GLOBAL KNIT-WEAR LTD

269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : August' 2008

Working Days : 24 Days Out Of 31 Days.

Working Hours : 192 Hours

General Overtime : 96 Hours

Actual Working Hours : 288 Hours

Power Failure : 156.33 Hours

Number Of Total Machine : 547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 543 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 764 44 808

B) New Recruit : 38 0 38

C) Separated during the Month : 35 0 35

Total at the close of Month (A+B- C) : 767 44 811

Approved Manpower : 869 Nos

Avarage Attendance Present 93.50% Absent 6.50%

Hours Hours Hours


A) Requisition Over Time : 50045 1492 51537

B) General Over Time : 14820 2414 17234

C) Total Over Time (A+B) : 64865 3906 68771

D) Over Time Amount : 772542 46520 819063

Factory Closed On :
01) 05 Fri Day

01) 02 Holy Day

__________________ ________________
Personnel-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : July' 2008

Working Days : 27 Days Out Of 31 Days.

Working Hours : 216 Hours

General Overtime : 108 Hours

Actual Working Hours : 324 Hours

Power Failure : 149.18 Hours

Number Of Total Machine : 547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 541 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 757 44 801

B) New Recruit : 42 0 42

C) Separated during the Month : 35 0 35

Total at the close of Month (A+B- C) : 764 44 808

Approved Manpower : 869 Nos

Avarage Attendance Present 93.55% Absent 6.45%

Hours Hours Hours


A) Requisition Over Time : 33680 1144 34824

B) General Over Time : 14734 2432 17166

C) Total Over Time (A+B) : 48414 3576 51990

D) Over Time Amount : 576611 42590 619201

Factory Closed On :
01) 04 Fri Day

__________________ ________________
Personnel-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : June' 2008

Working Days : 27 Days Out Of 31 Days.

Working Hours : 208 Hours

General Overtime : 104 Hours

Actual Working Hours : 312 Hours

Power Failure : 199.18 Hours

Number Of Total Machine : 547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 541 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 755 44 799

B) New Recruit : 30 0 30

C) Separated during the Month : 28 0 28

Total at the close of Month (A+B- C) : 757 44 801

Approved Manpower : 869 Nos

Avarage Attendance Present 91.03% Absent 8.97%

Hours Hours Hours


A) Requisition Over Time : 29831 1020 30851

B) General Over Time : 13034 2664 15698

C) Total Over Time (A+B) : 42865 3684 46549

D) Over Time Amount : 510522 43876 554399

Factory Closed On :
01) 04 Fri Day

__________________ ________________
Personnel-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : May' 2008

Working Days : 26 Days Out Of 31 Days.

Working Hours : 208 Hours

General Overtime : 104 Hours

Actual Working Hours : 312 Hours

Power Failure : 188.47 Hours

Number Of Total Machine : 547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 541 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 748 44 792

B) New Recruit : 44 0 44

C) Separated during the Month : 37 0 37

Total at the close of Month (A+B- C) : 755 44 799

Approved Manpower : 869 Nos

Avarage Attendance Present 92.84% Absent 7.16%

Hours Hours Hours


A) Requisition Over Time : 22739 719 23458

B) General Over Time : 13907 2602 16509

C) Total Over Time (A+B) : 36646 3321 39967

D) Over Time Amount : 436454 39553 476007

Factory Closed On :
01) 04 Fri Day (Now In Wednes Day)

02) 1 Day 1st May

__________________ ________________
Personnel-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : April' 2008

Working Days : 24 Days Out Of 30 Days.

Working Hours : 192 Hours

General Overtime : 96 Hours

Actual Working Hours : 288 Hours

Power Failure : 169.50 Hours

Number Of Total Machine : 547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 541 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 744 44 788

B) New Recruit : 43 0 43

C) Separated during the Month : 39 0 39

Total at the close of Month (A+B- C) : 748 44 792

Approved Manpower : 869 Nos

Avarage Attendance Present 93.31% Absent 6.69%

Hours Hours Hours


A) Requisition Over Time : 27935 851 28786

B) General Over Time : 13809 2346 16155

C) Total Over Time (A+B) : 41744 3197 44941

D) Over Time Amount : 497171 38076 535247

Factory Closed On :
01) 05 Fri Day (Now In Wednes Day)

02) 01 Day For 1st Boishak.

__________________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : March' 2008

Working Days : 26 Days Out Of 31 Days.

Working Hours : 208 Hours

General Overtime : 104 Hours

Actual Working Hours : 312 Hours

Power Failure : 73.55 Hours

Number Of Total Machine : 547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 541 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 733 44 777

B) New Recruit : 31 0 31

C) Separated during the Month : 20 0 20

Total at the close of Month (A+B- C) : 744 44 788

Approved Manpower : 869 Nos

Avarage Attendance Present 93.92% Absent 6.08%

Hours Hours Hours


A) Requisition Over Time : 25147 672 25819

B) General Over Time : 13857 2099 15956

C) Total Over Time (A+B) : 39004 2771 41775

D) Over Time Amount : 464538 33003 497540

Factory Closed On :
01) 04 Fri Day (Now In Wednes Day)

02) 01 Day For Melad-Un-Nabi.

__________________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Monthly Production Report
Month : February' 2008

Working Days : 24 Days Out Of 29 Days.

Working Hours : 192 Hours

General Overtime : 96 Hours

Actual Working Hours : 288 Hours

Power Failure : 60.45 Hours

Number Of Total Machine : 547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 541 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 729 44 773

B) New Recruit : 49 0 49

C) Separated during the Month : 45 0 45

Total at the close of Month (A+B- C) : 733 44 777

Approved Manpower : 869 Nos

Avarage Attendance Present 95.09% Absent 4.91%

Hours Hours Hours


A) Requisition Over Time : 26280 690 26970

B) General Over Time : 12050 2076 14126

C) Total Over Time (A+B) : 38330 2766 41096

D) Over Time Amount : 456510 32943 489453

Factory Closed On :
01) 04 Fri Day (Now In Wednes Day)

02) 01 Day For 21st February .

__________________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : January' 2008

Working Days : 26 Days Out Of 31 Days.

Working Hours : 208 Hours

General Overtime : 104 Hours

Actual Working Hours : 312 Hours

Power Failure : 73.00 Hours

Number Of Total Machine : 547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 536 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 726 44 770

B) New Recruit : 49 0 49

C) Separated during the Month : 46 0 46

Total at the close of Month (A+B- C) : 729 44 773

Approved Manpower : 869 Nos

Avarage Attendance Present 94.67% Absent 5.33%

Hours Hours Hours


A) Requisition Over Time : 13100 423 13523

B) General Over Time : 9439 2191 11630

C) Total Over Time (A+B) : 22539 2614 25153

D) Over Time Amount : 268439 31133 299572

Factory Closed On :
01) 05 Fri Day (Now In Wednes Day)

__________________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : December' 2007
Working Days : 22 Days Out Of 31 Days.

Working Hours : 176 Hours

General Overtime : 88 Hours

Actual Working Hours : 264 Hours

Power Failure : 39.55 Hours

Number Of Total Machine : 547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 534 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 687 44 731

B) New Recruit : 31 1 32

C) Separated during the Month : 32 1 33

Total at the close of Month (A+B- C) : 686 44 730

Approved Manpower : 869 Nos

Avarage Attendance Present 89.55% Absent 10.45%

Hours Hours Hours


A) Requisition Over Time : 8532 394 8926

B) General Over Time : 7230 2244 9474

C) Total Over Time (A+B) : 15762 2638 18400

D) Over Time Amount : 154152 25800 219144

Factory Closed On :
01) 05 Holy Day During Eid-Ul-Azha

02) 04 Fri Day (Now In Wednes Day)

__________________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : November' 2007
Working Days : 26 Days Out Of 30 Days.

Working Hours : 208 Hours

General Overtime : 104 Hours

Actual Working Hours : 312 Hours

Power Failure : 82.07 Hours

Number Of Total Machine : 547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 527 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 677 45 722

B) New Recruit : 25 1 26

C) Separated during the Month : 15 2 17

Total at the close of Month (A+B- C) : 687 44 731

Approved Manpower : 869 Nos

Avarage Attendance Present 93.78% Absent 6.22%

Hours Hours Hours


A) Requisition Over Time : 13246 772 14018

B) General Over Time : 7893 1980 9873

C) Total Over Time (A+B) : 21139 2752 23891

D) Over Time Amount : 206739 26915 233654

Factory Closed On :

02) 04 Fri Day (Now In Wednes Day)

__________________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : October' 2007
Working Days : 22 Days Out Of 31 Days.

Working Hours : 176 Hours

General Overtime : 88 Hours

Actual Working Hours : 264 Hours

Power Failure : 62.35 Hours

Number Of Total Machine : 547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 527 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 702 45 747

B) New Recruit : 9 0 9

C) Separated during the Month : 34 0 34

Total at the close of Month (A+B- C) : 677 45 722

Approved Manpower : 869 Nos

Avarage Attendance Present 85.15% Absent 14.85%

Hours Hours Hours


A) Requisition Over Time : 8063 457 8520

B) General Over Time : 3651 2405 6056

C) Total Over Time (A+B) : 11714 2862 14576

D) Over Time Amount : 114563 27990 142553

Factory Closed On :

01) 06 Holy Day During Eid-Ul-Fitre

02) 03 Fri Day (Now In Wednes Day)

__________________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : September' 2007
Working Days : 27 Days Out Of 30 Days (Including Extra Working Day For Khatoni)

Working Hours : 216 Hours

General Overtime : 108 Hours

Actual Working Hours : 324 Hours

Power Failure : 82.40 Hours

Number Of Total Machine : 547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 527 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 702 45 747

B) New Recruit : 10 0 10

C) Separated during the Month : 10 0 10

Total at the close of Month (A+B- C) : 702 45 747

Approved Manpower : 869 Nos

Avarage Attendance Present 91.10% Absent 8.90%

Hours Hours Hours


A) Requisition Over Time : 20253 474 20727

B) General Over Time : 7385 2254 9639

C) Total Over Time (A+B) : 27638 2728 30366

D) Over Time Amount : 270300 26680 296979

Factory Closed On :

01) 03 Fri Day (Now Wednes Day)

__________________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : August' 2007
Working Days : 25 Days Out Of 31 Days

Working Hours : 200 Hours

General Overtime : 100 Hours

Actual Working Hours : 300 Hours

Power Failure : 47.50 Hours

Number Of Total Machine : 547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 527 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 703 45 748

B) New Recruit : 2 0 2

C) Separated during the Month : 3 0 3

Total at the close of Month (A+B- C) : 702 45 747

Approved Manpower : 869 Nos

Avarage Attendance Present 91.10% Absent 8.90%

Hours Hours Hours


A) Requisition Over Time : 9082 160 9242

B) General Over Time : 5610 2390 8000

C) Total Over Time (A+B) : 14692 2550 17242

D) Over Time Amount : 143688 24939 168627

Factory Closed On :

01) 05 Fri Day (Now Wednes Day)

02) 01 Holy Day For Shob-E-Borat

__________________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : July' 2007
Working Days : 27 Days Out Of 31 Days

Working Hours : 216 Hours

General Overtime : 108 Hours

Actual Working Hours : 324 Hours

Power Failure : 114.50 Hours

Number Of Total Machine : 547 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 527 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 708 45 753

B) New Recruit : 29 0 29

C) Separated during the Month : 34 0 34

Total at the close of Month (A+B- C) : 703 45 748

Approved Manpower : 869 Nos

Avarage Attendance Present 90.64% Absent 9.36%

Hours Hours Hours


A) Requisition Over Time : 16996 360 17356

B) General Over Time : 32909 3059 35968

C) Total Over Time (A+B) : 49905 3419 53324

D) Over Time Amount : 488071 33438 521509

Factory Closed On :

01) 04 Fri Day Now (Wednes Day)

_________________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : June'2007
Working Days : 26 Days Out Of 30 Days

Working Hours : 208 Hours

General Overtime : 104 Hours

Actual Working Hours : 312 Hours

Power Failure : 87.50 Hours

Number Of Total Machine : 549 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 537 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 700 45 745

B) New Recruit : 41 0 41

C) Separated during the Month : 33 0 33

Total at the close of Month (A+B- C) : 708 45 753

Approved Manpower : 869 Nos

Avarage Attendance Present 90.90% Absent 9.10%

Hours Hours Hours


A) Requisition Over Time : 4455 415 4870

B) General Over Time : 35364 2332 37696

C) Total Over Time (A+B) : 39819 2747 42566

D) Over Time Amount : 389430 26866 416295

Factory Closed On :

01) 04 Fri Day Now (Wednes Day)

_________________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : May'2007

Working Days : 25 Days Out Of 31 Days


Working Hours : 200 Hours

General Overtime : 100 Hours

Actual Working Hours : 300 Hours

Power Failure : 81.00 Hours

Number Of Total Machine : 549 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 537 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 708 45 753

B) New Recruit : 41 0 41

C) Separated during the Month : 30 0 30

Total at the close of Month (A+B- C) : 719 45 764

Approved Manpower : 869 Nos

Avarage Attendance Present 90.90% Absent 9.10%

Hours Hours Hours


A) Requisition Over Time : 0

B) General Over Time : 0

C) Total Over Time (A+B) : 0 0 0

D) Over Time Amount : 0 0 0

Factory Closed On :

01) 05 Fri Day

02) 01 Holi Day (May Day)

_________________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : April'2007

Working Days : 25 Days Out Of 30 Days

Working Hours : 200 Hours


General Overtime : 100 Hours

Power Failure : 55.35 Hours

Actual Working Hours : 300 Hours

Number Of Total Machine : 549 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 537 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 750 42 792

B) New Recruit : 27 0 27

C) Separated during the Month : 20 0 20

Total at the close of Month (A+B- C) : 757 42 799

Approved Manpower : 869 Nos

Avarage Attendance Present 91.65% Absent 8.35%

Hours Hours Hours


A) Requisition Over Time : 8096 490 8586

B) General Over Time : 33800 2609 36409

C) Total Over Time (A+B) : 41896 3099 44995

D) Over Time Amount : 409743 30308 440051

Factory Closed On :

01) 04 Fri Day

02) 01 Holi Day

_________________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : April'2007

Working Days : 25 Days Out Of 30 Days

Working Hours : 200 Hours

General Overtime : 100 Hours


Power Failure : 55.35 Hours

Actual Working Hours : 300 Hours

Number Of Total Machine : 549 Nos.(Knitting 5G & 7G With All Other Machine)

Number Of Machine Use : 537 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 750 42 792

B) New Recruit : 27 0 27

C) Separated during the Month : 20 0 20

Total at the close of Month (A+B- C) : 757 42 799

Approved Manpower : 869 Nos

Avarage Attendance Present 91.65% Absent 8.35%

Hours Hours Hours


A) Requisition Over Time : 8096 490 8586

B) General Over Time : 33800 2609 36409

C) Total Over Time (A+B) : 41896 3099 44995

D) Over Time Amount : 409743 30308 440051

Factory Closed On :

01) 04 Fri Day

02) 01 Holi Day

_________________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : March'2007

Working Days : 27 Days Out Of 31 Days

Working Hours : 216 Hours

General Overtime : 104 Hours

Power Failure : 27.45 Hours (Without Generator from 17.03.07 to 31.03.07)


Actual Working Hours : 324 Hours

Number Of Total Machine : 549 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 537 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 753 42 795

B) New Recruit : 34 0 34

C) Separated during the Month : 30 0 30

Total at the close of Month (A+B- C) : 757 42 799

Avarage Attendance Present 88.70% Absent 11.30%

Hours Hours Hours


A) Requisition Over Time : 6732 609 7341

B) General Over Time : 30936 1971 32907

C) Total Over Time (A+B) : 37668 2580 40248

D) Over Time Amount : 368393 25232 393625

Factory Closed On :

01) 03 fridays (02 Fridays adjust with 02 exsisting festivalholidy for Eid-ul-azha, i.e general workingdays)

02) 01 Holi Day

_________________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : February'2007

Working Days : 23 Days Out Of 28 Days

Working Hours : 224 Hours

General Overtime : 112 Hours

Power Failure : 147.41 Hours (Without Generator)

Actual Working Hours : 336 Hours


Number Of Total Machine : 549 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 537 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 708 40 748

B) New Recruit : 41 0 41

C) Separated during the Month : 29 0 29

Total at the close of Month (A+B- C) : 720 40 760

Avarage Attendance Present 89.73% Absent 10.27%

Hours Hours Hours


A) Requisition Over Time : 7566 848 8414

B) General Over Time : 26853 1787 28640

C) Total Over Time (A+B) : 34419 2635 37054

D) Over Time Amount : 336618 25770 362388

Factory Closed On :

01) 04 Fri Day

02) 01 Holy Day (Mother Language Day).

_________________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : January'2007

Working Days : 23 Days Out Of 31 Days

Working Hours : 184 Hours

General Overtime : 92 Hours

Power Failure : 110.34 Hours (Without Generator)

Actual Working Hours : 276 Hours

Number Of Total Machine : 549 Nos.(Knitting 5G & 7G With All Outher Machine)
Number Of Machine Use : 537 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 689 40 729

B) New Recruit : 57 0 57

C) Separated during the Month : 38 0 38

Total at the close of Month (A+B- C) : 708 40 748

Avarage Attendance Present 88.00% Absent 12.00%

Hours Hours Hours


A) Requisition Over Time : 20099 848 20947

B) General Over Time : 14722 1385 16107

C) Total Over Time (A+B) : 34821 2233 37054

D) Over Time Amount : 340549 21839 362388

Factory Closed On :

01) 04 Fri Day

02) 04 Holy Day (For Eid-Ul-Azha)

_________________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : December'2006

Working Days : 24 Days Out Of 31 Days

Working Hours : 192 Hours

General Overtime : 96 Hours

Power Failure : 81.53 Hours (Without Generator)

Actual Working Hours : 288 Hours

Number Of Total Machine : 549 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 543 Nos.


PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 762 40 802

B) New Recruit : 0 0 0

C) Separated during the Month : 20 0 20

Total at the close of Month (A+B- C) : 742 40 782

Avarage Attendance Present 81.96% Absent 18.04%

Hours Hours Hours


A) Requisition Over Time : 965 122 1087

B) General Over Time : 3726 1800 5526

C) Total Over Time (A+B) : 4691 1922 6613

D) Over Time Amount : 45878 18797 64675

Factory Closed On :

01) 03 Fri Day

02) 04 Holy Day

______________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : November'2006

Working Days : 26 Days Out Of 30 Days

Working Hours : 208 Hours

General Overtime : 104 Hours

Power Failure : 117.05 Hours (Without Generator)

Actual Working Hours : 312 Hours

Number Of Total Machine : 543 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 531 Nos.


PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 771 45 816

B) New Recruit : 1 0 1

C) Separated during the Month : 10 0 10

Total at the close of Month (A+B- C) : 762 45 807

Avarage Attendance Present 84.08% Absent 15.92%

Hours Hours Hours


A) Requisition Over Time : 20665 289 20954

B) General Over Time : 18691 2046 20737

C) Total Over Time (A+B) : 39356 2335 41691

D) Over Time Amount : 384902 22836 407738

Factory Closed On :

01) 04 Fri Day

______________ ________________
Personnel-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : '2006

Working Days : Days Out Of Days

Working Hours : Hours

General Overtime : Hours

Power Failure : Hours (Without Generator)

Actual Working Hours : Hours

Number Of Total Machine : Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : Nos.


PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month :

B) New Recruit :

C) Separated during the Month :

Total at the close of Month (A+B- C) :

Avarage Attendance Present Absent

Hours Hours Hours


A) Requisition Over Time :

B) General Over Time :

C) Total Over Time (A+B) :

D) Over Time Amount :

Factory Closed On :

01)

02)

____________________ _________________ ________________


Personnel-In-Charge Executive (A/C) Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : October'2006

Working Days : 23 Days Out Of 31 Days

Working Hours : 184 Hours

General Overtime : 92 Hours

Power Failure : 37.33 Hours (Without Generator)

Actual Working Hours : 276 Hours

Number Of Total Machine : 543 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 531 Nos.


PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 774 45 819

B) New Recruit : 12 0 12

C) Separated during the Month : 15 0 15

Total at the close of Month (A+B- C) : 771 45 816

Avarage Attendance Present 86.50% Absent 13.50%

Hours Hours Hours


A) Requisition Over Time : 9657 470 10127

B) General Over Time : 27506 2420 29926

C) Total Over Time (A+B) : 37163 2890 40053

D) Over Time Amount : 363454 28264 391718

Factory Closed On :

01) 04 Fri Day

02) 04 Holy Day

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : September'2006

Working Days : 24 Days Out Of 30 Days

Working Hours : 192 Hours

General Overtime : 96 Hours

Power Failure : 108.05 Hours (Without Generator)

Actual Working Hours : 288 Hours

Number Of Total Machine : 543 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 531 Nos.


PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 794 45 839

B) New Recruit : 0 0 0

C) Separated during the Month : 20 0 20

Total at the close of Month (A+B- C) : 774 45 819

Avarage Attendance Present 89.15% Absent 10.85%

Hours Hours Hours


A) Requisition Over Time : 38366 1003 39369

B) General Over Time : 25080 2645 27725

C) Total Over Time (A+B) : 63446 3648 67094

D) Over Time Amount : 620502 35677 656179

Factory Closed On :

01) 05 Fri Day

02) 01 Holy Day

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : August'2006

Working Days : 26 Days Out Of 31 Days

Working Hours : 208 Hours

General Overtime : 104 Hours

Power Failure : 90.46 Hours (Without Generator)

Actual Working Hours : 312 Hours

Number Of Total Machine : 543 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 531 Nos.


PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 788 45 833

B) New Recruit : 30 0 30

C) Separated during the Month : 24 0 24

Total at the close of Month (A+B- C) : 794 45 839

Avarage Attendance Present 92.79% Absent 7.21%

Hours Hours Hours


A) Requisition Over Time : 44665 0 44665

B) General Over Time : 30179 1810 31989

C) Total Over Time (A+B) : 74844 1810 76654

D) Over Time Amount : 731974 17702 749676

Factory Closed On :

01) 04 Fri Day

02) 01 Holy Day

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : July'2006

Working Days : 27 Days Out Of 31 Days

Working Hours : 216 Hours

General Overtime : 108 Hours

Power Failure : 84.37 Hours (Without Generator)

Actual Working Hours : 324 Hours

Number Of Total Machine : 557 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 543 Nos.


PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 751 43 794

B) New Recruit : 25 0 25

C) Separated during the Month : 12 0 12

Total at the close of Month (A+B- C) : 764 43 807

Avarage Attendance Present 91.13% Absent 8.87%

Hours Hours Hours


A) Requisition Over Time : 42701 0 42701

B) General Over Time : 25595 3647 29242

C) Total Over Time (A+B) : 68296 3647 71943


D) Over Time Amount : 667935 35668 703603

Factory Closed On :

1) 04 Fri Day

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : June'2006

Working Days : 25 Days Out Of 30 Days

Working Hours : 200 Hours

General Overtime : 100 Hours

Power Failure : 66.55 Hours (Without Generator)

Actual Working Hours : 300 Hours

Number Of Total Machine : 570 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 543 Nos.

PRODUCTION ADMINSTRATIVE TOTAL


A) At The beginning Of Month : 721 42 763

B) New Recruit : 35 0 35

C) Separated during the Month : 5 0 5

Total at the close of Month (A+B- C) : 751 42 793

Avarage Attendance Present 92.12% Absent 7.88%

Hours Hours Hours


A) Requisition Over Time : 40227 0 40227

B) General Over Time : 16312 1407 17719

C) Total Over Time (A+B) : 56539 1407 57946


D) Over Time Amount : 452312.00 11256.00 566711.88

Factory Closed On :

1) 05 Fri Day

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : May'2006

Working Days : 26 Days Out Of 31 Days

Working Hours : 208 Hours

General Overtime : 104 Hours

Power Failure : 118.5 Hours (Without Generator)

Actual Working Hours : 312 Hours

Number Of Total Machine : 570 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 543 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 701 42 743

B) New Recruit : 25 0 25

C) Separated during the Month : 5 0 5


Total at the close of Month (A+B- C) : 721 42 763

Avarage Attendance Present 91.13% Absent 8.87%

Hours Hours Hours


A) Requisition Over Time : 24975 0 24975

B) General Over Time : 14109 3213 17322

C) Total Over Time (A+B) : 39084 3213 42297


D) Over Time Amount : 312672.00 25704.00 338376.00

Factory Closed On :

1) 04 Fri Day

2) 1 HolyDay( May Day)

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : April'2006

Working Days : 25 Days Out Of 30 Days

Working Hours : 200 Hours

General Overtime : 100 Hours

Power Failure : 61.49 Hours (Without Generator)

Actual Working Hours : 300 Hours

Number Of Total Machine : 570 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 543 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 713 42 755

B) New Recruit : 22 0 22

C) Separated during the Month : 34 0 34


Total at the close of Month (A+B- C) : 701 42 743

Avarage Attendance Present 90.12% Absent 9.88%

Hours Hours Hours


A) Requisition Over Time : 12895 0 12895

B) General Over Time : 11981 2769 14750

C) Total Over Time (A+B) : 24876 2769 27645


D) Over Time Amount : 199008.00 22152.00 221160.00

Factory Closed On :

1) 04 Fri Day

2) 1 HolyDay( Eid-E-Miladunnabi)

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : March'2006

Working Days : 25 Days Out Of 31 Days

Working Hours : 200 Hours

General Overtime : 100 Hours

Power Failure : 38.12 Hours (Without Generator)

Actual Working Hours : 300 Hours

Number Of Total Machine : 570 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 543 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 709 42 751

B) New Recruit : 24 0 24

C) Separated during the Month : 20 0 20


Total at the close of Month (A+B- C) : 713 42 755

Avarage Attendance Present 89.61% Absent 10.39%

Hours Hours Hours


A) Requisition Over Time : 12667 0 12667

B) General Over Time : 12003 2720 14723

C) Total Over Time (A+B) : 24670 2720 27390


D) Over Time Amount : 197360.00 21760.00 219120.00

Factory Closed On :

1) 5 Fri Day

2) 1 HolyDay( Independent Day)

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : February'2006

Working Days : 23 Days Out Of 28 Days

Working Hours : 184 Hours

General Overtime : 92 Hours

Power Failure : 32.37 Hours (Without Generator)

Actual Working Hours : 276 Hours

Number Of Total Machine : 570 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 558 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 749 49 798

B) New Recruit : 0 0 0

C) Separated during the Month : 40 0 40


Total at the close of Month (A+B- C) : 709 49 758

Avarage Attendance Present 91.21% Absent 8.79%

Hours Hours Hours


A) Requisition Over Time : 10517 0 10517

B) General Over Time : 11789 2372 14161

C) Total Over Time (A+B) : 22306 2372 24678


D) Over Time Amount : 178448.00 18976.00 197424.00

Factory Closed On :

1) 4 Fri Day

2) 1 HolyDay( Mother Language Day)

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : January'2006

Working Days : 23 Days Out Of 31 Days

Working Hours : 184 Hours

General Overtime : 92 Hours

Power Failure : 22.38 Hours (Without Generator)

Actual Working Hours : 276 Hours

Number Of Total Machine : 570 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 558 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 787 49 836

B) New Recruit : 2 0 2

C) Separated during the Month : 40 0 40


Total at the close of Month (A+B- C) : 749 49 798

Avarage Attendance Present 88.00% Absent 12.00%

Hours Hours Hours


A) Requisition Over Time : 4832 0 4832

B) General Over Time : 6454 2543 8997

C) Total Over Time (A+B) : 11286 2543 13829


D) Over Time Amount : 90288.00 20344.00 110632.00

Factory Closed On :

1) 2 Fri Day

2) 6 HolyDay( Eid Ul Azha)

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : December' 2005

Working Days : 31 Days Out Of 26 Days

Working Hours : 208 Hours

General Overtime : 104 Hours

Power Failure : 23.22 Hours (Without Generator)

Actual Working Hours : 312 Hours

Number Of Total Machine : 570 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 558 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 798 49 847

B) New Recruit : 4 0 4

C) Separated during the Month : 15 0 15


Total at the close of Month (A+B- C) : 787 49 836

Avarage Attendance Present 93.00% Absent 7.00%

Hours Hours Hours


A) Requisition Over Time : 7347 0 7347

B) General Over Time : 30401 2733 33134

C) Total Over Time (A+B) : 37748 2733 40481


D) Over Time Amount : 301984.00 21864.00 323848.00

Factory Closed On :

1) 5 Fri Day

2)

3)

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : November' 2005

Working Days : 30 Days Out Of 22 Days

Working Hours : 176 Hours

General Overtime : 88 Hours

Power Failure : 17.45 Hours (Without Generator)

Actual Working Hours : 264 Hours

Number Of Total Machine : 570 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 558 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 795 49 844

B) New Recruit : 20 0 20

C) Separated during the Month : 17 0 17


Total at the close of Month (A+B- C) : 798 49 847

Avarage Attendance Present 87.15% Absent 12.85%

Hours Hours Hours


A) Requisition Over Time : 9512 0 9512

B) General Over Time : 32160 2959 35119

C) Total Over Time (A+B) : 41672 2959 44631


D) Over Time Amount : 333376.00 23672.00 357048.00

Factory Closed On :

1) 4 Fri Day

2) 4 Holy Day

3)

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : October' 2005

Working Days : 25 Days Out Of 31 Days

Working Hours : 200 Hours

General Overtime : 100 Hours

Power Failure : 39.13 Hours (Without Generator)

Actual Working Hours : 300 Hours

Number Of Total Machine : 572 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 569 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 781 45 826

B) New Recruit : 1 0 1

C) Separated during the Month : 24 0 24


Total at the close of Month (A+B- C) : 758 45 803

Avarage Attendance Present 90.00% Absent 10.00%

Hours Hours Hours


A) Requisition Over Time : 0 0 0

B) General Over Time : 52428 4075 56503

C) Total Over Time (A+B) : 52428 4075 56503


D) Over Time Amount : 419424.00 32600.00 452024.00

Factory Closed On :

1) 4 Fri Day

2) 2 Holy Day

3)

4)

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : July ' 2005

Working Days : 31 Days Out Of 26 Days

Working Hours : 208 Hours

General Overtime : 104 Hours

Power Failure : 50.08 Hours (Without Generator)

Actual Working Hours : 312 Hours

Number Of Total Machine : 572 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 569 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 827 45 872

B) New Recruit : 5 0 5

C) Separated during the Month : 17 0 17


Total at the close of Month (A+B- C) : 815 45 860

Avarage Attendance Present 89.46% Absent 10.54%

Hours Hours Hours


A) Requisition Over Time : 14019 0 14019

B) General Over Time : 3861 47174 51035

C) Total Over Time (A+B) : 17880 47174 65054


D) Over Time Amount : 143040.00 377392.00 520432.00

Factory Closed On :

1) 5 Fri Day

2)

3)

4)

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : June ' 2005

Working Days : 30 Days Out Of 19 Days

Working Hours : 152 Hours

General Overtime : 76 Hours

Power Failure : 35.13 Hours (Without Generator)

Actual Working Hours : 300 Hours

Number Of Total Machine : 572 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 569 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 882 45 927

B) New Recruit : 7 0 7

C) Separated during the Month : 62 0 62


Total at the close of Month (A+B- C) : 827 45 872

Avarage Attendance Present 89.46% Absent 10.54%

Hours Hours Hours


A) Requisition Over Time : 1817 0 1817

B) General Over Time : 29031 3370 32401

C) Total Over Time (A+B) : 30848 3370 34218


D) Over Time Amount : 246784.00 26960.00 273744.00

Factory Closed On :

1) 4 Fri Day

2) 7 Days Strike

3)

4)

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : May' 2005

Working Days : 31 Days Out Of 25 Days

Working Hours : 200 Hours

General Overtime : 100 Hours

Power Failure : 48.18 Hours (Without Generator)

Actual Working Hours : 300 Hours

Number Of Total Machine : 572 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 569 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 832 45 877

B) New Recruit : 34 0 34

C) Separated during the Month : 29 0 29


Total at the close of Month (A+B- C) : 837 45 882

Avarage Attendance Present 92.61% Absent 7.39%

Hours Hours Hours


A) Requisition Over Time : 3632 0 3632

B) General Over Time : 38325 3713 42038

C) Total Over Time (A+B) : 41957 3713 45670


D) Over Time Amount : 335656.00 29704.00 365360.00

Factory Closed On :

1) 4 Fri Day

2) 2 Holy Day

3)

4)

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : April' 2005

Working Days : 30 Days Out Of 24 Days

Working Hours : 192 Hours

General Overtime : 96 Hours

Power Failure : 31.5 Hours (Without Generator)

Actual Working Hours : 288 Hours

Number Of Total Machine : 572 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 569 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 815 45 860

B) New Recruit : 29 0 29

C) Separated during the Month : 12 0 12


Total at the close of Month (A+B- C) : 832 45 877

Avarage Attendance Present 90.14% Absent 9.86%

Hours Hours Hours


A) Requisition Over Time : 1130 0 1130

B) General Over Time : 33021 3427 36448

C) Total Over Time (A+B) : 34151 3427 37578


D) Over Time Amount : 273208.00 27416.00 300624.00

Factory Closed On :

1) 5 Fri Day

2) 1 Holy Day

3)

4)

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : March' 2005

Working Days : 31 Days Out Of 26 Days

Working Hours : 208 Hours

General Overtime : 104 Hours

Power Failure : 2 Hours (Without Generator)

Actual Working Hours : 312 Hours

Number Of Total Machine : 572 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 769 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 735 45

B) New Recruit : 69 0 69

C) Separated during the Month : 34 0 34


Total at the close of Month (A+B- C) : 770 45 35

Avarage Attendance Present 93.00% Absent 7.00%

Hours Hours Hours


A) Requisition Over Time : 14669 0 14669

B) General Over Time : 17210 3394 20604

C) Total Over Time (A+B) : 31879 3394 35273


D) Over Time Amount : 255032.00 27152.00 282184.00

Factory Closed On :

1) 4 Fri Day

2) 1 Holy Day

3)

4)

______________ ________________
Pre pared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month : February'2005

Working Days : 22 Days Out Of 28 Days

Working Hours : 176 Hours

General Overtime : 88 Hours

Power Failure : 2 Hours (Without Generator)

Actual Working Hours : 264 Hours

Number Of Total Machine : 571 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 560 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 755 45 825

B) New Recruit : 4 0 4

C) Separated during the Month : 24 0 24


Total at the close of Month (A+B- C) : 735 45 805

Avarage Attendance Present 91.00% Absent 9.00%

Hours Hours Hours


A) Requisition Over Time : 4684 0 4684

B) General Over Time : 5884 2386 8270

C) Total Over Time (A+B) : 10568 2386 12954


D) Over Time Amount : 84544.00 19088.00 103632.00

Factory Closed On :

1) 4 Fri Day

2) 1 Holy Day

3) 1 Special Holy Day

4)

______________ _______________________ ________________


Pre pared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month :January'2005

Working Days : 20 Days Out Of 31 Days

Working Hours : 160 Hours

General Overtime : 80 Hours

Power Failure : 2 Hours (Without Generator)

Actual Working Hours : 240 Hours

Number Of Total Machine : 571 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 560 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 765 45 825

B) New Recruit : 2 0 2

C) Separated during the Month : 12 0 12


Total at the close of Month (A+B- C) : 755 45 815

Avarage Attendance Present 86.00% Absent 14.00%

Hours Hours Hours


A) Requisition Over Time : 2022 0 2022

B) General Over Time : 2120 2943 5063

C) Total Over Time (A+B) : 4142 2943 7085


D) Over Time Amount : 33136.00 23544.00 56680.00

Factory Closed On :

1) 4 Fri Day

2) 5 Holy Day

3)

4)

______________ _______________________ ________________


Pre pared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month :December'2004

Working Days : 31 Days Out Of 25 Days

Working Hours : 200 Hours

General Overtime : 100 Hours

Power Failure : 2 Hours (Without Generator)

Actual Working Hours : 300 Hours

Number Of Total Machine : 571 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 560 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 765 45 810

B) New Recruit : 7 0 7

C) Separated during the Month : 10 0 10


Total at the close of Month (A+B- C) : 762 45 807

Avarage Attendance Present 90.00% Absent 10.00%

Hours Hours Hours


A) Requisition Over Time : 16491 0 16491

B) General Over Time : 17201 3248 20449

C) Total Over Time (A+B) : 33692 3248 36940


D) Over Time Amount : 269536.00 25984.00 295520.00

Factory Closed On :

1) 5 Fri Day

2) 1 Holy Day

3)

4)

______________ _______________________ ________________


Pre pared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Monthly Production Report


Month :November'2004

Working Days : 30 Days Out Of 22 Days

Working Hours : 176 Hours

General Overtime : 88 Hours

Power Failure : 2 Hours (Without Generator)

Actual Working Hours : 262 Hours

Number Of Total Machine : 571 Nos.(Knitting 5G & 7G With All Outher Machine)

Number Of Machine Use : 560 Nos.

