Sei sulla pagina 1di 5

TMP (BJ1-F1) PROJECT

JOB SAFETY ANALYSIS (JSA) WORKSHEET

To: Mr. Y. Masuda - CSSB

Task / Job Description: Installation of Fabrication Yard Validity Period: Permit / Work Order No.:

Type of JSA

New

Revised

Purpose of JSA

Non Routine Work

Routine Work

Turnaround

Projects

Other:

CONTRACTOR / SUB CONTRACTOR Name Prepared by:


Mhd. Norizatdin

Main Contractor/Contractor Signature Date


27/7/11

Position Project coordinator

Company Taisei (TEM)

Name

Position

Company

Signature

Date

Reviewed by: 1 Tadam Sinawat 2 Thomas Ngasu 3 4 5

HSE Officer QC

Taisei (TEM) Taisei (TEM)

27/7/11 27/7/11

Reviewed by: 1 2 3 4 Main Contractor/Contractor: 1

Approved for Submission: 1

Workers : I acknowledge receiving these instruction, understand and will fully comply with the JSA (Toolbox after approval of this JSA) Company Name Signature I/C No. Date Company Name Signature

I/C No.

Date

Work Supervisor :

I Certify that I have explained JSA to all workers :

Name :. Signature : .

Date :

Page 1 of 5

TMP (BJ1-F1) PROJECT


JOB SAFETY ANALYSIS (JSA) WORKSHEET
Task / Job Description : Permit / Work Order No. : Potential Hazard Example for Specific Categories : Worker Slip/ Trip/ Fall Struck/ Against Overhead Work Burn (Heat/ Chemical) Eye Injury Radiation Hazard Sharp Objects Back Injury Hazardous Chemical Contacted by/ with Caught/ in/ on/ between Strains Electrical Hazard Equipment Fire Damage (Physical) Loss of Production Explosion Environment Gas Release Spill or Loss of Containment Dusty Off-Site Impact Severity: Extreme High Medium Low Multiple facilities, extensive damage or prolong loss of production. Single Fatality, major injury, > 1 lost Time Injury (LTI) major and loss of production. Major & minor injury loss of production. No injury, slight damage to equipment and no loss to production. Functional Area: Taisei Laydown Area Specific Area :

RISK RATING

Severity Low Med High Low Med High Extreme Controls

Likelihood Low Med High L L M L M H M H EX Mitigation


Safe working practices OPP, PTW, HSEMS OPP, HSEMS, PTW, HSE awareness, Special procedure, HSE awareness, OSH program

Likelihood: High Probable, likely to occur. Medium Possible could occur. Low Remote, unlikely to occur.

Basic Job Step 1.0 Site Survey and supervision

Potential Hazard

Who or What might be harmed (Person/Equip/ Env) Person

Risk Rating L

Action Party Supervisor

Traffic Coalition

Ensure all worker attend general Toolbox talk Observed traffic rules at all time.

2.0 Lifting Operation 2.1 Mobilize crane to work area 2.2 Positioning Mobile crane 2.3 Selection of lifting gear Pedestrians Traffic coalition Soft ground Under rated lifting gear Lifting gear fitness Person Equipment Person Equipment Person Equipment L L L L L L Mobile crane to be guide by Banks man wearing Orange vest Use steel plate when ground is soft Use padding base plate for out rigger. Outrigger shall be fully extended Trained rigger to confirm sling and tackle capacity, color coded and in good condition prior start work Worker Supervisor Crane operator Safety Supervisor Rigger

Page 2 of 5

TMP (BJ1-F1) PROJECT


JOB SAFETY ANALYSIS (JSA) WORKSHEET
Task / Job Description : Permit / Work Order No. : Functional Area: Taisei Laydown Area Specific Area :

Basic Job Step

Potential Hazard

Who or What might be harmed (Person/Equip/ Env) Who or What might be harmed (Person/Equip/ Env) Person Equipment

Risk Rating Risk Rating L

Controls

Action Party Action Party Rigger Supervisor

Basic Job Step

Potential Hazard

Controls

2.4 Lifting and install steel


structure.

Falling object Struck between object Pinch point

Ensure tagging is secured prior lift started. Ensure area barricaded. No person to be allowed under suspended load at all time Rigger to control load from swinging with tag line

3.0 Bolt tightening 3.1 Work with hand tools Pinch point Falling object Person L Ensure hand tools inspected prior start work. Use right tools for the job Hand tools to be secure with lanyard Worker Supervisor

4.0 Roof cladding installation 4,1 Working at height

Fall to different level Slip, trip and fall Falling object

Person Equipment

L L

Wear full body harness with double lanyard & 100% tie-off at all time to a secured anchorage point

Worker Supervisor

Use only safe scaffold structure with Green tag.

Barricade work area and posted signage men working above

Remove unwanted materials from height.

Page 3 of 5

TMP (BJ1-F1) PROJECT


JOB SAFETY ANALYSIS (JSA) WORKSHEET
Task / Job Description : Permit / Work Order No. : Functional Area: Taisei Laydown Area Specific Area :

Basic Job Step

Potential Hazard

Who or What might be harmed (Person/Equip/ Env) Person Equipment

Risk Rating L L

Controls

Action Party Worker

4.2 Handling of roof cladding 5.0 Hot work

Hand injuries Falling and flying object

Wear leather glove Secured cladding immediately whilst at height with tapper screw to its position.

5.1 Work with

power tools

Electrocutions Contact with rotating part Flying object

Person Equipment

L L L

Ensure power tool inspected and color coded Avoid work in wet conditions Use only industrial approves cord and socket. Do not remove safety guard Wear double eye protection. Face shield and safety glasses

Workers Supervisor

5.2 Welding support

Fire Combustible materials Eye injury

Person Equipment

L L L

Contain welding spatter with fire blanket. Remove combustible materials from welding area. Wear approve welding face shield. Ensure fire extinguisher available with watchman.

Workers Supervisor

6.0 Installation of electrical cable and utility 6.1 Cable pulling Hand injuries Back injury Person L Wear hand glove Share load with co-worker Train worker correct technique on manual handling Supervisor Worker HSE

Page 4 of 5

TMP (BJ1-F1) PROJECT


JOB SAFETY ANALYSIS (JSA) WORKSHEET
Task / Job Description : Permit / Work Order No. : Functional Area: Taisei Laydown Area Specific Area :

Basic Job Step 7.0 Completion of work

Potential Hazard

Who or What might be harmed (Person/Equip/ Env) Person

Risk Rating L

Controls

Action Party

Housekeeping

Remove all barrier tape and signages Ensure waste remove from site by respective contractor Supervisor

Page 5 of 5