPP- 59, Specification for Site Preparation 9130-BSC The OMC-R must be operational and ready for connection to the BSC. The router must be configured and ready for connection (if applicable).
14 / 46
1 Overview
1.3 Scheduling
The following table gives the duration for each task. Task Preliminary checks Preparation before leaving for the site Before starting (on arrival at the site) Boards installation Hardware check Set LIU shelf address Powering up the BSC rack Check the power panel Check the polarity on the BSC side Powering up the BSC rack Check power line redundancy Check firmware version Commissioning tests Option: LMT installation Connecting LMT to the BSC Software installation Perform rack inventory Connecting the OMC-R Option: Check the connection with the CBC End of commissioning Total Table 1: Scheduling 20 2 65 15 10 5 10 4h10 5 10 5 10 30 15 10 20 10 5 Duration (min)
15 / 46
1 Overview
1.4 Resources
1.4.1 Tools
1.4.1.1 Hardware Tools
The following table is used to check, at base, the availability of the necessary tools. See Tools Catalogue for Field Activity for checking the content. Kit name Basic kit Test cables and plugs (BSC) Utility PC (IMT) Digital multimeter Reference OUT 001 OUT 013 DES 002 DES 001 Calibration NO NO NO NO
1.4.1.3 Forms
None.
1.4.2 Supplies
None.
16 / 46
1 Overview
17 / 46
1 Overview
18 / 46
19 / 46
20 / 46
Note:
For JBXCCP boards shelf filling is done from center to shelf sides. When inserting the JBXTP boards make sure that both boards are of the same type and corresponding to the request. The following table gives the JBXCCP and JBXTP boards allocation in ATCA shelf.
Boards
Physical slots 2 x 3 x 4 x x x 5 x x x x x 6 7 8 9 10 x x x x x 11 x x x x 12 x x 13 14 -
JBXCCP
JBXTP
All
21 / 46
CLOSED
OPEN
H/S
OOS
CLOSED
OPEN
H/S
OOS
Physical 1 slot
9 10 11 12 13 14
JBXOMCP
JBXOMCP
Not Used
22 / 46
Not Used
JBXCCP
JBXCCP
JBXCCP
JBXSSW
JBXSSW
JBXCCP
JBXCCP
JBXCCP
JBXTP
JBXTP
5. Slide the board into the shelf until you feel resistance. 6. Simultaneously move the top and bottom handles to the inward position to lock the board to the shelf.
Figure 7: Board in ATCA Shelf, Secured with Handles to the Inward Position
23 / 46
7. Install one by one all the boards for the requested configuration. During boards insertion: Holes on back side of the board must be in line with guiding pins on the back plane
Figure 8: Holes in Line with Guiding Pins EMI stripes must not be damaged when inserting the boards
Figure 9: EMI Stripes 8. Tighten the front plate screws to secure the board to the shelf. 9. Insert a filler (JBXFILL) in each unused slot. 10. Tighten the front plate screws to secure the filler to the shelf.
24 / 46
JBXDUM 19 20
48 / 60 VDC
48 / 60 VDC
4A 4A
Figure 10: LIU Shelf for BSC with 200 and 400 TRX Configuration
25 / 46
The following figures show the LIU shelf for different 9130 BSC Evolution 600/800/1000 TRX configuration.
JBXPEM JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXMUX JBXMUX JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXPEM
48 / 60 VDC
48 / 60 VDC
4A 4A
Figure 11: LIU Shelf for BSC with 600 TRX Configuration
26 / 46
ETH 1
ETH 2
ETH 3 ETH 4 ETH 5 ETH 6 ETH 7 ETH 8 OOS
ETH 2
ETH 3 ETH 4 ETH 5 ETH 6 ETH 7 ETH 8 OOS
OK
OK
ACT
ACT
Test
Test
GbE
GbE
27 / 46
ATCA Shelf 4
ATCA Shelf 3
FRONT
Free Space (LIU Shelf 2)
REAR
LIU Shelf 1
123456789012345678 123456789012345678
3. Connect the first JLCAT6 Ethernet cable (1AB 22983 0005) to the GbE port on JBXMUX1 (slot 10) in JSXLIU shelf 1/2. See Figure 12. 4. Connect the second JLCAT6 Ethernet cable (1AB 22983 0005) on ATCA shelf 3/4, JAXSSW2, Ethernet port 2. See Figure 12. 5. Run the cable under the JSXLIU shelf 1. See Figure 13. 6. Connect the second JLCAT6 Ethernet cable (1AB 22983 0005) to the GbE port on JBXMUX2 (slot 12) in JSXLIU shelf 1/2. See Figure 12. To connect the OMC-R Ethernet cables: 1. Identify the OMC-R Ethernet cables 2. Connect the first OMC-R Ethernet cable to the ATCA shelf 3/4 JAXSSW1, Ethernet port 3 3. Label the cables near the connectors.