PRODUCTION ADMINSTRATIVE TOTAL

A) At The beginning Of Month : 799 45 844

B) New Recruit : 0 0 0

C) Separated during the Month : 34 0 34


Total at the close of Month (A+B- C) : 765 45 810

Avarage Attendance Present 88.00% Absent 12.00%

Hours Hours Hours


A) Requisition Over Time : 28230 0 28230

B) General Over Time : 9712 3758 13470

C) Total Over Time (A+B) : 37942 3758 41700


D) Over Time Amount : 303536.00 30064.00 333600.00

Factory Closed On :

1) 4 Fri Day

2) 4 Holy Day

3)

4)

______________ _______________________ ________________


Pre pared By Production-Co-Ordinator Plant-In-Charge
24 to 31 New Eng. 19/20

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

1713635184 Babul
24 to 31 New Eng. 19/20

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

1713635184 Babul
24 to 31 New Eng. 19/20

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

1713635184 Babul
24 to 31 New Eng. 19/20

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

1713635184 Babul
24 to 31 New Eng. 19/20

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

1713635184 Babul
24 to 31 New Eng. 19/20

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

1713635184 Babul
24 to 31 New Eng. 19/20

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

1713635184 Babul
24 to 31 New Eng. 19/20

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

1713635184 Babul
24 to 31 New Eng. 19/20

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

1713635184 Babul
24 to 31 New Eng. 19/20

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

1713635184 Babul
24 to 31 New Eng. 19/20

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

1713635184 Babul
r Khatoni)

24 to 31 New Eng. 19/20

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

1713635184 Babul
24 to 31 New Eng. 19/20

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

1713635184 Babul
24 to 31 New Eng. 19/20

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

1713635184 Babul
24 to 31 New Eng. 19/20

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

1713635184 Babul
24 to 31 New Eng. 19/20

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

1713635184 Babul
90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

24 to 31 New Eng. 19/20

1713635184 Babul
90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

24 to 31 New Eng. 19/20

1713635184 Babul

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9


24 to 31 New Eng. 19/20

1713635184 Babul

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

24 to 31 New Eng. 19/20


1713635184 Babul

90 Start 1250 Ltr Disel 1 to 22 Old Engine 8/9

24 to 31 New Eng. 19/20


832
832
832
832
832
832
832
832
832
832
832
832
832
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.09.2008
Month : August'2008

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive
01 Sage 0006 5G 890 200 383

03 G.Gold 9L-397 13158 5G 430 430 131

04 G.Gold 9L-432 5G 246 0 13

05 Sears TSF8-3540 5G 334 334 334

06 Sears VLF8-1513 5G 375 375 385

07 Sears 3517 5G 65 0 48

08 Quelle 3835 5G 83 83 85

09 Quelle 8105 5G 83 0 120

Sub Total (5GG) 2506 1422 1500


09 Eurofrente 11533 50 50 67
7G
10 Eurofrente 11544 83 83
7G 83
11 Eurofrente 11225 7G 117 117
119
12 Eurofrente 11532 7G
71 71 0
13 Eurofrente 11529 7G 83 83 87
14 K-Mart 9L-592 13750 7G 586 375 483
15 K-Mart 9L-592 13945
7G 841 841 630
15 K-Mart 9L-592 13949
7G 2026 0 44
16 G.Gold 9L-708 14278 7G 1400 1150 1400
17 G.Gold 9L-708 13807 7G 700 350 69
18 Sears NJF8-3508 7G 109 109 111
Sub Total (7GG) 6066 3229 3092

Grand Total 8573 4651 4592

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01

02

03
Total 0 0 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.08.2008
Month : July'2008

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive
01 G.Union MT-8016 5G 150 33 43

02 Sears TCF8-4579 5G 291 291 302

03 Sage 06/NI/NJ/AL 5G 1442 1442 765

04 Sears NJF8-3517 5G 65 48 22

05 G.Gold 9L432 13273 5G 246 246 234

06 Sears NJF8-3517 5G 467 45

07 Sage 0008 507224 5G 394 350

08 G.Union 84000 ET-9659 5G 257 1

Sub Total (5GG) 3312 2060 1762


09 G.Union MT-8212-B 200 167 181
7G
10 G.Gold 9L 592 13749 2026 1584
7G 1631
11 Sears TSF8-3527 7G 200 200
202
12 Sears TSF8-3528 7G
200 200 205
13 G.Gold 9L 708 7G 3009 500 1196
14 G.Gold 9L592 13750 7G 586 586 112
15 G.Union 84004/ET-898
7G 700 0 3
16 Eurofrente 11530 7G 38 38
17 Eurofrente 11531 7G 50 50
18 Eurofrente 11528 7G 71 71
Sub Total (7GG) 7079 3395 3529

Grand Total 10391 5456 5290

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01

02

03
Total 0 0 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.07.2008
Month : June'2008

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive
01 Sears NJF8-3504 5G 257 82 88

02 Sears NJF8-3517 5G 467 467 481

03 Sears VLF8-1513 5G 375 375 0

04 Sears VLF8-1508 5G 150 150 0

05 Sears NJF-3505 5G 319 167 0

06 Li & Fung RC-45 5G 721 437 378

07 G.Union MT-8016 BL 5G 150 150 113

08 G.Union 4000 CS-9659 5G 1000 4

09 G.Union ET-9659 5G 242

Sub Total (5GG) 3439 1828 1305


10 Sears TSF8-3527 166 166 168
7G
11 Sears TSF8-3528 7G 126 126
130
12 G.Union 4004/CS-898 7G 1200 199
229
13 G.Union 84004/ET-898
7G 700 700 680
14 G.Union MT-898BL MT-8212 7G 200 200 24
15 G.Gold 9L 708 7G 8831 1000 1242
16 G.Gold 9L592 13749 7G 2026 833 360
17 Eurofrente 11447 7G 4150 3
Sub Total (7GG) 17399 3224 2835

Grand Total 20837 5052 4141

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0

02

03
Total 0.00 0.00 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.06.2008
Month : May'2008

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive
01 G.Union 1011CV CS-8000 5G 150 33 49

02 G.Gold 9L446 13346 5G 543 543 547

03 Li & Fung RC-45 5G 1221 333 284

04 Sears NJF8-3505 5G 319 319

05 Sears VLF8-1513 5G 375 375

06 Sears NJF8-3517 5G 467 467

07 Sears NJF8-3504 5G 175

08 G.Union 4000 CS-9659 5G 1000 123

Sub Total (5GG) 4075 2071 1178


09 K-Mart 9L440 13116 2092 1208 1275
7G
10 Eirpfremte 11447 7G 4150 1333
1341
11 G.Union 4004 CS-898 7G 1200 533
1001

Sub Total (7GG) 7442 3075 3616

Grand Total 11517 5146 4794

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0

02

03
Total 0.00 0.00 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.05.2008
Month : April'2008

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive
01 G.Union 84007 ET-8001 5G 500 80 166

02 G.Gold 29L275 5G 300 133 162

03 Quelle 7374 5G 217 175 235

04 Quelle 3835 5G 357 265 251

05 G.Union 4000 CS-9659 5G 1000 583 888

06 Li & Fung RC 5G 1221 638

07 Branex LM-870 5G 133 8

08 G.Gold 9L446 13346 5G 2808 1

09 G.Union 1011CV CS-8000 5G 300 48

10 G.Union 1011CV CS-8000 5G 150 107

Sub Total (5GG) 6986 1874 1867


11 Eurofrente 11447 ET-898
7G 4150 2867 1908
12 G.Union 8401 ET-8037
7G 500 333 292
13 G.Union 4010 CS-8003-1
7G 1000 6
14 G.Gold 9L440 13116
2092 830

Sub Total (7GG) 7742 3200 3036

Grand Total 14728 5074 4903

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0

02

03
Total 0.00 0.00 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Production Details
All Figure In DZ Date : 01.04.2008
Month : March'2008

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive
01 G.Union 4016 CS-8037 5G 1000 417 455

02 Atlantic 14256 5G 182 182 191

03 N.Mann 550/477 5G 133 117 118

04 G.Gold 29L275 5G 300 300 139

05 Branex LM-869 5G 133 133 135

06 Branex LM-870 5G 133 133 126

07 Branex LM-871 5G 133 133 134

08 Branex LM-874 5G 133 133 135

09 G.Union 87007 ET-8001 5G 500 500 344

10 G.Union 3805 CK-8013 5G 300 300 307

11 G.Union 84006 ET-8000 5G 500 31

12 G.Union 1011CV CS-8000 5G 300 152

13 Quelle 7374 5G 2600 25

14 Quelle 3835 5G 357 110

Sub Total (5GG) 6705 2348 2401


15 G.Union 84004 ET-898 7G 300 113 123
16 G.Union 4036 CS-8034 7G 1000 333 341
17 G.Union 4010 CS-8003-1 7G 1000 1000 1005
18 Quelle 3423 7G 83 83 85
19 Eurofrente 11447 7G 4150 1567 938
20 G.Union 4005 CS-6840 7G 700 2
21 G.Union 84016 ET-8037 7G 500 214
Sub Total (7GG) 7733 3096 2707

Grand Total 14438 5444 5108

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0

02

03
Total 0.00 0.00 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Production Details
All Figure In DZ Date : 01.03.2008
Month : February'2008

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive
01 G.Union 84006 ET-8000 5G 500 392 379

02 G.Union 84000 ET-9659 5G 500 83 86

03 G.Union 4016 CS-8037 5G 1000 0 554

04 G.Union 1011CV CS-8000 5G 300 250 105

05 Atlantic 15684 5G 617 617 623

06 Atlantic 19056 5G 25 0 26 Recvd From GSGL-1

07 N.Mann 550/477 5G 133 0 17

Sub Total (5GG) 3075 1342 1790


08 Global Gold 9 L 120 12770
7G 600 150 177
09 Global Gold 9 l 119 12772
7G 750 237 150
10 Branex LBW 9060
7G 283 242 252
11 G.Union 84005 ET- 6840
7G 500 105 115
12 G.Union 4005 CS-6840
7G 700 75 112
13 G.Union 4004 CS-898
7G 700 450 526
14 G.Union 84004 ET-898
7G 300 300 182
15 G.Union 4036 CS-8034
7G 1000 1000 668
Sub Total (7GG) 4833 2559 2180

Grand Total 7909 3901 3970

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 0

02

03
Total 0.00 0.00 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Production Details
All Figure In DZ Date : 01.02.2008
Month : January'2008

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive
01 N.Mann 550/477 5G 133 133 139

02 G.Union 4000 CS-9659 5G 1000 125 146

03 G.Union 4006 CS-8000 5G 500 500 565

04 G.Union 8400 ET-8000 5G 500 500 99

05 G.Union 84000 ET-9659 5G 500 500 422

Sub Total (5GG) 2633 1758 1371


08 Branex LM-862
7G 167 167 169
09 Branex LM-863
7G 83 83 84
10 Branex LM-861
7G 267 267 271
11 Branex LBW 9060
7G 283 283 39
12 Global Gold 9 L 119 12772
7G 750 750 513
13 Global Gold 9 l 120 12770
7G 600 600 442
14 G.Union 4005 CS-6840
7G 700 255 179
15 G.Union 84005 ET- 6840
7G 500 483 377
16 G.Union 84004 ET-898
7G 300 133 247

Sub Total (7GG) 3650 3022 2322

Grand Total 6283 4780 3693

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 0

02

03
Total 0.00 0.00 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Production Details
All Figure In DZ Date : 01.01.2008
Month : December'2007

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive
01 Quelle 8912 5G 542 58 50

02 N.Mann 550/477 5G 125 125 128

03 G.Gold 9 J020 12714 5G 110 110 112

04 G.Gold 9 J020 12716 5G 24 24 27

05 G.Gold 9 J020 12685 5G 280 280 287

06 G.Union 4000 CS-9659 5G 1000 1000 871

07 Atlantic 19056 5G 230 0 20

Sub Total (5GG) 2311 1597 1494


08 Quelle 4000
7G 667 250 286
09 Quelle 8832
7G 708 150 115
10 Quelle 8824
7 258 258 261
11 Quelle 8832
500 500 587
12 Quelle 8703
333 333 349
13 Branex LM-862
167 167 0
14 Branex LM-863
83 83 0
15 Branex LM-861
267 267 0
16 G.Union 4005 CS-6840
700 0 445
17 G.Union 84005 ET-6840
0 0 17
Sub Total (7GG) 3683 2008 2060

Grand Total 5994 3606 3554

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 0

02

03
Total 0.00 0.00 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.12.2007
Month : November'2007

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive
01 Eurofrente 10764 5G 143 0 2

02 Eurofrente 10877 5G 208 0 7

03 Quelle 3835 5G 275 275 265

04 Quelle 8912 5G 542 542 501

Sub Total (5GG) 1168 817 775


05 Quelle 8832
7G 1042 1042 1064
06 Quelle 8832-B
7G 708 417 536
07 Quelle 4000
7G 667 667 401
08 Quelle 8820
7G 542 542 527
09 Les. Line 5868
7G 125 0 12
10 Les. Line 5872
7G 500 250 303
11 Les. Line 5870
7G 241 0 107
12 G.Union 7603
7G 334 0 1
13 G.Gold 012630
7G 500 500 468
Sub Total (7GG) 4658 3417 3419

Grand Total 5826 4233 4194

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 0

02

03
Total 0.00 0.00 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 03.11.2007
Month : October'2007

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive
01 Eurofrente 10764 5G 143 117 125

02 Eurofrente 10877 5G 208 117 115

03 Quelle 3835 5G 275 0 13

04 Sfera 0766/8021 5G 161 0 18

Sub Total (5GG) 787 233 271


05 Quelle 3512
7G 250 250 259
06 Quelle 8820
7G 542 0 27
07 Quelle 3204
7G 142 142 144
08 Quelle 8703
7G 267 267 275
09 Les. Line 5872
7G 500 500 183
10 Les. Line 5870
7G 457 457 431
11 G.Union 7603
7G 334 334 195
12 G.Gold 9H269/12630
7G 500 500 37
Sub Total (7GG) 2991 2449 1551

Grand Total 3778 2683 1822

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 0

02

03
Total 0.00 0.00 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 02.10.2007
Month : September'2007

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive
01 Eurofrente 10764 5G 143 143 19

02 Eurofrente 10877 5G 208 208 101

03 Quelle 3835 5G 150 150 154

04 Sfera 0766/8021 5G 161 164 148

Sub Total (5GG) 662 665 422


05 Quelle 8711 7G 133 67 70
06 Quelle 8711-B 7G 342 342 346
07 Quelle 8824 7G 583 483 501
08 Quelle 8824-B 7G 350 350 361
09 Quelle 8821 7G 373 343 397
10 Quelle 3885 7G 133 0 8
11 Quelle 8703 7G 133 133 140
12 Les. Line 18902 7G 412 412 413
13 Les. Line 5870 7G 457 0 18
14 G.Union 7603 7G 334 0 144
15 N.Mann 017/531 7G 200 200 206
Sub Total (7GG) 3451 2330 2603

Grand Total 4113 2996 3025

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 0

02

03
Total 0.00 0.00 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.09.2007
Month : August'2007

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive
01 Quelle 3835 5G 67 67 69

02 G.Gold 19H987 5G 250 83 87

03 G.Gold 19H542 12229 5G 662 0 41

04 G.Gold 19H542 12227 5G 80 0 27

05 G.Gold 19H542 12228 5G 696 696 625

Sub Total (5GG) 1755 846 849


06 Sears 3547 7G 333 167 173
07 Quelle 8711 7G 133 0 67
08 Quelle 8824 7G 583 583 97
09 Quelle 8821 7G 1200 1200 57
10 Quelle 3885 7G 133 0 130
11 Quelle 8703 7G 192 192 167
12 L.Line 47902 7G 639 0 41
13 Zara 5747/246 7G 833 833 817
14 Zara 5747/296 7G 206 206 209
Sub Total (7GG) 4253 3181 1758

Grand Total 6007 4027 2607

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 0

02

03
Total 0.00 0.00 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 05.08.2007
Month : July'2007

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive
01 Quelle 3835 5G 200 200 202

02 Tiara 4H215 5G 162 0 75

03 K-Mart 9H049 5G 1564 1500 1550

04 Sears 1504 5G 167 0 1

05 Sears 1513 5G 233 0 15

06 G.Gold 19H542 12229 5G 379 379 343

07 G.Gold 19H542 12227 5G 80 80 54

08 G.Gold 19H542 12228 5G 696 160 82

Sub Total (5GG) 3481 2319 2322


09 Sears 1535 7G 167 0 1
10 Sears 3544 7G 317 303 310
11 Sears 3547 7G 333 333 170
12 Quelle 8820 7G 443 443 762
13 Quelle 3885 7G 333 333 345
14 Quelle 8703 7G 225 225 236
15 Les. Line 47902 7G 639 622 630
16 Zara 5747/246 7G 458 0 19
Sub Total (7GG) 2915 2260 2473

Grand Total 6396 4579 4795

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 0

02

03
Total 0.00 0.00 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.07.2007
Month : June'2007

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive

01 N.Mann 138/751 5G 42 42 44

02 N.Mann 327/052 5G 42 42 41

03 G.Union 8480 5G 1000 0 51

04 Tiara 4H215 5G 1006 767 724

05 Sears 1537 5G 375 0 121

06 Sears 1504 5G 167 167 170

07 Sears 1513 5G 233 233 223

08 G.Gold(K-Mart) 9H 049 5G 1564 897 37

Sub Total (5GG) 4428 2148 1411

09 Sears 3543 7G 309 200 232

10 Sears 1535 7G 167 167 171

11 Sears 3544 7G 317 0 13

12 Quelle 3204 7G 667 125 160

13 Quelle 8820 7G 3010 3010 2317

14 Quelle 3885 7G 133 133 138


Sub Total (7GG) 4602 3635 3031

Grand Total 9030 5783 4442

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 0

02

03
Total 0.00 0.00 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.06.2007
Month : May'2007

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive

01 Quelle 3212 5G 333 225 233

02 Great Union 8480 5G 1000 933 899

03 Tiara 4H215/28813 5G 408 0 232

04 Sears VLF7-1537 5G 292 292 263

05 Sears VLF7-1500 5G 99 0 75

06 Sears VLF7-1513 5G 233 233 0

07 N.Mann 138/751 5G 42 42 0

08 N.Mann 327/052 5G 42 42 0

Sub Total (5GG) 2449 1767 1702

09 Sears TSF7-3542 7G 123 98 110

10 Sears TSF7-3543 7G 309 309 84

11 Sears TSF7-3544 7G 214 214 219

12 Sears VLF7-1535 7G 167 167 0

13 Quelle 2479 7G 142 100 109

14 Quelle 3204 7G 667 667 525

15 Great Union 1603 7G 300 300 307

16 Tiara 4H216/28659 7G 500 333 381

17 Eurofrente 10394 7G 1223 917 959


Sub Total (7GG) 3643 3103 2694

Grand Total 6092 4871 4396

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 0

02

03
Total 0.00 0.00 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.05.2007
Month : April'2007

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive

01 Quelle 3733 5G 333 333 245

02 Quelle 3885 5G 208 208 206

03 Quelle 3915 5G 133 133 136

04 Quelle 3212 5G 333 0 103

05 N.Mann 138/751 5G 83 83 62

06 N.Mann 327/052 5G 83 83 45

07 Sears VLF7-1500 5G 568 568 580

08 Sears VLF7-1500-B 5G 188 188 192

09 Sears VLF7-1500-C 5G 50 50 34

10 Sears VLF7-1504/44 5G 83 83 0

11 Sears VLF7-1513/50 5G 117 117 0

12 G.Union 17200 5G 500 0 34

13 G.Union 8480 5G 1000 0 61

Sub Total (5GG) 3680 1847 1698

14 G.Union 1604 7G 300 167 231

15 Quelle 3885 7G 333 333 322

16 Quelle 8711 7G 367 367 373

17 Quelle 2479 7G 142 142 146

18 Quelle 2479-B 7G 142 0 38

19 Tiara 28658 7G 500 500 505

20 Tiara 28659 7G 500 500 126

21 Eurofrente 10394 7G 1223 0 277

22 Sears TSF6-3542 7G 123 123 20

23 Sears TSF6-3544 7G 214 214 0


Sub Total (7GG) 3842 2344 2038

Grand Total 7522 4191 3736

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 0

02

03
Total 0.00 0.00 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.04.2007
Month : March'2007

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive

01 G.Union 1612 5G 300 300 259

02 G.Union 17200 5G 500 500 474

03 G.Union 17201 5G 500 500 507

04 G.Union 7600 5G 1000 208 255

05 N.Mann 327/052 5G 83 83 86

06 N.Mann 138/751 5G 83 83 74

05 Quelle 3733 5G 333 333 57

06 Quelle 3835 5G 208 0 40


Sub Total (5GG) 3008 2008 1752

08 G.Union 7606 7G 700 0 134

09 G.Union 7603 7G 700 533 575

10 G.Union 7613 7G 500 500 510

11 G.Union 1613 7G 300 300 299

12 G.Union 1603 7G 300 300 306

12 G.Union 1604 7G 300 300 81

13 Quelle 3885 7G 333 333 23

14 Eurofrente 10394(EX-09447) 7G 527 527 0


Sub Total (7GG) 3660 2794 1928

Grand Total 6668 4802 3680

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 0

02

03
Total 0.00 0.00 0
_____________ ________________
Prepared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.03.2007
Month : February'2007

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive

01 G.Union 1615 5G 700 208 94

02 G.Union 7609 5G 1000 542 901

03 G.Union 7600 5G 1000 1000 707

04 G.Union 1612 5G 300 0 42


Sub Total (5GG) 3000 1750 1743

08 Quelle 8711 7G 525 275 273

09 Quelle 8706 7G 150 150 154

10 G.Union 7604 7G 700 83 109

11 G.Union 7605 7G 1000 375 332

12 G.Union 7606 7G 700 700 574

12 G.Union 7603 7G 700 700 134

13 G.Union 1613 7G 300 0 7


Sub Total (7GG) 4075 2283 1583

Grand Total 7075 4033 3326

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 0

02

03
Total 0.00 0.00 0
_____________ ________________
Prepared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.02.2007
Month : January'2007

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive

01 N.Mann 550/477 5G 100 100 106

02 Quelle 7692 5G 333 258 256

03 Quelle 3212 5G 333 0 11

04 Quelle 3812 5G 100 100 104

05 G.Union 7615 5G 700 700 614

06 G.Union 7609 5G 1000 0 109

07 G.Union 7600 5G 1000 0 56


Sub Total (5GG) 3567 1158 1256

08 Quelle 8711 7G 833 525 245

09 Quelle 7452 7G 133 0 57

10 Quelle 3252 7G 267 0 73

11 Quelle 8706 7G 150 150 0

12 G.Union 7604 7G 700 333 605

13 G.Union 7605 7G 1000 1000 683


Sub Total (7GG) 3083 2008 1663

Grand Total 6650 3167 2919

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 0
02

03
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 06.01.2007
Month : December '2006

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive

01 N.Mann 550/477 5G 100 58 10

02 Quelle 3212 5G 333 333 323

03 Quelle 7692 5G 333 333 71

04 5G
Sub Total (5GG) 767 725 404

05 Quelle 8711 7G 833 833 742

06 Quelle 8706 7G 833 833 849

07 Quelle 3252 7G 267 267 196

08 Quelle 7452 7G 133 133 80

Sub Total (7GG) 2067 2067 1867

Grand Total 2833 2792 2271

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0

02

03
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 02.12.2006
Month : November '2006

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive

01 Eurofrente 09750 5G 521 202 224

02 Eurofrente 09770 5G 150 133 147

03 Quelle 3795 5G 125 125 127

04 N.Mann 550/477 5G 100 0 95


Sub Total (5GG) 896 460 592

05 Quelle 7452(B) 7G 88 0 31

06 Quelle 7452(C) 7G 175 175 77

07 Quelle 7452(D) 7G 100 16 113

08 Quelle 8703 7G 2083 2083 2114

Sub Total (7GG) 2446 2274 2335

Grand Total 3343 2734 2928

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 0

02

03
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date :
Month :

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive

Sub Total (5GG) 0 0 0


Sub Total (7GG)

Grand Total

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
Total

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.11.2006
Month : October '2006

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive

01 N.Mann 550/477 5G 83 83 35

02 Eurofrente 09769 5G 487 487 435

03 Eurofrente 09750 5G 521 521 319

04 Eurofrente 09770 5G 150 150 9


Sub Total (5GG) 1242 1242 798

13 Sears 3534 7G 124 0 38

14 Quelle 8609 7G 433 250 346

15 Quelle 3905 7G 98 0 31

16 Quelle 7294 7G 134 83 93

17 Quelle 3955 7G 154 83 188

18 Quelle 3792 7G 471 408 270

22 Quelle 3792(B) 7G 321 125 122

23 Quelle 7392 7G 250 250 253

24 Quelle 7392(B) 7G 58 0 60
19 Quelle 7452 7G 87 87 91

25 Quelle 7452(B) 7G 88 88 77

20 Quelle 7452(C) 7G 175 175 73

21 Quelle 7452(D) 7G 100 100 5


Sub Total (7GG) 2494 1650 1647

Grand Total 3735 2892 2445

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 03.10.2006
Month : September '2006

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive

01 G.Gold 21D050CT 010075 5G 220 83 56

02 G.Gold 1D158 010251 5G 1380 1005 1228

03 G.Gold 1D158 010249 5G 783 783 101

04 N.Mann 550/477 5G 83 0 43

05 Sears 3542 5G 217 217 150

06 Eurofrente 9769 5G 487 0 54


Sub Total (5GG) 3170 2088 1632

13 Rajan MK-413608 7G 400 0 39

14 Sears TSF6-3534 7G 158 158 160

15 Sears TSF6-3534 7G 124 124 92

16 Sears VLS7-1500 7G 200 200 205

17 Tiara 44D788RS 7G 500 0 92

18 Quelle 3575 7G 150 83 84


22 Quelle 8609 7G 408 181 216

23 Quelle 8609(B) 7G 433 433 94

24 Quelle 8602 7G 233 208 186

19 Quelle 8602(B) 7G 208 0 213

25 Quelle 3732 7G 367 367 375

20 Quelle 3905 7G 200 200 173

21 Quelle 7294 7G 208 208 119


Sub Total (7GG) 3590 2163 2048

Grand Total 6760 4251 3680

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.09.2006
Month : August '2006

Total Production
SL Buyer Style No. P.O No. GG Remarks
Order Qty Target Achive
10 G.Gold 21D050CT 010074 5G 330 330 333

11 G.Gold 21D050CT 010075 5G 220 220 168

12 G.Gold 1D158 010251 5G 1380 167 96

05 N.Mann 550/477 5G 127 127 129

06 Quelle 3795 5G 250 133 138

07 Quelle 7214 5G 238 0 71

08 Quelle 3023 5G 104 104 96

09 Quelle 3033 5G 108 108 77

01 Sears 3537 5G 500 500 444

02 Sears 3538 5G 144 167 144

03 Sears 1500 5G 151 151 158

04 Sears 3540 5G 200 210 204


Sub Total (5GG) 3752 2217 2058
13 Quelle 8609 7G 333 208 285

14 Quelle 3792 7G 167 0 153


15 Quelle 2670 7G 167 167 172

16 Quelle 3575 7G 150 150 71

17 Quelle 8602 7G 233 233 51

18 Quelle 8609 7G 408 0 5

22 Rajan MK-413609 7G 400 400 406

23 Rajan MK-413612 7G 400 400 408

24 Rajan MK-413608 7G 300 300 268

19 Sears 1511 7G 125 0 102

25 Tiara 44D788RS 7G 500 500 111

20 W.Smith 611166 7G 410 410 415

21 W.Smith 611165 7G 410 410 422


Sub Total (7GG) 4002 3177 2869

Grand Total 7754 5394 4927

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.08.2006
Month : July '2006

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 Sears 60252-C 5G 432 83 60

02 Quelle 3537 5G 500 167 60

03 Quelle 3795 5G 125 125 130

04 Quelle 3795 B 5G 250 250 251

05 Quelle 3595 5G 167 0 82

06 Quelle 8614 5G 1008 1879 1972

07 Quelle 7214 5G 238 238 171

08 Quelle 3023 5G 104 104 11

09 Quelle 3033 5G 108 108 35


Sub Total (5GG) 2931 2954 2772
10 Quelle 8602 7G 293 83 206

11 Quelle 3094 7G 500 417 460


12 Quelle 8609 7G 333 333 54

13 Quelle 3792 7G 167 167 16

14 Quelle 3142 7G 67 67 67

15 Sears 1504 7G 224 399 404

16 Sears 1502 7G 237 237 139

17 Sears 3536 7G 417 333 397

18 Sears 3534 7G 667 0 201

19 Sears 1511 7G 158 158 54

20 N.Mann 017/477 7G 146 146 153

21 Wehmeyer WR-08 7G 200 100 123

7G

7G
Sub Total (7GG) 3408 2440 2274

Grand Total 6340 5394 5046

60552
Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.07.2006
Month : June '2006

