Sei sulla pagina 1di 46

Alcatel-Lucent GSM

9130 BSC Evolution Commissioning

BSC & TC Document Commissioning Manual Release B10

3BK 17430 3121 RJZZA Ed.07

BLANK PAGE BREAK

Status Short title

RELEASED mxbsccom
All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization from Alcatel-Lucent.

2 / 46

3BK 17430 3121 RJZZA Ed.07

Contents

Contents
Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.1 Hardware Description - Rack Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.2 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.3 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.4 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1.5 Grouped Task Sequence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.2.2 Site-Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.4.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9130 BSC Evolution Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.1 Before Going on Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2 Before You Start (On Arrival at the Site) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2.1 Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2.2 Required Knowledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3 Complete BSC Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.1 Install Boards in ATCA Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.2 Check Boards Position in LIU Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.3 Check the ATCA-LIU Ethernet Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.4 Check the JSXLIU Shelf Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.5 Connect PCM Cables to JSXLIU Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4 Hardware Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.1 Check the Equipment Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.2 Check the JAXPC Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.4.3 Check the JAXPC Address for Board Variant Before 3BK 27226 AACA . . . . . . 2.4.4 Check the JAXPC Address from Board Variant 3BK 27226 AACA On . . . . . . . 2.4.5 Check the JBXFAN Switch Position . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5 Powering Up the BSC Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.1 Check the Customer Power Panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.2 Check Polarity of DC Cables on BSC Side . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.3 Powering Up the BSC Rack . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.5.4 Check Power Line Redundancy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.6 Check BIOS Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.7 Software Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.8 Check the Firmware Version . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9 Commissioning Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9.1 Option: LMT Installation (O1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9.2 Connect the LMT to the BSC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.9.3 Option: Connect O&M cables from MFS to BSC (O2) . . . . . . . . . . . . . . . . . . . . . . 2.9.4 Perform the Rack Inventory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.10 Connect the OMC-R . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.11 Option: Check the Connection with the CBC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.11.1 Open a Telnet Session . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.11.2 Ping the CBC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.12 End of Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 7 8 8 12 12 12 13 14 14 14 15 16 16 16 17 19 20 20 20 20 21 21 25 27 29 30 31 31 31 31 33 34 35 35 35 37 38 40 41 41 41 41 42 43 44 44 45 45 46 46

3BK 17430 3121 RJZZA Ed.07

3 / 46

Contents

4 / 46

3BK 17430 3121 RJZZA Ed.07

Preface

Preface
Purpose
This document describes the configuration and verification procedures to be carried out when commissioning the 9130 BSC Evolution in release B10. In this document JBXTP stands for all TPGSM functional variants JBXTP and JBXTP3. Procedures specific to any variant should be mentioned explicitly.

Whats New

In Edition 07
Description improvement in Check Power Redundancy for ATCA Shelves (Section 2.5.4.1).

In Edition 06
Description improvement in the following sections: Hardware Description - Rack Configurations (Section 1.1.1) Site-Specific Information (Section 1.2.2) Check the JAXPC Address (Section 2.4.2) Check the JBXFAN Switch Position (Section 2.4.5) Check BIOS Settings (Section 2.6) Connect the OMC-R (Section 2.10). Section Check the Extraction Handles was removed.

In Edition 05
Description improvement in: Site-Specific Information (Section 1.2.2) Install Boards in ATCA Shelf (Section 2.3.1).

In Edition 04
Update with the new equipment naming.

In Edition 03
Update of system title.

3BK 17430 3121 RJZZA Ed.07

5 / 46

Preface

In Edition 02
Section Check the Extraction Handles was added.

In Edition 01
First release of the document.

Audience

This document is addressing to the following: Site administrators Supervisors Project managers Field service technicians Occasional users

Assumed Knowledge

The personnel involved must be familiar with: Commissioning tools Personal Computers using the Windows 2000/XP environment Digitals UNIX operating system environment.

6 / 46

3BK 17430 3121 RJZZA Ed.07

1 Overview

1 Overview
This Overview gives information needed by project managers and foremen, for presentation to the customer and for site planning.

3BK 17430 3121 RJZZA Ed.07

7 / 46

1 Overview

1.1 Presentation
1.1.1 Hardware Description - Rack Configurations
The following figure shows the rack layout for an 9130 BSC Evolution in 1000 TRX configuration.

JSXPDU

Free Space (ATCA Shelf 4)

CLOSED

OPEN

H/S OOS

CLOSED

OPEN

H/S OOS

CLOSED

OPEN

H/S OOS

CLOSED

OPEN

H/S OOS

Not Used
XLIU XLIU
4A

JBXOMCP

JBXOMCP

JBXSSW

JBXSSW

JBXCCP

JBXCCP

JBXCCP

1234567890123456789 Air inlet 1234567890123456789 1234567890123456789


Free space (LIU Shelf 2)
1
XPEM

2 3 4
XLIU XLIU XLIU

JBXCCP

5 6 7 8
XLIU XLIU XLIU XLIU

9 10 11 12 13 14 15 16 17 18 19 20 21
XLIU XMUX XMUX XLIU XLIU XLIU XLIU XLIU XLIU XPEM

LIU Shelf 1

JBXCCP

48 / 60 VDC

48 / 60 VDC

4A

Figure 1: Example of 9130 BSC Evolution Rack Layout - Front View

8 / 46

Not Used

JBXCCP

JBXTP

JBXTP

ATCA Shelf 3

3BK 17430 3121 RJZZA Ed.07

1 Overview

The following figure shows the rack layout for an 9130 BSC Evolution 1000 TRX configuration /9130 MFS Evolution 9 JBXGPU configuration in case of rack shared configuration.