28 / 46
MUX A
PEM A
LIU 16
LIU 10
LIU 14
LIU 12
LIU 13
LIU 15
MUX B
10
11
12
13
14
15
16
17
18
19
20
Figure 14: Slot 11 Back Panel Jumper Numbering 3. If the positions of the jumpers are not as described, it must be corrected. 4. Fix the dummy panel on slot 11 and fix it with the screws.
PEM B
LIU 11
LIU 6
LIU 4
LIU 7
LIU 8
LIU 2
LIU 3
LIU 5
LIU 9
LIU 1
21
29 / 46
30 / 46
2.4.3 Check the JAXPC Address for Board Variant Before 3BK 27226 AACA
To check the JAXPC address: 1. Put on an ESD wrist strap and connect it to the shelf by attaching the front or rear ESD jack. 2. Unfasten the screws fixing the JAXPC card to the ATCA shelf. 3. Carefully remove the JAXPC card from the slot. 4. Check if S2 switch is set to 0 and S1 switch is set to 3 for shelf 3 and to 4 for shelf 4 . If different setting is present correct it as follows.
31 / 46
S2
S1
Figure 15: Rotary Switches on JAXPC Card Before Variant 3BK 27226 AACA 5. On the JAXPC board set the S2 switch to 0. 6. On the JAXPC board set the S1 switch to 3 for shelf 3 and to 4 for shelf 4. See Figure 2 for shelf numbering. 7. Carefully insert the JAXPC card in the slot. 8. Tighten the screws fixing the JAXPC card to the ATCA shelf. 9. Place the JAXPC board handle switch to Closed position.
32 / 46
2.4.4 Check the JAXPC Address from Board Variant 3BK 27226 AACA On
To check the JAXPC address: 1. Check if SGA MS switch is set to 0 and SGA LS switch is set to 3 for shelf 3 and to 4 for shelf 4 . If different setting is present correct it as follows.
MS
LS
Figure 16: Rotary Switches on JAXPC Card from Variant 3BK 27226 AACA On 2. On the JAXPC board set the SGA MS switch to 0. 3. On the JAXPC board set the SGA LS switch to 3 for shelf 3 and to 4 for shelf 4. See Figure 2 for shelf numbering. 4. Perform the same operation for both JAXPC cards in a shelf and for both shelves if equipped.
33 / 46
Figure 17: JBXFAN Cover Fixing Screws 2. Remove the JBXFAN cover plate.
Figure 18: Remove JBXFAN Cover 3. Check if JBXFAN switch is set to Closed position otherwise set it to Close position. 4. Perform the check for all four JBXFAN units and for all equipped ATCA shelves. 5. Fit back the JBXFAN cover and fasten the fixing screws.
34 / 46
I
O
I
O
I
O
I
O
I
O
I
O
I
O
I
O
I
O
I
O
Shelf 4
Shelf 2
Shelf 3
Shelf 1
Shelf 4
Shelf 2
Shelf 3
Shelf 1
35 / 46
Breaker
BATR
GND
to ATCA shelf
Figure 20: Connections for One Single Breaker 4. Check the power line connections for both lines A and B: Blue cables in the BATA and BATB position Black cables in the BATR position Yellow-green cable in GND position 5. Check that nothing can cause a short circuit between the BATA, BATB and BATR connectors.
Line cable from power station (branch A) 35 mm 2 diameter 14 mm Line cable from power station (Branch B) 35 mm 2 diameter 14 mm
BATA BATR
BATB BATR
Earthing (GND)
75A
10A
75A
10A
75A
75A
10A
75A
10A
75A
Racking braket
Figure 21: Connections from Power Station to PDU 6. On the site power panel, connect the power supply line, using fuse holder A first. Circuit A is connected.
36 / 46
7. Test the A circuit. Check with the multimeter the presence of -48V and the polarity between BATA and BATR. 8. On the site power panel, disconnect the power supply line, using fuse holder A. 9. Repeat the previous operations for circuit B. Check the presence of -48V and the polarity between BATA/B and BATR on each circuit, then leave the circuits disconnected. 10. Replace the PDU cover plate.
4. Switch ON (engage) the switches A4 and B4. Power LED on JBXPEMs in JSXLIU shelf switches ON. 5. Switch ON (engage) the breakers A3 and B3. 6. Check on each JBXPS front panel that Rev. Power LED is OFF. If Rev. Power LED is ON switch OFF the breakers A3 and B3 and check power polarity on JBXPS terminals. 7. Switch ON the breaker on all JBXPS modules. The OK green LED on each JBXPS switches ON.
8. If JSXLIU2 shelf is used, switch ON (engage) the switches A2 and B2. Power LED on JBXPEMs in JSXLIU shelf switches ON. 9. If ATCA4 shelf is used, switch ON (engage) the switches A1 and B1. 10. Check on each JBXPS front panel that Rev. Power LED is OFF. If Rev. Power LED is ON switch OFF the breakers A1 and B1 and check power polarity on JBXPS terminals. 11. Switch ON the breaker on all JBXPS modules. The OK green LED on each JBXPS switches ON.