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 Sears 1500 5G 35 35 36

02 Sears 60252-C 5G 432 432 435

03 Sears 60252-C(B) 5G 432 167 350

04 Quelle 3595 5G 167 167 89

05 Quelle 3795 5G 175 300 180

06 Quelle 8614 5G 1675 250 277

07 Quelle 8614(B) 5G 2021 1010 1276

05 5G
Sub Total (5GG) 4935 2360 2643
06 N.Mann 017/531 7G 271 79 93

07 N.Mann 017/477 7G 146 83 92


08 Sears 3531 7G 625 442 455

09 Sears 3532 7G 334 334 332

10 Sears 3534 7G 237 237 242

11 Sears 3534(B) 7G 667 375 472

01 Sears 3536 7G 417 0 24

12 Eurofrente 09447 7G 460 0 25

12 Quelle 3732 7G 167 167 171

12 Quelle 8602 7G 658 658 463

13 Quelle 3094 7G 500 233 52

13 Wehmeyer WR-08 7G 200 0 80

13 7G

13 7G
Sub Total (7GG) 4680 2608 2501

Grand Total 9615 4967 5144

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.07.2006
Month : June '2006

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 Sears 1500 5G 35 35 36

02 Sears 60252-C 5G 432 432 435

03 Sears 60252-C(B) 5G 432 167 350

04 Quelle 3595 5G 167 167 89

05 Quelle 3795 5G 175 300 180

06 Quelle 8614 5G 1675 250 277

07 Quelle 8614(B) 5G 2021 1010 1276

05 5G
Sub Total (5GG) 4935 2360 2643
06 N.Mann 017/531 7G 271 79 93

07 N.Mann 017/477 7G 146 83 92


08 Sears 3531 7G 625 442 455

09 Sears 3532 7G 334 334 332

10 Sears 3534 7G 237 237 242

11 Sears 3534(B) 7G 667 375 472

01 Sears 3536 7G 417 0 24

12 Eurofrente 09447 7G 460 0 25

12 Quelle 3732 7G 167 167 171

12 Quelle 8602 7G 658 658 463

13 Quelle 3094 7G 500 233 52

13 Wehmeyer WR-08 7G 200 0 80

13 7G

13 7G
Sub Total (7GG) 4680 2608 2501

Grand Total 9615 4967 5144

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 02.06.2006
Month : May '2006

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 Quelle 7214 5G 150 0 154

02 Quelle 8614 5G 1675 258 1410

03 Sears 1500 5G 666 0 65

04 N.Mann 550/477 5G 75 75 15

05 G.Union S-373 5G 100 0 61


Sub Total (5GG) 2666 333 1705
06 Quelle 2619 7G 233 0 25

07 Quelle 3295 7G 183 0 113

08 Quelle 2615 7G 292 0 279

09 Quelle 2479 7G 200 200 205

10 Quelle 2670 7G 333 333 342


11 Quelle 2667 7G 267 133 276

01 Eurofrente 09447 7G 960 0 73

12 Sears 3531 7G 625 625 174

12 Sears 3532 7G 334 334 7

12 Sears 3533 7G 500 0 126

13 N.Mann 017/531 7G 271 271 188

13 N.Mann 017/477 7G 146 146 63

13 G.Union 3029 7G 350 350 360

13 G.Union 6030 7G 104 104 108


Sub Total (7GG) 4798 2496 2339

Grand Total 7464 2829 4044

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
04
05
06
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 02.05.2006
Month : April '2006

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 Quelle 3023 5G 150 150 150

02 Quelle 3033 5G 150 150 155

03 Quelle 3795 5G 342 342 76

04 Scope 13463 5G 40 0 42

05 N.Mann 550/477 5G 67 67 69

06 N.Mann 550/477(B) 5G 75 0 65

07 G.Union S-372 5G 100 100 87

08 G.Union S-373 5G 100 100 57

09 Eurofrente 09029 5G 113 25 68

10 Eurofrente 08206 5G 186 100 96

11 Sears 1500 5G 666 666 618


Sub Total (5GG) 1988 1699 1483
01 Eurofrente 09447 7G 960 0 4

02 Quelle 2620 7G 233 0 143

03 Quelle 8602 7G 325 0 306

04 Quelle 2619 7G 233 233 214

05 Quelle 3792 7G 167 167 137

06 Quelle 3792(B) 7G 166 166 171

07 Quelle 2627 7G 200 200 206

08 Quelle 3295 7G 183 0 72

09 Quelle 2611 7G 200 200 206

10 Quelle 2615 7G 292 292 24

11 Quelle 2479 7G 200 0 6

12 Sears 3533 7G 500 500 378

13 Rajan MK-413315 7G 300 0 11


Sub Total (7GG) 3960 1758 1878

Grand Total 5948 3458 3361

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
04
05
06
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 02.04.2006
Month : March '2006

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 Scope 13463 5G 200 117 87

02 Scope 13465 5G 200 200 202

03 Zara 5747/541 5G 301 233 332

04 Quelle 3023 5G 150 150 153

05 Quelle 3033 5G 150 0 152

06 Quelle 3795 5G 342 0 271

07 Quelle 7214 5G 150 150 152


08 Eurofrente 09209 5G 113 0 45

09 Eurofrente 08206 5G 186 186 94

Sub Total (5GG) 1791 1036 1488

01 Quelle 2620 7G 233 0 94

02 Quelle 8602 7G 325 0 35

03 Quelle 3732 7G 133 133 137

04 Quelle 3792 7G 167 333 39

05 Eurofrente 09447 7G 960 960 870

06 Rajan MK-413315 7G 300 300 298

07 G.Union L-444 7G 300 217 145

08 G.Union 8497 7G 188 188 157

Sub Total (7GG) 2607 2131 1775

Grand Total 4398 3167 3263

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
04
05
06
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.03.2006
Month : February '2006

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 Scope 13463 5G 200 200 117

02 Scope 13465 5G 200 200 0

03 Zara 5747/541 5G 321 333 205

04 Zara 5747/541 (B) 100 0 13


Sub Total (5GG) 821 733 335

01 Quelle 8609 7G 900 0 99

02 Quelle 8609(B) 7G 708 708 620

03 Quelle 7382 7G 100 58 60

04 Quelle 3732 7G 192 192 196

05 Quelle 8602 7G 700 700 706

06 Eurofrente 08997 7G 90 90 94

07 N.Mann 429/546 7G 308 308 321

08 G.Union L-444 7G 300 300 162

09 G.Union 8497 7G 188 0 35

Sub Total (7GG) 3486 2357 2293

Grand Total 4307 3090 2628

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
04
05
06
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.02.2006
Month : January '2006

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 Zara 5747/504 5G 321 100 57

02
Sub Total (5GG) 321 100 57

03 Quelle 8603 7G 1250 0 31

04 Quelle 8609 7G 1708 1708 1202

05 Quelle 3732 7G 67 67 80

06 Quelle 7382 7G 100 100 39

Sub Total (7GG) 3125 1875 1352

Grand Total 3446 1975 1409

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
04
05
06
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.12.2006
Month : December '2005

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 Zara 5747/504 5G 321 513 266

02
Sub Total (5GG) 321 513 266

03 N.Mann 317/349 7G 708 388

04 Quelle 8602 7G 833 833 855

05 Quelle 8603 7G 1250 1250 1254

06 Quelle 8609 7G 600 417 65

07 Quelle 8603 (B) 7G 650 650 627

08 Quelle 7382 7G 100 100 105

09 Quelle 3732 7G 67 67 62

Sub Total (7GG) 4208 3317 3355

Grand Total 4529 3829 3622

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
04
05
06
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.12.2005
Month : November '2005

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 Zara 5747/600 5G 406 406 319

02

03

04

05
06

Sub Total (5GG) 406 406 319

07 Quelle 8602 7G 10000 10000 784

08 Bay-City 451 7G 1600 0 379

09 Sears 07MCS6-2486 7G 596 596 607

10 Sears 07MCS6-2472 7G 267 267 271

11 N.Mann 317/349 7G 708 708 324

12 Quelle 8602 (B) 7G 833 417 11

Sub Total (7GG) 14004 11988 2375

Grand Total 14410 12394 2694

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
04
05
06
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.11.2005
Month : October '2005

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 Eurofrent 08206 5G 360 0 5

02 Eurofrent 09209 5G 16 0 18

03 Sears 1539 5G 153 0 20

04 Sears 1538 5G 112 0 23


05 Sears 1537 5G 99 99 64

06 Sears 1536 5G 137 137 140

Sub Total (5GG) 876 235 270

07 Bay-City 451 7G 1800 1610 1189

08 Bay-City 449 7G 758 454 474

09 Dynesty 9106 7G 333 0 56

10 Quelle 8602 7G 1333 1333 1342

11 Quelle 8602(B) 7G 1000 417 241

12 Sears 07MCS6-2472R 7G 267 267

Sub Total (7GG) 5492 4081 3302

Grand Total 6368 4316 3572

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
04
05
06
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.10.2005
Month : September '2005

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 Bay-City 452 5G 1625 1208 1157

02 Eurofrente 09029 5G 140 140 140

03 Eurofrente 08206 5G 360 360 360


04 Sears 1539 5G 153 0 136

05 Sears 1538 5G 112 0 93

06 Sears 1537 5G 99 0 36

07 Sears 1531 5G 175 175 0

08 Sears 1536 5G 137 137 0

09
Sub Total (5GG) 2800 2020 1922

09 Quelle 7610 7G 313 135 135

10 Quelle 7610(C) 7G 63 92 92

10 Rajan 515043 7G 268 250 191

11 Rajan 516078 7G 13 13 11

12 Rajan 515029 7G 216 216 210

13 Rajan 515028 7G 216 216 140

14 Bay-City 451 7G 1800 417 199

15 Bay-City 449 7G 758 758 289

16 Dynesty 9106 7G 300 0 198

17 7G

18 7G

7G
Sub Total (7GG) 3946 2097 1465

Grand Total 6746 4117 3386

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
04
05
06
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 02.09.2005
Month : August '2005

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 Sears 1514 5G 382 108 101

02 Sears 1516 5G 362 0 8


03 Sears 3530 5G 500 350 358

04 Sears 3534 5G 517 517 524

05 G.Gold 7358 5G 300 300 308

06 Bay-City 452 5G 1625 500 486

07 5G

08 5G

09 5G
Sub Total (5GG) 3685 1775 1785

09 Rajan 515043 7G 222 0 9

10 Rajan 516086 7G 226 0 41

10 Rajan 516076 7G 66 0 41

11 Rajan 515043 7G 268 0 78

12 Rajan 516078 7G 13 0 2

13 Rajan 515029 7G 216 0 4

14 Quelle 7610 7G 1000 1000 917

15 Quelle 7610(B) 7G 917 917 917

16 Quelle 7610(C) 7G 313 313 142

17 7G

18 7G

7G
Sub Total (7GG) 3240 2229 2151

Grand Total 6925 4004 3936

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
04
05
06
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.08.2005
Month : July '2005

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 Sears 1514 5G 382 333 216


02 Sears 1516 5G 362 0 59

03 Sears 3516 5G 501 0 4

04 Sears 1330 5G 175 125 126

05 Sears 3530 5G 500 125 147

06 Sears 3515 5G 750 750 759

07 Rajan MK-412651 5G 200 0 8

07 Rajan MK-413162 5G 200 200 4

07 Bernardi 237-W 5G 180 180 191

08 Zara 5747/830 5G 271 0 254


Sub Total (5GG) 3520 1713 1768

09 Rajan MK-412960 7G 250 125 98

10 Rajan MK-515048 7G 200 200 201

10 Rajan MK-516086 7G 226 227 186

11 Rajan MK-515043 7G 222 222 214

12 Rajan MK-516076 7G 66 79 26

13 Bay-City 162979 7G 1000 167 139

14 Bay-City 162989 7G 750 333 288

15 Bernardi 46-C 7G 280 233 264

16 Quelle 7824 7G 67 67 70

17 Quelle 7610 7G 1000 0 115

18 7G

7G
Sub Total (7GG) 4060 1653 1601

Grand Total 7580 3366 3369

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 0
02
03
04
05
06
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.06.2005
Month : June '2005

Total Production
SL Buyer Style/P.O No Item GG Remarks
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 Sears 1516 5G 362 362 220

02 Sears 1514 5G 382 382 70

03 Sears 3531 5G 500 500 448

04 Sears 3516 5G 501 501 267

05 Sears 1311 5G 228 228 160

06 Sears 1330 5G 175 175 54

07 Rajan 412651 5G 200 200 85

08 G.Gold 7548 5G 100 100 18


Sub Total (5GG) 2447 2447 1323

09 Rajan 412960 7G 250 250.00 127

10 G.Gold 8151 7G 250 250.00 116

10 Quelle 2480 7G 166.67 166.67 31

11 Quelle 2481 7G 183.33 183.33 36

12 Quelle 2486 7G 166.67 166.67 142

13 Quelle 2485 7G 166.67 166.67 168

14 Bay-City 162979 7G 750.00 750.00 159

15 Bay-City 192689 7G 562.50 562.50 344

16 Sears 1304 7G 321.58 321.58 212

17 Sears 1310 7G 342.42 342.42 163

18 Bernardi 46-C 7G 363.33 363.33 110

7G
Sub Total (7GG) 3523 3523 1608

Grand Total 5970 5970 2931

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01
02
03
04
05
06
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.06.2005
Month : May'2005

Total Production
SL Buyer Style/P.O No Item GG Remarks
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 Whemeyer WR-1 5G 427 427 437

02 Sears 50108-C 5G 594 594 585

03 Sears 1309 5G 272 272 276

04 Sears 1516 5G 362 237 79

05 Sears 3531 5G 500 500 62

06 Rajan MK-412651 5G 200 200 67


Sub Total (5GG) 2355 2230 1506

09 Rajan MK-412654 7G 200 0.00 18

10 Rajan MK-412960 7G 250.00 0.00 26

11 Rajan MK-412727 7G 300.00 300.00 190

12 Rajan MK-412655 7G 200.00 200.00 158

13 Quelle 2479 7G 216.67 163.58 152

14 Quelle 2480 7G 166.67 79.58 78

15 Quelle 2481 7G 183.33 183.33 151

16 Bay-City 162979 7G 750.00 750.00 706

17 Bay-City 162989 7G 562.50 562.50 132

18 Sears 1304 7G 260.33 260.33 264

19 Sears 1304-B 7G 321.58 321.58 119

20 Sears 1310 7G 342.42 342.42 184

21 G.Gold 08151 7G 250.00 250.00 143

22 7G

7G
Sub Total (7GG) 4004 3413 2321

Grand Total 6358 5643 3827

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01
02
03
04
05
06
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.05.2005
Month :April'2005

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 Eurofrente 08207 5G 119 119 41

02 Eurofrente 08206 5G 219 219 153

03 Rajan MK-412892 5G 200 200 205

04 G.Gold 007999 5G 500 500 516

05 Sears 1308 5G 140 140 143

06 Sears 1307 5G 271 271 274

07 Sears 1307-B 5G 276 276 284


Sub Total (5GG) 1724 1724 1616

08 Quelle 7824 7G 66.75 66.75 52

09 Rajan MK-412654 7G 200 200.00 117

10 Rajan MK-413066 7G 200.00 200.00 203

11 Rajan MK-413076 7G 300.00 300.00 301

12 G.Gold 17653(8040) 7G 418.00 418.00 116

13 G.Gold 17653(8041) 7G 300.00 300.00 307

14 G.Gold 17653(8039) 7G 200 200.00 204

15 Scope 58417 7G 138 138.00 120

16 Scope 58413 7G 138 138.00 116

17 Scope 58415 7G 138 138.00 140

18 Scope 58403 7G 138 138.00 140

19 Quelle 2480 7G 166.67 166.67 87

20 Quelle 2479 7G 216.67 216.67 43

21 Rajan MK-412727 7G 300.00 300.00 114

22 Rajan MK-412655 7G 200.00 200.00 37

7G
Sub Total (7GG) 3120 3120 2099

Grand Total 4844 4844 3715

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01
02
03
04
05
06
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.04.2005
Month :March'2005

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 Bay-City 16-A 5G 566.67 566.67 571.00

02 Eurofrente 08207 5G 118.5 118.5 82.08

03 Eurofrente 08206 5G 219 219 71.58

04

05

06

07
Sub Total (5GG) 904.17 904.17 724.67

08 Bay-City 5D-366 7G 960.00 250.00 245.58

09 Bay-City 380-44/49 7G 2917.5 2833.33 2833.00

10 N.Mann 115/149 7G 356.25 183.33 191.50

11 N.Mann 115/827 7G 152.92 152.92 159.67

12 Quelle 7824 7G 66.75 66.75 16.33

13 Rajan MK-41654 7G 200.00 200.00 74.25

14 G.Gold 17653 7G 418 418 310.58

15 Scope 58417 7G 138 19.67

16 Scope 58413 7G 138 24.42


Sub Total (7GG) 5347.42 4104.33 3875.00

Grand Total 6251.58 5008.50 4599.67

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01
02
03
04
05
06
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 02.03.2005
Month :February'2005

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 Scope 58423 5G 250 0 7.00

02 G.Union C-603 5G 300 300 302.33

03 G.Union C-603/B 5G 125 125 127.83

04

05

06

07
Sub Total (5GG) 675 425 437.17

08 Scope 58417 7G 300.00 0.00 2.67

09 Bay-City 5-E 7G 960 960.00 965.92

10 Bay-City 5-D 7G 1600.00 1600.00 1379.83

11 Bay-City 380-44/49 7G 2917.50 0.00 99.33

12 N.Mann 115/149 7G 356.25 356.25 175.75

13 7G

14

15

16

17
Sub Total (7GG) 6133.75 2916.25 2623.50

Grand Total 6808.75 3341.25 3060.67

Reason For Short Fall

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01
02
03
04
05
06
07
Total 0.00 0.00 0

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Production Details
All Figure In DZ Date : 01.12.2004
Month :November'2004

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive

01 Eurofrenty 08231 5G 78.5 78.5 42.33

02

03

04

05

06

07
Sub Total (5GG) 78.5 78.5 42.33

08 Hong-Song YS-14214-S 7G 1179 1179 65.58

09 Hong-Song WS-14212-S 7G 332 332 288.75

10 Sears CTS5-2298 R 7G 433.33 433.33 353.75

11 Karstadt K-03 7G 417.00 417.00 371.33

12 N.Mann 115/667 7G 125.00 125.00 129.17

13 N.Mann 115/149 7G 1250.00 1250.00 664.17

14

15

16

17
Sub Total (7GG) 3736.33 3736.33 1872.75

Grand Total 3814.83 3814.83 1915.08

Reason For Short Fall

Production Target Status

Total Production
SL Buyer Style/P.O No Item GG Remarks
Order Qty Target Achive
01 Eurofrenty 78.50 78.50 42.33
02 HongSong 1511.00 1511.00 354.33
03 Sears 433.33 433.33 353.75
04 Karstadt 417.00 417.00 371.33
05 N.Mann 1375.00 1375.00 793.33
06
07
Total 3814.83 3814.83 1915.07

_____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.09.2008

Month : August' 2008


Total Shipped Short/Over Ship
SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Sears 3517 5G 63 64 1 6-Aug

02 Sears 3517-B 5G 65 65 0 6-Aug

03 G.Gold 9L-432 5G 245 233 -12 7-Aug

04 Sage 0008 5G 394 394 0 9-Aug

05 Sage 0006 5G 890 403 Balance Qty 12-Aug

06 Sears 3540 5G 334 215 Partial 27-Aug

07 Quelle 3835 5G 83 82 -1 28-Aug

08 Sears 1513 5G 375 375 30-Aug

Sub Total (5GG) 2449 1831 -12

09 K-Mart 9L-592/13749 7G 2026 888 Partial 6-Aug

10 K-Mart 9L-592/13749 7G - 123 Partial 7-Aug

11 G.Gold 9L-708/14279 7G 1400 1370 Partial 26-Aug

12 K-Mart 9L-592/13749 7G - 42 Partial 21-Aug

13 G.Gold 9L-708/14278 7G 1400 249 Partial 28-Aug

14 G.Gold 9L-708/13807 7G 700 153 Partial 28-Aug

15 Sears 3508 7G 109 105 -4 28-Aug

16 K-Mart 9L-592/13750 7G 586 586 20-Aug

17 Eurofrente 11225 7G 117 50 Partial 14-Aug

Sub Total (7GG) 6338 3566 -4

Grand Total (5+7) GG 8787 5397 -16

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.08.2008

Month : July' 2008


Total Shipped Short/Over Ship
SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
1011CV/
01 G.Union CS-8000
5G 150 150 3-Jul

02 Li & Fung RC-45 5G 503 400 Parctial 4-Jul

Quality & Assort.


03 Li & Fung RC-45 5G 84 -18 6-Jul
Problem

04 G.Union 8212/MT-8016 5G 150 150 17-Jul

05 Sage 0008 5G 394 59 Parctial 21-Jul

06 Sears TSF8-4579 5G 290 297 7 23-Jul

07 Sage 06/NI/NJ/AL 5G 890 247 Parctial 30-Jul

Sub Total (5GG) 2377 1388 -11

08 G. Union 84004 7G 700 700 3-Jul

09 G. Union 4004/CS-898 7G 700 690 -10 4-Jul Assortment Problem

10 Sears 3527 7G 54 54 0 6-Jul

11 Sears 3528 7G 126 42 Blance Qty 6-Jul

12 G. Union 8212 7G 200 200 17-Jul

13 Sears 3527 7G 200 109 Partial 23-Jul

14 G.Gold 9L708 7G 3009 209 27-Jul

9L 592/
15 G.Gold 13749
7G 2026 935 Partial 30-Jul

16 Sears TSF8-3528 7G 200 203 3 30-Jul

17 Sears TSF8-3527 7G 90 Blance Qty 31-Jul

Rcvc From CSL


18 Sefra 8306 12G 784 392 24-Jul
Stitchitn To Export
Sub Total (7GG) 7999 3623 -7

Grand Total (5+7) GG 10376 5011 -19

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.07.2008

Month : June' 2008


Total Shipped Short/Over Ship
SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Li & Fung RC-45 5G 665 23 Partial 6-Jan

02 Li & Fung RC-45 5G 140 Partial 18-Jun

03 G. Union 4000/CS-9659 5G 1000 500 Partial 18-Jun

Quality & Assortment


04 G.Gold 9L446 5G 542 529 -14 18-Jun
Problem

05 G. Union 4000/CS-9659 5G 500 Balance Qty 19-Jun

06 Sears 3504 5G 257 255 -2 26-Jun Quality Problem

07 Sears 3517 5G 467 297 Partial 26-Jun

Sub Total (5GG) 2931 2243 -16

08 G.Gold 9L524 7G 283 136 6-Jun Rcvd from CSL For


Linking to Poly

09 Eurofrente 11447 7G 1100 1100 10-Jun

Shipped Swt.
10 G.Gold 4004/CS-898 7G 500 400 22-Jun
Complex

11 Sears 3527 7G 166 110 Partial 26-Jun

12 Sears 3528 7G 126 84 Partial 26-Jun

Sub Total (7GG) 2175 1830 0

Grand Total (5+7) GG 5106 4073 -16

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.06.2008

Month : May' 2008


Total Shipped Short/Over Ship
SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Branex LM-869 5G 133 133 27-May

02 Branex LM-870 5G 133 131 27-May

03 Branex LM-871 5G 133 133 27-May

04 Branex LM-874 5G 133 134 27-May

Sub Total (5GG) 533 532 0

05 Eurofrente 11447 7G 4150 2500 Partial 20-May

06 Eurofrente 11447 7G 550 Balance Qty 30-May

07 K-Mart 9L440 7G 2092 2083 -10 31-May

Sub Total (7GG) 6242 5133 -10

Grand Total (5+7) GG 6775 5664 -10

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 03.05.2008

Month : April' 2008


Total Shipped Short/Over Ship
SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
Ttl Qty 3900 Pcs
01 Quelle 7374 5G 269 92 Partial 17-Apr 3226 Pcs GKL
674 Pcs G.S.G.L-1

02 G.Union 84007/ET-8001 5G 500 424 Partial 18-Apr

03 G.Union 84007/ET-8001 5G 76 Balance Qty 19-Apr

04 G.Union 1011CV/CS-8000 5G 300 300 21-Apr

05 G.Gold 29L275 5G 300 296 -4 21-Apr Quality Problem

06 Quelle 7374 5G 102 Balance Qty 24-Apr

07 Quelle 3835 5G 357 355 -2 24-Apr Emb Problem

Knitting Qty. Can Not


08 Quelle 7374 5G 65 -10 30-Apr done For Yarn
Problem

Sub Total (5GG) 1726 1710 -16

09 Quelle 3423 7G 83 83 10-Apr

10 G.Union 4010/CS-8003/1 7G 1000 1000 13-Apr

11 G.Union 84016/ET-8037 7G 500 500 18-Apr

Sub Total (7GG) 1583 1583 0

Grand Total (5+7) GG 3309 3293 -16

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.04.2008

Month : March' 2008


Total Shipped Short/Over Ship
SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 G.Union 8400/ET-9659 5G 500 424 Partial 5-Mar

02 G.Union 4000GT/CS-9659 5G 300 300 10-Mar

03 G.Union 8400/ET-9659 5G 0 76 Balance Qty 10-Mar

04 G.Union 84006/ET-8000 5G 500 500 10-Mar

05 G.Union 4016/CS-8037 5G 1000 1000 25-Mar

06 N.Mann 500/477 5G 133 135 2 27-Mar

07 Atlantic 14256 5G 182 183 29-Mar

08 G.Union 3805/CK-8013 5G 300 300 31-Mar

Sub Total (5GG) 2915 2918 2

09 G.Union 84005/ET-6840 7G 500 424 Partial 5-Mar

10 G.Union 4004/CS-898 7G 700 400 Partial 10-Mar

11 G.Union 84004/ET-898 7G 300 200 Partial 10-Mar

12 G.Union 4005GT/CS-6840 7G 300 300 10-Mar

13 G.Union 84005/ET-6840 7G 0 76 Balance Qty 10-Mar

14 G.Union 4004/CS-898 7G 0 300 Balance Qty 10-Mar

15 G.Union 84004/ET-898 7G 0 100 Balance Qty 10-Mar

4036GT/
16 G.Union 7G 300 300 24-Mar
CS-8034
4036 P/
17 G.Union 7G 500 500 25-Mar
CS-8034
4036 Line
18 G.Union CS-8034
7G 200 200 25-Mar

19 Branex LBW-9060 7G 283 284 1 31-Mar

Sub Total (7GG) 3083 3084 1

Grand Total (5+7) GG 5998 6002 3

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.03.2008

Month : February' 2008

Total Shipped Short/Over Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 Atlantic 15684 5G 617 167 Partial 20-Feb

02 G.Union 4006/CS-8000 5G 500 432 Partial 23-Feb

03 Atlantic 15684 5G 450 451 1 24-Feb

04 G.Union 4000/CS9659 5G 700 700 0 25-Feb

05 G.Union 4006/CS-8000 5G 500 68 Balance Qty 26-Feb

Recvd from
06 G.Union 4006/CS-8000 5G 58 35 0 Orchid Swt.Knitting &
Linking Proces

07 Atlantic 19056 5G 25 13 0 Rcvd From


GSGL-1 Knitting
Sub Total (5GG) 2850 1866 1

08 Branex LM-861 7G 267 266 0 7-Feb

09 Branex LM-863 7G 83 82 -1 7-Feb Assortment Problem

10 G.Gold 9L-119/2770 7G 750 750 0 9-Feb

11 G.Gold 9L-120/2772 7G 600 600 0 11-Feb

12 Branex LM-862 7G 167 166 0 14-Feb

13 G.Union 4005/CS-6840 7G 400 400 0 25-Feb

14 Zara 5747/001 12G 48 48 0 15-Feb

Sub Total (7GG) 2315 2313 -1

Grand Total (5+7) GG 5165 4178 0

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details

All Figure In DZ Date : 01.02.2008

Month : January' 2008

Total Shipped Short/Over Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 N.Mann 8912 5G 133 134 1 24-Jan

Sub Total (5GG) 133 134 1

07 Quelle 8832 5G 500 515 15 10-Jan

08 Quelle 8824 7G 258 259 1 10-Jan

09 Quelle 8703 7G 333 336 3 24-Jan

10 Zara 5747/521 12G 18 18 0 3-Jan

11 Zara 5747/522 12G 83 83 0 18-Jan

12 Safara 816/8007 12G 182 182 0 28-Jan

Sub Total (7GG) 1375 1393 18

Grand Total (5+7) GG 1508 1527 19

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details

All Figure In DZ Date : 02.12.2007

Month : November' 2007

Total Shipped Short/Over Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 Quelle 3835 5G 275 276 1 22-Nov

01 Eurofrente 10764 5G 143 143 0 29-Nov

02 Eurofrente 10877 5G 208 208 0 29-Nov

Sub Total (5GG) 626 627 1

03 Les. Line 5870 7G 441 441 0 3-Nov

04 Les. Line 5872 7G 483 483 0 13-Nov

05 Les. Line 5868 7G 119 119 0 13-Nov

06 Quelle 8820 7G 542 542 0 22-Nov

07 G.Gold 012630 7G 500 498 -2 29-Nov

08 Cellio V-Stripe 12G 83 33 Partial 6-Nov

Sub Total (7GG) 2168 2116 -2

Grand Total (5+7) GG 2794 2743 -1

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details

All Figure In DZ Date : 03.10.2007

Month : October' 2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 Sfera 0766/8021 5G 161 140 0 20-Oct

01 Sfera 0766/8021 5G 161 21 0 23-Oct

02 N.Mann 017/531 5G 200 200 0 4-Oct

Sub Total (5GG) 361 221 0

03 Quelle 8824 7G 350 357 7 10-Oct

04 Quelle 8703 7G 138 137 -1 10-Oct

05 Quelle 3512 7G 250 251 1 25-Oct

06 Quelle 8703 7G 267 271 4 31-Oct

07 Quelle 3204 7G 142 142 0 31-Oct

08 Les. Line 18902 7G 407 407 0 11-Oct

09 G.Union 7603 7G 334 334 0 31-Oct

Sub Total (7GG) 1888 1899 11

Grand Total (5+7) GG 2249 2120 11

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.10.2007
Month : September' 2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 G. Gold 19H987 5G 258 176 Partial 2-Aug

02 Quelle 3835 5G 150 146 -4 26-Sep 1752

Sub Total (5GG) 408 322 -4

03 Quelle 8821 7G 1200 68 Prtial 6-Sep

04 Seras 3549 7G 250 125 Partial 7-Sep

05 Zara 5747/296 7G 206 46 Nill 1-Sep

06 Zara 5747/296 7G 160 27 Partial 7-Sep

07 Zara 5747/296 7G 160 133 12-Sep

08 Quelle 8821 7G 373 381 0 13-Sep

09 Quelle 8703 7G 192 196 0 13-Sep

10 Quelle 3885 7G 67 67 13-Sep

11 Quelle 8824 7G 583 567 -16 14-Sep

12 Quelle 8711 7G 342 329 -13 26-Sep

13 Quelle 8711 7G 133 134 0 26-Sep

14 Quelle 3885 7G 133 131 -2 26-Sep


Sub Total (7GG) 3799 2204 -31
15 Zara 5747/260 7G 954 236 Partial 20-Sep Rcvd. From Dhaka

16 Zara 5747/260 7G 954 233 Partial 23-Sep Rcvd. From Dhaka

17 Zara 5747/260 7G 954 321 Partial 23-Sep Rcvd. From Dhaka


Sub Total (12GG) 2862 790 0

Grand Total (5+7+12) GG 7069 3316 -35


______________________ __________________ ________________ ______________
Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details

All Figure In DZ Date : 01.09.2007


Month : August' 2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 G.Gold 19H542 5G 459 461 12-Aug

02 G.Gold 19H542/12228 5G 696 657 Partial 19-Aug

03 G.Gold 19H542/12228 5G 696 39 Partial 27-Aug

Sub Total (5GG) 1851 1157 0

12 Les.Line 47902W 7G 639 626 -13 13-Aug

14 Sears 3547 7G 333 335 0 16-Aug

5747/246
15 Zara 7G 375 375 0 18-Aug
36362

5747/246
16 Zara 7G 458 458 0 18-Aug
36361

Sub Total (7GG) 1805 1794 -13

Grand Total (5+7) GG 3656 2951 -13


______________________ __________________ ________________ ______________
Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 05.08.2007
Month : July' 2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Sears 1537 5G 292 292 0 4-Jul

02 N.Mann 138/751 5G 42 42 0 6-Jul

03 N.Mann 327/052 5G 42 43 0 6-Jul

04 Tiara 4H215/28875 5G 162 162 0 8-Jul

05 Tiara 4H215/28803 5G 338 338 0 8-Jul

06 Quelle 3835 5G 200 192 8 13-Jul

07 Sears 1504 5G 167 165 2 18-Jul

08 Sears 1513 5G 233 231 2 18-Jul

09 K-Mart 9H049/12186 5G 1564 780 Partial 22-Jul

10 K-Mart 9H049/12186 5G 1564 784 Partial 29-Jul

11 Sears 1500 5G 50 50 0 29-Jul

12 Sears 1537 5G 83 84 0 29-Jul


Sub Total (5GG) 4736 3162 12
12 Quelle 8820 7G 879 872 7 6-Jul

14 Sears 1535 7G 167 167 0 8-Jul

15 Sears 3543 7G 309 309 0 11-Jul

16 Sears 3544 7G 317 318 0 12-Jul

17 Quelle 8820 7G 510 496 14 12-Jul

18 Quelle 8820 7G 283 293 0 27-Jul

19 Quelle 3885 7G 333 330 3 27-Jul

20 Quelle 8703 7G 225 231 0 27-Jul


Sub Total (7GG) 3024 3016 24

21 Eurofrente 10610 12G 108 108 0 31-Jul

Sub Total (12GG) 108 108 0

Grand Total (5+7+12) GG 7868 6286 36

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.07.2007
Month : June'2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 G.Union 8480 5G 1000 1000 0 12-Jun