JSXPDU
CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS

JBXOMCP

JBXOMCP

Not Used

1234567890123456789 1234567890123456789 Air inlet 1234567890123456789 1234567890123456789


CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS H/S CLOSED / OPEN OOS CLOSED / OPEN H/S OOS

JBXOMCP

JBXOMCP

JBXSSW

JBXSSW

JBXGPU

JBXGPU

JBXGPU

JBXGPU

JBXGPU

JBXGPU

JBXGPU

JBXGPU

JBXGPU
XLIU XLIU XPEM
48 / 60 VDC 4A

1234567890123456789 1234567890123456789 Air inlet 1234567890123456789 1234567890123456789


1 2 3 4
XLIU

5 6 7 8
XLIU XLIU

9 10 11 12 13 14 15 16 17 18 19 20 21
XLIU XMUX XMUX XLIU XLIU XLIU XLIU XLIU XLIU

LIU Shelf 2

XPEM

XLIU

XLIU

XLIU

XLIU

48 / 60 VDC

4A

2 3 4
XLIU XLIU XLIU

5 6 7 8
XLIU XLIU XLIU XLIU

9 10 11 12 13 14 15 16 17 18 19 20 21
XLIU XMUX XMUX XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XPEM

LIU Shelf 1

XPEM

48 / 60 VDC

48 / 60 VDC

4A 4A

Figure 2: Example of 9130 BSC Evolution Rack Layout - Front View

JBXGPU

ATCA Shelf 3

Not Used

JBXSSW

JBXSSW

JBXCCP

JBXCCP

JBXCCP

JBXCCP

JBXCCP

JBXCCP

JBXTP

JBXTP

ATCA Shelf 4

3BK 17430 3121 RJZZA Ed.07

9 / 46

1 Overview

The following figure shows the rack layout in case of rack shared by two 9130 BSC Evolution 1000 TRX configuration.

JSXPDU
CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS

JBXOMCP

JBXOMCP

Not Used Not Used


XLIU XLIU
48 / 60 VDC 4A

1234567890123456789 1234567890123456789 Air inlet 1234567890123456789 1234567890123456789


CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS

JBXOMCP

JBXOMCP

1234567890123456789 1234567890123456789 Air inlet 1234567890123456789 1234567890123456789


1 2 3 4
XLIU

5 6 7 8
XLIU XLIU

9 10 11 12 13 14 15 16 17 18 19 20 21
XLIU XMUX XMUX XLIU XLIU XLIU XLIU XLIU XLIU

XPEM

XLIU

XLIU

XLIU

XLIU

XPEM

LIU Shelf 2
48 / 60 VDC 4A

1
XPEM

2 3 4
XLIU XLIU XLIU

5 6 7 8
XLIU XLIU XLIU XLIU

9 10 11 12 13 14 15 16 17 18 19 20 21
XLIU XMUX XMUX XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XPEM

LIU Shelf 1
48 / 60 VDC 48 / 60 VDC 4A 4A

Figure 3: Example of Two 9130 BSC Evolution Rack Layout - Front View

10 / 46

Not Used

JBXSSW

JBXSSW

JBXCCP

JBXCCP

JBXCCP

JBXCCP

JBXCCP

JBXCCP

JBXTP

JBXTP

ATCA Shelf 3

Not Used

JBXSSW

JBXSSW

JBXCCP

JBXCCP

JBXCCP

JBXCCP

JBXCCP

JBXCCP

JBXTP

JBXTP

ATCA Shelf 4

3BK 17430 3121 RJZZA Ed.07

1 Overview

The following figure shows the back rack layout for an 9130 BSC Evolution in any configuration.

1234567890123456789 1234567890123456789 Air outlet 1234567890123456789 1234567890123456789


JAXSSW JAXSSW

1234567890123456789 1234567890123456789 Air outlet 1234567890123456789 1234567890123456789


JAXSSW JAXSSW
JAXSMM

JAXSMM

JAXSMM

JAXSMM
OOS OK ACT

JAXPC JAXPC

JBXPS
(POWER)

JBXPS
(POWER)

JBXPS JBXPS
(POWER) (POWER)

JBXPS
(POWER)

JBXPS
(POWER)

JAXPC

JAXPC

Telco Alarms & Relays

OK ACT

Telco Alarms & Relays

OOS

OOS OK ACT
Alarm/ Reset H/S

GND
+(RETURN)
OK

OOS OK ACT

JAXPC JAXPC
JAXPC JAXPC

GND

Alarm/ Reset H/S

+(RETURN)

+(RETURN)

+(RETURN)

+(RETURN)

Closed Open

Closed Open

OOS

OOS OK

H/S

+(RETURN)

Handle

Handle

H/S

H/S

H/S

For shelf variant before 3BK 27291 ABxx

From shelf variant 3BK 27291 ABxx on

Figure 4: Example of 9130 BSC Evolution Rack Layout - Rear View

3BK 17430 3121 RJZZA Ed.07

11 / 46

1 Overview

1.1.2 Cases
None.

1.1.3 Options
The following options apply: O1: Install LMT O2: Connect O&M cables from MFS to BSC, in rack shared configuration

1.1.4 Restrictions
None.

12 / 46

3BK 17430 3121 RJZZA Ed.07

1 Overview

1.1.5 Grouped Task Sequence


The following figure shows the task sequence for the 9130 BSC Evolution commissioning.

Before going site

Before you start

Boards installation

Hardware check

Set LIU shelf address

Power up rack

Check firmware version

Commisioning test

Connect the OMCR

Check connection to CBC

End commissioning

3BK 17430 3121 RJZZA Ed.07

13 / 46

1 Overview

1.2 Preparation
1.2.1 Prerequisites
The following prerequisites apply: The site must conform to the "Safety rules" (see B10 BSS Methods Handbook). The site must conform to SPP- 59, Specification for Site Preparation 9130-BSC The OMC-R must be operational and ready for connection to the BSC. The router must be configured and ready for connection (if applicable).

