Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
OBRA GRUESA
UNIDAD
Ciudad : Sucre
Computado por: Juan Pablo Ach
Revisado por:
tipo de cambio =
CANTIDAD
P.UNIT. Bs.
7.07
PARCIAL Bs.
OBRAS PREPARATORIAS
1
2
3
4
INSTALACIN DE FAENAS
GL
1.00
287.50
287.50
REPLANTEO Y TRAZADO
GL
32.42
17.25
559.25
M3
41.33
23.00
0.00
950.59
M2
88.68
129.48
11482.15
6
7
8
M2
268.60
138.81
37283.02
M2
108.12
219.26
23706.28
CANALETA DE DESAGUE
ML
48.68
74.42
3622.60
#VALUE!
ESTRUCTURAS DE H A
9
10
11
12
13
14
15
16
17
ZAPATAS DE HA
M3
9.60
1689.50
16219.20
COLUMNA DE HA
M3
5.23
2908.95
15213.80
VIGA DE HA
M3
8.29
2543.21
21083.24
CIMIENTOS DE HC
M3
21.03
629.66
13241.74
IMPERMEABILIZACION DE CIMIENTOS
M2
37.65
42.81
1611.97
SOBRE CIMIENTOS HC
M3
5.79
750.78
4347.00
MURO DE CONTENCION DE HA
M3
8.97
2250.57
20187.64
LOSA ALIVIANADA N 10
M2
210.20
346.04
72736.56
ESCALERAS DE H A
M3
3.14
2496.78
7839.88
18
EMPEDRADO Y CONTRAPISO DE H
M2
94.46
88.88
8395.94
19
M2
91.90
135.76
12476.11
20
M2
187.64
135.76
25473.54
21
22
23
24
25
26
27
28
29
30
31
32
M2
279.54
17.53
4899.22
M2
148.77
128.17
19067.48
ML
278.35
200.09
55694.63
ML
73.54
27.89
2050.85
REVESTIMIENTO DE AZULEJO
M2
52.75
189.46
9994.15
REVOQUE EXTERIOR
M2
77.57
70.14
5440.64
M2
555.50
40.89
22716.62
M2
279.54
48.74
13623.94
M2
140.59
124.58
17514.63
M2
555.50
32.46
18034.03
M2
77.57
20.47
1587.86
BARNIZADO EN MADERA
CARPINTERIA PUERTA VIDRIERA TARARA
INCLUYE QUINCALLERIA
CARPINTERIA VENTANAS INCLUYE
QUINCALLERIA
M2
76.41
45.32
3463.02
PZA
23.00
1241.86
28562.83
PZA
20.00
611.55
12230.94
33
34
35
36
37
38
39
40
41
42
43
44
PZA
2.00
681.88
1363.76
PZA
4.00
412.97
1651.86
PZA
4.00
521.58
2086.33
PZA
2.00
662.17
1324.34
PZA
2.00
624.08
1248.16
PZA
2.00
1266.38
2532.76
PZA
3.00
508.28
1524.83
CAMARA DESGRASADORA
PZA
2.00
508.28
1016.55
REJILLA DE PISO
PZA
12.00
50.49
605.82
PTO
1.00
977.50
977.50
PTO
30.00
28.29
848.70
PTO
2.00
279.45
558.90
PTO
15.00
75.08
1126.25
PTO
20.00
218.48
4369.54
PZA
1.00
749.80
749.80
PZA
9.00
38.05
342.48
ML
10.25
98.18
1006.30
ML
36.50
90.59
3306.37
ML
25.54
195.58
4995.13
GBL
1.00
460.00
INSTALACION ELECTRICA
45
46
47
48
49
50
ACABADOS
51
52
53
54
LIMPIEZA GENERAL
460.00
543694.21
Son Cuatrocientos setenta y dos mil cuatrocientos setenta y nueve 76/100 Bolivianos
Son sesenta y seis mil ochocientos veintiocho 82/100 Dlares Amricanos
PARC.$US
287.5
17.25
23
0
40.66
250.00
79.10
15.00
134.45
20.00
1624.07
112.59
129.4785
5273.41
120.70
3353.08
190.66
512.39
64.71
2294.09
1469.13
2151.88
2529.52
2982.07
2211.49
1872.95
547.53
138.805
219.259
74.4165
#VALUE!
1689.4995
2908.948
2543.2135
629.6595
42.8145
750.7775
2250.573
346.035
2496.7765
228.00
37.23
614.85
652.85
2855.39
1957.02
10288.06
300.90
1108.89
2171.11
0
1187.54
77.29
88.8835
1764.66
118.05
135.7575
3603.05
118.05
135.7575
692.96
15.24
2696.96
111.45
7877.60
173.99
290.08
24.25
1413.60
164.75
769.54
60.99
3213.10
35.56
1927.01
42.38
2477.32
108.33
2550.78
28.23
224.59
17.80
489.82
39.41
17.526
128.1675
200.0885
27.8875
189.4625
70.1385
40.894
48.737
124.5795
32.4645
20.47
45.3215
4040.00
1079.88
1241.862
1729.98
531.78
611.547
192.89
592.94
233.64
359.10
295.10
453.55
187.32
575.80
176.54
542.68
0
681.881
412.965
521.5825
662.17
624.082
358.24
1101.20
1266.38
215.68
441.98
143.78
441.98
508.277
508.277
50.485
977.5
0
28.29
279.45
75.0835
218.477
749.8
38.0535
0
98.1755
90.5855
195.5805
460
85.69
43.90
138.26
850.00
120.04
24.60
79.05
243.00
159.30
65.29
618.04
189.98
106.05
652.00
48.44
33.09
142.33
85.37
467.66
78.77
706.52
170.07
65.06
400.00
76901.59
P.UNIT. Bs.
PARCIAL Bs.
PARC.$US
OBRA GRUESA
M2
272.82
85.00
23189.70
2862.93
OBRA FINA
M2
272.82
85.00
23189.70
2862.93
46379.40
5725.85
P.UNIT. Bs.
PARCIAL Bs.
PARC.$US
OBRA GRUESA
M2
272.82
75.00
20461.50
2526.11
OBRA FINA
M2
272.82
75.00
20461.50
2526.11
40923.00
5052.22