02 Tiara 4H215/28813 5G 408 408 0 23-Jun

03 Tiara 4H215/28802 5G 100 100 0 23-Jun

Sub Total (5GG) 1508 1508 0

04 G.Union 1603 7G 300 300 0 2-Jun

05 Sears 3542 7G 123 124 0 12-Jun

06 Sears 3544 7G 214 215 0 12-Jun

07 Quelle 2479 7G 142 145 0 14-Jun

08 Quelle 3204 7G 667 661 7 14-Jun

09 Quelle 8820 7G 2500 1621 Partial 28-Jun

10 Quelle 3885 7G 133 134 0 28-Jun

Sub Total (7GG) 4079 3200 7

Grand Total 5587 4708 7

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01

02
03

04

05
Total

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.06.2007
Month : May'2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 N.Mann 138/751 5G 42 42 0 9-May

02 N.Mann 327/052 5G 42 42 0 9-May 504

03 Sears VLF7-1500 5G 188 188 0 15-May

04 Quelle 3212 5G 333 329 4 29-May Quality Problem

05 Sears VLF7-1500 5G 50 50 0 31-May

Sub Total (5GG) 655 651 4

06 Tiara 4H216/28658 7G 500 500 0 7-May

07 Quelle 2479 7G 141 142 0 9-May

08 Eurofrente 10394 7G 800 800 0 22-May

09 Tiara 4H216/28659 7G 500 498 2 21-May Quality Problem

10 Eurofrente 10394 7G 423 423 0 31-May

Sub Total (7GG) 2364 2363 0

Grand Total 3019 3014 4

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01

02
03

04

05
Total

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.05.2007
Month : April'2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 N.Mann 138/751 5G 83 83 5-Apr

02 N.Mann 327/052 5G 83 83 5-Apr

03 Quelle 3733 5G 333 333 12-Apr

04 Quelle 3835 5G 208 202 6 12-Apr Embd. Problem

05 Quelle 3915 5G 133 134 0 18-Apr

03 G.Union 17200 5G 500 500 22-Apr

04 Sears VLF7-1500 5G 568 569 28-Apr

Sub Total (5GG) 1908 1904 6

06 G.Union 7613 7G 500 500 9-Apr

07 G.Union 1603 7G 300 300 9-Apr

07 G.Union 1604 7G 300 300 22-Apr

08 Quelle 3885 7G 333 331 2 12-Apr Print Problem

09 Quelle 8711 7G 367 369 27-Apr

Sub Total (7GG) 1800 1800 2

Grand Total 3708 3704 8

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01

02

03

04

05
Total

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.04.2007
Month : March'2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 G.Union 7609 5G 1000 1000 0 1-Mar

02 G.Union 7615 5G 700 168 Partial 11-Mar

03 G.Union 7600 5G 1000 168 Partial 11-Mar

04 G.Union 7600 5G 832 832 Partial 16-Mar

05 G.Union 17201 5G 500 500 0 31-Mar

Sub Total (5GG) 4032 2668 0

06 G.Union 7606 7G 700 168 Partial 11-Mar

07 G.Union 7603 7G 700 168 Partial 13-Mar

08 G.Union 7606 7G 532 532 0 16-Mar

09 G.Union 7603 7G 532 532 0 29-Mar

10 G.Union 1613 7G 300 300 0 29-Mar

Sub Total (7GG) 2764 1700 0

Grand Total 6796 4368 0

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01
02

03

04

05

06

07

08
Total

____________ ________________
Prepared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.04.2007
Month : March' 2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 N.Mann 550/477 5G 100 103 1-Feb

02 G.Union 7615 5G 700 532 Partial 28-Feb

Sub Total (5GG) 800 635 0


Due To Printing
03 Quelle 8706 7G 833 818 -15 1-Feb
Problem
Due To Yarn Dying
04 Quelle 8711 7G 525 502 -23 22-Feb
Problem

05 Quelle 8706 7G 150 151 0 22-Feb

06 G.Union 7604 7G 700 700 0 21-Feb

07 G.Union 7605 7G 1000 1000 0 21-Feb

Sub Total (7GG) 3208 3171 -38

Grand Total 4008 3806 -38

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01

02

03

04
05

06

07

08
Total

____________ ________________
Prepared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.03.2007
Month : February' 2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 N.Mann 550/477 5G 100 103 1-Feb

02 G.Union 7615 5G 700 532 Partial 28-Feb

Sub Total (5GG) 800 635 0


Due To Printing
03 Quelle 8706 7G 833 818 -15 1-Feb
Problem
Due To Yarn Dying
04 Quelle 8711 7G 525 502 -23 22-Feb
Problem

05 Quelle 8706 7G 150 151 0 22-Feb

06 G.Union 7604 7G 700 700 0 21-Feb

07 G.Union 7605 7G 1000 1000 0 21-Feb

Sub Total (7GG) 3208 3171 -38

Grand Total 4008 3806 -38

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01

02

03

04
05

06

07

08
Total

____________ ________________
Prepared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.02.2007
Month : January' 2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 Quelle 3212 5G 333 328 -5 11-Jan

02 Quelle 7692 5G 333 322 -11 18-Jan

03 Quelle 3812 5G 100 100 0 25-Jan


Sub Total (5GG) 766 750 -16
05 Quelle 3252 7G 267 265 -2 11-Jan

06 Quelle 7452 7G 133 134 0 25-Jan

07 7G

08 7G

09 7G
Sub Total (7GG) 400 399 -2

Grand Total 1166 1149 -18

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01

02

03

04
05

06

07

08
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 06.01.2007
Month : December' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 N.Mann 550/477 5G 100 101 0 20-Dec

02 5G

03 5G

04 5G

05 5G
Sub Total (5GG) 100 101 0
05 Quelle 8703 7G 212 202 11 6-Dec Quality Problem

06 Quelle 8711 7G 833 781 52 28-Dec Due To Over Weight

07 7G

08 7G

09 7G

10 7G

11 7G

12 7G
Sub Total (7GG) 1045 983 63

Grand Total 1145 1084 63

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01

02

03
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.12.2006
Month : November' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 N.Mann 550/477 5G 83 83 0 9-Nov

02 Eurofrente 09769 5G 487 487 0 16-Nov

03 Eurofrente 09770 5G 150 150 0 16-Nov

04 Eurofrente 09750 5G 521 513 8 18-Nov

05 Quelle 3795 5G 125 75 Partial 30-Nov


Sub Total (5GG) 1366 1308 8
05 Quelle 7392 7G 210 190 20 2-Nov

06 Quelle 7452 7G 175 165 Partial 9-Nov

07 Quelle 3955 7G 183 83 100 9-Nov 100 DZ Stock Lot

08 Quelle 3792 7G 58 59 0 9-Nov

09 Quelle 7452 7G 275 246 29 23-Nov

10 Quelle 7392 7G 58 62 0 23-Nov

11 Quelle 8703 7G 2083 1871 Partial 30-Nov

12 Leasure Line 17908 7G 63 23 Partial 5-Nov Rcvd. From Savar Swtr.


Sub Total (12GG) 3105 2699 149
15 Zara 5747/260 12G 102 7 Partial 9-Nov
Sub Total (7GG) 102 7

Grand Total 4573 4014 157


Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01

02

03
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.11.2006
Month : October' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 G.Gold 1D159 3G 42 13 Partial 21-Oct Rcvd From SAVAR Swtr.
Sub Total (1.5GG) 42 13
02 G.Gold 1D158/10251 5G 546 216 Partial 2-Oct

03 G.Gold 1D158/10251 5G 268 200 Partial 10-Oct

04 G.Gold 1D158/10251 5G 130 36 Partial 11-Oct

05 G.Gold 1D158/10249 5G 100 98 2 11-Oct Assortment Problem


Sub Total (5GG) 1044 550 2
06 Sears VSL7-1500 7G 200 200 0 1-Oct

07 Sears TSF6-3534 7G 124 123 1 12-Oct

08 Quelle 3732 7G 367 132 Partial 5-Oct

09 Quelle 3905 7G 200 73 Partial 5-Oct

10 Quelle 3732 7G 234 100 Partial 6-Oct

11 Quelle 3905 7G 127 29 Partial 6-Oct

12 Quelle 7294 7G 208 74 Partial 6-Oct

13 Quelle 8609 7G 433 124 Partial 12-Oct

14 Quelle 3732 7G 134 122 13 12-Oct Printing Problem

15 Quelle 3905 7G 98 87 11 12-Oct Quality Problem

16 Quelle 3792 7G 408 129 Partial 12-Oct

17 Quelle 7294 7G 134 119 15 13-Oct Quality & Printing Problem

18 Quelle 8609 7G 309 303 6 19-Oct Yarn Shading Problem


19 Quelle 3792 7G 344 345 19-Oct

20 Quelle 7392 7G 250 40 Partial 21-Oct

21 Leasure Line 17908 7G 185 34 Partial 20-Oct Rcvd From SAVAR Swtr.

22 Leasure Line 17908 7G 185 17 Partial 21-Oct Rcvd From SAVAR Swtr.
Sub Total (7GG) 3940 2051 46

Grand Total 5026 2614 48

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 03.10.2006
Month : September' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Zara 5747/703 1.5G 409 134 0 19-Sep Savar Sweater

02 Zara 5747/703 1.5G 132 46 Partial 25-Sep Savar Sweater


Sub Total (1.5GG) 541 180
03 G.Gold 21D050CT/10074 5G 330 330 0 5-Sep

04 G.Gold 21D050CT/10075 5G 220 220 0 5-Sep

05 Rajan MK-413609 5G 400 400 0 6-Sep

06 Rajan MK-413612 5G 400 400 0 6-Sep

07 Rajan MK-413608 5G 300 300 0 6-Sep

08 Sears TSF6-3540 5G 200 201 0 11-Sep

09 Sears TSF6-3542 5G 217 216 1 13-Sep

10 Bay-City 303696/30 5G 161 56 Partial 18-Sep Savar Sweater

11 G.Gold 1D158/010251 5G 1380 834 Partial 30-Sep


Sub Total (5GG) 3608 2957 1
12 Quelle 3575 7G 150 147 3 8-Sep

13 Quelle 8602 7G 233 46 Partial 8-Sep

14 Rajan LK-41CROP 7G 300 104 Partial 11-Sep Savar Sweater

15 Quelle 8602 7G 187 181 6 15-Sep


16 Quelle 8609 7G 408 274 Partial 15-Sep

17 Quelle 8609 7G 135 130 5 21-Sep

16 Quelle 8602 7G 208 213 0 28-Sep

17 Sears 3534 7G 157 158 0 28-Sep


Sub Total (7GG) 1778 1253 14

Grand Total 5927 4390 15

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.08.2006
Month : July' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Tiara 4D-769 3G 400 160 3-Jul OSL
Sub Total (3GG) 400 160
02 Quelle 8614 5G 1008 540 Partial 7-Jul

03 Quelle 8614 5G 1680 469 Partial 13-Jul

04 Quelle 3795 5G 125 89 Partial 13-Jul

05 Quelle 3795 5G 36 37 0 20-Jul

06 Quelle 3595 5G 167 157 10 20-Jul

07 Quelle 8614 5G 1213 612 Partial 21-Jul

08 Quelle 8614 5G 600 589 11 28-Jul

09 Sears 60252-C 5G 432 415 17 16-Jul


Sub Total (5GG) 5261 2908 38
10 M.Hidary FGB06821 7G 42 17 0 3-Jul OSL

11 Sears 3534 7G 667 667 0 10-Jul

12 Sears 3536 7G 417 228 Partial 16-Jul

13 Sears 1502 7G 237 234 3 26-Jul

14 Sears 1504 7G 399 172 Partial 27-Jul

15 Quelle 8602 7G 152 124 Partial 13-Jul


16 Quelle 8602 7G 293 142 Partial 7-Jul

17 Quelle 3094 7G 500 112 Partial 21-Jul

18 Quelle 3094 7G 388 271 Partial 28-Jul

19 Quelle 3142 7G 67 66 1 20-Jul

20 Wehmeyer WR-08 7G 200 135 Partial 13-Jul

21 Wehmeyer WR-08 7G 65 63 2 20-Jul

22 N.Mann 017/477 7G 146 83 Partial 28-Jul


Sub Total (7GG) 3573 2314 6

Grand Total 9234 5382 44

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.07.2006
Month : June' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Quelle 8614 5G 1675 1253 Partial 1-Jun

02 Eurofrente 09181 5G 186 186 0 9-Jun

03 Eurofrente 09182 5G 113 107 6 9-Jun

04 Quelle 8614 5G 422 418 4 9-Jun

05 Quelle 3023 5G 150 142 8 15-Jun

06 Quelle 3033 5G 150 140 10 15-Jun

07 Quelle 7214 5G 150 141 9 15-Jun

08 Sears 60252-C 5G 432 416 16 18-Jun

09 Quelle 8614 5G 2021 337 Partial 22-Jun

10 Quelle 3795 5G 175 165 10 22-Jun

11 Quelle 8614 5G 2021 676 Partial 29-Jun


Sub Total (5GG) 7495 3981 63
01 Quelle 2667 7G 267 40 Partial 1-Jun

02 Sears 3533 7G 500 492 8 8-Jun


03 N.Mann 017/531 7G 271 263 7 9-Jun 3252

04 N.Mann 017/477 7G 146 140 6 9-Jun

05 Sears 1500 7G 35 35 0 12-Jun

06 Sears 3531 7G 625 619 6 15-Jun

07 Sears 3534 7G 237 232 5 18-Jun

08 Sears 3532 7G 334 332 1 22-Jun

09 Quelle 3732 7G 167 155 12 22-Jun

10 Eurofrente 09447 7G 460 460 0 26-Jun

11 Quelle 8602 7G 658 365 Partial 29-Jun


Sub Total (7GG) 3700 3133 45

Grand Total 11195 7114 108

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.06.2006
Month : May' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Scope 13463 5G 40 40 0 2-May

02 N.Mann 550/477 5G 67 67 0 4-May

03 G.Union S-372 5G 100 98 2 7-May

04 G.Union S-373 5G 100 100 0 7-May

05 Rajan MK-413315 5G 300 294 6 8-May

06 Sears 1500 5G 666 670 0 17-May

07 N.Mann 550/477 5G 75 76 0 25-May


Sub Total (5GG) 1348 1345 8
01 Quelle 2627 7G 200 200 0 10-May

02 Quelle 2611 7G 200 202 0 10-May

03 Quelle 3295 7G 183 179 4 11-May

04 Quelle 2620 7G 233 231 2 11-May


05 Quelle 3792 7G 166 166 0 17-May

06 Quelle 2619 7G 233 229 4 17-May

07 Quelle 8602 7G 325 324 1 17-May

08 Quelle 2615 7G 292 289 3 19-May

09 Quelle 2667 7G 267 230 Partial 25-May

10 Quelle 2479 7G 200 202 0 25-May

11 Quelle 2670 7G 333 337 0 25-May

12 Eurofrente 09447 7G 900 500 Partial 27-May

13 G.Union CS-3029 7G 350 350 0 31-May

14 G.Union ET-6030 7G 104 104 Partial 31-May


Sub Total (7GG) 3986 3543 14

Grand Total 5334 4888 22

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.05.2006
Month : April' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Quelle 7214 5G 150 147 3 27-Apr

02 Quelle 3033 5G 150 150 0 27-Apr

03 Quelle 3023 5G 150 151 0 27-Apr

04 Scope 13463 5G 200 201 0 30-Apr

05 Scope 13465 5G 200 200 0 30-Apr

Sub Total (5GG) 850 849 3


01 G.Union 8497 7G 188 188 0 3-Apr

02 G.Union L-444 7G 300 299 1 10-Apr


03 Quelle 3732 7G 133 134 0 19-Apr

04 Quelle 3792 7G 167 167 0 27-Apr

05 Quelle 3792(B) 7G 342 339 3 27-Apr

Sub Total (7GG) 1130 1127 4

Grand Total 1980 1976 7

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.04.2006
Month : March' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Zara 5747/541 7G 201 201 0 7-Mar

02 Zara 5747/541 7G 100 100 0 9-Mar

03 Zara 5747/541 7G 241 241 0 16-Mar

Sub Total (5GG) 542 542 0


01 N.Mann 429/546 7G 308 311 0 2-Mar

02 Eurofrente 08997 7G 50 50 0 2-Mar

03 Quelle 3732 7G 192 192 0 16-Mar

04 Quelle 8602 7G 700 701 0 29-Mar

Sub Total (7GG) 1250 1254 0

Grand Total 1792 1796 0

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.03.2006
Month : February' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 5G

02 5G
Sub Total (5GG) 0 0 0
01 Quelle 8609 7G 900 852 48 3-Feb Yarn & Shading Problem

02 Quelle 7382 7G 100 93 7 8-Feb Printing Problem

03 Quelle 3732 7G 67 67 0 8-Feb

04 Quelle 8609 7G 708 709 1 17-Feb

05 Eurofrente 08997 7G 90 40 Partial 25-Feb

Sub Total (7GG) 1865 1761 56

Grand Total 1865 1761 56

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.02.2006
Month : January' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Zara 5747/504 5G 321 316 5 9-Jan

02 5G
Sub Total (5GG) 321 316 5
05 Quelle 8603(B) 7G 650 636 14 5-Jan Shading Problem

06 Quelle 7382 7G 100 99 1 5-Jan Assortment Problem

07 Quelle 3732 7G 67 67 0 5-Jan

08 Quelle 8609 7G 600 600 0 25-Jan

Sub Total (7GG) 1417 1402 15

Grand Total 1738 1718 20

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.12.2005
Month : December' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Zara 574/600 5G 596 596 0 1-Dec

02 Putteman RH3335TG 5G 100 100 0 12-Dec


Sub Total (5GG) 696 696 0
05 Sears 2486 7G 406 406 0 1-Dec

06 N.Mann 317/349 7G 708 700 8 8-Dec

07 Quelle 8602 7G 833 844 0 15-Dec

08 Quelle 8603 7G 1250 1250 0 29-Dec

Sub Total (7GG) 3197 3200 8

Grand Total 3893 3896 8

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.12.2005
Month : November ' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Eurofrente 9029 5G 16 16 0 7-Nov

02 5G
03 5G

04 5G

05 5G

06 5G

Sub Total (5GG) 16 16 0


05 Quelle 8602 7G 1333 1333 0 2-Nov

06 Bay-City 451 7G 1800 830 Partial 15-Nov

07 Bay-City 451 7G 1800 75 Partial 16-Nov

08 Bay-City 451 7G 1800 395 Partial 17-Nov

09 Bay-City 451 7G 1800 265 Partial 18-Nov

10 Quelle 8602 7G 1000 993 7 24-Nov

11 Bay-City 451 7G 35 35 26-Nov

12 Sears 07MCS6-2472 7G 267 267 0 27-Nov

13 7G
Sub Total (7GG) 9835 4193 7

Grand Total 9851 4209 7

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.11.2005
Month : October ' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Sears 1539 5G 153 155 0 10-Oct

02 Sears 1538 5G 112 113 0 10-Oct


03 Sears 1537 5G 99 99 0 10-Oct

04 Sears 1536 5G 137 137 0 10-Oct

05 Eurofrente 09209 5G 140 140 0 23-Oct

06 Eurofrente 08206 5G 360 360 0 23-Oct

Sub Total (5GG) 1001 1004 0


05 Bay-City 452 7G 1625 1625 0 1-Oct

06 Wal Mart 9106 7G 333 33 0 10-Oct

07 Wal Mart 9106 7G 333 100 0 10-Oct

08 Bay-City 449 7G 758 758 0 17-Oct

09 7G

10 7G

11 7G

12 7G

13 7G
Sub Total (7GG) 3049 2516 0

Grand Total 4050 3520 0

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.10.2005
Month : September' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Sears 1516 5G 194 193 1 1-Sep Process Loss

02 Sears 1514 5G 382 382 0 1-Sep


03 G.Gold 7358 5G 300 300 0 6-Sep

04 Bay-City 452 5G 1625 0 0 29-Sep

Sub Total (5GG) 2501 875 1


05 Quelle 7610(B) 7G 917 860 Partial 1-Sep

06 Quelle 7610 7G 57 57 0 8-Sep

07 Quelle 7610 7G 63 63 0 8-Sep

08 Quelle 7610 7G 250 251 0 8-Sep

09 Rajan W515043 7G 268 266 2 22-Sep Process Loss

10 Rajan W515029 7G 216 212 4 22-Sep Process Loss

11 Rajan W515028 7G 133 129 4 22-Sep Process Loss

12 Rajan W515078-L 7G 13 12 1 22-Sep Process Loss

13 Quelle 3575 7G 133 64 Partial 22-Sep


Sub Total (7GG) 2050 1914 11
17 Zara 5747/800 1.5G 42 0 10-Sep
18
Sub Total (1.5G) 0 42 0
19

20

Grand Total 4551 2831 12

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.08.2005
Month : August' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Sears 3515 5G 750 752 1-Aug

02 Rajan MK-412651 5G 200 190 10 9-Aug Process Loss


03 Sears 3534 5G 517 518 29-Aug

04 Sears 1516 5G 362 167 Partial 29-Aug

Sub Total (5GG) 1829 1627 10


05 G.Gold 27750 7G 50 18 2-Aug GSGL-1

06 Rajan MK-412655 7G 200 198 2 6-Aug Process Loss

07 Rajan MK-412960 7G 250 248 2 6-Aug Process Loss

08 Rajan W-515048 7G 200 194 6 11-Aug Process Loss

09 Rajan W-515043 7G 222 218 4 11-Aug Process Loss

10 Quelle 7824 7G 67 66 1 11-Aug Process Loss

11 Zara 5747/830 7G 271 248 23 11-Aug Assortment Problem

12 Zara 5747/830 7G 271 4 13-Aug Shiped From Orchid

13 Rajan MK-516086 7G 226 223 3 17-Aug Process Loss

14 Rajan MK-516076 7G 66 66 17-Aug

15 Sears TSF5-3530 7G 500 504 21-Aug

16 Quelle 7610 7G 1000 1003 25-Aug

17

18 7G

19 7G

20 7G

Sub Total (7GG) 3323 2990 41

Grand Total 5152 4617 51

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.08.2005
Month : July' 2005
Total Shipped Short Ship
SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Sears 1311 5G 228 226 2 4-Jul Process Loss

02 Sears 3516 5G 501 495 6 10-Jul Process Loss

03 Sears 1330 5G 175 179 0 17-Jul

04 Bernardi 237/W 5G 180 180 0 31-Jul

Sub Total (5GG) 1084 1080 8


05 G.Gold 27822 7G 250 140 Partial 5-Jul

06 Sears 1304 7G 322 323 0 7-Jul

07 G.Gold 27822 7G 250 110 Partial 10-Jul

08 Bernardi 05/C-46W 7G 363 83 Partial 15-Jul

09 Bay-City 162979 7G 1000 500 Partial 17-Jul

10 Bay-City 162989 7G 750 413 Partial 17-Jul

11 G.Gold 17653/8039 7G 200 196 4 17-Jul

12 Bay-City 162979 7G 501 200 Partial 18-Jul

13 Bay-City 162989 7G 338 150 Partial 18-Jul

14 Bay-City 162979 7G 250 250 0 20-Jul

15 Bay-City 162989 7G 188 188 0 20-Jul

16 Rajan MK-412654 7G 200 140 60 20-JulApplique Dyeing Quality Rejec

17 G.Gold 17653/8040 7G 418 330 88 23-Jul Fack Fur Short.

18 G.Gold 17653/8041 7G 300 130 Partial 24-Jul

19 G.Gold 17653/8041 7G 300 150 Partial 26-Jul

20 Bernardi 05/C-46W 7G 280 280 0 31-Jul

Sub Total (7GG) 5910 3583 152

Grand Total 6994 4663 160

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.07.2005
Month : June' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Sears 1309 5G 272 273 0 4-Jun

02 Sears 50108 5G 594 585 9 26-Jun

03 Sears 3531 5G 500 486 14 26-Jun

04 Sears 1307 5G 276 274 2 14-Jun

05 G.Gold 7548 5G 100 94 6 28-Jun

Sub Total (5GG) 1742 1712 31


04 Sears 1304 7G 260 260 0 4-Jun

05 Bay-City 366/367 7G 2643 1280 Partial 9-Jun

06 Sears 1310 7G 342 338 2 12-Jun

07 Quelle 2479 7G 217 218 0 15-Jun

08 Quelle 2480 7G 167 167 0 15-Jun

09 Quelle 2481 7G 183 181 2 15-Jun

10 Bay-City 366/367 7G 2560 1264 Partial 15-Jun

11 Quelle 2482 7G 167 158 9 30-Jun

12 Quelle 2485 7G 167 159 8 30-Jun

13 Quelle 2486 7G 167 164 3 30-Jun

Sub Total (7GG) 6873 4189 24

Grand Total 8615 5901 55

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
06
07
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.06.2005
Month : May' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Rajan MK-412692 5G 200 200 0.00 15-May

02 G.Gold 007999 5G 500 400 Partial 15-May

03 Eurofrente 08206 5G 119 120 18-May

04 Eurofrente 08207 5G 219 220 18-May

05 Wehemer WR-01 5G 427 427 25-May

5G

Sub Total (5GG) 1465 1367 0.00


08 Rajan MK-413066 7G 200 200 0 15-May

09 Rajan Mk-412727 7G 300 260 Partial 15-May

10 Rajan MK-412727 7G 40 36 4 16-May

11 Rajan MK-413076 7G 300 298 2 16-May

Sub Total (7GG) 840 794 6

Grand Total 2305 2161 6

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
06
07
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.05.2005
Month : April' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Bay-City 370 5G 567 567 0.00 24-Apr

02 Sears 1307 5G 271 269 2 28-Apr P.Loss & Quality Rejection

03 Sears 1308 5G 140 138 2 28-Apr P.Loss & Quality Rejection

04 5G

05 5G

06 5G

07
Sub Total (5GG) 978 974 4.00
08 Bay-City 380-44/49 7G 2086.5 1043 Partial 6-Apr

09 Bay-City 380-44/49 7G 1044 446 Partial 11-Apr

10 Bay-City 380-44/49 7G 599 599 Partial 21-Apr

11 Quelle 7824 7G 67 62 5 28-Apr Printing Problem

12 Scope 58417 7G 138 138 28-Apr

13 Scope 58413 7G 138 138 28-Apr

14 Scope 58415 7G 138 138 28-Apr

15 Scope 59403 7G 138 138 28-Apr

16

17

18
Sub Total (7GG) 4348.5 2702 5

Grand Total 5326.5 3676 9

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
06
07
Total
____________ ________________________ ________________
Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.04.2005
Month : March' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 G.Union C-603 5G 300 300 12-Mar

02 G.Union C-603 B 5G 125 125 12-Mar

03

04

05

06

07
Sub Total (5GG) 425 425 0
08 N.Mann 115/149 7G 356.25 356.92 10-Mar

09 G.Union 38497 7G 225 225 12-Mar

10 Casabawa Dec 04-A 7G 220 220 22-Mar

11 Casabawa Dec 04-B 7G 176.67 176.67 22-Mar

12 Bay-City 380-44/49 7G 2917.5 831 Partial 30-Mar

13 N.Mann 115/827 7G 152.92 155.17 30-Mar

14 G.Union 6596 7G 350 350 31-Mar

15 G.Union 38497 7G 350 350 31-Mar

16

17

18
Sub Total (7GG) 4748.34 2665 0

Grand Total 5173.34 3090 0

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
06
07
Total
____________ ________________________ ________________
Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.02.2005
Month :January'2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01

02

03

04

05

06

07
Sub Total (5GG) 0 0 0
08 N.Mann 115/827 7G 500 501 0 17-Jan

09 7G

10 7G

11 7G

12 7G

13 7G

14 7G

15 7G

16

17

18
Sub Total (7GG) 500 501 0

Grand Total 500 501 0

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
06
07
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.01.2005
Month :December'2004

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01

02

03

04

05

06

07
Sub Total (5GG) 0 0 0
08 Sears 2298 7G 433.33 419.83 13.5 5-Dec

09 N.Mann 115/149 7G 1250 1241.83 8.17 9-Dec

10 Karstadt K-03 7G 417 342 75 9-Dec

11 Seras 2300 7G 400 400.17 0 28-Dec

12 Zara 5747/001 7G 1566.7 1567 0 30-Dec

13 7G

14 7G

15 7G

16

17

18
Sub Total (7GG) 4067.03 3970.83 96.67

Grand Total 4067.03 3970.83 96.67

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
06
07
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.12.2004
Month :November'2004

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Eufrenty 08206 7G 250 244 6 11-Nov

02 Eufrenty 08207 7G 167 164.5 2.5 11-Nov

03 Eufrenty 08231 7G 78.5 78.42 0 11-Nov

04

05

06

07
Sub Total (5GG) 495.5 486.92 8.5
08 N.Mann 115/509 7G 132.92 133.17 0 4-Nov

09 N.Mann 115/667 7G 125 127.17 0 10-Nov

10 Hong Song YS-14214 7G 1179 1162 17 12-Nov

11 Quelle 3532 7G 33.33 33.33 0 11-Nov

12 Karstadt K-03 7G 417 4.5 Partial 27-Nov

13 Casabawa Nob-10 B 7G 83.33 92 27-Nov

14 Hong Song WS-14212 7G 332 320 12 29-Nov

15 Hong Song YS-14213-S 7G 604 599.17 4.83

16

17

18
Sub Total (7GG) 2906.58 2471.34 33.83

Grand Total 3402.08 2958.26 42.33

Shipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
06
07
Total
____________ ________________________ ________________
Prepared By Production-Co-Ordinator Plant-In-Charge
2395
900

996

var Swtr.
VAR Swtr.

ng Problem

Problem
5688

VAR Swtr.

VAR Swtr.

10008
g Problem
Quality Rejec
y Rejection

y Rejection
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.09.2008
Month : August' 2008

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 G.Gold 9L-432 5G 245 233 -12 Assortment Problem

Total (5GG) 245 233 -12


02 Sears 3508 7G 109 105 -4 Assortment Problem

Total (7GG) 109 105 -4

Grand Total (5GG&7GG) 354 338 -16

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.08.2008
Month : July' 2008

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
Quality & Assort.
01 Li & Fung RC-45 5G 503 484 -18
Problem

Total (5GG) 503 484.17 -18


02 G.Union 4004/CS898 7G 700 690 -10 Assortment Problem

03 Sears 3527 7G 54 54 0

Total (7GG) 754 744 -10

Grand Total (5GG&7GG) 1257 1228 -28

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.07.2008
Month : June' 2008

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 G.Gold 9L446 5G 542 529 -14 Quality & Assortment Problem

02 Sears 3504 5G 257 255 -2 Quality Problem

Total (5GG) 799 783.42 -16

Total (7GG) 0 0 0

Grand Total (5GG&7GG) 799 783 -16

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.06.2008
Month : May' 2008

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01

Total (5GG) 0 0 0
01 K-Mart 9L440 7G 2092 2083 -10 Quality Problem

Total (7GG) 2092 2083 -10

Grand Total (5GG&7GG) 2092 2083 -10

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 03.05.2008
Month : April' 2007

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 G.Gold 29L275 5G 300 296 -4 Quality Problem

02 Quelle 3835 5G 357 355 -2 Emb Problem

03 Quelle 7374 5G 269 259 -10 Knitting Qty. Can Not done For
Yarn Problem
Total (5GG) 926 910 -16
K-Mart 9L440 7G 2092 2083 -10 Quality Problem

Total (7GG) 2092 2083 -10

Grand Total (5GG&7GG) 3018 2993 -25

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.01.2008
Month : December' 2007

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 5G
Nill
02 5G

Total (5GG) 0 0 0
01 Quelle 4000 7G 667 648 -19 Short For Twist Problem

02 7G

03 7G

Total (7GG) 667 648 -19

Grand Total (5GG&7GG) 667 648 -19

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 03.11.2007
Month : October' 2007

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 5G

02 5G

Total (5GG) 0 0 0
01 7G

02 7G

03 7G

Total (7GG) 0 0 0

Grand Total (5GG&7GG) 0 0 0

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 02.10.2007
Month : September' 2007

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Quelle 3835 5G 150 146 4 Short For Embd. Problem.