1.2.2 Site-Specific Information


Network information: BSC Id and name External Host name, external IP address and netmask for each OMCP station OMCP1 is START_OAM_IP_ADDRESS OMCP2 is START_OAM_IP_ADDRESS + 1 IP address of the alias host name for active station ("station_BSC") The IP address of 9130 BSC Evolution is START_OAM_IP_ADDRESS + 2 IP address for the default gateway for external network used for connection BSC - OMC If necessary, IP address for the external router for subnet B and subnet C IP address for the CBC User name and password for external router between BSC and CBC Ports in external router where to connect the Ethernet cables Routing configuration between OMC-R and BSC Local network sockets position to plug in the OMCP Servers network cables (if applicable) Position of cables connection on the CISCO router to plug in the OMCP Servers network cables (if applicable). BSC configuration: Number of CCP boards JBXTP board variant LIU shelf configuration.

14 / 46

3BK 17430 3121 RJZZA Ed.07

1 Overview

1.3 Scheduling
The following table gives the duration for each task. Task Preliminary checks Preparation before leaving for the site Before starting (on arrival at the site) Boards installation Hardware check Set LIU shelf address Powering up the BSC rack Check the power panel Check the polarity on the BSC side Powering up the BSC rack Check power line redundancy Check firmware version Commissioning tests Option: LMT installation Connecting LMT to the BSC Software installation Perform rack inventory Connecting the OMC-R Option: Check the connection with the CBC End of commissioning Total Table 1: Scheduling 20 2 65 15 10 5 10 4h10 5 10 5 10 30 15 10 20 10 5 Duration (min)

3BK 17430 3121 RJZZA Ed.07

15 / 46

1 Overview

1.4 Resources
1.4.1 Tools
1.4.1.1 Hardware Tools
The following table is used to check, at base, the availability of the necessary tools. See Tools Catalogue for Field Activity for checking the content. Kit name Basic kit Test cables and plugs (BSC) Utility PC (IMT) Digital multimeter Reference OUT 001 OUT 013 DES 002 DES 001 Calibration NO NO NO NO

1.4.1.2 Software Tools


The following table is used to check, at base, the availability and the version of the necessary software. Refer to the corresponding document for checking the SW version. Name Windows 2000/XP Netscape Communicator 4.78 Version checking -

1.4.1.3 Forms
None.

1.4.2 Supplies
None.

16 / 46

3BK 17430 3121 RJZZA Ed.07

1 Overview

1.4.3 Applicable Documents


The following list is used to check, at base, the availability of the necessary documents. Catalogue of Technical and Logistic Information (ITL), 3DF 00462 0004 AAAGA Catalogue of Instruction Operation (IO), 3DF 00300 0004 UAZZA BSS Methods Handbook, 3BK 21268 AAAA PCZZA CI 08 - Site Equipment Inventory, 3BK 17257 0001 RJZZA Tools Catalogue for Field Activity, 3BK 20458 0001 RJZZA SPP-59, Specification for Site Preparation 9130 MFS Evolution/BSC Evolution, 8BL 00704 0076 DRZZA BSS site premises inspections, post handover, 8BL 00704 0016 DRBRA Site Premises Inspection Form (CEL), 8BL 00704 0015 DRBRA 9130 BSC Evolution Software Installation, 3BK 17430 3126 RJZZA 9130 BSC Evolution Firmware Upgrade, 3BK 17422 3106 RJZZA.

3BK 17430 3121 RJZZA Ed.07

17 / 46

1 Overview

18 / 46

3BK 17430 3121 RJZZA Ed.07

2 9130 BSC Evolution Commissioning

2 9130 BSC Evolution Commissioning


This section describes the tasks to be performed during 9130 BSC Evolution commissioning.

3BK 17430 3121 RJZZA Ed.07

19 / 46

2 9130 BSC Evolution Commissioning

2.1 Before Going on Site


Before going on site you must check the following: All Prerequisites (Section 1.2.1) are fulfilled The customer has been informed of the Date and time Site name and address Purpose of the operation. Personnel are available and ready for operation (refer to Scheduling (Section 1.3) Site-Specific Information (Section 1.2.2) is available Tools (Section 1.4.1) are available and ready for operation Software Tools (Section 1.4.1.2) are available and ready for operation Applicable Documents (Section 1.4.3) are available.

2.2 Before You Start (On Arrival at the Site)


2.2.1 Checks
Before you start, perform the following operations: Check that all Prerequisites (Section 1.2.1) are fulfilled Check applicable notifications and operating instructions (refer to the Applicable Notifications List and Applicable Operation Instructions List) Check the availability of all necessary tools and supplies. Refer to BSS site premises inspections, post handover and complete the Site Premises Inspection Form (CEL). Check that the safety precautions have been taken in accordance with the safety instructions described in the B10 BSS Methods Handbook. Check which Cases (Section 1.1.2) or Options (Section 1.1.3) apply Complete the header field of the CCL. The CCL is completed as each instruction is carried out.

2.2.2 Required Knowledge


You must be familiar with the following: The safety rules and precautions given in the B10 BSS Methods Handbook. How to document faults and anomalies as described in the B10 BSS Methods Handbook.

20 / 46

3BK 17430 3121 RJZZA Ed.07

2 9130 BSC Evolution Commissioning

2.3 Complete BSC Configuration


2.3.1 Install Boards in ATCA Shelf
To install the boards: 1. Check the configuration requested by the customer. Refer to Site-Specific Information (Section 1.2.2) for details.

Note:

For JBXCCP boards shelf filling is done from center to shelf sides. When inserting the JBXTP boards make sure that both boards are of the same type and corresponding to the request. The following table gives the JBXCCP and JBXTP boards allocation in ATCA shelf.