37 / 46
38 / 46
resource: {RACK,0}{ADVANCEDTCA_CHASSIS,3}{FAN_TRAY_SLOT,1} {COOLING_UNIT,4} fan: num 1, id Fan min 15 max 100 default 100 state ignored resource: {RACK,0}{ADVANCEDTCA_CHASSIS,3}{FAN_TRAY_SLOT,2} {COOLING_UNIT,5} fan: num 1, id Fan min 15 max 100 default 100 state ignored 5. Check that the four fan trays are running (RPM not equal to zero). Enter the command: hpisensor | grep "RPM" An example of the output of the command is given below. RDR[131073]: Sensor Fan RPM = 1840.00 rpm RDR[131073]: Sensor Fan RPM = 1800.00 rpm RDR[131073]: Sensor Fan RPM = 1840.00 rpm RDR[131073]: Sensor Fan RPM = 1800.00 rpm 6. On the power distribution unit (JSXPDU), switch OFF the -48 V DC power supply lines A3 (if ATCA shelf 3 is used) or A1 (if ATCA shelf 4 is used) using the corresponding fuse holders. 7. Check that the ATCA shelves remain powered up and the boards are not affected. For all boards check the LEDs status. 8. For the fan trays repeat steps 4 and 5, then check that: The four fan trays are still detected RPM must be different from zero. 9. Switch ON the -48 V DC power supply lines A3 (if ATCA shelf 3 is used) or A1 (if ATCA shelf 4 is used). No boards are affected and lines A3 and A1 are connected. 10. On the power distribution unit (JSXPDU), switch OFF the -48 V DC power supply lines B3 (if ATCA shelf 3 is used) or B1 (if ATCA shelf 4 is used) using the corresponding fuse holders. 11. Check that the ATCA shelves remain powered up and the boards are not affected. For all boards check the LEDs status. 12. For the fan trays repeat steps 4 and 5, then check that: The four fan trays are still detected RPM must be different from zero.
39 / 46
13. Switch ON the -48 V DC power supply lines B3 (if ATCA shelf 3 is used) and B1 (if ATCA shelf 4 is equipped) No boards are affected and lines B3 and B1 are connected. 14. Close the connection on the shelf manager and remove the cable.
40 / 46
For Windows 2000: telnet set term vt100 open 172.17.y.8 <port number> Port number is 4503 for OMCP1 Port number is 4504 for OMCP2 y is 3 for the lower ATCA Shelf y is 4 for the upper ATCA Shelf 4. Type the username: root and the password: alcatel 5. Reboot the OMCP board: reboot
Note:
For hardware reset of board variants before 3BK 27236 AACA use the reset button from JBXOMCP board. For board variants from 3BK 27236 AACA on, the reset button is no more available. 6. With the OMCP terminal window connection through SHMC selected, press [ ESC ] + [ 2 ] or press [ F2 ] several times from the installation PC keyboard during the OMCP booting sequence. 7. Check System Time and System Date from Main menu are the current ones, otherwise you must correct it. 8. Check boot sequence from Boot menu are the correct ones, otherwise you must modify it. The correct order must be Hard Drive -> ETH1 -> ETH2 -> CD-ROM Drive -> Removable Devices. 9. Press [ F10 ] and then press [ Enter ] to save the changes you made and exit the BIOS.
41 / 46
OK
ACT
HS
Figure 22: JAXSSW at the ATCA Rear Side 2. Check on the front panel that the LED corresponding to the connection port is lit (for the port Eth8 the corresponding LED is situated on row 8 column C).
A B C
1 2 3 4 5 6 7 8
B A S E
I N T E R F A C E
42 / 46
ETH 1
ETH 1
ETH 2
ETH 2
ETH 3
ETH 4 ETH 5 ETH 6 ETH 7 ETH 8 OOS
ETH 3
ETH 4 ETH 5 ETH 6 ETH 7 ETH 8 OOS
OK
OK
ACT
ACT
JAXSSW2 JAXSSW1
12345678901234567890 JLCAT6 Ethernet cables 12345678901234567890 1AB 22983 0001 12345678901234567890 12345678901234567890 12345678901234567890
ETH 1 ETH 1
ETH 2
ETH 2
ETH 3
ETH 4 ETH 5 ETH 6 ETH 7 ETH 8 OOS
ETH 3
ETH 4 ETH 5 ETH 6 ETH 7 ETH 8 OOS
OK
OK
ACT
ACT
JAXSSW2 JAXSSW1
43 / 46
3. Wait for the telecom boards to finish their initialization Check the equipment status.
44 / 46
45 / 46
46 / 46