Sei sulla pagina 1di 1

DEVELOPMENT STATE/TRIPURA

First track L
ittle Anshuman, a student when an engine of the Northeast
of class five, kept his ear Frontier Railway reached here af-
close to the rail track in a ter traversing a stretch of 68 km
bid to catch an ‘unknown’ noise between Ambassa and Agartala.
amid sounds of approaching joy The train started its journey from
and celebration. He kept struck to Swapnabari, in Authamura hill
the rail, as his ear sensed the slow ranges, amid unprecedented se-
rumbling in the track. But before curity cover. “Since it was a trial
he could understand what that run so we drove the engine very
sound really was, he was whisked slowly. We did not face any prob-
away by a cop who by then had lem on the way but we stopped
at all stations as crowds gathered

Debiprasad Bhowmik
heard over his wireless set that it
was approaching. everywhere to get a glimpse of
Anshuman ran straight to the the engine. I have never seen such
platform and soon got mingled enthusiasm before,” said Narayan
in the crowd, which flooded the Dutta, one of the drivers of the en-
Agartala Railway Station to wit- gine. While Narayan was talking
ness a ‘historic event’. At last to reporters, the other members of People cheer as the train makes its first chug.

the moment came – a giant rail his crew – driver Sudhanshu Ku-
engine, overloaded with people, mar Das and assistants Nabendu many as 36 people – attached to and Baramura hill ranges, which
finally moved into the Agartala Bhattacharjee and Chandan Ma- this project - died in nearly 28 separate Agartala from Ambassa.
Railway Station, opening a new jumder – got into a huddle with militant attacks during work. The Now that the engine trial has been
chapter in Tripura’s glorious his- other railway staff members to rebels kidnapped a total of 67 successful, soon the Railway
tory. For the thousands of people celebrate the day. Agartala has people connected to this rail proj- Safety and Security Board will
who had turned up since early become the second state capital ect and only 19 were freed after visit the state and a goods train tri-
morning – the long wait was over. in the Northeast after Guwahati huge ransoms were paid to the ul- al will be done. Once the Railway
It was not a wait of a day; it was to have a railhead. tras. “It was a big challenge and Safety and Security Board gives
a wait of decades. For little Ans- Trains first reached Tripura in at times, it was difficult but we final clearance, passenger service
human the joy was some thing 1964 when the railway was ex- had only one mission – to bring will begin. The NFR is eyeing the
beyond imagination. Holding his tended from Southern Assam to the rail up to Agartala and we did auspicious day of 15th August to
breathe, he shouted, “My Agartala the North Tripura town of Dhar- it because we got all-round sup- start passenger service.
now has a rail” – Anshuman’s joy managar. Later it was extended port,” said F.S. Meena, Deputy Meanwhile, the Agartala- Sa-
perhaps reverberated in every one further to Kumarghat. But then, it Chief Engineer, the Northeast broom rail link project has been
and the happiness was writ large took 40 years to get the railhead Frontier Railways (Construc- sanctioned. The 110 km Agartala
on every face. “It is a great mo- to Agartala. Long sustained tribal tion). - Sabroom line work would be-
ment. I have no words to express insurgency in the state has a lot The 109-km rail link between gin by January 2009. The Tripura
my joy. In my youth, I had taken to do with it. The impetus grew Kumarghat, in North Tripura dis- government is trying to push the
part in agitations in the demand more in the Manmohan Singh led trict bordering Assam, and Agar- Centre to begin Agartala–Dhaka
of a railhead, now I have grown UPA government at the Centre tala was sanctioned in 1997 by and Sabroom–Chittagong rail
old but I am glad that our demand with nagging pressure from the the then HD Dave Gowda gov- service. Experts here feel that if
has been fulfilled,” said Ramen- state government. Chief Minister ernment. The rough terrain and Agartala is linked to Bangladesh
dra Banik, an octogenarian. Manik Sarkar had been the most the threat of militant attack had via rail, the Northeast can very
This spell of joy ahead of vocal about it. forced the NFR to carry out the easily access the Southeast Asian
Kharchi Puja – a major festival of This project was a herculean work of laying the tracks at snail markets through the Chittagong
the indigenous tribes, has come at challenge for the Northeast Fron- pace. port.
a good time. Agartala finally made tier Railway. The ‘human cost’ Moreover, big tunnels had to
it to the national rail network of this project was enormous. As be cut through the Atharamura Ratnadeep Choudhury

30 August 08 August 08 31

Potrebbero piacerti anche