Boards

Configuration (No. of TRX) 1

Physical slots 2 x 3 x 4 x x x 5 x x x x x 6 7 8 9 10 x x x x x 11 x x x x 12 x x 13 14 -

JBXCCP

200 400 600 800 1000

JBXTP

All

Table 2: JBXCCP and JBXTP Position in ATCA Shelf

3BK 17430 3121 RJZZA Ed.07

21 / 46

2 9130 BSC Evolution Commissioning

The ATCA configuration is described in the following figure:


CLOSED / OPEN H/S OOS CLOSED / OPEN H/S OOS

CLOSED

OPEN

H/S

OOS

CLOSED

OPEN

H/S

OOS

Physical 1 slot

9 10 11 12 13 14

JBXOMCP

JBXOMCP

Not Used

12345678901234567890123456789012 12345678901234567890123456789012 Air inlet 12345678901234567890123456789012 12345678901234567890123456789012 12345678901234567890123456789012


Figure 5: ATCA Shelf Boards 2. Put on an ESD wrist strap and connect it to the shelf by attaching the front or rear ESD jack. 3. Ensure that the lower and upper handles are in the outward position. 4. Insert the board into the shelf by placing the top and bottom edges of the board in the card guides of the shelf. Ensure that the guiding module of shelf and board are aligned properly. Press the lower and upper parts of the handle together.

Figure 6: Insert the Board

22 / 46

3BK 17430 3121 RJZZA Ed.07

Not Used

JBXCCP

JBXCCP

JBXCCP

JBXSSW

JBXSSW

JBXCCP

JBXCCP

JBXCCP

JBXTP

JBXTP

2 9130 BSC Evolution Commissioning

5. Slide the board into the shelf until you feel resistance. 6. Simultaneously move the top and bottom handles to the inward position to lock the board to the shelf.

Figure 7: Board in ATCA Shelf, Secured with Handles to the Inward Position

3BK 17430 3121 RJZZA Ed.07

23 / 46

2 9130 BSC Evolution Commissioning

7. Install one by one all the boards for the requested configuration. During boards insertion: Holes on back side of the board must be in line with guiding pins on the back plane

Figure 8: Holes in Line with Guiding Pins EMI stripes must not be damaged when inserting the boards

Figure 9: EMI Stripes 8. Tighten the front plate screws to secure the board to the shelf. 9. Insert a filler (JBXFILL) in each unused slot. 10. Tighten the front plate screws to secure the filler to the shelf.

24 / 46

3BK 17430 3121 RJZZA Ed.07

2 9130 BSC Evolution Commissioning

2.3.2 Check Boards Position in LIU Shelf


Check the configuration requested by the customer. Refer to Site-Specific Information (Section 1.2.2) for details. In case of 200 and 400 TRX configurations check that there are boards on slots 19 and 20 (for slot numbering, see Figure 2), otherwise you must replace the JBXDUM fillers from slots 19 and 20 with the JBXLIU boards from slots 8 and 9, using the procedure below. The following table shows the boards correspondence in case of replacing JBXLIU with JBXDUM: JBXLIU Slot No. in LIU Shelf 8 9 Table 3: Boards Correspondence To move the boards from slots 8 and 9 to slots 19 and 20, in LIU shelf: 1. Put on an ESD wrist strap and connect it to the shelf by attaching the front or rear ESD jack 2. Unfasten the top and the bottom screws of the JBXDUM fillers. 3. Remove the JBXDUM fillers. 4. Unfasten the top and the bottom screws of the JBXLIU boards. The bottom screw is located under the handle. 5. Using the board handle, remove the JBXLIU boards. 6. Using the board handle, insert the JBXLIU boards to the corresponding slots, until you feel resistance (for boards correspondence see Table 3). 7. Fasten the top and the bottom screws of the JBXLIU boards. 8. Insert the JBXDUM fillers in the empty slots. 9. Fasten the top and the bottom screws of the JBXDUM fillers. The following figures show the LIU shelf for different 9130 BSC Evolution 200 and 400 TRX configurations.
JBXPEM JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXDUM JBXDUM JBXMUX JBXMUX JBXDUM JBXDUM JBXDUM JBXDUM JBXDUM JBXDUM JBXLIU JBXLIU JBXPEM

JBXDUM 19 20

48 / 60 VDC

48 / 60 VDC

4A 4A

Figure 10: LIU Shelf for BSC with 200 and 400 TRX Configuration

3BK 17430 3121 RJZZA Ed.07

25 / 46

2 9130 BSC Evolution Commissioning

The following figures show the LIU shelf for different 9130 BSC Evolution 600/800/1000 TRX configuration.
JBXPEM JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXMUX JBXMUX JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXLIU JBXPEM

48 / 60 VDC

48 / 60 VDC

4A 4A

Figure 11: LIU Shelf for BSC with 600 TRX Configuration

26 / 46

3BK 17430 3121 RJZZA Ed.07

2 9130 BSC Evolution Commissioning

2.3.3 Check the ATCA-LIU Ethernet Cables


Shelves used for 9130 BSC Evolution configurations are: ATCA shelf 3 with LIU shelf 1 ATCA shelf 4 and LIU shelf 2. Therefore the inter-shelves Ethernet cables are always connected between: ATCA shelf 3 and LIU shelf 1 ATCA shelf 4 and LIU shelf 2. To connect ATCA-LIU Ethernet cables: 1. Connect the first JLCAT6 Ethernet cable (1AB 22983 0005) on ATCA shelf 3/4, JAXSSW1, Ethernet port 2. See Figure 12.
ETH 1

ETH 1

ETH 2
ETH 3 ETH 4 ETH 5 ETH 6 ETH 7 ETH 8 OOS

ETH 2
ETH 3 ETH 4 ETH 5 ETH 6 ETH 7 ETH 8 OOS

OK

OK

ACT

ACT

ATCA Shelf 3 Rear side


HS HS

JAXSSW2 JAXSSW1 JLCAT6 Ethernet cables 1AB 22983 0005

JBXLIU JBXLIU JBXMUX JBXDUM JBXMUX JBXLIU JBXLIU

Test

Test

GbE

GbE

LIU Shelf 1 Front side

Figure 12: JLCAT6 Cable Connection

3BK 17430 3121 RJZZA Ed.07

27 / 46

2 9130 BSC Evolution Commissioning

2. Run the cable under the JSXLIU shelf 1

ATCA Shelf 4

ATCA Shelf 3

FRONT
Free Space (LIU Shelf 2)