02 5G

Total (5GG) 150 146 4


01 Quelle 8824 7G 583 567 16 Short For Printing Problem.

02 Quelle 8711 7G 342 329 13 Short For Shading Problem

03 Quelle 3885 7G 133 131 2 Short For Printing Problem.

Total (7GG) 1058 1027 31

Grand Total (5GG&7GG) 1208 1173 35

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.09.2007
Month : August' 2007

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 5G

02 5G

02 5G

Total (5GG) 0 0 0
01 Les. Line 47902W 7G 639 626 -13 For Quality & Assortment Problem

02 7G

03 7G

Total (7GG) 639 626 -13

Grand Total (5GG&7GG) 639 626 -13

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 05.08.2007
Month : July' 2007

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Quelle 3835 5G 200 192 8 Embd. & Quality Problem

02 Sears 1504 5G 167 165 2 Process Loss

02 Sears 1513 5G 233 231 2 Quality Problem

Total (5GG) 600 588 12


01 Quelle 8820 7G 510 496 14 Printing & Yarn Shahding Problem

02 Quelle 3885 7G 333 329 3 Printing Problem

03 Quelle 8820 7G 879 872 7 Printing & Yarn Shahding Problem

Total (7GG) 1722 1697 24

Grand Total (5GG&7GG) 2322 2285 36

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.07.2007
Month : June,2007

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 5G

02 5G

Total (5GG) 0 0 0
01 Quelle 3204 7G 667 661 6 Shading & Quality Problem

02 7G

Total (7GG) 667 661 6

Grand Total (5GG&7GG) 667 661 6

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.06.2007
Month : May,2007

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Quelle 3212 5G 333 329 4 Quality Problem

02 5G

Total (5GG) 333 329 4


01 Tiara 2H216/28659 7G 500 498 2 Shading & Quality Problem

02 7G

Total (7GG) 500 498 2

Grand Total (5GG&7GG) 833 827 6

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.05.2007
Month : April,2007

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Quelle 3835 5G 208 202 6 Embd. Problem

02 5G

Total (5GG) 208 202 6


01 Quelle 3885 7G 333 331 2 Printing Problem

02 7G

Total (7GG) 333 331 2

Grand Total (5GG&7GG) 541 533 8

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.04.2007
Month : March,2007

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 5G

02 Nill 5G

Total (5GG) 0 0 0
01 7G

02 Nill 7G

Total (7GG) 0 0 0

Grand Total (5GG&7GG) 0 0 0

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ ________________
Prepared By Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.03.2007
Month : February,2007

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 5G

02 5G

Total (5GG) 0 0 0
01 Quelle 8706 7G 833 818 -15 Due To Printing Problem

02 Quelle 8711 7G 525 502 -23 Due To Yarn Dying Problem

Total (7GG) 1358 1320 -38

Grand Total (5GG&7GG) 1358 1320 -38

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ ________________
Prepared By Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.02.2007
Month : January,2007

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Quelle 3212 5G 333 328 5 Over Weight

02 Quelle 7692 5G 333 322 11 Over Weight

Total (5GG) 666 650 16


01 Quelle 3252 7G 267 265 2 Quality Problem

Total (7GG) 267 265 2

Grand Total (5GG&7GG) 933 915 18

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 06.01.2007
Month : December,2006

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty

01 5G

Total (5GG) 0 0 0

01 Quelle 8703 7G 212 202 11 Quality Problem

02 Quelle 8711 7G 833 781 52 Due To Over Weight

03
Total (7GG) 1045 983 63

Grand Total (5GG&7GG) 1045 983 63

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 02.12.2006
Month : November,2006

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty

01 Eurofrente 09750 5G 521 513 8 Process Loss.

Total (5GG) 521 513 8

01 Quelle 7392 7G 210 190 20 Quality Problem.

02 Quelle 3955 7G 183 83 100 Stock Lot.

03 Quelle 7452 7G 275 246 29 Embd. Problem.


Total (7GG) 668 519 149

Grand Total (5GG&7GG) 1189 1032 157

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date :
Month :

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty

Total (5GG)

Total (7GG)

Grand Total (5GG&7GG)

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.11.2006
Month : October,2006

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 G.Gold 1D158/10249 5G 100 98 2 Assortment Problem

Total (5GG) 100 98 2


01 Quelle 3732 7G 134 122 13 Printing Problem
02 Quelle 3905 7G 98 87 11 Quality Problem
03 Quelle 7294 7G 134 119 15 Quality & Printing Problem
04 Quelle 8609 7G 309 303 6 Yarn Shading Problem
05 Sears TSF6-3534 7G 124 123 1 Assortment Problem
06

Total (7GG) 799 754 46

Grand Total (5GG&7GG) 899 852 48

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.10.2006
Month : September,2006

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Sears TSF6-3542 5G 217 216 1 Quality Problem.

Total (5GG) 217 216 1


01 Quelle 3575 7G 150 147 3 Precess Loss
02 Quelle 8602 7G 187 181 6 Due To Yarn Shading.
03 Quelle 8609 7G 135 130 5 Quality Problem.

Total (7GG) 472 458 14

Grand Total (5GG&7GG) 689 674 15

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.09.2006
Month : August,2006

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Quelle 3033 5G 108 107 1
02 Quelle 7214 5G 238 234 4 Due To Quality Problem
03 Sears 3538 5G 144 142 2
04
Total (5GG) 490 483 7
01 N.Mann 017/477 7G 63 62 1
02 Quelle 3795 7G 250 248 2
03 Quelle 8609 7G 246 241 5 Yarn Shading Problem
04 Quelle 2670 7G 167 166 1
05 Sears 3536 7G 188 179 9 Process Loss
06 Sears 1511 7G 158 149 9 Process Loss/Shading Problem
07 W.Smith 611166 7G 410 406 4 Assortment Problem.
08 W.Smith 611165 7G 410 409 1
Total (7GG) 1892 1860 32

Grand Total (5GG&7GG) 2382 2343 39

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.08.2006
Month : July,2006

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Sears 60252-C 5G 432 415 17 Due To Worng Yarn Reqr. Prob.
02 Quelle 3595 5G 167 157 10 Quality With Print Problrm.
03 Quelle 8614 5G 600 589 11 Quality Problrm.

Total (5GG) 1199 1161 38


01 Quelle 3142 7G 67 66 1 Quality Problem
02 Wehmeyer WR-08 7G 65 63 2
03 Sears 1502 7G 237 234 3

Total (7GG) 369 363 6

Grand Total (5GG&7GG) 1568 1524 44

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.07.2006
Month : June,2006

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Eurofrenty 09182 5G 113 107 6
02 Quelle 8614 5G 422 418 4 Assortment Problem.
03 Quelle 3023 5G 150 142 8
04 Quelle 3033 5G 150 140 10
05 Quelle 7214 5G 150 141 9
06 Quelle 3795 5G 175 165 10
07 Sears 60252-C 5G 432 416 16

Total (5GG) 1592 1529 63


01 Sears 3533 7G 500 492 8
02 N.Mann 017/531 7G 271 263 7
03 N.Mann 017/477 7G 146 140 6
04 Sears 3531 7G 625 619 6
05 Sears 3534 7G 237 232 5
05 Sears 3532 7G 334 332 1
05 Quelle 3732 7G 167 155 12
Total (7GG) 2280 2233 45

Grand Total (5GG&7GG) 3872 3762 108

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks
____________ _________________________ ________________
Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 02.06.2006
Month : April,2006

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 G.Union S-372 5G 100 98 2 Assortment Problem.
02 Rajan MK-413315 5G 300 394 6 Assortment Problem.

Total (5GG) 400 492 8


01 Quelle 3295 7G 183 179 4 Yarn Problem
02 Quelle 2620 7G 233 231 2
03 Quelle 2619 7G 233 229 4
04 Quelle 8602 7G 325 324 1
05 Quelle 2615 7G 292 289 3
Total (7GG) 1266 1252 14

Grand Total (5GG&7GG) 1666 1744 22

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks
____________ _________________________ ________________
Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 02.05.2006
Month : April,2006

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Quelle 7214 5G 150 147 3 Process Loss
02

Total (5GG) 150 147 3


01 G.Union L-444 7G 300 299 1
02 Quelle 3792(B) 7G 342 339 3 Process Loss

Total (7GG) 642 638 4

Grand Total (5GG&7GG) 792 785 7

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks
____________ _________________________ ________________
Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.04.2006
Month : March,2006

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 5G
02

Total (5GG) 0 0 0
01 Quelle 8609 7G 900 852 48 Yarn & Shading Problem
02 Quelle 7382 7G 100 93 7 Printing Problem

Total (7GG) 1000 945 55

Grand Total (5GG&7GG) 1000 945 55

Statement Of Shortage in Importer Consignment :


Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.03.2006
Month : February,2006

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 5G
02

Total (5GG) 0 0 0
01 Quelle 8609 7G 900 852 48 Yarn & Shading Problem
02 Quelle 7382 7G 100 93 7 Printing Problem

Total (7GG) 1000 945 55


Grand Total (5GG&7GG) 1000 945 55

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.02.2006
Month : January,2006

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Zara 5747/504 5G 321 316 5
02

Total (5GG) 321 316 5


03 Quelle 8603 (B) 7G 650 636 14 Shading Problem
04 Quelle 7382 7G 100 99 1 Assortment Problem
05
Total (7GG) 750 735 15

Grand Total (5GG&7GG) 1071 1051 20

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.01.2006
Month : December,2005

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 5G
02
Total (5GG) 0 0 0
03 N.Mann 317/349 7G 708 700 8 Yarn Problem
04
05

Total (7GG) 708 700 8

Grand Total (5GG&7GG) 708 700 8

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.11.2005
Month : November,2005

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 5G
02

Total (5GG) 0 0 0
03 Quelle 8602 7G 1000 993 7 Assortment Problem
04
05

Total (7GG) 1000 993 7

Grand Total (5GG&7GG) 1000 993 7

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.10.2005
Month : September,2005

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Sears 1516 5G 194 193 1 Process Loss
02 5G
Total (5GG) 194 193 1
03 Rajan W515043 7G 268 266 2 Process Loss
04 Rajan W515029 7G 216 212 4 Process Loss
05 Rajan W-515028 7G 133 129 4 Process Loss
06 Rajan W-515078-L 7G 12 13 1 Process Loss

Total (7GG) 629 620 11

Grand Total (5GG&7GG) 823 813 12

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 02.09.2005
Month : August,2005

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Rajan MK-412651 5G 200 190 10 Process Loss
02 5G

Total (5GG) 200 190 10


03 Rajan MK-412655 7G 200 198 2 Process Loss
04 Rajan MK-412960 7G 250 248 2 Process Loss
05 Rajan W-515048 7G 200 194 6 Process Loss
06 Rajan W-515043 7G 222 218 4 Process Loss
07 Quelle 7824 7G 67 66 1 Process Loss
08 Zara 5747/830 7G 271 248 23 Assortment Problem
09 Rajan MK-516076 7G 226 223 3 Process Loss
10 7G
Total (7GG) 1436 1395 41

Grand Total (5GG&7GG) 1636 1585 51

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 02.08.2005
Month : July,2005
Total Shipped Short
SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Sears 1311 5G 228 226 2 Process Loss
02 Sears 3516 5G 501 495 6 Process Loss
03 5G
04 5G

Total (5GG) 729 721 8


03 G.Gold 17653/8039 7G 200 193 4 Process Loss
04 Rajan MK-412654 7G 200 140 60 Applique Dyeing Quality Rejection
05 G.Gold 17653/8040 7G 418 330 88 Fack Fur Short
06 7G
07 7G
Total (7GG) 818 663 152

Grand Total (5GG&7GG) 1547 1384 160

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.06.2005
Month : June,2005

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Sears 50108 5G 594 585 9 Yarn Problem
02 Sears 3531 5G 500 486 14 Process Loss
03 Sears 1307 5G 276 274 2 Process Loss
04 G.Gold 7548 5G 100 94 6 Process Loss

Total (5GG) 1469.83 1439 31


03 Sears 1310 7G 342 338 2 Process Loss
04 Quelle 2481 7G 183 181 2 Quality Problem
05 Quelle 2482 7G 167 158 9 Knitting Short
06 Quelle 2485 7G 167 159 8 Process Loss
07 Quelle 2486 7G 167 164 3 Quality Problem
Total (7GG) 1026 1000 24

Grand Total (5GG&7GG) 2495.83 2439 55

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.06.2005
Month : May,2005

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 5G
02 5G

Total (5GG) 0 0 0
03 Rajan MK-412727 7G 40 36 4 Process Loss
04 Rajan MK-413076 7G 300 298 2 Process Loss
05
06
07
Total (7GG) 340 334 6

Grand Total (5GG&7GG) 340 334 6

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Short Shipment (If Any)
All Figure In DZ Date : 02.05.2005
Month : April,2005

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Sears 1307 5G 271 269 2 P.Loss & Quality Rejection
02 Sears 1308 5G 140 138 2 P.Loss & Quality Rejection

Total (5GG) 411 407 4


03 Quelle 7824 7G 67 62 5 Printing Problem
04 7G
05
06
07
Total (7GG) 67 62 5

Grand Total (5GG&7GG) 478 469 9

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 02.01.2005
Month : December,2004

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Sears 2298 7G 433.33 419.83 13.5
02 N.Mann 115/149 7G 1250 1241.83 8.17
03 Karstadt K-03 7G 417 342 75
04
05
06
07
08
09
10
11
12
13
14
Grand Total 2100.33 2003.66 96.67

Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks
____________ _________________________ ________________
Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Short Shipment (If Any)


All Figure In DZ Date : 01.12.2004
Month :November,2004

Total Shipped Short


SL Buyer Style/P.O No GG Reason For Short Shipped
Order Qty Qty Shipped Qty
01 Eufrenty 08206 5G 250 244 6
02 Eufrenty 08207 5G 167 164.5 2.5
03 Hong Song YS-14214-S 7G 1179 1162 17
04 Hong Song WS-14212-S 7G 332 320 12
05 Hong Song YS-14213-S 7G 604 599.17 4.83
06
07
08
09
10
11
12
13
14
Grand Total 2532 2489.67 42.33
Statement Of Shortage in Importer Consignment :

Description Of Itme Qty As Per PI Qty As Per Invoice Qty Received Remarks

____________ _________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
rtment Problem
hading Problem
Yarn Reqr. Prob.
ng Quality Rejection
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.09.2008
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF AUGUST' 2008

TTL TTL TTL % Of


Position Aql Remarks
Inspection Passed Re-Check Error

Internal 2.5 12 12 Nill 6.5%

External 2.5 6 6 Nill 5.63%

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.08.2008
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF JULY' 2008
TTL TTL TTL % Of
Position Aql Remarks
Inspection Passed Re-Check Error

Internal 2.5 3 3 Nill 5.9%

Sears Style #3528, Recheck Due to


Measurement Discrepecny
External 2.5 16 14 2 6.05% Style-3527 Recheck Due to Tack
Massing.

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.07.2008
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF JUNE' 2008

TTL TTL TTL % Of


Position Aql Remarks
Inspection Passed Re-Check Error

Internal 2.5 2 2 Nill 5%


Sears Style #3528,3504 Recheck Due
External 2.5 12 10 2 6.34% to Measurement Discrepecny

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.07.2008
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF JUNE'2008

TTL TTL TTL % Of


Position Aql Remarks
Inspection Passed Re-Check Error

Internal 2.5 2 2 Nill 5%

Sears Style #3528,3504 Recheck Due


External 2.5 12 10 2 6.34% to Measurement Discrepecny

% Error = (TTL Major Defect / Inspected Qty X 100)


_______________ _______________ _______________
Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.06.2008
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF MAY'2008

TTL TTL TTL % Of


Position Aql Remarks
Inspection Passed Re-Check Error

Internal 2.5 2 2 Nill 4.66

External 4 3 3 Nill 4.80%

% Error = (TTL Major Defect / Inspected Qty X 100)


_______________ _______________ _______________
Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.05.2008
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF APRIL'2008

TTL TTL TTL % Of


Position Aql Remarks
Inspection Passed Re-Check Error

Internal 2.5 Nill Nill Nill Nill

External 4 13 13 Nill 4.67%

% Error = (TTL Major Defect / Inspected Qty X 100)


_______________ _______________ _______________
Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.04.2008
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF MARCH'2008

TTL TTL TTL % Of


Position Aql Remarks
Inspection Passed Re-Check Error

Internal 2.5 Nill Nill Nill Nill

External 4 19 19 Nill 6.73%

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.03.2008
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF FEBRUARY'2008

TTL TTL TTL % Of


Position Aql Remarks
Inspection Passed Re-Check Error

Internal 0 0 0 0 0.00%

9L 119 & 9L 120 Inspection Report


External 4 9 9 0 6.21% not Recvd From Buyer

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.02.2008
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF JANUARY'2008
TTL TTL TTL % Of
Position Aql Remarks
Inspection Passed Re-Check Error

Internal 2.5 3 3 0 5.67%

External 2.5 5 5 0 3.68%

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.01.2008
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF DECEMBER'2007

TTL TTL TTL % Of


Position Aql Remarks
Inspection Passed Re-Check Error

# 9J020 Due to side Seam Shape


Internal 2.5 3 2 1 6.25% poor

St# 4000 Due to Twist Problem.


External 2.5 12 9 3 4.62% St# 8832, Due to Dirty Problem
% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.12.2007
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF NOVEMBER'2007

TTL TTL TTL % Of


Position Aql Remarks
Inspection Passed Re-Check Error

# 10764 & 10877, Eurofrente,


Internal 2.5 4 2 2 7.50% recheck due to dirt, ndl drop,
pocket joining, problem.

External 2.5 5 5 Nill 2.73%

% Error = (TTL Major Defect / Inspected Qty X 100)


_______________ _______________ _______________
Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 03.11.2007
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF OCTOBER'2007

TTL TTL TTL % Of


Position Aql Remarks
Inspection Passed Re-Check Error

# 0766/8021, Sfera recheck due to


Internal 2.5 2 1 1 7.50% NDL drop & assortment problem.

St # 18902 recheck due to Neck


External 2.5 10 9 1 4.13% shapepoor & bottom sweep minus.

% Error = (TTL Major Defect / Inspected Qty X 100)


_______________ _______________ _______________
Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 02.09.2007
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF SEP'2007

TTL TTL TTL % Of


Position Aql Remarks
Inspection Passed Re-Check Error

St #19H987, Recheck Due to Dirty,


Internal 2.5 7 6 1 8.00% Hood & Bottom Rolled,EMB Thick
& Thin .

St # 3885 Olive Color Recheck Due


External 2.5 11 10 1 3.55% to uneven Dyeing Problem.

% Error = (TTL Major Defect / Inspected Qty X 100)


_______________ _______________ _______________
Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.07.2007
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF JUNE '2007

TTL TTL TTL % Of


Position Remarks
Inspection Passed Re-Check Error

Internal 2 2 Nill 4.29%

External 10 10 Nill 5.44%

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.06.2007
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF MAY '2007

TTL TTL TTL % Of


Position Remarks
Inspection Passed Re-Check Error

Internal 4 4 0 4.79%

External 6 6 0 3.45%

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.05.2007
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF APRIL '2007

TTL TTL TTL % Of


Position Remarks
Inspection Passed Re-Check Error
Internal Nill
327/052 Recheck Due To
External 15 13 2 4.21% Iron,Trimining & Hole Problem

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.04.2007
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF MARCH '2007

TTL TTL TTL % Of


Position Remarks
Inspection Passed Re-Check Error

Internal 9 9 0 4.79%

External Nill Nill Nill 0.00%

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.03.2007
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF FEBRUARY '2007

TTL TTL TTL % Of


Position Remarks
Inspection Passed Re-Check Error
Internal Nill 0 0 0.00%
# 8706 Recheck Due To Uneven
deying,Dirty,Knot Etc
External 12 10 2 4.03% #8711 Recheck Due To Yarn
deying Prob.,Ring Mark Etc

% Error = (TTL Major Defect / Inspected Qty X 100)

Note : Buyer : Great Union # 7615 Final Inspection report did not found from Buyer/Inspector.

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.02.2007
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF JANUARY '2007

TTL TTL TTL % Of


Position Remarks
Inspection Passed Re-Check Error
Internal 0 0 0 0.00%
External 8 8 0 3.45%

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 06.01.2007
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF DECEMBER '2006

TTL TTL TTL % Of


Position Remarks
Inspection Passed Re-Check Error
Internal 0 0 0 0.00%
External 8 8 0 3.45%

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 02.12.2006
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF NOVEMBER '2006
TTL TTL TTL % Of
Position Remarks
Inspection Passed Re-Check Error
01. St:# 09769 For ArmHole(-)
tendency,Nk Seam (1x1) Open.
Internal 6 4 2 4.46% 02. St:# 09750 Pocket Link
Open,Mest. Problem.
External 13 13 0 3.40%

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date :
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF
TTL TTL TTL % Of
Position Remarks
Inspection Passed Re-Check Error

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 03.11.2006
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF OCTOBER '2006

TTL TTL TTL % Of


Position Remarks
Inspection Passed Re-Check Error
Internal 3 3 Nill 5.86%
St:# 7294 For Hole,Oil Mark
External 22 19 3 4.04% St:# 3955 For Poor Neck
Shape.

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 03.10.2006
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF SEPTEMBER '2006

TTL TTL TTL % Of


Position Remarks
Inspection Passed Re-Check Error
Internal 10 9 1 3.93% St:# MK-413612 For NDL Drop
St:# 8602 For Hole,Linking
External 14 13 1 5.06% Defect, Knot, Chest Stripe
Un-even.

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.09.2006
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF August '2006
TTL TTL TTL % Of
Position Remarks
Inspection Passed Re-Check Error
Internal 4 4 Nill 5.09%
External 25 23 2 5.09% Recheck : # 7214(Quelle)

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.08.2006
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF July '2006

TTL TTL TTL % Of


Position Remarks
Inspection Passed Re-Check Error
Internal 2 2 Nill 5.36%
Recheck : # 3795
External 36 34 2 5.02%
# 3595(Quelle)

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.07.2006
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF June '2006

TTL TTL TTL % Of


Position Remarks
Inspection Passed Re-Check Error
Internal 3 3 Nill 3.60%
Recheck : #3023(Quelle)
External 42 40 2 4.73%
#3534(Sears)

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.05.2006
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF April '2006

TTL No Of % Of
Position A.Q.L Remarks
Inspection Recheck Error
Internal Nill 0 Nill 0.00%
External 2.5 18 2 4.57% Note : 01

% Error = (TTL Major Defect / Inspected Qty X 100)

Note : 01 : Style No # 8497,#13463,#13465 Inspection Is Ok But Inspection Report Is Not Rcvd. From
Buyer/ Marchandiser.

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.04.2006
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF March '2006

TTL No Of % Of
Position A.Q.L Remarks
Inspection Recheck Error
Internal 2.5 5 Nill 4.14%
External 2.5 6 Nill 3.50%

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.03.2006
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF February '2006

TTL No Of % Of
Position A.Q.L Remarks
Inspection Recheck Error
Internal 2.5 1 Nill 6
External 2.5 7 Nill 3.77

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.09.2005
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF August '2005

TTL No Of % Of
Position A.Q.L Remarks
Inspection Recheck Error
Internal 2.5 9 1 5.23
External 2.5/4 5 2 4.77

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.08.2005
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF July '2005

TTL No Of % Of
Position A.Q.L Remarks
Inspection Recheak Error
Internal 2.5 6 2 4.26
External 4 10 2 4.7

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.06.2005
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF May '2005

TTL No Of % Of
Position A.Q.L Remarks
Inspection Recheak Error
Internal 2.5 3 2 3.78 Eurofrente
External 4 5 Nill 4.82

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.05.2005
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF April '2005

TTL No Of % Of
Position A.Q.L Remarks
Inspection Recheak Error
Internal 0 0 0 0
External 2.5 9 1 4

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.05.2005
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF April '2005

TTL No Of % Of
Position A.Q.L Remarks
Inspection Recheak Error
Internal 0 0 0 0
External 2.5 9 1 4

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.04.2005
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF February '2005

TTL No Of % Of
Position A.Q.L Remarks
Inspection Recheak Error
Internal 2.5 1 Nil 4 Left Over
External 4 4 Nil 4.58
External 2.5 4 Nil 2.66

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.02.2005
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF February '2005

TTL No Of % Of
Position A.Q.L Remarks
Inspection Recheak Error
Internal Nill Nill Nil Nill
External 4 2 Nil 5.23

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.02.2005
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF January '2005

TTL No Of % Of
Position A.Q.L Remarks
Inspection Recheak Error
Internal 2.5 1 Nil 4
External 2.5 1 Nil 2.85

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.01.2005
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF December '2004

TTL No Of % Of
Position A.Q.L Remarks
Inspection Recheak Error
Internal 2.5 1 Nil 3.17
External 2.5 5 Nil 2.8

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date :01.12.2004
MONTHLY Q.C REPORT SUMMARY
FOR THE MONTH OF November'2004

TTL No Of % Of
Position A.Q.L Remarks
Inspection Recheak Error
Internal Nil 4 Nil 6.26 01 Stock Lot In Casabawa
External Nil 7 5 3.28

% Error = (TTL Major Defect / Inspected Qty X 100)

_______________ _______________ _______________


Prepared By Q.A.D In-Charge Plant-In-Charge
nspector.
vd. From
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.09.2008
Factory Wise Total Machine Status
For The Month Of August' 08

No Of No Of M/C
SL Description Of Machine Stock In Hand Remarks
Total M/C In Use
01 Knitting 5G 140 140
02 Knitting 7G 210 204 6
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 9 9
06 Dial Linking Machine 84 84
07 Flat Lock Machine 3 3
08 Over Lock Machine 2 2
09 Interlock Machine 3 3
10 Button Hole Machine 5 5
11 Button Attached Machine 3 3
12 Sewing Machine 20 20
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 5 5
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
30 Computer 1 1
31 IPS 2 2
Total 549 543 6

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.08.2008
Factory Wise Total Machine Status
For The Month Of July' 08

No Of No Of M/C
SL Description Of Machine Stock In Hand Remarks
Total M/C In Use
01 Knitting 5G 140 140
02 Knitting 7G 210 204 6
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 9 9
06 Dial Linking Machine 84 84
07 Flat Lock Machine 3 3
08 Over Lock Machine 2 2
09 Interlock Machine 3 3
10 Button Hole Machine 4 4
11 Button Attached Machine 2 2
12 Sewing Machine 20 20
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 5 5
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
30 Computer 1 1
31 IPS 2 2
Total 547 541 6

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.07.2008
Factory Wise Total Machine Status
For The Month Of June' 08

No Of No Of M/C
SL Description Of Machine Stock In Hand Remarks
Total M/C In Use
01 Knitting 5G 140 140
02 Knitting 7G 210 204 6
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 9 9
06 Dial Linking Machine 84 84
07 Flat Lock Machine 3 3
08 Over Lock Machine 2 2
09 Interlock Machine 3 3
10 Button Hole Machine 4 4
11 Button Attached Machine 2 2
12 Sewing Machine 20 20
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 5 5
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
30 Computer 1 1
31 IPS 2 2
Total 547 541 6

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.06.2008
Factory Wise Total Machine Status
For The Month Of May' 08

No Of No Of M/C
SL Description Of Machine Stock In Hand Remarks
SL Description Of Machine Stock In Hand Remarks
Total M/C In Use
01 Knitting 5G 140 140
02 Knitting 7G 210 204 6
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 9 9
06 Dial Linking Machine 84 84
07 Flat Lock Machine 3 3
08 Over Lock Machine 2 2
09 Interlock Machine 3 3
10 Button Hole Machine 4 4
11 Button Attached Machine 2 2
12 Sewing Machine 20 20
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 5 5
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
30 Computer 1 1
31 IPS 2 2
Total 547 541 6

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.05.2008
Factory Wise Total Machine Status
For The Month Of April' 08

No Of No Of M/C
SL Description Of Machine Stock In Hand Remarks
Total M/C In Use
01 Knitting 5G 140 140
02 Knitting 7G 210 204 6
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 9 9
06 Dial Linking Machine 84 84
07 Flat Lock Machine 3 3
08 Over Lock Machine 2 2
09 Interlock Machine 3 3
10 Button Hole Machine 4 4
11 Button Attached Machine 2 2
12 Sewing Machine 20 20
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 5 5
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
30 Computer 1 1
31 IPS 2 2
Total 547 541 6

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.04.2008
Factory Wise Total Machine Status
For The Month Of March' 08

No Of No Of M/C
SL Description Of Machine Stock In Hand Remarks
Total M/C In Use
01 Knitting 5G 140 140
02 Knitting 7G 210 204 6
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 9 9
06 Dial Linking Machine 84 84
07 Flat Lock Machine 3 3
08 Over Lock Machine 2 2
09 Interlock Machine 3 3
10 Button Hole Machine 4 4
11 Button Attached Machine 2 2
12 Sewing Machine 20 20
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 5 5
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
30 Computer 1 1
31 IPS 2 2
Total 547 541 6

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.03.2008
Factory Wise Total Machine Status
For The Month Of February' 08

No Of No Of M/C
SL Description Of Machine Stock In Hand Remarks
Total M/C In Use
01 Knitting 5G 140 140
02 Knitting 7G 210 204 6
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 9 9
06 Dial Linking Machine 84 84
07 Flat Lock Machine 3 3
08 Over Lock Machine 2 2
09 Interlock Machine 3 3
10 Button Hole Machine 4 4
11 Button Attached Machine 2 2
12 Sewing Machine 20 20
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 5 5
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
30 Computer 1 1
31 IPS 2 2
Total 547 541 6

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.02.2008
Factory Wise Total Machine Status
For The Month Of January' 08

No Of No Of M/C
SL Description Of Machine Stock In Hand Remarks
Total M/C In Use
01 Knitting 5G 140 136 4
02 Knitting 7G 210 204 6
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 9 9
06 Dial Linking Machine 84 84
07 Flat Lock Machine 3 3
08 Over Lock Machine 2 2
09 Interlock Machine 3 3
10 Button Hole Machine 4 3 1
11 Button Attached Machine 2 2
12 Sewing Machine 20 20
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 5 5
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
30 Computer 1 1
31 IPS 2 2
Total 547 536 11

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.01.2008
Factory Wise Total Machine Status
For The Month Of December' 07

No Of No Of M/C
SL Description Of Machine Stock In Hand Remarks
Total M/C In Use
01 Knitting 5G 140 136 4
02 Knitting 7G 210 204 6
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 9 9
06 Dial Linking Machine 84 84
07 Flat Lock Machine 3 2 1
08 Over Lock Machine 2 2
09 Interlock Machine 3 3
10 Button Hole Machine 4 3 1
11 Button Attached Machine 2 2
12 Sewing Machine 20 19 1
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 5 5
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
30 Computer 1 1
31 IPS 2 2
Total 547 534 13

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 02.12.2007
Factory Wise Total Machine Status
For The Month Of November' 07

No Of No Of M/C
SL Description Of Machine Stock In Hand Remarks
Total M/C In Use
01 Knitting 5G 140 135 5
02 Knitting 7G 210 200 10
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 9 9
06 Dial Linking Machine 84 84
07 Flat Lock Machine 3 2 1
08 Over Lock Machine 2 2
09 Interlock Machine 3 3
10 Button Hole Machine 4 3 1
11 Button Attached Machine 2 2
12 Sewing Machine 20 19 1
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 5 3 2
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
30 Computer 1 1
31 IPS 2 2
Total 547 527 20

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 03.11.2007
Factory Wise Total Machine Status
For The Month Of October' 07

No Of No Of M/C
SL Description Of Machine Stock In Hand Remarks
Total M/C In Use
01 Knitting 5G 140 135 5
02 Knitting 7G 210 200 10
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 9 9
06 Dial Linking Machine 84 84
07 Flat Lock Machine 3 2 1
08 Over Lock Machine 2 2
09 Interlock Machine 3 3
10 Button Hole Machine 4 3 1
11 Button Attached Machine 2 2
12 Sewing Machine 20 19 1
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 5 3 2
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
30 Computer 1 1
31 IPS 2 2
Total 547 527 20

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.09.2007
Factory Wise Total Machine Status
For The Month Of August' 07

No Of No Of M/C
SL Description Of Machine Stock In Hand Remarks
Total M/C In Use
01 Knitting 5G 140 135 5
02 Knitting 7G 210 200 10
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 9 9
06 Dial Linking Machine 84 84
07 Flat Lock Machine 3 2 1
08 Over Lock Machine 2 2
09 Interlock Machine 3 3
10 Button Hole Machine 4 3 1
11 Button Attached Machine 2 2
12 Sewing Machine 20 19 1
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 5 3 2
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
30 Computer 1 1
31 IPS 2 2
Total 547 527 20

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 05.08.2007
Factory Wise Total Machine Status
For The Month Of July' 07

No Of No Of M/C
SL Description Of Machine Stock In Hand Remarks
Total M/C In Use
01 Knitting 5G 140 135 5
02 Knitting 7G 210 200 10
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 9 9
06 Dial Linking Machine 84 84
07 Flat Lock Machine 3 2 1
08 Over Lock Machine 2 2
09 Interlock Machine 3 3
10 Button Hole Machine 4 3 1
11 Button Attached Machine 2 2
12 Sewing Machine 20 19 1
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 5 3 2
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
30 Computer 1 1
31 IPS 2 2
Total 547 527 20

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.07.2007
Factory Wise Total Machine Status
For The Month Of June'07

No Of No Of M/C No Of Total
SL Description Of Machine Remarks
Total M/C In Use Idle Machine
01 Knitting 5G 140 140
02 Knitting 7G 212 212
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 14 14
06 Dial Linking Machine 84 84
07 Flat Lock Machine 4 0 4
08 Over Lock Machine 4 2 2 Savar + AMGL For Repair
09 Interlock Machine 3 3
10 Button Hole Machine 3 0 3
11 Button Attached Machine 2 0 2
12 Sewing Machine 18 18
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 3 2 1
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
Total 549 537 12

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.05.2007
Factory Wise Total Machine Status
For The Month Of April'07

No Of No Of M/C No Of Total
SL Description Of Machine Remarks
Total M/C In Use Idle Machine
01 Knitting 5G 140 140
02 Knitting 7G 212 212
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 14 14
06 Dial Linking Machine 84 84
07 Flat Lock Machine 4 0 4
08 Over Lock Machine 4 2 2 Savar + AMGL For Repair

09 Interlock Machine 3 3
10 Button Hole Machine 3 0 3
11 Button Attached Machine 2 0 2
12 Sewing Machine 18 18
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 3 2 1
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
Total 549 537 12

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.04.2007
Factory Wise Total Machine Status
For The Month Of March'07

No Of No Of M/C No Of Total
SL Description Of Machine Remarks
Total M/C In Use Idle Machine
01 Knitting 5G 140 140
02 Knitting 7G 212 212
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 14 14
06 Dial Linking Machine 84 84
07 Flat Lock Machine 4 0 4
08 Over Lock Machine 4 2 2 Savar + AMGL For Repair