REAR

LIU Shelf 1

Figure 13: JLCAT6 Cable Routing

123456789012345678 123456789012345678

3. Connect the first JLCAT6 Ethernet cable (1AB 22983 0005) to the GbE port on JBXMUX1 (slot 10) in JSXLIU shelf 1/2. See Figure 12. 4. Connect the second JLCAT6 Ethernet cable (1AB 22983 0005) on ATCA shelf 3/4, JAXSSW2, Ethernet port 2. See Figure 12. 5. Run the cable under the JSXLIU shelf 1. See Figure 13. 6. Connect the second JLCAT6 Ethernet cable (1AB 22983 0005) to the GbE port on JBXMUX2 (slot 12) in JSXLIU shelf 1/2. See Figure 12. To connect the OMC-R Ethernet cables: 1. Identify the OMC-R Ethernet cables 2. Connect the first OMC-R Ethernet cable to the ATCA shelf 3/4 JAXSSW1, Ethernet port 3 3. Label the cables near the connectors.

28 / 46

3BK 17430 3121 RJZZA Ed.07

2 9130 BSC Evolution Commissioning

2.3.4 Check the JSXLIU Shelf Address


To check the JSXLIU shelf address: 1. Remove the dummy panel from the slot 11 in JSXLIU shelf 2. On the slot 11 check that the shelf address is set as follows: 1, jumper from position 1 is removed (see Figure 14 a), if the concerning BSC is installed in the lower ATCA Shelf 2, jumper from position 2 is removed (see Figure 14 b), if the concerning BSC is installed in the upper ATCA Shelf
a) b) 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8

MUX A

PEM A

LIU 16

LIU 10

LIU 14

LIU 12

LIU 13

LIU 15

MUX B

10

11

12

13

14

15

16

17

18

19

20

Figure 14: Slot 11 Back Panel Jumper Numbering 3. If the positions of the jumpers are not as described, it must be corrected. 4. Fix the dummy panel on slot 11 and fix it with the screws.

PEM B

LIU 11

LIU 6

LIU 4

LIU 7

LIU 8

LIU 2

LIU 3

LIU 5

LIU 9

LIU 1

21

3BK 17430 3121 RJZZA Ed.07

29 / 46

2 9130 BSC Evolution Commissioning

2.3.5 Connect PCM Cables to JSXLIU Shelf


To connect the PCM cables to the JSXLIU shelf: 1. Connect the cables to the JBXLIU boards 2. Check that there is a good connection of the cables 3. Close the front door to check if the cables are not stressed by it 4. Open the front door and arrange the cables if necessary 5. Attach the cables to the rack 6. Label the cables near the connectors.

30 / 46

3BK 17430 3121 RJZZA Ed.07

2 9130 BSC Evolution Commissioning

2.4 Hardware Checks


2.4.1 Check the Equipment Configuration
The hardware check is done to see if the equipment configuration corresponds to the customers order. Check the presence and position of the boards according to the requested configuration. Refer to the Site-Specific Information and Hardware Description - Rack Configurations sections.

2.4.2 Check the JAXPC Address


Depending on the board variant apply the appropriate case: Check the JAXPC Address for Board Variant Before 3BK 27226 AACA (Section 2.4.3) Check the JAXPC Address from Board Variant 3BK 27226 AACA On (Section 2.4.4).

2.4.3 Check the JAXPC Address for Board Variant Before 3BK 27226 AACA
To check the JAXPC address: 1. Put on an ESD wrist strap and connect it to the shelf by attaching the front or rear ESD jack. 2. Unfasten the screws fixing the JAXPC card to the ATCA shelf. 3. Carefully remove the JAXPC card from the slot. 4. Check if S2 switch is set to 0 and S1 switch is set to 3 for shelf 3 and to 4 for shelf 4 . If different setting is present correct it as follows.

3BK 17430 3121 RJZZA Ed.07

31 / 46

2 9130 BSC Evolution Commissioning

S2

S1

Figure 15: Rotary Switches on JAXPC Card Before Variant 3BK 27226 AACA 5. On the JAXPC board set the S2 switch to 0. 6. On the JAXPC board set the S1 switch to 3 for shelf 3 and to 4 for shelf 4. See Figure 2 for shelf numbering. 7. Carefully insert the JAXPC card in the slot. 8. Tighten the screws fixing the JAXPC card to the ATCA shelf. 9. Place the JAXPC board handle switch to Closed position.

32 / 46

3BK 17430 3121 RJZZA Ed.07

2 9130 BSC Evolution Commissioning

2.4.4 Check the JAXPC Address from Board Variant 3BK 27226 AACA On
To check the JAXPC address: 1. Check if SGA MS switch is set to 0 and SGA LS switch is set to 3 for shelf 3 and to 4 for shelf 4 . If different setting is present correct it as follows.

MS

LS

Figure 16: Rotary Switches on JAXPC Card from Variant 3BK 27226 AACA On 2. On the JAXPC board set the SGA MS switch to 0. 3. On the JAXPC board set the SGA LS switch to 3 for shelf 3 and to 4 for shelf 4. See Figure 2 for shelf numbering. 4. Perform the same operation for both JAXPC cards in a shelf and for both shelves if equipped.

3BK 17430 3121 RJZZA Ed.07

33 / 46

2 9130 BSC Evolution Commissioning

2.4.5 Check the JBXFAN Switch Position


This check must be done only in case of JBXFAN variants before 3BK 27352 AACA. To check the JBXFAN switch position: 1. Unfasten the screws fixing the JBXFAN cover plate.

Figure 17: JBXFAN Cover Fixing Screws 2. Remove the JBXFAN cover plate.

Figure 18: Remove JBXFAN Cover 3. Check if JBXFAN switch is set to Closed position otherwise set it to Close position. 4. Perform the check for all four JBXFAN units and for all equipped ATCA shelves. 5. Fit back the JBXFAN cover and fasten the fixing screws.

34 / 46

3BK 17430 3121 RJZZA Ed.07

2 9130 BSC Evolution Commissioning

2.5 Powering Up the BSC Rack


Two people are needed for performing this task.

2.5.1 Check the Customer Power Panel


To check the rating of the fuses: 1. On the customer power panel, check for the existence of two DC power supply distribution circuits. Each distribution circuit is provided with a DC circuit breaker (fuse holder). (See Site-Specific Information (Section 1.2.2) ) 2. On the power panel, disconnect the two -48V power supply lines by using the fuse holders for the rack. 3. Check that the fuse ratings are in accordance with the SPP document (See SPP-59).

2.5.2 Check Polarity of DC Cables on BSC Side


To check the connection of the power cables between the site power panel and the power interface on the BSC side: 1. At the customer power panel, make sure the two power lines for the BSC are disconnected (breakers OFF) (See Site-Specific Information (Section 1.2.2) ). 2. At the 9130 BSC Evolution, check that the A1 to A5 and B1 to B5 switches, located at the front of the PDU, are OFF. If not, switch them OFF.
A1 A2 A3 A4 A5 B1 B2 B3 B4 B5

I
O

I
O

I
O

I
O

I
O

I
O

I
O

I
O

I
O

I
O

Shelf 4

Shelf 2

Shelf 3

Shelf 1

Shelf 4

Shelf 2

Shelf 3

Shelf 1

Figure 19: PDU on top of 9130 BSC Evolution (JSXPDU)

3BK 17430 3121 RJZZA Ed.07

35 / 46

2 9130 BSC Evolution Commissioning

3. At the top of the BSC rack, remove the PDU cover.


Cover (made of two independent parts for branch A and B) 35 mm
2

from power station VBAT

Breaker

BATR

GND

Cables must be fixed on this plane 16 mm


2

to ATCA shelf

Figure 20: Connections for One Single Breaker 4. Check the power line connections for both lines A and B: Blue cables in the BATA and BATB position Black cables in the BATR position Yellow-green cable in GND position 5. Check that nothing can cause a short circuit between the BATA, BATB and BATR connectors.
Line cable from power station (branch A) 35 mm 2 diameter 14 mm Line cable from power station (Branch B) 35 mm 2 diameter 14 mm

BATA BATR

BATB BATR

Earthing (GND)

75A

10A

75A

10A

75A

75A

10A

75A

10A

75A

Racking braket

Battery return connection plate (BATR)

Figure 21: Connections from Power Station to PDU 6. On the site power panel, connect the power supply line, using fuse holder A first. Circuit A is connected.

36 / 46

3BK 17430 3121 RJZZA Ed.07

2 9130 BSC Evolution Commissioning

7. Test the A circuit. Check with the multimeter the presence of -48V and the polarity between BATA and BATR. 8. On the site power panel, disconnect the power supply line, using fuse holder A. 9. Repeat the previous operations for circuit B. Check the presence of -48V and the polarity between BATA/B and BATR on each circuit, then leave the circuits disconnected. 10. Replace the PDU cover plate.

2.5.3 Powering Up the BSC Rack


In the following steps power up only the shelves used by the installed configuration. To power up the BSC rack: 1. On the JSXPDU, check that the corresponding switches, Ax and Bx are in the OFF position (see Figure 19) where: x is 1 for ATCA Shelf 4 x is 2 for JSXLIU Shelf 2 x is 3 for ATCA Shelf 3 x is 4 for JSXLIU Shelf 1. 2. Check that switches on JBXPS modules are switched OFF, otherwise set them OFF. 3. On the site power panel, connect the DC power supply lines (circuits A and B). DC Lines A and B are connected.

Power Up JSXLIU1 Shelf Power Up ATCA3 Shelf

4. Switch ON (engage) the switches A4 and B4. Power LED on JBXPEMs in JSXLIU shelf switches ON. 5. Switch ON (engage) the breakers A3 and B3. 6. Check on each JBXPS front panel that Rev. Power LED is OFF. If Rev. Power LED is ON switch OFF the breakers A3 and B3 and check power polarity on JBXPS terminals. 7. Switch ON the breaker on all JBXPS modules. The OK green LED on each JBXPS switches ON.

Power Up JSXLIU2 Shelf Power Up ATCA4 Shelf

8. If JSXLIU2 shelf is used, switch ON (engage) the switches A2 and B2. Power LED on JBXPEMs in JSXLIU shelf switches ON. 9. If ATCA4 shelf is used, switch ON (engage) the switches A1 and B1. 10. Check on each JBXPS front panel that Rev. Power LED is OFF. If Rev. Power LED is ON switch OFF the breakers A1 and B1 and check power polarity on JBXPS terminals. 11. Switch ON the breaker on all JBXPS modules. The OK green LED on each JBXPS switches ON.

3BK 17430 3121 RJZZA Ed.07

37 / 46

2 9130 BSC Evolution Commissioning

2.5.4 Check Power Line Redundancy


2.5.4.1 Check Power Redundancy for ATCA Shelves
To check the power lines redundancy for ATCA shelves: 1. Connect an Ethernet cable between the PC and the ETH port of the active shelf manager. The active shelf manager is the one with the ACT LED switched ON. 2. Open a telnet session on the active shelf manager: telnet 172.168.y.x where: x is 8 if the active JAXSMM is JAXSMM1 x is 9 if the active JAXSMM is JAXSMM2 y is 3 for ATCA shelf 3 y is 4 fot ATCA shelf 4. 3. Enter the user name and password: Username: root Password: root 4. Check that the four fan trays are correctly detected. Enter the following command: hpifan An example of the output of the command is given below. resource: {RACK,0}{ADVANCEDTCA_CHASSIS,3}{COOLING_UNIT,0} {COOLING_UNIT,0} fan: num 1, id Fan min 0 max 100 default 35 current 35 resource: {RACK,0}{ADVANCEDTCA_CHASSIS,3}{FAN_TRAY_SLOT,4} {COOLING_UNIT,7} fan: num 1, id Fan min 15 max 100 default 100 state ignored resource: {RACK,0}{ADVANCEDTCA_CHASSIS,3}{FAN_TRAY_SLOT,3} {COOLING_UNIT,6} fan: num 1, id Fan min 15 max 100 default 100 state ignored