09 Interlock Machine 3 3
10 Button Hole Machine 3 0 3
11 Button Attached Machine 2 0 2
12 Sewing Machine 18 18
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 3 2 1
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
Total 549 537 12

___________ ________________
Prepared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.01.2007
Factory Wise Total Machine Status
For The Month Of January'07

No Of No Of M/C No Of Total
SL Description Of Machine Remarks
Total M/C In Use Idle Machine
01 Knitting 5G 140 140
02 Knitting 7G 212 212
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 14 14
06 Dial Linking Machine 84 84
07 Flat Lock Machine 4 0 4
08 Over Lock Machine 4 2 2 Savar + AMGL For Repair

09 Interlock Machine 3 3
10 Button Hole Machine 3 0 3
11 Button Attached Machine 2 0 2
12 Sewing Machine 18 18
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 3 2 1
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
Total 549 537 12

___________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.12.2006
Factory Wise Total Machine Status
For The Month Of November'06

No Of No Of M/C No Of Total
SL Description Of Machine Remarks
Total M/C In Use Idle Machine
01 Knitting 5G 112 112
02 Knitting 7G 240 240
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 14 14
06 Dial Linking Machine 84 84
07 Flat Lock Machine 4 0 4
08 Over Lock Machine 4 2 2 Savar + AMGL For Repair

09 Interlock Machine 3 3
10 Button Hole Machine 3 0 3
11 Button Attached Machine 2 0 2
12 Sewing Machine 18 18
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 3 2 1
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
Total 549 537 12

___________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.11.2006
Factory Wise Total Machine Status
For The Month Of October'06

No Of No Of M/C No Of Total
SL Description Of Machine Remarks
Total M/C In Use Idle Machine
01 Knitting 5G 112 112
02 Knitting 7G 240 240
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 20 20
06 Dial Linking Machine 72 72
07 Flat Lock Machine 4 0 4
08 Over Lock Machine 4 2 2 Savar + AMGL For Repair

09 Interlock Machine 3 3
10 Button Hole Machine 3 0 3
11 Button Attached Machine 2 0 2
12 Sewing Machine 18 18
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 3 2 1
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
Total 543 531 12

___________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 03.10.2006
Factory Wise Total Machine Status
For The Month Of September'06

No Of No Of M/C No Of Total
SL Description Of Machine Remarks
Total M/C In Use Idle Machine
01 Knitting 5G 112 112
02 Knitting 7G 240 240
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 20 20
06 Dial Linking Machine 72 72
07 Flat Lock Machine 4 0 4
08 Over Lock Machine 4 2 2 Savar + AMGL For Repair

09 Interlock Machine 3 3
10 Button Hole Machine 3 0 3
11 Button Attached Machine 2 0 2
12 Sewing Machine 18 18
13 Label Cutter Machine 1 1
14 Boilar Machine 1 1
15 Washing Machine 3 3
16 Water Separator 2 2
17 Dryer Machine 4 4
18 Iron Machine 13 13
19 Generator 1 1
20 Water Pump 3 2 1
21 Glass Table (1st Insp.) 13 13
22 Glass Lamp (Final) 3 3
23 Bengin Gun 2 2
24 Welding 1 1
25 Blouer Machine 1 1
26 Dril Machine 2 2
27 Grinding Machine 2 2
28 Wood Cutter Machine 1 1
29 Vacuam Cleaner 1 1
Total 543 531 12

___________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.03.2006
Factory Wise Total Machine Status
For The Month Of February'06

No Of No Of M/C No Of Total
SL Description Of Machine Remarks
Total M/C In Use Idle Machine
01 Knitting 5G 51 51
02 Knitting 7G 301 289
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 50 35
06 Dial Linking Machine 65 65
07 Flat Lock Machine 4 4
08 Over Lock Machine 4 4
09 Interlock Machine 2 2
10 Twist Machine 1 1
11 Button Hole Machine 3 3
12 Button Attached Machine 4 4
13 Sewing Machine 18 18
14 Label Cutter Machine 1 1
15 Boilar Machine 1 1
16 Washing Machine 3 3
17 Water Separator 2 2
18 Dryer Machine 4 4
19 Iron Machine 14 14
20 Generator 1 1
21 Water Pump 5 5
22 Glass Table 13 13
23 Glass Lamp 3 3
24 Bengin Gun 2 2
25 Welding 1 1
26 Blouer Machine 1 1
27 Dril Machine 2 2
28 Grinding Machine 2 2
29 Wood Cutter Machine 1 1
Total 570 531 12

___________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 02.06.2005
Factory Wise Total Machine Status
For The Month Of May '05

No Of No Of M/C No Of Total
SL Description Of Machine Remarks
Total M/C In Use Idle Machine
01 Knitting 5G 51 51
02 Knitting 7G 301 301
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 50 50
06 Dial Linking Machine 65 65
07 Super Dial Machine 2 2
08 Flat Lock Machine 4 4
09 Over Lock Machine 4 4
10 Interlock Machine 2 2
11 Twist Machine 1 1
12 Button Hole Machine 3 3
13 Button Attached Machine 4 4
14 Sewing Machine 18 18
15 Label Cutter Machine 1 1
16 Boilar Machine 1 1
17 Washing Machine 3 3
18 Water Separator 2 2
19 Dryer Machine 4 3 1
20 Iron Machine 14 14
21 Generator 1 1
22 Water Pump 5 5
23 Glass Table 13 13
24 Glass Lamp 3 2 1
25 Bengin Gun 2 1 1
26 Welding 1 1
27 Blouer Machine 1 1
28 Dril Machine 2 2
29 Grinding Machine 2 2
30 Wood Cutter Machine 1 1
Total 572 569 3

___________ ________________
Prepared By Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.05.2005
Factory Wise Total Machine Status
For The Month Of April'05

No Of No Of M/C No Of Total
SL Description Of Machine Remarks
Total M/C In Use Idle Machine
01 Knitting 5G 51 51
02 Knitting 7G 301 301
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 50 50
06 Dial Linking Machine 65 65
07 Super Dial Machine 2 2
08 Flat Lock Machine 4 4
09 Over Lock Machine 4 4
10 Interlock Machine 2 2
11 Twist Machine 1 1
12 Button Hole Machine 3 3
13 Button Attached Machine 4 4
14 Sewing Machine 18 18
15 Label Cutter Machine 1 1
16 Boilar Machine 1 1
17 Washing Machine 3 3
18 Water Separator 2 2
19 Dryer Machine 4 3 1
20 Iron Machine 14 14
21 Generator 1 1
22 Water Pump 5 5
23 Glass Table 13 13
24 Glass Lamp 3 2 1
25 Bengin Gun 2 1 1
26 Welding 1 1
27 Blouer Machine 1 1
28 Dril Machine 2 2
29 Grinding Machine 2 2
30 Wood Cutter Machine 1 1
Total 572 569 3

___________ ________________
Prepared By Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.03.2005
Factory Wise Total Machine Status
For The Month Of February'05

No Of No Of M/C No Of Total
SL Description Of Machine Remarks
Total M/C In Use Idle Machine
01 Knitting 5G 51 51
02 Knitting 7G 301 301
03 Auto Placket Machine 3 3
04 Winding Machine 8 8
05 Flat Linking Machine 50 50
06 Dial Linking Machine 65 65
07 Super Dial Machine 2 2
08 Flat Lock Machine 4 4
09 Over Lock Machine 4 4
10 Interlock Machine 2 2
11 Twist Machine 1 1
12 Button Hole Machine 3 3
13 Button Attached Machine 4 4
14 Sewing Machine 18 18
15 Label Cutter Machine 1 1
16 Boilar Machine 1 1
17 Washing Machine 3 3
18 Water Separator 2 2
19 Dryer Machine 4 3 1
20 Iron Machine 14 14
21 Generator 1 1
22 Water Pump 5 5
23 Glass Table 13 13
24 Glass Lamp 3 2 1
25 Bengin Gun 2 1 1
26 Welding 1 1
27 Blouer Machine 1 1
28 Dril Machine 2 2
29 Grinding Machine 2 2
30 Wood Cutter Machine 1 1
Total 572 569 3

___________ ________________
Prepared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 02.02.2005
Factory Wise Total Machine Status
For The Month Of January'05

No Of M/C No Of Total
SL Description Of Machine Remarks
In Use Idle Machine
01 Knitting 5G 151
02 Knitting 7G 201
03 Auto Placket Machine 2
04 Winding Machine 8 1
05 Flat Linking Machine 50
06 Dial Linking Machine 65 1
07 Super Dial Machine 3
08 Flat Lock Machine 4
09 Over Lock Machine 4
10 Interlock Machine 2
11 Twist Machine 1
12 Button Hole Machine 3
13 Button Attached Machine 4
14 Sewing Machine 15
15 Label Cutter Machine 1
16 Boilar Machine 1
17 Washing Machine 3
18 Water Separator 2
19 Dryer Machine 3 1
20 Iron Machine 14
21 Generator 1
22 Water Pump 5
23 Glass Table 13
24 Glass Lamp 2 1
25 Bengin Gun 1 1
26 Welder 1
27 Blouer Machine 1
28 Dril Machine 2
29 Grinding Machine 2
30 Wood Cutter Machine 1
Total 566 5

___________ ________________
Prepared By Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.09.2008


Buyer Wise Production & Export Summarry
For The Month Of August'08

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks

01 Sage 5G 384 797

02 G.Gold 5G 144 233

03 Sears 5G 767 719

04 Quelle 5G 205 82

Total 5GG 1500 1831

05 Eurofrente 7G 356 50

06 K-Mart 7G 1139 1639

07 G.Gold 7G 1469 1772

08 Sears 7G 108 105

Total 7GG 3072 3566


Grand Total (5G+7G) 4572 5397

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.08.2008


Buyer Wise Production & Export Summarry
For The Month Of July'08
SL Buyer Gauge Product.In.Dz Export In Dz. Remarks

01 G.Union 5G 44 300

02 G.Gold 5G 234 0

03 Sage 5G 1115 306

04 Sears 5G 369 297

05 Li & Fung 5G 0 484

Total 5GG 1762 1388

05 G.Gold 7G 2938 1144

06 G.Union 7G 184 1590

07 Seara 7G 407 497

08 Safra 12G 0 392

Total 7GG 3529 3623


Grand Total (5G+7G) 5290 5011

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.07.2008


Buyer Wise Production & Export Summarry
For The Month Of June'08

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Sears 5G 569 552

02 Li& Fung 5G 378 163

03 G.Union 5G 359 1000

04 G.Gold 5G 529

Total 5GG 1305 2243

05 G.Gold 7G 1601 536

06 Sears 7G 298 194

07 Eurofrente 7G 3 1100

08 G.Union 7G 933

Total 7GG 2835 1830


Grand Total (5G+7G) 4141 4073

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.06.2008


Buyer Wise Production & Export Summarry
For The Month Of May'08

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks

01 G.Union 5G 172
02 Sears 5G 175

03 G.Gold 5G 547

04 Li& Fung 5G 284

05 Branex 5G 532

Total 5GG 1178 532

06 G.Union 7G 1001

07 K-Mart 7G 1275 2083

08 Eurofrente 7G 1341 3050

Total 7GG 3616 5133


Grand Total (5G+7G) 4794 5664

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 02.05.2008


Buyer Wise Production & Export Summarry
For The Month Of April'08

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks

01 G.Union 5G 1209 800

02 Quelle 5G 486 614


03 G.Gold 5G 164 296

04 Branex 5G 8 0

Total 5GG 1867 1710

05 G.Union 7G 298 1500

06 G.Gold 7G 830 0

07 Eurofrente 7G 1908 0

08 Quelle 7G 0 83

Total 7GG 3036 1583


Grand Total (5G+7G) 4903 3293

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.04.2008


Buyer Wise Production & Export Summarry
For The Month Of March'08

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks

01 G.Union 5G 1288 2600

02 Branex 5G 530 0

03 Quelle 5G 135 0

04 N.Mann 5G 118 135


05 Atlantic 5G 191 183

06 G.Gold 5G 139

Total 5GG 2401 2918

07 G.Union 7G 1684 2800

08 Quelle 7G 85 0

09 Eurofrente 7G 938 0

10 Branex 7G 0 284

Total 7GG 2707 3084


Grand Total (5G+7G) 5108 6002

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.03.2008


Buyer Wise Production & Export Summarry
For The Month Of February'08

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks

01 Atlantic 5G 649 631

02 G.Union 5G 1123 1235

03 N.Mann 5G 17 0

Total 5GG 1790 1866


04 G.Gold 7G 327 1350

05 Branex 7G 252 514

06 G.Union 7G 1602 400

07 Zara 12G 0 48 Recvd From Swt.Complex

Total 7GG 2180 2312


Grand Total (5G+7G) 3970 4178

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.02.2008


Buyer Wise Production & Export Summarry
For The Month Of January'08

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks

01 N.Mann 5G 139 134

02 G.Union 5G 1232 0

Total 5GG 1371 134

03 G.Gold 7G 955 0
04 Branex 7G 564 0

05 G.Union 7G 803 0

06 Quelle 7G 0 1110

07 Zara 12G 0 101 Recvd From Swt.Complex

08 Sfara 12G 0 182 Recvd From Swt.Complex

Total 7GG 2323 1393


Grand Total (5G+7G) 3693 1527

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.01.2008


Buyer Wise Production & Export Summarry
For The Month Of December'07

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks

01 G.Gold 5G 425 414

02 Quelle 5G 50 619

03 Atlantic 5G 20 0
04 N.Mann 5G 128 126

05 G.Union 5G 871 0

Total 5GG 1494 1159

06 Quelle 7G 1598 2372

07 G.Union 7G 462

08 G.Gold 7G 0 49

Total 7GG 2060 2421


Grand Total (5G+7G) 3554 3580

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 02.12.2007


Buyer Wise Production & Export Summarry
For The Month Of November'07

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks

01 Eurofrente 5G 9 351

02 Quelle 5G 766 276

Total 5GG 775 627

05 Quelle 7G 2529 542


06 Les. Line 7G 422 1043

07 G.Union 7G 1 0

08 G.Gold 7G 468 498

09 Cellio 12G 0 33

Total 7GG 3420 2116


Grand Total (5G+7G) 4195 2743

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 03.11.2007


Buyer Wise Production & Export Summarry
For The Month Of October'07

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks

01 Eurofrente 5G 240 0

02 Quelle 5G 13 0

03 Sfera 5G 18 161

04 N.Mann 5G 0 200

Total 5GG 271 361


05 Quelle 7G 705 1158

06 Les. Line 7G 614 407

07 G.Union 7G 195 334

08 G.Gold 7G 37 0

09 7G

10 7G

Total 7GG 1551 1899


Grand Total (5G+7G) 1822 2260

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 02.10.2007


Buyer Wise Production & Export Summarry
For The Month Of September'07

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks

01 Eurofrente 5G 120 0

02 Quelle 5G 154 146

03 G.Gold 5G 0 176

04 Sfera 5G 148 0

Total 5GG 422 322

05 Quelle 7G 1823 1873


06 Less. Line 7G 431 0

07 G.Union 7G 144 0

08 N.Mann 7G 206 0

09 Zara 7G 0 206

10 Sears 7G 0 125

Total 7GG 2604 2204

11 Zara 12G 0 790

Total 7GG 0 790


Grand Total (5G+7G+12) 3026 3316

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.09.2007


Buyer Wise Production & Export Summarry
For The Month Of August'07

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks

01 Quelle 5G 69 0

02 G.Gold 5G 780 1157

Total 5GG 849 1157

07 Sears 7G 173 335


08 Quelle 7G 518 0

09 Les. Line 7G 41 626

10 Zara 7G 1026 833

Total 7GG 1758 1794


Grand Total (5G & 7G) 2607 2951

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 05.08.2007


Buyer Wise Production & Export Summarry
For The Month Of July'07

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks

01 Quelle 5G 202 192

02 Tiara 5G 75 500

03 K-Mart 5G 1550 1564

04 Sears 5G 16 822

05 G.Gold 5G 479 0
06 N.Mann 5G 0 85

Total 5GG 2322 3163

07 Sears 7G 481 794

08 Quelle 7G 1343 2222

09 Les. Line 7G 630 0

10 Zara 7G 19 0

Total 7GG 2473 3016

11 Eurofrente 7G 0 108

Total 12GG 0 108


Grand Total (5G & 7G) 4795 6287

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.07.2007


Buyer Wise Production & Export Summarry
For The Month Of June'07

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks

01 N.Mann 5G 85 0

02 G.Union 5G 51 1000

03 Tiara 5G 724 508

04 Sears 5G 514 0

05 G.Gold (K-Mart) 5G 37 0

Total 5GG 1411 1508


05 Sears 7G 416 339

06 Quelle 7G 2615 2561

07 G.Union 7G 0 300

Total 7GG 3031 3200

Grand Total (5G & 7G) 4442 4708

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.07.2007


Buyer Wise Production & Export Summarry
For The Month Of June'07

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks

01 N.Mann 5G 85 0

02 G.Union 5G 51 1000

03 Tiara 5G 724 508

04 Sears 5G 514 0

05 G.Gold (K-Mart) 5G 37 0

Total 5GG 1411 1508

05 Sears 7G 416 339

06 Quelle 7G 2615 2561


07 G.Union 7G 0 300

Total 7GG 3031 3200

Grand Total (5G & 7G) 4442 4708

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.06.2007


Buyer Wise Production & Export Summarry
For The Month Of May'07

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks

01 Quelle 5G 233 329

02 G.Union 5G 899 0

03 Tiara 5G 232 0

04 Sears 5G 338 238

05 N.Mann 5G 0 84

Total 5GG 1702 651

04 Sears 7G 413 0

05 Quelle 7G 634 142

06 G.Union 7G 307 0
07 Tiara 7G 381 998

08 Eurofrente 7G 959 1223


Total 7GG 2694 2363

Grand Total (5G & 7G) 4396 3014

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.05.2007


Buyer Wise Production & Export Summarry
For The Month Of April'07

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Quelle 5G 690 669
02 N.Mann 5G 107 166
03 Sears 5G 806 569
03 G.Union 5G 95 500
Total 5GG 1698 1904
04 G.Union 7G 231 1100
05 Quelle 7G 880 700
06 Tiara 7G 630 0
07 Eurofrente 7G 277 0
08 Sears 7G 20 0
Total 7GG 2038 1800

Grand Total (5G & 7G) 3736 3704


______________________ __________________ ________________ ______________
Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.04.2007


Buyer Wise Production & Export Summarry
For The Month Of March'07

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 G.Union 5G 1495 2668
02 N.Mann 5G 160 0
03 Quelle 5G 97 0
Total 5GG 1752.00 2668.00
04 G.Union 7G 1905 1700
05 Quelle 7G 23 0
Total 7GG 1928.00 1700.00

Grand Total (5G & 7G) 3680 4368


____________ ________________
Prepared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.03.2007


Buyer Wise Production & Export Summarry
For The Month Of February'07

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 G.Union 5G 1743 532
02 N.Mann 5G 0 103

Total 5GG 1743.00 635.00


04 Quelle 7G 426 1471
05 G.Union 7G 1157 1700
Total 7GG 1583.00 3171.00

Grand Total (5G & 7G) 3326 3806

____________ ________________
Prepared By Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.02.2007


Buyer Wise Production & Export Summarry
For The Month Of January'07

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 N.Mann 5G 106 0
02 Quelle 5G 371 750
03 G.Union 5G 779 0
Total 5GG 1256.00 750.00
04 Quelle 7G 375 399
05 G.Union 7G 1288 0
Total 7GG 1663.00 399.00

Grand Total (5G & 7G) 2919 1149

____________ _______________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 02.12.2006


Buyer Wise Production & Export Summarry
For The Month Of November'06

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Eurofrente 5G 370 1150
02 Quelle 5G 127 75
03 N.Mann 5G 95 83
Total 5GG 592.00 1308.00
04 Quelle 7G 2335 2676
05 Leasure Line 7G 0 23
Total 7GG 2335.00 2699.00

06 7G 7
Zara 0
Total 12GG 0 7

Grand Total(1.5G,5G&7G) 2927 4014

____________ _______________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date :


Buyer Wise Production & Export Summarry
For The Month Of

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01

Total 1.5GG

Total 5GG

Total 7GG

Grand Total(1.5G,5G&7G)

____________ _______________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.11.2006


Buyer Wise Production & Export Summarry
For The Month Of October'06

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 G.Gold 3G 0 13

Total 1.5GG 0.00 13.00


02 N.Mann 5G 35 0
03 Eurofrente 5G 763 0

03 G.Gold 5G 0 550

Total 5GG 798.00 550.00

08 Sears 7G 38
323
08 7G
Quelle 1609 1728

Total 7GG 1647 2051

Grand Total(1.5G,5G&7G) 2445 2614

____________ _______________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 03.10.2006


Buyer Wise Production & Export Summarry
For The Month Of September'06

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Zara 1.5 G 0 180
Total 1.5GG 0.00 180.00
02 G.Gold 5G 1385 1384
03 N.Mann 5G 43 0
04 Sears 5G 150 417
05 Eurofrente 5G 54 0
06 Bay-City 5G 0 56
07 Rajan 5G 0 1100
Total 5GG 1632.00 2957.00
08 Rajan 7G 39 104
08 Sears 7G 457 158
09 7G
Tiara 92 0
10 7G
Quelle 1460 991

Total 7GG 2048 1253

Grand Total(1.5G,5G&7G) 3680 4390

____________ _______________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.09.2006


Buyer Wise Production & Export Summarry
For The Month Of August'06

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 G.Gold 5G 597 0
02 N.Mann 5G 129 128
03 Quelle 5G 382 581
04 Sears 5G 950 795.00
04 Rajan 5G 0 60.00
Total 5GG 2058.00 1564.00
04 Quelle 7G 737 1015
05 Rajan 7G 1082 317
06 Sears 7G 102 552
07 Tiara 7G 111 0
08 7G
W.Smith 837 815
N.Mann 7G 0 62

Total 5GG 2869 2761

Grand Total(5G&7G) 4927 4325

____________ _______________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.08.2006


Buyer Wise Production & Export Summarry
For The Month Of July'06

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Tiara 3G 0 160
Total 3GG 0.00 160.00
02 Sears 5G 120 415
03 Quelle 5G 2652 2493

Total 5GG 2772.00 2908.00


04 Quelle 7G 803 715
05 Sears 7G 1195 1318
06 N.Mann 7G 153 83
07 Wehmeyer 7G 123 198
7G

Total 5GG 2274 2314

Grand Total(5G&7G) 5046 5382

____________ _______________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.07.2006


Buyer Wise Production & Export Summarry
For The Month Of June'06

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Quelle 5G 1822 3272
02 Sears 5G 821 416
03 N.Mann 5G 0 0
04 G.Union 5G 0 0.00
05 Rajan 5G 0 0
06 Eurofrente 5G 0 293.00

Total 5GG 2643.00 3981.00


07 Eurofrente 7G 25 460
08 Quelle 7G 686 560
09 Sears 7G 1525 1710
10 N.Mann 7G 185 403
11 7G
Wehmeyer 80

Total 5GG 2501 3133

Grand Total(5G&7G) 5144 7114

____________ _______________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 02.06.2006


Buyer Wise Production & Export Summarry
For The Month Of May'06

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Quelle 5G 1564 0
02 Sears 5G 65 670
03 N.Mann 5G 15 143
04 G.Union 5G 61 198.00
05 Rajan 5G 0 294
06 Scope 5G 0 40.00

Total 5GG 1705.00 1345.00


07 Eurofrente 7G 73 500
08 Quelle 7G 1240 2589
09 Sears 7G 307 0
10 N.Mann 7G 251 0
11 7G
G.Union 468 454

Total 5GG 2339 3543

Grand Total(5G&7G) 4044 4888

____________ _______________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.03.2006


Buyer Wise Production & Export Summarry
For The Month Of February'06

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Scope 5G 117
02 Zara 5G 218

Total 5GG 335.00 0.00


03 Quelle 7G 1681 1721
04 Eurofrente 7G 94 40
05 N.Mann 7G 321
06 G.Union 7G 197

Total 5GG 2293 1761

Grand Total(5G&7G) 2628 1761

____________ _______________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.02.2006


Buyer Wise Production & Export Summarry
For The Month Of January'06

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Zara 5G 57 316

Total 5GG 57.00 316.00


02 Quelle 7G 1352 1402

Total 5GG 1352 1402

Grand Total(5G&7G) 1409 1718

____________ _______________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.11.2005


Buyer Wise Production & Export Summarry
For The Month Of October'05

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Eurofrente 5G 23 500
02 Sears 5G 247 504.00

Total 5GG 270.00 1004.00


06 Bay-City 7G 1663 2383.00

07 Dynasty 7G 56 133

08 Quelle 7G 1583

09

10

11

Total 5GG 3302.00 2516.00

Grand Total(5G&7G) 3572.00 3520.00


____________ _______________________ ________________
Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.12.2005


Buyer Wise Production & Export Summarry
For The Month Of November'05

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Zara 5G 319
02 Eurofrente 5G 0 16.00

Total 5GG 319.00 16.00


06 Quelle 7G 795 2326
07 7G
Bay-City 379 1600
08 7G
Sears 878 267
09 7G
N.Mann 324
10

11

Total 5GG 2375 4193.00

Grand Total(5G&7G) 2694 4209.00


____________ _______________________ ________________
Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.11.2005


Buyer Wise Production & Export Summarry
For The Month Of October'05

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Eurofrente 5G 23 500
02 Sears 5G 247 504.00

Total 5GG 270.00 1004.00


06 Bay-City 7G 1663 2383.00

07 Dynasty 7G 56 133

08 Quelle 7G 1583

09

10

11

Total 5GG 3302.00 2516.00

Grand Total(5G&7G) 3572.00 3520.00


____________ _______________________ ________________
Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.10.2005


Buyer Wise Production & Export Summarry
For The Month Of September'05

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Sears 5G 265 575
02 Bay-City 5G 1157
03 Eurofrente 5G 500
04 G.Gold 5G 300.00
05
06
Total 5GG 1922.00 875.00
06 Quelle 7G 227 1295.00

07 Rajan 7G 552 619

08 Bay-City 7G 488

09 Dynasty 7G 198

10 Zara 1.5 G 42

11

Total 5GG 1465.00 1956.00

Grand Total(5G&7G) 3387.00 2831.00


____________ _______________________ ________________
Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 02.09.2005


Buyer Wise Production & Export Summarry
For The Month Of August'05

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Sears 5G 991 1437
02 G.Gold 5G 308
03 Bay-City 5G 486
04 Rajan 5G 0 190.00
05
06
Total 5GG 1785.00 1627.00
06 Rajan 7G 175 1147.00

07 Quelle 7G 1976 1069

08 G.Gold 7G 0 18.00

09 Zara 7G 0 252.00

10 Sears 7G 0 504

11

Total 5GG 2151.00 2990.00

Grand Total(5G&7G) 3936.00 4617.00


____________ _______________________ ________________
Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 02.08.2005


Buyer Wise Production & Export Summarry
For The Month Of July'05

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Sears 5G 1311 900
02 Rajan 5G 12
03 Bernardi 5G 191 180
04 Zara 5G 254
05
06

Total 5GG 1768.00 1080.00

06 Rajan 7G 725 140.00

07 Bay-City 7G 427 1701

08 Bernardi 7G 264 363.00

09 Quelle 7G 185

10 G.Gold 7G 1056
11 Sears 7G 323

Total 5GG 1601.00 3583.00

Grand Total(5G&7G) 3369.00 4663.00

____________ _______________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 01.06.2005


Buyer Wise Production & Export Summarry
For The Month Of May '05

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Whemeyer 5G 437 427.00
02 Sears 5G 1002
03 Rajan 5G 67 200
04 Eurofrente 5G 340.00
05 G.Gold 5G 400.00
06
Total 5GG 1506.00 1367.00
06 Rajan 7G 392 794.00
07 Quelle 7G 381
08 Bay-City 7G 838
09 Sears 7G 567
10 G.Gold 7G 143

Total 5GG 2321.00 794.00

Grand Total(5G&7G) 3827.00 2161.00

____________ _______________________ ________________

Prepared By Production-Co-Ordinator Plant-In-Charge


GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 02.05.2005


Buyer Wise Production & Export Summarry
For The Month Of April '05

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Eurofrente 5G 194.00
02 Rajan 5G 205.00
03 G.Gold 5G 516.00
04 Sears 5G 701.00 407.00
05 Bay-City 5G 0.00 567.00
Total 5GG 1616.00 974.00
06 Quelle 7G 182.00 62.00
07 Rajan 7G 772.00
08 G.Gold 7G 628.00
09 Scope 7G 516.00 552.00
10 Bay-City 7G 0 2088

Total 5GG 2098.00 2702.00

Grand Total(5G&7G) 3714.00 3676.00

____________ _______________________ ________________

Prepared By Production-Co-Ordinator Plant-In-Charge


GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

All Figure In DZ Date : 02.03.2005


Buyer Wise Production & Export Summarry
For The Month Of February'05

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Scope 5G 7.00 252.00
02 G.Union 5G 430.16
03 Scope 7G 2.67 300.00
04 Bay-City 7G 2445.08
05 N.Mann 7G 175.75 64.83
06 Casabawa 7G 166.67
07 7G
08

Total 3060.66 783.5


____________ _______________________ ________________

Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

All Figure In DZ Date :02.02.2005


Buyer Wise Production & Export Summarry
For The Month Of January'05

SL Buyer Gauge Product.In.Dz Export In Dz. Remarks


01 Scope 5G 249.50
02 G.Union 7G 832.34
03 N.Mann 7G 516.67 501.00
04 Scope 7G 301.92
05 7G
06 7G
07 7G
08

Total 1900.43 501

____________ _______________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
Rajan MK-412692 5G 200 200

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260


Rajan MK-412692 5G 200 200

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260


Rajan MK-412692 5G 200 200

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan MK-412692 5G 200 200


Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan MK-412692 5G 200 200


Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan MK-412692 5G 200 200


Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan MK-412692 5G 200 200


Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan MK-412692 5G 200 200

Rajan MK-413066 7G 200 200


Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan MK-412692 5G 200 200


Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan MK-412692 5G 200 200

Rajan MK-412692 5G 200 200

Rajan MK-413066 7G 200 200


Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan MK-412692 5G 200 200

Rajan MK-412692 5G 200 200

Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400


Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan MK-412692 5G 200 200

Rajan MK-412692 5G 200 200

Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

Rajan MK-413066 7G 200 200


Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

Rajan MK-413066 7G 200 200


Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400


G.Gold 007999 5G 500 400

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400


Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260

Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260


Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-413066 7G 200 200

Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260


Rajan MK-413066 7G 200 200

Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan Mk-412727 7G 300 260


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-412727 7G 40 36

Rajan MK-413076 7G 300 298


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

G.Gold 007999 5G 500 400

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-412727 7G 40 36

Rajan MK-413076 7G 300 298


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

Eurofrente 08206 5G 119 120

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-412727 7G 40 36

Rajan MK-413076 7G 300 298


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

Eurofrente 08206 5G 119 120

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-412727 7G 40 36

Rajan MK-413076 7G 300 298


Rajan MK-412692 5G 200 200

Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

Eurofrente 08206 5G 119 120

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-412727 7G 40 36

Rajan MK-413076 7G 300 298


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

Eurofrente 08206 5G 119 120

Wehemer WR-01 5G 427 427

Eurofrente 08206 5G 119 120

Wehemer WR-01 5G 427 427

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-412727 7G 40 36

Rajan MK-413076 7G 300 298


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

Eurofrente 08206 5G 119 120

Wehemer WR-01 5G 427 427

Eurofrente 08206 5G 119 120

Wehemer WR-01 5G 427 427

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-412727 7G 40 36

Rajan MK-413076 7G 300 298


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

Eurofrente 08206 5G 119 120

Wehemer WR-01 5G 427 427

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-412727 7G 40 36

Rajan MK-413076 7G 300 298


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

Eurofrente 08206 5G 119 120

Wehemer WR-01 5G 427 427

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-412727 7G 40 36

Rajan MK-413076 7G 300 298


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

Eurofrente 08206 5G 119 120

Eurofrente 08207 5G 219 220

Eurofrente 08207 5G 219 220

Wehemer WR-01 5G 427 427

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-412727 7G 40 36

Rajan MK-413076 7G 300 298


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

Eurofrente 08206 5G 119 120

Eurofrente 08207 5G 219 220

Eurofrente 08207 5G 219 220

Wehemer WR-01 5G 427 427

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-412727 7G 40 36

Rajan MK-413076 7G 300 298


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

Eurofrente 08206 5G 119 120

Eurofrente 08207 5G 219 220

Eurofrente 08207 5G 219 220

Wehemer WR-01 5G 427 427

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-412727 7G 40 36

Rajan MK-413076 7G 300 298


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

Eurofrente 08206 5G 119 120

Eurofrente 08207 5G 219 220

Wehemer WR-01 5G 427 427

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-412727 7G 40 36

Rajan MK-413076 7G 300 298


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

Eurofrente 08206 5G 119 120

Eurofrente 08207 5G 219 220

Wehemer WR-01 5G 427 427

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-412727 7G 40 36

Rajan MK-413076 7G 300 298


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

Eurofrente 08206 5G 119 120

Eurofrente 08207 5G 219 220

Wehemer WR-01 5G 427 427

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-412727 7G 40 36

Rajan MK-413076 7G 300 298


Rajan MK-412692 5G 200 200

G.Gold 007999 5G 500 400

Eurofrente 08206 5G 119 120

Eurofrente 08207 5G 219 220

Wehemer WR-01 5G 427 427

Rajan MK-413066 7G 200 200

Rajan Mk-412727 7G 300 260

Rajan MK-412727 7G 40 36

Rajan MK-413076 7G 300 298


GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.09.2008
Needle Consumption Report
For The Month Of August' 2008