38 / 46

3BK 17430 3121 RJZZA Ed.07

2 9130 BSC Evolution Commissioning

resource: {RACK,0}{ADVANCEDTCA_CHASSIS,3}{FAN_TRAY_SLOT,1} {COOLING_UNIT,4} fan: num 1, id Fan min 15 max 100 default 100 state ignored resource: {RACK,0}{ADVANCEDTCA_CHASSIS,3}{FAN_TRAY_SLOT,2} {COOLING_UNIT,5} fan: num 1, id Fan min 15 max 100 default 100 state ignored 5. Check that the four fan trays are running (RPM not equal to zero). Enter the command: hpisensor | grep "RPM" An example of the output of the command is given below. RDR[131073]: Sensor Fan RPM = 1840.00 rpm RDR[131073]: Sensor Fan RPM = 1800.00 rpm RDR[131073]: Sensor Fan RPM = 1840.00 rpm RDR[131073]: Sensor Fan RPM = 1800.00 rpm 6. On the power distribution unit (JSXPDU), switch OFF the -48 V DC power supply lines A3 (if ATCA shelf 3 is used) or A1 (if ATCA shelf 4 is used) using the corresponding fuse holders. 7. Check that the ATCA shelves remain powered up and the boards are not affected. For all boards check the LEDs status. 8. For the fan trays repeat steps 4 and 5, then check that: The four fan trays are still detected RPM must be different from zero. 9. Switch ON the -48 V DC power supply lines A3 (if ATCA shelf 3 is used) or A1 (if ATCA shelf 4 is used). No boards are affected and lines A3 and A1 are connected. 10. On the power distribution unit (JSXPDU), switch OFF the -48 V DC power supply lines B3 (if ATCA shelf 3 is used) or B1 (if ATCA shelf 4 is used) using the corresponding fuse holders. 11. Check that the ATCA shelves remain powered up and the boards are not affected. For all boards check the LEDs status. 12. For the fan trays repeat steps 4 and 5, then check that: The four fan trays are still detected RPM must be different from zero.

3BK 17430 3121 RJZZA Ed.07

39 / 46

2 9130 BSC Evolution Commissioning

13. Switch ON the -48 V DC power supply lines B3 (if ATCA shelf 3 is used) and B1 (if ATCA shelf 4 is equipped) No boards are affected and lines B3 and B1 are connected. 14. Close the connection on the shelf manager and remove the cable.

2.5.4.2 Check Power Redundancy for LIU Shelf


To check the power line redundancy for JSXLIU shelf: 1. On the power distribution unit (JSXPDU), disconnect the -48 V DC power supply line A4 (if JSXLIU shelf 1 is used) or A2 (if JSXLIU 2 is used). 2. Check that the boards in JSXLIU shelf remain powered up and are not affected (The LED on both JBXPEM front plate boards is orange). 3. Reconnect the -48 V DC power line A4 (if JSXLIU shelf 1 is used) or A2 (if JSXLIU 2 is used). No boards are affected and line A4 or A2 are connected. 4. On the power distribution unit (JSXPDU), disconnect the -48 V DC power supply line B4 (if JSXLIU shelf 1 is used) or B2 (if JSXLIU 2 is used). 5. Check that the boards in JSXLIU shelf remain powered up and are not affected (The LED on both JBXPEM front plate boards is orange). 6. Reconnect the -48 V DC power line B4 (if JSXLIU shelf 1 is used) or B2 (if JSXLIU 2 is used). No boards are affected and line B4 or B2 are connected.

2.6 Check BIOS Settings


Perform the following steps for both OMCP1 and OMCP2 boards. To check System Date & Time and Boot Sequence on the OMCPs: 1. Connect the Ethernet cable from the Local PC to the JAXSSW1 port ETH 8 in corresponding ATCA shelf see Connect the LMT to the BSC (Section 2.9.2). 2. Using Internet Protocol (TCP/IP) Properties window, set the Local PC IP address. The IP address for Local PC is 172.17.0.251 The subnetmask is 255.255.0.0 3. Open a DOS console window. Connect to the OMCP board through SHMC as follows: For Windows XP: telnet 172.17.y.8 <port number> Port number is 4503 for OMCP1 Port number is 4504 for OMCP2 y is 3 for the lower ATCA Shelf y is 4 for the upper ATCA Shelf

40 / 46

3BK 17430 3121 RJZZA Ed.07

2 9130 BSC Evolution Commissioning

For Windows 2000: telnet set term vt100 open 172.17.y.8 <port number> Port number is 4503 for OMCP1 Port number is 4504 for OMCP2 y is 3 for the lower ATCA Shelf y is 4 for the upper ATCA Shelf 4. Type the username: root and the password: alcatel 5. Reboot the OMCP board: reboot

Note:

For hardware reset of board variants before 3BK 27236 AACA use the reset button from JBXOMCP board. For board variants from 3BK 27236 AACA on, the reset button is no more available. 6. With the OMCP terminal window connection through SHMC selected, press [ ESC ] + [ 2 ] or press [ F2 ] several times from the installation PC keyboard during the OMCP booting sequence. 7. Check System Time and System Date from Main menu are the current ones, otherwise you must correct it. 8. Check boot sequence from Boot menu are the correct ones, otherwise you must modify it. The correct order must be Hard Drive -> ETH1 -> ETH2 -> CD-ROM Drive -> Removable Devices. 9. Press [ F10 ] and then press [ Enter ] to save the changes you made and exit the BIOS.