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 6 Pkt 45 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 2 Pkt 13 Pkt
11 DP X 5 # 17 Pkt Pkt
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16 2 Pkt 16 Pkt
19 DC X 27 # 18 Pkt Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 Pkt Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 8 Pkt 10 Pkt
26 TQ X 1 # 16 Pkt 39 Pkt
27 UO X 113 # 11
28 UO X 113 # 12
29 UO X 113 # 14
30 UO X 113 # 10
31 UY X 1 # 16 Pkt 4 Pkt
32 UY X 14 # 10 Pkt Pkt
33 TO X 7 # 18
34 TO X 7 # 11
35 TO X 7 # 12
36 TO X 7 # 14
37 TO X 7 # 16
38 DM X 13 # 18
39 DM X 13 # 16/18
40 DM X 13 # 14
41 10" KNIFE # 16/18
42 8" KNIFE #
43 A BELT #
44 1/2" KNIFE #
45 USSUE (7G) # Pcs Pcs
46 7G KNITTING NEEDLE # 532 13800 Pcs 114600 Pcs
47 5G KNITTING NEEDLE # 396 8200 Pcs 55200 Pcs
48 12G KNITTING NEEDLE # Pcs Pcs
49 3G KNITTING NEEDLE # Pcs Pcs
50 PYC - 22 # Pkt Pkt
51 PYE - 23 # Pkt Pkt
52 PYC - 21 # 1 Pkt 15 Pkt
53 PAY - 7 # 2 Pkt 11 Pkt
54 PAY - 4 # 6 Pkt Pkt
55 PAY - 23 # Pkt Pkt
56 HARA DOMI # Pcs Pcs
57 HARACHI 7G # 300 Pcs 2500 Pcs
58 HARACHI 5G # 100 Pcs 700 Pcs
______________________ ________________
Production-Co-Ordinator Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.08.2008
Needle Consumption Report
For The Month Of July' 2008

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 6 Pkt 39 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 4 Pkt 11 Pkt
11 DP X 5 # 17 Pkt Pkt
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16 2 Pkt 14 Pkt
19 DC X 27 # 18 Pkt Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 Pkt Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 2 Pkt
26 TQ X 1 # 16 4 Pkt 39 Pkt
27 UO X 113 # 11
28 UO X 113 # 12
29 UO X 113 # 14
30 UO X 113 # 10
31 UY X 1 # 16 Pkt 4 Pkt
32 UY X 14 # 10 Pkt Pkt
33 TO X 7 # 18
34 TO X 7 # 11
35 TO X 7 # 12
36 TO X 7 # 14
37 TO X 7 # 16
38 DM X 13 # 18
39 DM X 13 # 16/18
40 DM X 13 # 14
41 10" KNIFE # 16/18
42 8" KNIFE #
43 A BELT #
44 1/2" KNIFE #
45 USSUE (7G) # Pcs Pcs
46 7G KNITTING NEEDLE # 532 17000 Pcs 100800 Pcs
47 5G KNITTING NEEDLE # 396 6000 Pcs 47000 Pcs
48 12G KNITTING NEEDLE # Pcs Pcs
49 3G KNITTING NEEDLE # Pcs Pcs
50 PYC - 22 # Pkt Pkt
51 PYE - 23 # Pkt Pkt
52 PYC - 21 # 2 Pkt 14 Pkt
53 PAY - 7 # 2 Pkt 9 Pkt
54 PAY - 4 # 6 Pkt Pkt
55 PAY - 23 # Pkt Pkt
56 HARA DOMI # Pcs Pcs
57 HARACHI 7G # Pcs 2200 Pcs
58 HARACHI 5G # Pcs 600 Pcs
______________________ ________________
Production-Co-Ordinator Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.07.2008
Needle Consumption Report
For The Month Of June' 2008

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 9 Pkt 33 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 2 Pkt 7 Pkt
11 DP X 5 # 17 Pkt Pkt
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16 2 Pkt 12 Pkt
19 DC X 27 # 18 Pkt Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 Pkt Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 2 Pkt
26 TQ X 1 # 16 5 Pkt 35 Pkt
27 UO X 113 # 11
28 UO X 113 # 12
29 UO X 113 # 14
30 UO X 113 # 10
31 UY X 1 # 16 Pkt 4 Pkt
32 UY X 14 # 10 Pkt Pkt
33 TO X 7 # 18
34 TO X 7 # 11
35 TO X 7 # 12
36 TO X 7 # 14
37 TO X 7 # 16
38 DM X 13 # 18
39 DM X 13 # 16/18
40 DM X 13 # 14
41 10" KNIFE # 16/18
42 8" KNIFE #
43 A BELT #
44 1/2" KNIFE #
45 USSUE (7G) # Pcs Pcs
46 7G KNITTING NEEDLE # 532 15400 Pcs 83800 Pcs
47 5G KNITTING NEEDLE # 396 6400 Pcs 41000 Pcs
48 12G KNITTING NEEDLE # Pcs Pcs
49 3G KNITTING NEEDLE # Pcs Pcs
50 PYC - 22 # Pkt Pkt
51 PYE - 23 # Pkt Pkt
52 PYC - 21 # 2 Pkt 12 Pkt
53 PAY - 7 # 1 Pkt 7 Pkt
54 PAY - 4 # 6 Pkt Pkt
55 PAY - 23 # Pkt Pkt
56 HARA DOMI # Pcs Pcs
57 HARACHI 7G # 200 Pcs 2200 Pcs
58 HARACHI 5G # 200 Pcs 600 Pcs
______________________ ________________
Production-Co-Ordinator Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.06.2008
Needle Consumption Report
For The Month Of May' 2008

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 5 Pkt 24 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 2 Pkt 5 Pkt
11 DP X 5 # 17 Pkt Pkt
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16 2 Pkt 10 Pkt
19 DC X 27 # 18 Pkt Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 Pkt Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 2 Pkt
26 TQ X 1 # 16 11 Pkt 30 Pkt
27 UO X 113 # 11
28 UO X 113 # 12
29 UO X 113 # 14
30 UO X 113 # 10
31 UY X 1 # 16 Pkt 4 Pkt
32 UY X 14 # 10 Pkt Pkt
33 TO X 7 # 18
34 TO X 7 # 11
35 TO X 7 # 12
36 TO X 7 # 14
37 TO X 7 # 16
38 DM X 13 # 18
39 DM X 13 # 16/18
40 DM X 13 # 14
41 10" KNIFE # 16/18
42 8" KNIFE #
43 A BELT #
44 1/2" KNIFE #
45 USSUE (7G) # Pcs Pcs
46 7G KNITTING NEEDLE # 532 14600 Pcs 68400 Pcs
47 5G KNITTING NEEDLE # 396 3400 Pcs 34600 Pcs
48 12G KNITTING NEEDLE # Pcs Pcs
49 3G KNITTING NEEDLE # Pcs Pcs
50 PYC - 22 # Pkt Pkt
51 PYE - 23 # Pkt Pkt
52 PYC - 21 # 2 Pkt 10 Pkt
53 PAY - 7 # 1 Pkt 6 Pkt
54 PAY - 4 # 6 Pkt Pkt
55 PAY - 23 # Pkt Pkt
56 HARA DOMI # Pcs Pcs
57 HARACHI 7G # 200 Pcs 2000 Pcs
58 HARACHI 5G # 100 Pcs 400 Pcs

______________________ ________________
Production-Co-Ordinator Plant-In-Charge

GLOBAL KNITWEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.05.2008
Needle Consumption Report
For The Month Of April' 2008

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 5 Pkt 19 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 Pkt 3 Pkt
11 DP X 5 # 17 Pkt Pkt
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16 2 Pkt 8 Pkt
19 DC X 27 # 18 Pkt Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 Pkt Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 2 Pkt
26 TQ X 1 # 16 4 Pkt 19 Pkt
27 UO X 113 # 11
28 UO X 113 # 12
29 UO X 113 # 14
30 UO X 113 # 10
31 UY X 1 # 16 2 Pkt 4 Pkt
32 UY X 14 # 10 Pkt Pkt
33 TO X 7 # 18
34 TO X 7 # 11
35 TO X 7 # 12
36 TO X 7 # 14
37 TO X 7 # 16
38 DM X 13 # 18
39 DM X 13 # 16/18
40 DM X 13 # 14
41 10" KNIFE # 16/18
42 8" KNIFE #
43 A BELT #
44 1/2" KNIFE #
45 USSUE (7G) # Pcs Pcs
46 7G KNITTING NEEDLE # 532 13000 Pcs 53800 Pcs
47 5G KNITTING NEEDLE # 396 8600 Pcs 31200 Pcs
48 12G KNITTING NEEDLE # Pcs Pcs
49 3G KNITTING NEEDLE # Pcs Pcs
50 PYC - 22 # Pkt Pkt
51 PYE - 23 # Pkt Pkt
52 PYC - 21 # 2 Pkt 8 Pkt
53 PAY - 7 # 1 Pkt 5 Pkt
54 PAY - 4 # 6 Pkt Pkt
55 PAY - 23 # Pkt Pkt
56 HARA DOMI # Pcs Pcs
57 HARACHI 7G # 600 Pcs 1800 Pcs
58 HARACHI 5G # 200 Pcs 300 Pcs

______________________ ________________
Production-Co-Ordinator Plant-In-Charge

GLOBAL KNITWEAR LTD


269 DEWAN HAT CHITTAGONG
Date : 01.04.2008
Needle Consumption Report
For The Month Of March' 2008

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 2 Pkt 14 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 Pkt 3 Pkt
11 DP X 5 # 17 Pkt Pkt
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16 2 Pkt 6 Pkt
19 DC X 27 # 18 Pkt Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 Pkt Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 2 Pkt
26 TQ X 1 # 16 Pkt 15 Pkt
27 UO X 113 # 11
28 UO X 113 # 12
29 UO X 113 # 14
30 UO X 113 # 10
31 UY X 1 # 16 Pkt 2 Pkt
32 UY X 14 # 10 Pkt Pkt
33 TO X 7 # 18
34 TO X 7 # 11
35 TO X 7 # 12
36 TO X 7 # 14
37 TO X 7 # 16
38 DM X 13 # 18
39 DM X 13 # 16/18
40 DM X 13 # 14
41 10" KNIFE # 16/18
42 8" KNIFE #
43 A BELT #
44 1/2" KNIFE #
45 USSUE (7G) # Pcs Pcs
46 7G KNITTING NEEDLE # 532 11600 Pcs 40800 Pcs
47 5G KNITTING NEEDLE # 396 11200 Pcs 22600 Pcs
48 12G KNITTING NEEDLE # Pcs Pcs
49 3G KNITTING NEEDLE # Pcs Pcs
50 PYC - 22 # Pkt Pkt
51 PYE - 23 # Pkt Pkt
52 PYC - 21 # Pkt 6 Pkt
53 PAY - 7 # 2 Pkt 4 Pkt
54 PAY - 4 # 6 Pkt Pkt
55 PAY - 23 # Pkt Pkt
56 HARA DOMI # Pcs Pcs
57 HARACHI 7G # 500 Pcs 1200 Pcs
58 HARACHI 5G # 100 Pcs 100 Pcs

______________________ ________________
Production-Co-Ordinator Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.03.2008
Needle Consumption Report
For The Month Of February' 2008

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 8 Pkt 12 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 Pkt 3 Pkt
11 DP X 5 # 17 Pkt Pkt
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16 2 Pkt 4 Pkt
19 DC X 27 # 18 Pkt Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 Pkt Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 2 Pkt
26 TQ X 1 # 16 7 Pkt 15 Pkt
27 UO X 113 # 11
28 UO X 113 # 12
29 UO X 113 # 14
30 UO X 113 # 10
31 UY X 1 # 16 Pkt 2 Pkt
32 UY X 14 # 10 Pkt Pkt
33 TO X 7 # 18
34 TO X 7 # 11
35 TO X 7 # 12
36 TO X 7 # 14
37 TO X 7 # 16
38 DM X 13 # 18
39 DM X 13 # 16/18
40 DM X 13 # 14
41 10" KNIFE # 16/18
42 8" KNIFE #
43 A BELT #
44 1/2" KNIFE #
45 USSUE (7G) # Pcs Pcs
46 7G KNITTING NEEDLE # 532 13400 Pcs 29200 Pcs
47 5G KNITTING NEEDLE # 396 6800 Pcs 11400 Pcs
48 12G KNITTING NEEDLE # Pcs Pcs
49 3G KNITTING NEEDLE # Pcs Pcs
50 PYC - 22 # Pkt Pkt
51 PYE - 23 # Pkt Pkt
52 PYC - 21 # 2 Pkt 6 Pkt
53 PAY - 7 # 7 Pkt 2 Pkt
54 PAY - 4 # 6 Pkt Pkt
55 PAY - 23 # Pkt Pkt
56 HARA DOMI # Pcs Pcs
57 HARACHI 7G # 100 Pcs 700 Pcs
58 HARACHI 5G # Pcs Pcs

______________________ ________________
Production-Co-Ordinator Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.02.2008
Needle Consumption Report
For The Month Of January' 2008

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 4 Pkt 4 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 3 Pkt 3 Pkt
11 DP X 5 # 17 Pkt Pkt
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16 2 Pkt 2 Pkt
19 DC X 27 # 18 Pkt Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 Pkt Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 2 Pkt 2 Pkt
26 TQ X 1 # 16 8 Pkt 8 Pkt
27 UO X 113 # 11
28 UO X 113 # 12
29 UO X 113 # 14
30 UO X 113 # 10
31 UY X 1 # 16 2 Pkt 2 Pkt
32 UY X 14 # 10 Pkt Pkt
33 TO X 7 # 18
34 TO X 7 # 11
35 TO X 7 # 12
36 TO X 7 # 14
37 TO X 7 # 16
38 DM X 13 # 18
39 DM X 13 # 16/18
40 DM X 13 # 14
41 10" KNIFE # 16/18
42 8" KNIFE #
43 A BELT #
44 1/2" KNIFE #
45 USSUE (7G) # Pcs Pcs
46 7G KNITTING NEEDLE # 532 15800 Pcs 15800 Pcs
47 5G KNITTING NEEDLE # 396 4600 Pcs 4600 Pcs
48 12G KNITTING NEEDLE # Pcs Pcs
49 3G KNITTING NEEDLE # Pcs Pcs
50 PYC - 22 # Pkt Pkt
51 PYE - 23 # Pkt Pkt
52 PYC - 21 # 4 Pkt 4 Pkt
53 PAY - 7 # 1 Pkt 1 Pkt
54 PAY - 4 # 6 Pkt Pkt
55 PAY - 23 # Pkt Pkt
56 HARA DOMI # Pcs Pcs
57 HARACHI 7G # 600 Pcs 600 Pcs
58 HARACHI 5G # Pcs Pcs

______________________ ________________
Production-Co-Ordinator Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.01.2008
Needle Consumption Report
For The Month Of December' 2007

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 8 Pkt 66 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 2 Pkt 16 Pkt
11 DP X 5 # 17 Pkt 2 Pkt
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16 2 Pkt 13 Pkt
19 DC X 27 # 18 Pkt 6 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 Pkt 2 Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 1 Pkt 16 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 1 # 16 Pkt 8 Pkt
31 UY X 14 # 10 Pkt 2 Pkt
32 TO X 7 # 18
33 TO X 7 # 11
34 TO X 7 # 12
35 TO X 7 # 14
36 TO X 7 # 16
37 DM X 13 # 18
38 DM X 13 # 16/18
39 DM X 13 # 14
40 10" KNIFE # 16/18
41 8" KNIFE #
42 A BELT #
43 1/2" KNIFE #
44 USSUE (7G) # Pcs 10 Pcs
45 7G KNITTING NEEDLE # 532 12400 Pcs 153600 Pcs
46 5G KNITTING NEEDLE # 396 4800 Pcs 77800 Pcs
47 12G KNITTING NEEDLE # Pcs 430 Pcs
48 3G KNITTING NEEDLE # Pcs 200 Pcs
49 PYC - 22 # Pkt Pkt
50 PYE - 23 # Pkt Pkt
51 PYC - 21 # 1 Pkt 3 Pkt
52 PAY - 7 # Pkt 12 Pkt
53 PAY - 4 # 6 Pkt 26 Pkt
54 PAY - 23 # Pkt 3 Pkt
55 HARA DOMI # Pcs 500 Pcs
56 HARACHI 7G # 0 Pcs 1900 Pcs
57 HARACHI 5G # 200 Pcs 1300 Pcs

______________________ ________________
Production-Co-Ordinator Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.12.2007
Needle Consumption Report
For The Month Of November' 2007

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 6 Pkt 58 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 Pkt 14 Pkt
11 DP X 5 # 17 Pkt 2 Pkt
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16 3 Pkt 11 Pkt
19 DC X 27 # 18 Pkt 6 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 Pkt 2 Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 2 Pkt 15 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 1 # 16 Pkt 8 Pkt
31 UY X 14 # 10 Pkt 2 Pkt
32 TO X 7 # 18
33 TO X 7 # 11
34 TO X 7 # 12
35 TO X 7 # 14
36 TO X 7 # 16
37 DM X 13 # 18
38 DM X 13 # 16/18
39 DM X 13 # 14
40 10" KNIFE # 16/18
41 8" KNIFE #
42 A BELT #
43 1/2" KNIFE #
44 USSUE (7G) # Pcs 10 Pcs
45 7G KNITTING NEEDLE # 532 18700 Pcs 141200 Pcs
46 5G KNITTING NEEDLE # 396 1600 Pcs 73000 Pcs
47 12G KNITTING NEEDLE # Pcs 430 Pcs
48 3G KNITTING NEEDLE # Pcs 200 Pcs
49 PYC - 22 # Pkt Pkt
50 PYE - 23 # Pkt Pkt
51 PYC - 21 # Pkt 2 Pkt
52 PAY - 7 # 2 Pkt 12 Pkt
53 PAY - 4 # 6 Pkt 26 Pkt
54 PAY - 23 # Pkt 3 Pkt
55 HARA DOMI # Pcs 500 Pcs
56 HARACHI 7G # 500 Pcs 1900 Pcs
57 HARACHI 5G # Pcs 1100 Pcs

______________________ ________________
Production-Co-Ordinator Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.10.2007
Needle Consumption Report
For The Month Of September' 2007

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 7 Pkt 52 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 4 Pkt 14 Pkt
11 DP X 5 # 17 Pkt 2 Pkt
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16 2 Pkt 8 Pkt
19 DC X 27 # 18 Pkt 6 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 Pkt 2 Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 2 Pkt 13 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 1 # 16 Pkt 8 Pkt
31 UY X 14 # 10 Pkt 2 Pkt
32 TO X 7 # 18
33 TO X 7 # 11
34 TO X 7 # 12
35 TO X 7 # 14
36 TO X 7 # 16
37 DM X 13 # 18
38 DM X 13 # 16/18
39 DM X 13 # 14
40 10" KNIFE # 16/18
41 8" KNIFE #
42 A BELT #
43 1/2" KNIFE #
44 USSUE (7G) # Pcs 10 Pcs
45 7G KNITTING NEEDLE # 532 14800 Pcs 122500 Pcs
46 5G KNITTING NEEDLE # 396 3000 Pcs 71400 Pcs
47 12G KNITTING NEEDLE # 30 Pcs 430 Pcs
48 3G KNITTING NEEDLE # Pcs 200 Pcs
49 PYC - 22 # Pkt Pkt
50 PYE - 23 # Pkt Pkt
51 PYC - 21 # Pkt 2 Pkt
52 PAY - 7 # Pkt 10 Pkt
53 PAY - 4 # 6 1 Pkt 26 Pkt
54 PAY - 23 # Pkt 3 Pkt
55 HARA DOMI # Pcs 500 Pcs
56 HARACHI 7G # 400 Pcs 1400 Pcs
57 HARACHI 5G # 100 Pcs 1100 Pcs

______________________ ________________
Production-Co-Ordinator Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.09.2007
Needle Consumption Report
For The Month Of August' 2007

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 8 Pkt 45 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 Pkt 10 Pkt
11 DP X 5 # 17 Pkt 2 Pkt
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16 Pkt 6 Pkt
19 DC X 27 # 18 2 Pkt 6 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 Pkt 2 Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 11 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 1 # 16 Pkt 8 Pkt
31 UY X 14 # 10 Pkt 2 Pkt
32 TO X 7 # 18
33 TO X 7 # 11
34 TO X 7 # 12
35 TO X 7 # 14
36 TO X 7 # 16
37 DM X 13 # 18
38 DM X 13 # 16/18
39 DM X 13 # 14
40 10" KNIFE # 16/18
41 8" KNIFE #
42 A BELT #
43 1/2" KNIFE #
44 USSUE (7G) # Pcs 10 Pcs
45 7G KNITTING NEEDLE # 532 9600 Pcs 107700 Pcs
46 5G KNITTING NEEDLE # 396 2200 Pcs 68400 Pcs
47 12G KNITTING NEEDLE # Pcs 400 Pcs
48 3G KNITTING NEEDLE # Pcs 200 Pcs
49 PYC - 22 # Pkt Pkt
50 PYE - 23 # Pkt Pkt
51 PYC - 21 # 2 Pkt 2 Pkt
52 PAY - 7 # Pkt 10 Pkt
53 PAY - 4 # 6 18 Pkt 25 Pkt
54 PAY - 23 # Pkt 3 Pkt
55 HARA DOMI # Pcs 500 Pcs
56 HARACHI 7G # 200 Pcs 1000 Pcs
57 HARACHI 5G # Pcs 1000 Pcs

______________________ ________________
Production-Co-Ordinator Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 05.08.2007
Needle Consumption Report
For The Month Of July' 2007

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 8 Pkt 37 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 2 Pkt 10 Pkt
11 DP X 5 # 17 Pkt 2 Pkt
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16 2 Pkt 6 Pkt
19 DC X 27 # 18 Pkt 4 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 Pkt 2 Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 2 Pkt 11 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 1 # 16 5 Pkt 8 Pkt
31 UY X 14 # 10 Pkt 2 Pkt
32 TO X 7 # 18
33 TO X 7 # 11
34 TO X 7 # 12
35 TO X 7 # 14
36 TO X 7 # 16
37 DM X 13 # 18
38 DM X 13 # 16/18
39 DM X 13 # 14
40 10" KNIFE # 16/18
41 8" KNIFE #
42 A BELT #
43 1/2" KNIFE #
44 USSUE (7G) # Pcs 10 Pcs
45 7G KNITTING NEEDLE # 532 25100 Pcs 98100 Pcs
46 5G KNITTING NEEDLE # 396 12200 Pcs 66200 Pcs
47 12G KNITTING NEEDLE # Pcs 400 Pcs
48 3G KNITTING NEEDLE # Pcs 200 Pcs
49 PYC - 22 # Pkt Pkt
50 PYE - 23 # Pkt Pkt
51 PYC - 21 # Pkt Pkt
52 PAY - 7 # 9 Pkt 10 Pkt
53 PAY - 4 # 6 Pkt 7 Pkt
54 PAY - 23 # Pkt 3 Pkt
55 HARA DOMI # Pcs 500 Pcs
56 HARACHI 7G # 200 Pcs 800 Pcs
57 HARACHI 5G # Pcs 1000 Pcs

______________________ ________________
Production-Co-Ordinator Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.07.2007
Needle Consumption Report
For The Month Of June' 2007

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 4 Pkt 29 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 2 Pkt 8 Pkt
11 DP X 5 # 17 Pkt 2 Pkt
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16 2 Pkt 4 Pkt
19 DC X 27 # 18 Pkt 4 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 Pkt 2 Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 2 Pkt 9 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 1 # 16 Pkt 3 Pkt
31 UY X 14 # 10 Pkt 2 Pkt
32 TO X 7 # 18
33 TO X 7 # 11
34 TO X 7 # 12
35 TO X 7 # 14
36 TO X 7 # 16
37 DM X 13 # 18
38 DM X 13 # 16/18
39 DM X 13 # 14
40 10" KNIFE # 16/18
41 8" KNIFE #
42 A BELT #
43 1/2" KNIFE #
44 USSUE (7G) # Pcs 10 Pcs
45 7G KNITTING NEEDLE # 532 14000 Pcs 73000 Pcs
46 5G KNITTING NEEDLE # 396 7000 Pcs 54000 Pcs
47 12G KNITTING NEEDLE # Pcs 400 Pcs
48 3G KNITTING NEEDLE # Pcs 200 Pcs
49 PYC - 22 # Pkt Pkt
50 PYE - 23 # Pkt Pkt
51 PYC - 21 # Pkt Pkt
52 PAY - 7 # Pkt 1 Pkt
53 PAY - 4 # 6 3 Pkt 7 Pkt
54 PAY - 23 # Pkt 3 Pkt
55 HARA DOMI # Pcs 500 Pcs
56 HARACHI 7G # 300 Pcs 600 Pcs
57 HARACHI 5G # 200 Pcs 1000 Pcs

______________________ ________________
Production-Co-Ordinator Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.06.2007
Needle Consumption Report
For The Month Of May' 2007

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 7 Pkt 25 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 Pkt 6 Pkt
11 DP X 5 # 17 Pkt 2 Pkt
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16 2 Pkt 2 Pkt
19 DC X 27 # 18 Pkt 4 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 Pkt 2 Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 7 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 1 # 16 Pkt 3 Pkt
31 UY X 14 # 10 Pkt 2 Pkt
32 TO X 7 # 18
33 TO X 7 # 11
34 TO X 7 # 12
35 TO X 7 # 14
36 TO X 7 # 16
37 DM X 13 # 18
38 DM X 13 # 16/18
39 DM X 13 # 14
40 10" KNIFE # 16/18
41 8" KNIFE #
42 A BELT #
43 1/2" KNIFE #
44 USSUE (7G) # Pcs 10 Pcs
45 7G KNITTING NEEDLE # 532 14200 Pcs 59000 Pcs
46 5G KNITTING NEEDLE # 396 10400 Pcs 47000 Pcs
47 12G KNITTING NEEDLE # Pcs 400 Pcs
48 3G KNITTING NEEDLE # Pcs 200 Pcs
49 PYC - 22 # Pkt Pkt
50 PYE - 23 # Pkt Pkt
51 PYC - 21 # Pkt Pkt
52 PAY - 7 # Pkt 1 Pkt
53 PAY - 4 # 6 1 Pkt 4 Pkt
54 PAY - 23 # Pkt 3 Pkt
55 HARA DOMI # Pcs 500 Pcs
56 HARACHI 7G # Pcs 300 Pcs
57 HARACHI 5G # 200 Pcs 800 Pcs

______________________ ________________
Production-Co-Ordinator Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.05.2007
Needle Consumption Report
For The Month Of April' 2007

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 4 Pkt 18 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 Pkt 6 Pkt
11 DP X 5 # 17 Pkt 2 Pkt
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 Pkt 4 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 Pkt 2 Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 7 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 1 # 16 Pkt 3 Pkt
31 UY X 14 # 10 Pkt 2 Pkt
32 TO X 7 # 18
33 TO X 7 # 11
34 TO X 7 # 12
35 TO X 7 # 14
36 TO X 7 # 16
37 DM X 13 # 18
38 DM X 13 # 16/18
39 DM X 13 # 14
40 10" KNIFE # 16/18
41 8" KNIFE #
42 A BELT #
43 1/2" KNIFE #
44 USSUE (7G) # Pcs 10 Pcs
45 7G KNITTING NEEDLE # 532 11400 Pcs 44800 Pcs
46 5G KNITTING NEEDLE # 396 9200 Pcs 36600 Pcs
47 12G KNITTING NEEDLE # Pcs 400 Pcs
48 3G KNITTING NEEDLE # Pcs 200 Pcs
49 PYC - 22 # Pkt Pkt
50 PYE - 23 # Pkt Pkt
51 PYC - 21 # Pkt Pkt
52 PAY - 7 # 1 Pkt 1 Pkt
53 PAY - 4 # 6 Pkt 3 Pkt
54 PAY - 23 # Pkt 3 Pkt
55 HARA DOMI # 500 Pcs 500 Pcs
56 HARACHI 7G # 100 Pcs 300 Pcs
57 HARACHI 5G # 200 Pcs 600 Pcs

______________________ ________________
Production-Co-Ordinator Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.04.2007
Needle Consumption Report
For The Month Of March' 2007

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 8 Pkt 14 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 2 Pkt 6 Pkt
11 DP X 5 # 17 2 Pkt 2 Pkt
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 Pkt 4 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 Pkt 2 Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 5 Pkt 7 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 1 # 16 3 Pkt 3 Pkt
31 UY X 14 # 10 2 Pkt 2 Pkt
32 TO X 7 # 18
33 TO X 7 # 11
34 TO X 7 # 12
35 TO X 7 # 14
36 TO X 7 # 16
37 DM X 13 # 18
38 DM X 13 # 16/18
39 DM X 13 # 14
40 10" KNIFE # 16/18
41 8" KNIFE #
42 A BELT #
43 1/2" KNIFE #
44 USSUE (7G) # 10 Pcs 10 Pcs
45 7G KNITTING NEEDLE # 532 10100 Pcs 33400 Pcs
46 5G KNITTING NEEDLE # 396 10500 Pcs 27400 Pcs
47 12G KNITTING NEEDLE # 200 Pcs 400 Pcs
48 3G KNITTING NEEDLE # 200 Pcs 200 Pcs
49 PYC - 22 # Pkt Pkt
50 PYE - 23 # Pkt Pkt
51 PYC - 21 # Pkt Pkt
52 PAY - 7 # Pkt Pkt
53 PAY - 4 # 6 1 Pkt 3 Pkt
54 PAY - 23 # 3 Pkt 3 Pkt
55 HARACHI 7G # 100 Pcs 200 Pcs
56 HARACHI 5G # 100 Pcs 400 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.03.2007
Needle Consumption Report
For The Month Of February' 2007

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 Pkt 6 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16 4 Pkt 4 Pkt
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 2 Pkt 4 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16 2 Pkt 2 Pkt
24 TV X 7 # 18
25 TQ X 7 # 16 2 Pkt 2 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 13100 Pcs 23300 Pcs
44 5G KNITTING NEEDLE # 396 6600 Pcs 16900 Pcs
44 12G KNITTING NEEDLE # Pcs 200 Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # Pkt Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 7 # Pkt Pkt
49 PAY - 4 # 6 Pkt 2 Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # Pcs 100 Pcs
52 HARACHI 5G # 100 Pcs 300 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.02.2007
Needle Consumption Report
For The Month Of January' 2007

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 6 Pkt 6 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 2 Pkt 2 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 10200 Pcs 10200 Pcs
44 5G KNITTING NEEDLE # 396 10300 Pcs 10300 Pcs
44 12G KNITTING NEEDLE # 200 Pcs 200 Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # Pkt Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 7 # Pkt Pkt
49 PAY - 4 # 6 2 Pkt 2 Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # 100 Pcs 100 Pcs
52 HARACHI 5G # 200 Pcs 200 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 06.01.2007
Needle Consumption Report
For The Month Of December' 2006

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt 3 Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 7 Pkt 249 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt 17 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 Pkt 54 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 17 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt 1 Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 9800 Pcs 177600 Pcs
44 5G KNITTING NEEDLE # 396 5500 Pcs 73100 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # Pkt 27 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 7 # 1 Pkt 15 Pkt
49 PAY - 4 # 6 Pkt 3 Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # Pcs 6800 Pcs
52 HARACHI 5G # 100 Pcs 700 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.12.2006
Needle Consumption Report
For The Month Of November' 2006

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt 3 Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 22 Pkt 242 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt 17 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 2 Pkt 54 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 17 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt 1 Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 13200 Pcs 167800 Pcs
44 5G KNITTING NEEDLE # 396 1000 Pcs 67600 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # 1 Pkt 27 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 7 # 2 Pkt 14 Pkt
49 PAY - 4 # 6 Pkt 3 Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # 300 Pcs 6800 Pcs
52 HARACHI 5G # Pcs 600 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.11.2006
Needle Consumption Report
For The Month Of October' 2006

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt 3 Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 27 Pkt 220 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt 17 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 Pkt 52 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 17 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt 1 Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 16000 Pcs 154600 Pcs
44 5G KNITTING NEEDLE # 396 2400 Pcs 66600 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # 2 Pkt 26 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 7 # Pkt 12 Pkt
49 PAY - 4 # 6 Pkt 3 Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # 200 Pcs 6500 Pcs
52 HARACHI 5G # Pcs 600 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 03.10.2006
Needle Consumption Report
For The Month Of September' 2006

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 2 Pkt 3 Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 19 Pkt 193 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt 17 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 2 Pkt 52 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 17 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt 1 Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 17000 Pcs 138600 Pcs
44 5G KNITTING NEEDLE # 396 8400 Pcs 64200 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # 2 Pkt 24 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 7 # 2 Pkt 12 Pkt
49 PAY - 4 # 6 Pkt 3 Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # 300 Pcs 6300 Pcs
52 HARACHI 5G # Pcs 600 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.09.2006
Needle Consumption Report
For The Month Of August' 2006

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 1 Pkt 1 Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 20 Pkt 174 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 1 Pkt 17 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 1 Pkt 50 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 17 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt 1 Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 25800 Pcs 121600 Pcs
44 5G KNITTING NEEDLE # 396 9800 Pcs 55800 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # 3 Pkt 22 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 7 # 3 Pkt 10 Pkt
49 PAY - 4 # 6 Pkt 3 Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # 100 Pcs 6000 Pcs
52 HARACHI 5G # 200 Pcs 600 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.08.2006
Needle Consumption Report
For The Month Of July' 2006