2.7 Software Installation


To install the 9130 BSC Evolution software, refer to the 9130 BSC Evolution Software Installation document (3BK 17430 3126 RJZZA). After finishing the software installation perform the commissioning tests.

2.8 Check the Firmware Version


For checking the Firmware Version please refer to 9130 BSC Evolution Firmware Upgrade.

2.9 Commissioning Tests


2.9.1 Option: LMT Installation (O1)
If you have not already installed the LMT, refer to the 9130 BSC Evolution Terminal User Guide for how to install and configure the LMT.

3BK 17430 3121 RJZZA Ed.07

41 / 46

2 9130 BSC Evolution Commissioning

2.9.2 Connect the LMT to the BSC


The LMT cable (with RJ45 connector) must be available at ATCA shelf rear side (shelf 3 or 4). 1. Connect the LMT to the JAXSSW1 (position 7 on used ATCA shelf rear side), port ETH8. See Tools (Section 1.4.1)

ETH 1 ETH 2 ETH 3 ETH 4 ETH 5 ETH 6 ETH 7 ETH 8 OOS

OK

ACT

HS

Figure 22: JAXSSW at the ATCA Rear Side 2. Check on the front panel that the LED corresponding to the connection port is lit (for the port Eth8 the corresponding LED is situated on row 8 column C).
A B C

1 2 3 4 5 6 7 8

B A S E

I N T E R F A C E

Figure 23: Part of JBXSSW Front Plate

42 / 46

3BK 17430 3121 RJZZA Ed.07

2 9130 BSC Evolution Commissioning

2.9.3 Option: Connect O&M cables from MFS to BSC (O2)


In case of rack shared configuration, O&M link can be transported from MFS to OMC-R via BSC. On ATCA rear side, connect the O&M Ethernet cables as follows: 1. Connect the first JLCAT6 cable (1AB229830001) from ATCA Shelf 4 JAXSSW1 port ETH3 to ATCA Shelf 3 JAXSSW1 port ETH3. 2. Connect the second JLCAT6 cable (1AB229830001) from ATCA Shelf 4 JAXSSW2 port ETH3 to ATCA Shelf 3 JAXSSW2 port ETH3.

ETH 1

ETH 1
ETH 2

ETH 2

ETH 3
ETH 4 ETH 5 ETH 6 ETH 7 ETH 8 OOS

ETH 3
ETH 4 ETH 5 ETH 6 ETH 7 ETH 8 OOS

OK

OK

ACT

ACT

ATCA Shelf 4 Rear side


HS HS

JAXSSW2 JAXSSW1

12345678901234567890 JLCAT6 Ethernet cables 12345678901234567890 1AB 22983 0001 12345678901234567890 12345678901234567890 12345678901234567890
ETH 1 ETH 1

ETH 2

ETH 2

ETH 3
ETH 4 ETH 5 ETH 6 ETH 7 ETH 8 OOS

ETH 3
ETH 4 ETH 5 ETH 6 ETH 7 ETH 8 OOS

OK

OK

ACT

ACT

ATCA Shelf 3 Rear side


HS HS

JAXSSW2 JAXSSW1

Figure 24: ATCA Shelf 3,4 rear side

3BK 17430 3121 RJZZA Ed.07

43 / 46

2 9130 BSC Evolution Commissioning

2.9.4 Perform the Rack Inventory


To check the firmware status and the hardware technical level of the hardware by performing a rack inventory: 1. Check the hardware technical level of modules and boards by performing the rack inventory. To perform the 9130 BSC Evolution rack inventory, refer to the CI 08 - Site Equipment Inventory document (3BK 17257 0001 RJZZA). 2. Check that there are no errors reported by the Inventar software regarding the technical level of modules and boards.

2.10 Connect the OMC-R


1. Ask the OMC-R operator to check the network connection to the 9130 BSC Evolution. Open for example SSH connection for all external IP addresses as following: OMCP1 is START_OAM_IP_ADDRESS OMCP2 is START_OAM_IP_ADDRESS + 1 Active OMCP is START_OAM_IP_ADDRESS + 2. See Site-Specific Information (Section 1.2.2). 2. Wait for OMC-R confirmation that the connection is OK.

Check the Equipment Status

3. Wait for the telecom boards to finish their initialization Check the equipment status.

44 / 46

3BK 17430 3121 RJZZA Ed.07

2 9130 BSC Evolution Commissioning

2.11 Option: Check the Connection with the CBC


2.11.1 Open a Telnet Session
To open a Telnet session: 1. In Windows 2000/XP, select: Start Run 2. In Open window enter: telnet 3. Click on [ Ok ] A telnet window opens. 4. Connect to the station as follows: Under Windows 2000, the connection is done as follows: set term vt100 open 172.17.y.x Under Windows XP, the connection is done as follows: open 172.17.y.x where: x is 3 for OMCP1 x is 4 for OMCP2 y is 3 for Shelf 3 y is 4 for Shelf 4 5. Click on [ Enter ] 6. In the Telnet window enter the login name and password. 7. Connect to the router used for connection with CBC server telnet <IP address of the gateway for LSN> By default IP address of the gateway for LSN1 is 172.17.y.10, for LSN2 is 172.18.y.10 user: password: where: y is 3 for Shelf 3 y is 4 for Shelf 4 8. Press [ Enter ] to start.

3BK 17430 3121 RJZZA Ed.07

45 / 46

2 9130 BSC Evolution Commissioning

2.11.2 Ping the CBC


To ping the CBC: 1. Enter the following command to check the connection between the BSC and the CBC: ping <IP address of the CBC> If answers from the CBC are received, the connection between the BSC and the CBC server is established. 2. Exit from the router: quit 3. Exit from BSC Control Station exit

2.12 End of Commissioning


1. Leave the 9130 BSC Evolution powered up 2. Close the doors of the rack 3. Check the CCL 4. Leave the site tidy: Remove all packaging and unused equipment. Clean the site. 5. Close the site and hand the keys to the key holder 6. Return the completed forms and the inventory files relating to the operation to base.