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 32 Pkt 154 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt 16 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 18 Pkt 49 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 17 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt 1 Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 25400 Pcs 95800 Pcs
44 5G KNITTING NEEDLE # 396 13200 Pcs 46000 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # 2 Pkt 19 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 7 # 4 Pkt 7 Pkt
49 PAY - 4 # 6 Pkt 3 Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # 200 Pcs 5900 Pcs
52 HARACHI 5G # 100 Pcs 400 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.06.2006
Needle Consumption Report
For The Month Of June' 2006

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 33 Pkt 122 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 3 Pkt 16 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 9 Pkt 31 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 3 Pkt 17 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 1 Pkt 1 Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 13200 Pcs 70400 Pcs
44 5G KNITTING NEEDLE # 396 11200 Pcs 32800 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # 5 Pkt 17 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 7 # Pkt 3 Pkt
49 PAY - 4 # 6 2 Pkt 3 Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # 100 Pcs 5700 Pcs
52 HARACHI 5G # Pcs 300 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.06.2006
Needle Consumption Report
For The Month Of May' 2006

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 28 Pkt 89 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 1 Pkt 13 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 8 Pkt 22 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 2 Pkt 14 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 19000 Pcs 57200 Pcs
44 5G KNITTING NEEDLE # 396 7000 Pcs 21600 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # 5 Pkt 12 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 7 # 1 Pkt 3 Pkt
49 PAY - 4 # 6 Pkt 1 Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # Pcs 5600 Pcs
52 HARACHI 5G # Pcs 300 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.05.2006
Needle Consumption Report
For The Month Of April' 2006

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 27 Pkt 61 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 2 Pkt 12 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 6 Pkt 14 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 4 Pkt 12 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 15400 Pcs 38200 Pcs
44 5G KNITTING NEEDLE # 396 7600 Pcs 14600 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # 4 Pkt 7 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 7 # 2 Pkt 2 Pkt
49 PAY - 4 # 6 Pkt 1 Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # 400 Pcs 5600 Pcs
52 HARACHI 5G # 300 Pcs 300 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.02.2006
Needle Consumption Report
For The Month Of January 2006

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 12 Pkt 12 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 4 Pkt 4 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 12000 Pcs 12000 Pcs
44 5G KNITTING NEEDLE # 396 400 Pcs 400 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # 2 Pkt 2 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 6 # Pkt Pkt
49 PAY - 4 # 6 Pkt Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # 5200 Pcs 5200 Pcs
52 HARACHI 5G # Pcs Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.11.2005
Needle Consumption Report
For The Month Of October 2005

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 1 Pkt 2 Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 18 Pkt 146 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 5 Pkt 26 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt 3 Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 6 Pkt 51 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 4 Pkt 20 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 11900 Pcs 109500 Pcs
44 5G KNITTING NEEDLE # 396 1600 Pcs 47000 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # 4 Pkt 56 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 6 # 1 Pkt 10 Pkt
49 PAY - 6 # Pkt Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # 500 Pcs 2600 Pcs
52 HARACHI 5G # Pcs 1500 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.09.2005
Needle Consumption Report
For The Month Of August 2005

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt 1 Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 23 Pkt 114 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 1 Pkt 17 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt 3 Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 9 Pkt 38 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 1 Pkt 13 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 6800 Pcs 83800 Pcs
44 5G KNITTING NEEDLE # 396 7400 Pcs 38600 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # 8 Pkt 45 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 6 # 2 Pkt 7 Pkt
49 PAY - 6 # Pkt Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # 200 Pcs 1000 Pcs
52 HARACHI 5G # 200 Pcs 1100 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.08.2005
Needle Consumption Report
For The Month Of June 2005

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 1 Pkt 1 Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 16 Pkt 91 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt 16 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt 3 Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 12 Pkt 29 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 12 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 8400 Pcs 77000 Pcs
44 5G KNITTING NEEDLE # 396 7400 Pcs 31200 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # 11 Pkt 37 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 6 # 1 Pkt 5 Pkt
49 PAY - 6 # Pkt Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # 300 Pcs 800 Pcs
52 HARACHI 5G # 300 Pcs 900 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.06.2005
Needle Consumption Report
For The Month Of May 2005

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 15 Pkt 47 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 4 Pkt 16 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 1 Pkt 3 Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 4 Pkt 12 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 3 Pkt 11 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 15000 Pcs 53000 Pcs
44 5G KNITTING NEEDLE # 396 8800 Pcs 15000 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # 8 Pkt 19 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 6 # Pkt 2 Pkt
49 PAY - 6 # Pkt Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # 100 Pcs 300 Pcs
52 HARACHI 5G # 200 Pcs 400 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.05.2005
Needle Consumption Report
For The Month Of April 2005

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 15 Pkt 32 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 3 Pkt 12 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt 2 Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 2 Pkt 8 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 5 Pkt 8 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 14000 Pcs 35000 Pcs
44 5G KNITTING NEEDLE # 396 5200 Pcs 8000 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # 4 Pkt 11 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 6 # 1 Pkt 2 Pkt
49 PAY - 6 # Pkt Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # 100 Pcs 200 Pcs
52 HARACHI 5G # 200 Pcs 200 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.03.2005
Needle Consumption Report
For The Month Of February 2005

Sl Types Of Needle This Month Consumption Total Consumption Remarks


01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 5 Pkt 17 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 9 Pkt 9 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 2 Pkt 2 Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 4 Pkt 6 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 3 Pkt 3 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 11000 Pcs 21000 Pcs
44 5G KNITTING NEEDLE # 396 2000 Pcs 2800 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # 3 Pkt 7 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 6 # Pkt 1 Pkt
49 PAY - 6 # Pkt Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # Pcs 100 Pcs
52 HARACHI 5G # Pcs Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.03.2005
Needle Consumption Report
For The Month Of January 2005
Sl Types Of Needle This Month Consumption Total Consumption Remarks
01 DB X 1-2 # 11 Pkt Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt Pkt
04 DB X 1-2 # 16 12 Pkt 12 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 2 Pkt 2 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 10000 Pcs 10000 Pcs
44 5G KNITTING NEEDLE # 396 800 Pcs 800 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt Pkt
46 PYE - 23 # 2 Pkt 2 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 6 # 1 Pkt 1 Pkt
49 PAY - 6 # Pkt Pkt
50 PAY - 23 # Pkt Pkt
51 HARACHI 7G # 100 Pcs 100 Pcs
52 HARACHI 5G # Pcs Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.01.2005
Needle Consumption Report
For The Month Of January 2005

Sl Types Of Needle Total Consumption Remarks


01 DB X 1-2 # 11 Pkt 7 Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt 195 Pkt
04 DB X 1-2 # 16 12 Pkt 21 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt 19 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt 8 Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 2 Pkt 47 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 20 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt 3 Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 10000 Pcs 222000 Pcs
44 5G KNITTING NEEDLE # 396 800 Pcs 81000 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt 3 Pkt
46 PYE - 23 # 2 Pkt 50 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 6 # Pkt 6 Pkt
49 PAY - 6 # 1 Pkt 19 Pkt
50 PAY - 23 # Pkt 8 Pkt
51 HARACHI 7G # 100 Pcs 4700 Pcs
52 HARACHI 5G # Pcs 1800 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 02.01.2005
Needle Consumption Report
For The Month Of December 2004

Sl Types Of Needle Total Consumption Remarks


01 DB X 1-2 # 11 Pkt 7 Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt 195 Pkt
04 DB X 1-2 # 16 4 Pkt 9 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt 19 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt 8 Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 1 Pkt 45 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 20 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt 3 Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 14400 Pcs 212000 Pcs
44 5G KNITTING NEEDLE # 396 Pcs 80200 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt 3 Pkt
46 PYE - 23 # 3 Pkt 48 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 6 # Pkt 6 Pkt
49 PAY - 6 # 1 Pkt 18 Pkt
50 PAY - 23 # Pkt 8 Pkt
51 HARACHI 7G # 200 Pcs 4600 Pcs
52 HARACHI 5G # Pcs 1800 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
Date : 01.12.2004
Needle Consumption Report
For The Month Of November 2004

Sl Types Of Needle Total Consumption Remarks


01 DB X 1-2 # 11 Pkt 7 Pkt
02 DB X 1-2 # 12
03 DB X 1-2 # 14 Pkt 195 Pkt
04 DB X 1-2 # 16 5 Pkt 5 Pkt
05 DB X 1-2 # 18
06 DB X 1KM # 9
07 DP X 5 # 11
08 DP X 5 # 12
09 DP X 5 # 14 Pkt 19 Pkt
10 DP X 5 # 16
11 DP X 5 # 18
12 DP X 5 # 21
13 DP X 5 # 22
14 BB # 21 Pkt 8 Pkt
15 DC X 27 # 11
16 DC X 27 # 12
17 DC X 27 # 14
18 DC X 27 # 16
19 DC X 27 # 18 Pkt 44 Pkt
20 TV X 7 # 11
21 TV X 7 # 12
22 TV X 7 # 14
23 TV X 7 # 16
24 TV X 7 # 18
25 TQ X 7 # 16 Pkt 20 Pkt
26 UO X 113 # 11
27 UO X 113 # 12
28 UO X 113 # 14
29 UO X 113 # 10
30 UY X 14 # 10 Pkt 3 Pkt
31 TO X 7 # 18
32 TO X 7 # 11
33 TO X 7 # 12
34 TO X 7 # 14
35 TO X 7 # 16
36 DM X 13 # 18
37 DM X 13 # 16/18
38 DM X 13 # 14
39 10" KNIFE # 16/18
40 8" KNIFE #
41 A BELT #
42 1/2" KNIFE #
43 7G KNITTING NEEDLE # 532 19800 Pcs 197600 Pcs
44 5G KNITTING NEEDLE # 396 200 Pcs 80200 Pcs
44 5G KNITTING NEEDLE # 494 Pcs Pcs
45 PYC - 22 # Pkt 3 Pkt
46 PYE - 23 # 2 Pkt 45 Pkt
47 PYC - 21 # Pkt Pkt
48 PAY - 6 # 1 Pkt 6 Pkt
49 PAY - 6 # Pkt 17 Pkt
50 PAY - 23 # Pkt 8 Pkt
51 HARACHI 7G # 200 Pcs 4400 Pcs
52 HARACHI 5G # Pcs 1800 Pcs

______________ ________________
Prepared By Plant-In-Charge
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY
For The Month Of August'08

5GG
Ttl Ttl Ttl
D.T Sage Sage Quelle Sears Quelle G.Gold G.Gold Eurofrente Sears
0006 0006-B 8105 1513 3517 3540 3835 9L 432 9 L 397 5G 9L708 9L 592 /49 9L 592 /50 9L 592 /45 11225 11529 11544 11533 3508 7G (5G+7G)

1-Aug 0 0 0
2-Aug 586 4 144 734 599 132 469 1200 1934
3-Aug 539 48 29 194 25 835 759 137 576 1472 2307
4-Aug 331 377 49 66 118 27 968 813 206 592 1611 2579
5-Aug 194 69 144 97 10 197 63 774 927 52 670 12 1661 2435
6-Aug 0 552 8 173 70 204 63 1070 708 0 696 53 1457 2527
7-Aug 0 520 160 36 202 3 921 502 0 678 137 1317 2238
8-Aug 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
9-Aug 0 484 124 27 88 8 731 645 0 681 152 1478 2209
10-Aug 0 552 177 22 80 26 857 468 0 519 190 1177 2034
11-Aug 0 714 112 3 8 88 38 963 420 0 424 243 20 1107 2070
12-Aug 0 60 177 0 5 15 53 310 597 0 284 10 226 34 1151 1461
13-Aug 0 0 265 0 145 3 49 462 546 0 140 48 349 42 1125 1587
14-Aug 0 0 265 0 198 0 51 514 546 0 61 158 62 126 72 69 1094 1608
15-Aug 0 0 196 0 134 0 20 350 0 0 0 0 0 66 66 416
16-Aug 0 0 153 0 110 0 34 297 427 0 0 166 0 79 9 56 737 1034
17-Aug 0 0 0 0 0 0 0 0 0 0 0
18-Aug 0 0 188 0 184 0 55 427 413 0 0 321 0 101 36 129 1000 1427
19-Aug 0 0 313 0 226 0 64 603 484 0 0 290 0 202 77 152 1205 1808
20-Aug 0 0 404 0 251 0 65 720 540 0 0 402 0 135 102 157 1336 2056
21-Aug 0 0 344 0 233 0 61 638 602 0 0 549 0 145 78 143 1517 2155
22-Aug 0 0 257 0 234 0 57 548 431 0 0 361 0 103 56 114 1065 1613
23-Aug 0 0 271 0 217 0 66 554 769 0 0 553 0 54 72 132 1580 2134
24-Aug 0 0 167 0 239 0 76 482 615 0 0 446 0 51 68 72 1252 1734
25-Aug 0 0 167 0 239 0 76 482 615 0 0 446 0 51 68 72 1252 1734
26-Aug 84 151 403 100 738 707 651 184 5 38 1585 2323
27-Aug 116 140 253 117 626 1036 407 112 46 1601 2227
28-Aug 146 142 224 135 647 936 628 67 167 1798 2445
29-Aug 118 96 146 103 463 620 487 194 1301 1764
30-Aug 200 240 160 600 900 720 190 1810 2410
31-Aug 200 250 160 610 1000 700 200 1900 2510
Total 1650 2951 1441 4621 572 3939 1020 153 1577 17924 17625 527 5790 7343 1424 1047 1001 802 1296 36855 54779
In DZ 138 246 120 385 48 328 85 13 131 1494 1469 44 483 612 119 87 83 67 108 3071 4565
____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY
For The Month Of July'08

5GG
Ttl Ttl Ttl
D.T G. Union G. Union G.Gold G.Gold G. Union Sears
8210-G 8210-G 84000 9L432 0006 4579 3517-B 5G 9L708 9L 592 9L592b 9L592b ET-898 MT-8212 MT-8212 3527 7G (5G+7G)

1-Jul 75 75 11 86 839 554 33 193 193 1812 1898


2-Jul 57 57 13 70 1065 874 4 314 314 2571 2641
3-Jul 19 19 125 144 982 898 0 367 367 2614 2758
4-Jul 0 0 0
5-Jul 3 209 212 838 771 302 302 82 2295 2507
6-Jul 198 198 676 916 288 288 209 2377 2575
7-Jul 2 237 239 453 676 274 274 236 1913 2152
8-Jul 9 195 204 360 512 290 290 203 1655 1859
9-Jul 45 234 279 500 387 135 135 234 1391 1670
10-Jul 84 183 267 395 417 12 12 237 1073 1340
11-Jul 37 37 51 137 225 0 225
12-Jul 71 71 115 263 449 411 316 250 977 1426
13-Jul 82 82 96 279 457 421 274 218 913 1370
14-Jul 119 119 118 302 539 469 234 287 990 1529
15-Jul 51 51 140 289 480 357 325 250 932 1412
16-Jul 141 340 481 297 501 93 891 1372
17-Jul 135 197 332 257 763 57 1077 1409
18-Jul 105 65 101 271 0 271
19-Jul 132 405 150 687 292 746 63 1101 1788
20-Jul 161 517 146 824 296 892 0 1188 2012
21-Jul 190 473 25 688 347 922 0 1269 1957
22-Jul 178 626 804 379 1079 1458 2262
23-Jul 187 657 844 453 1111 1564 2408
24-Jul 181 653 834 501 1115 1616 2450
25-Jul 0 0 0
26-Jul 199 661 860 688 1055 1743 2603
27-Jul 176 716 892 612 1164 1776 2668
28-Jul 153 1028 1181 557 1033 1590 2771
29-Jul 105 1110 1215 535 875 166 166 1742 2957
30-Jul 66 1076 1142 727 651 477 477 2332 3474
31-Jul 36 1193 259 1488 639 506 695 695 2535 4023
Total 511 511 14 2805 9180 3623 259 16392 14346 19567 1338 1338 37 2175 2175 0 2419 43395 59787
In DZ 43 43 1 234 765 302 22 1366 1196 1631 112 112 3 181 181 0 202 3616 4982
____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY
For The Month Of June'08

5GG
Ttl Ttl Ttl
D.T Sears Sears LI& Fung G.Union G.Gold Sears
3504 3504 3517 RC-45 8016 CS-9659 5G 9L708 9L 592 3527 3528 3528 ET-898 8212 7G (5G+7G)

1-Jun 8 8 8 5 5 13
2-Jun 183 183 16 181 380 241 172 413 793
3-Jun 230 230 96 316 642 422 296 718 1360
4-Jun 294 294 130 273 697 445 341 786 1483
5-Jun 200 200 207 276 683 507 365 872 1555
6-Jun 58 58 0 58
7-Jun 125 125 239 247 611 653 477 1130 1741
8-Jun 12 12 429 267 708 670 545 1215 1923
9-Jun 5 5 407 231 643 589 7 545 1141 1784
10-Jun 423 255 678 423 53 481 957 1635
11-Jun 429 294 723 355 158 53 53 619 1342
12-Jun 491 267 758 233 228 136 136 150 883 1641
13-Jun 157 157 196 110 110 416 573
14-Jun 500 259 759 237 324 131 131 147 970 1729
15-Jun 489 275 764 252 285 214 214 188 1153 1917
16-Jun 592 345 937 246 369 199 199 180 1193 2130
17-Jun 572 166 738 197 289 202 202 219 1109 1847
18-Jun 336 270 606 337 97 314 314 293 1355 1961
19-Jun 167 303 64 53 587 401 1 187 187 288 1064 1651
20-Jun 0 0 0
21-Jun 41 85 160 286 727 3 15 15 455 1215 1501
22-Jun 13 285 298 727 668 1395 1693
23-Jun 292 292 862 18 632 1512 1804
24-Jun 226 226 1002 221 458 1681 1907
25-Jun 72 72 1106 612 237 1955 2027
26-Jun 56 56 1022 842 278 2142 2198
27-Jun 0 0 0
28-Jun 50 50 1100 779 363 8 2250 2300
29-Jun 8 26 34 1112 866 268 30 2276 2310
30-Jun 195 120 315 1027 981 115 254 2377 2692
1-Jul 0 0 0
Total 1057 1057 5767 0 4538 1351 53 12766 14898 4319 2010 1561 1561 8161 292 32802 45568
In DZ 88 88 481 0 378 113 4 1064 1242 360 168 130 130 680 24 2734 3797
____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY
For The Month Of May'08

5GG
Ttl Ttl Ttl
D.T G.Union G.Union Branex LI& Fung G.Union G.Gold
ET-8000 ET-8000 CS-9659 CS-8000 RC-45 5G ET-898 4010 CS-898 CS-898 9L440 3423 7G (5G+7G)

1-May 0 0 0
2-May 3 21 24 839 839 863
3-May 31 31 1003 1003 1034
4-May 10 10 1143 1143 1153
5-May 10 10 15 15 552 582 592
6-May 0 53 53 53
7-May 0 0 0
8-May 88 41 129 128 128 1177 1433 1562
9-May 94 30 124 105 105 995 1205 1329
10-May 105 21 126 130 130 1025 1285 1411
11-May 227 27 21 275 147 147 1006 1300 1575
12-May 299 199 51 549 179 179 979 1337 1886
13-May 310 110 50 470 224 224 1031 1479 1949
14-May
15-May 231 111 63 405 221 221 963 1405 1810
16-May 96 64 76 236 342 342 741 1425 1661
17-May 23 97 120 242 242 979 1463 1583
18-May 146 146 293 293 847 1433 1579
19-May 173 173 339 339 741 1419 1592
20-May 166 166 425 425 525 1375 1541
21-May 120 120 319 319 273 911 1031
22-May 155 155 686 686 213 1585 1740
23-May 154 154 748 748 113 1609 1763
24-May 177 177 971 971 78 2020 2197
25-May 253 253 891 891 15 1797 2050
26-May 280 280 1071 1071 4 2146 2426
27-May 251 251 1108 1108 2216 2467
28-May 171 171 0 171
29-May 330 330 1087 1087 2174 2504
30-May 295 295 1152 1152 2304 2599
31-May 284 284 1185 1185 2370 2654
Total 0 0 1476 583 0 0 3405 5464 0 0 12008 12008 15295 0 39311 44775
In DZ 0 0 123 49 0 0 284 455 0 0 1001 1001 1275 0 3276 3731

____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY
For The Month Of April'08

5GG
Ttl Ttl Ttl
D.T G.Union G.Union Branex N.Mann G.Union G.Gold
ET-8000 ET-8000 CS-9659 CS-8000 CS-8000 550/477 5G ET-898 4010 CS-6840 CS-6840 9L440 3423 7G (5G+7G)

1-Apr 0 41 41 41
2-Apr 0 7 7 7
3-Apr 0 26 26 26
4-Apr 0 0 0
5-Apr 0 0 0
6-Apr 0 0 0
7-Apr 100 100 0 100
8-Apr 247 247 0 247
9-Apr 0 0 0
10-Apr 371 22 393 0 393
11-Apr 532 44 576 0 576
12-Apr 669 32 701 0 701
13-Apr 819 66 885 0 885
14-Apr 36 36 0 36
15-Apr 827 86 913 91 91 1004
16-Apr 56 56 0 56
17-Apr 826 72 898 160 160 1058
18-Apr 790 71 861 320 320 1181
19-Apr 896 89 985 459 459 1444
20-Apr 988 988 588 588 1576
21-Apr 1109 6 1115 572 572 1687
22-Apr 843 843 700 700 1543
23-Apr 0 0 0
24-Apr 632 632 796 796 1428
25-Apr 258 72 330 1008 1008 1338
26-Apr 236 86 322 1072 1072 1394
27-Apr 148 129 277 1154 1154 1431
28-Apr 255 341 596 1028 1028 1624
29-Apr 108 379 487 1176 1176 1663
30-Apr 5 275 280 841 841 1121
1-May 0 0 0
Total 0 0 10659 580 1282 0 0 12521 0 74 0 0 9965 0 10039 22560
In DZ 0 0 888 48 107 0 0 1043 0 6 0 0 830 0 837 1880

____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY
For The Month Of March'08

5GG
Ttl Ttl Ttl
D.T G.Union G.Union Branex N.Mann G.Union Quelle
ET-8000 ET-8000 CK-8013 CS-8000 LM-874 LM-869 550/477 5G ET-898 4010 CS-6840 CS-6840 CS-8034 3423 7G (5G+7G)

1-Mar 11 11 325 43 379 321 354 675 1054


2-Mar 10 10 341 75 426 405 22 22 394 843 1269
3-Mar 9 9 158 44 73 284 360 598 958 1242
4-Mar 23 23 60 64 108 255 321 11 548 880 1135
5-Mar 117 117 8 65 115 305 60 161 451 672 977
6-Mar 197 197 83 107 387 5 387 577 969 1356
7-Mar 121 143 264 664 554 1218 1482
8-Mar 8 138 185 331 1021 363 1384 1715
9-Mar 35 153 197 385 968 165 1133 1518
10-Mar 24 115 188 327 1056 59 1115 1442
11-Mar 45 81 146 158 430 969 29 998 1428
12-Mar 0 0 0
13-Mar 91 97 103 10 22 323 890 890 1213
14-Mar 263 125 72 175 2 637 978 978 1615
15-Mar 345 195 121 212 3 876 978 978 1854
16-Mar 466 158 149 235 1008 899 899 1907
17-Mar 541 100 70 234 945 679 58 737 1682
18-Mar 577 71 49 268 965 381 98 479 1444
19-Mar 376 12 10 146 544 291 69 360 904
20-Mar 555 22 201 778 388 121 509 1287
21-Mar 0 0 0
22-Mar 292 12 106 410 393 126 519 929
23-Mar 93 17 18 128 301 113 414 542
24-Mar 32 66 5 103 103 113 216 319
25-Mar 25 4 29 60 100 160 189
26-Mar 0 0 0
27-Mar 12 12 111 121 232 244
28-Mar 0 94 66 160 160
29-Mar 0 87 35 122 122
30-Mar 0 76 76 76
31-Mar 0 108 108 108
Total 367 367 3688 1820 1623 1614 1419 10531 1472 12054 22 22 4092 1020 18682 29213
In DZ 31 31 307 152 135 135 118 878 123 1005 2 2 341 85 1557 2434

____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY
For The Month Of February'08

5GG
Ttl Ttl Ttl
D.T G.Union G.Union N.Mann G.Union
ET-8000 ET-8000 ET-9659 550/477 5G ET-898 CS-6840 CS-6840 ET6840 CS-898 7G (5G+7G)
1-Feb 182 182 196 378 141 141 165 447 825
2-Feb 324 324 236 560 186 186 172 544 1104
3-Feb 259 259 116 375 380 380 185 945 1320
4-Feb 317 317 50 367 208 208 60 197 673 1040
5-Feb 355 355 67 422 80 80 270 370 800 1222
6-Feb 0 0 0
7-Feb 304 304 47 351 20 20 251 346 637 988
8-Feb 314 314 115 429 3 3 139 388 533 962
9-Feb 323 323 86 409 173 350 523 932
10-Feb 292 292 40 332 175 312 487 819
11-Feb 287 287 31 318 124 372 496 814
12-Feb 254 254 25 279 6 134 372 512 791
13-Feb 81 81 6 87 0 87
14-Feb 111 111 111 5 320 320 7 652 763
15-Feb 132 132 5 137 10 379 389 526
16-Feb 114 114 5 119 37 379 416 535
17-Feb 139 139 6 145 58 463 521 666
18-Feb 177 177 177 95 455 550 727
19-Feb 135 135 135 91 452 543 678
20-Feb 19 19 19 0 19
21-Feb 0 0 0
22-Feb 99 99 99 74 325 399 498
23-Feb 58 58 58 83 420 503 561
24-Feb 95 95 95 216 168 384 479
25-Feb 76 76 76 295 25 320 396
26-Feb 41 41 413 45 13 471 512
27-Feb 0 0 0
28-Feb 24 24 56 80 390 390 470
29-Feb 77 77 112 189 405 405 594
1-Mar 0 0 0
2-Mar 0 0 0
Total 4548 4548 1031 209 5788 2178 1338 1338 1378 6308 12540 18328
In DZ 379 379 86 17 482 182 112 112 115 526 1045 1527

____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY
For The Month Of January'08

5GG
Ttl Ttl Ttl
D.T N.Mann N.Mann G.Union
550/477 550/477 CS-8000 5G 9060 CS-6840 CS-6840 ET6840 CS-898 7G (5G+7G)
1-Dec 0 401 401 171 973 973
2-Dec 0 0 0 0 0 0 0
3-Dec 80 80 470 470 525 1465 1545
4-Dec 178 178 220 220 719 1159 1337
5-Dec 136 136 236 372 25 25 855 905 1277
6-Dec 141 141 286 427 9 9 731 749 1176
7-Dec 240 240 261 501 559 559 1060
8-Dec 210 210 306 516 526 526 1042
9-Dec 0 0 0
10-Dec 187 187 245 432 306 306 738
11-Dec 186 186 276 462 108 108 570
12-Dec 177 177 311 488 3 3 29 35 523
13-Dec 215 215 288 503 5 5 10 513
14-Dec 124 124 324 448 0 448
15-Dec 51 51 319 370 0 370
16-Dec 0 0 0 0 0 0
17-Dec 397 397 3 3 400
18-Dec 344 344 131 131 475
19-Dec 379 379 295 295 674
20-Dec 384 384 388 388 772
21-Dec 333 333 9 400 409 742
22-Dec 0 0 398 398 59 376 435 833
23-Dec 0 0 0 0 0
24-Dec 388 388 53 27 27 393 500 888
25-Dec 434 434 31 89 89 242 451 885
26-Dec 369 369 36 115 115 106 372 741
27-Dec 207 207 60 146 146 114 466 673
28-Dec 39 39 61 171 171 148 551 590
29-Dec 0 52 183 183 152 570 570
30-Dec 0 43 96 96 101 336 336
31-Dec 0 65 183 183 118 549 549
Total 1667 1667 0 6782 8449 469 2143 2143 4529 2967 12251 20700
In DZ 139 139 0 565 704 39 179 179 377 247 1021 1725

____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY
For The Month Of December'07

5GG
Ttl Ttl Ttl
D.T G.Gould N.Ma G.U G.U G.Union
12714 12714 12685 550/477 5G 8824 CS-6840 CS-6840 ET6840 7603 7G (5G+7G)
1-Dec 0 151 151 151
2-Dec 8 8 8 204 204 212
3-Dec 15 15 3 18 425 425 443
4-Dec 190 190 94 284 311 311 595
5-Dec 0 0 0
6-Dec 232 232 267 499 305 305 804
7-Dec 203 203 328 531 345 345 876
8-Dec 126 126 531 657 271 271 928
9-Dec 37 37 549 586 400 400 986
10-Dec 162 162 401 63 626 241 241 867
11-Dec 122 122 609 126 857 292 292 1149
12-Dec 249 249 600 257 1106 104 104 1210
13-Dec 60 504 564 37 90 90 217 781
14-Dec 496 496 8 174 174 356 852
15-Dec 84 84 36 301 301 638 722
16-Dec 0 257 257 514 514
17-Dec 0 313 313 626 626
18-Dec 0 661 661 1322 1322
19-Dec 0 0 0
20-Dec 0 0 0
21-Dec 0 0 0
22-Dec 0 0 0
23-Dec 0 0 0
24-Dec 0 0 0
25-Dec 0 0 0
26-Dec 0 0 0
27-Dec 0 254 254 508 508
28-Dec 0 530 530 1060 1060
29-Dec 0 474 474 34 982 982
30-Dec 0 901 901 64 1866 1866
31-Dec 0 1385 1385 111 2881 2881
Total 1344 1344 3442 1530 6316 3130 5340 5340 209 0 14019 20335
In DZ 112 112 287 128 526 261 445 445 17 0 1168 1695

____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY
For The Month Of November'07

5GG
Ttl Ttl Ttl
D.T Eurofrente Sfera L. Line G.Union
10764 10764 10877 5G 8824 5868 5868 5872 7603 7G (5G+7G)
1-Nov 16 16 16 550 11 561 577
2-Nov 6 6 6 623 623 629
3-Nov 0 748 748 748
4-Nov 0 906 906 906
5-Nov 0 758 758 758
6-Nov 0 30 30 30
7-Nov 0 0 0
8-Nov 0 12 12 12
9-Nov 0 9 9 9
10-Nov 0 144 144 288 288
11-Nov 0 0 0
12-Nov 0 0 0
13-Nov 0 0 0
14-Nov 0 0 0
15-Nov 0 0 0
16-Nov 0 0 0
17-Nov 0 0 0
18-Nov 0 0 0
19-Nov 0 0 0
20-Nov 0 0 0
21-Nov 0 0 0
22-Nov 0 0 0
23-Nov 0 0 0
24-Nov 0 0 0
25-Nov 0 0 0
26-Nov 0 0 0
27-Nov 78 78 0 78
28-Nov 0 0 0
29-Nov 0 0 0
30-Nov 0 15 15 15
0 0 0
Total 22 22 78 0 100 15 144 144 3636 11 3950 4050
In DZ 2 2 7 0 8 1 12 12 303 1 329 338

____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY
For The Month Of Oct'07

5GG
Ttl Ttl Ttl
D.T Eurofrente Sfera L. Line G.Union
10764 10764 10877 0766/8021 5G 8703 8703 5872 7603 7G (5G+7G)
1-Oct 5 5 63 125 193 194 194 387
2-Oct 13 13 83 94 190 126 126 316
3-Oct 0 0 0
4-Oct 24 24 113 137 109 109 246
5-Oct 35 35 128 163 156 156 319
6-Oct 48 48 166 214 104 104 318
7-Oct 63 63 139 202 12 12 157 181 383
8-Oct 41 41 139 180 65 65 187 317 497
9-Oct 64 64 111 175 74 74 149 297 472
10-Oct 15 15 61 76 70 70 67 207 283
11-Oct 61 61 79 140 133 133 122 388 528
12-Oct 0 0 0
13-Oct 0 0 0
14-Oct 0 0 0
15-Oct 0 0 0
16-Oct 0 0 0
17-Oct 0 0 0
18-Oct 8 8 19 27 73 73 45 191 218
19-Oct 33 33 33 66 171 171 52 394 460
20-Oct 45 45 31 76 202 202 84 488 564
21-Oct 0 128 128 43 299 299
22-Oct 82 82 53 135 143 143 66 352 487
23-Oct 88 88 43 131 350 350 164 864 995
24-Oct 0 0 0
25-Oct 174 174 47 221 992 992 127 2111 2332
26-Oct 129 129 21 150 744 744 125 155 1768 1918
27-Oct 0 0 0
28-Oct 178 178 5 183 416 102 518 701
29-Oct 144 144 20 164 658 658 822
30-Oct 101 101 14 115 649 649 764
31-Oct 152 152 8 160 145 145 349 135 774 934
Total 1503 1503 1376 219 3098 3302 3302 2197 2344 11145 14243
In DZ 125 125 115 18 258 275 275 183 195 929 1187

____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY
For The Month Of AUGUST '07

5GG
Ttl Ttl Ttl
D.T Quelle Sears L. Line
3835 3835 1504 5G 8703 8703 47902 7G (5G+7G)
1-Aug 0 0 0
2-Aug 0 50 50 50
3-Aug 0 12 12 12
4-Aug 0 5 5 5
5-Aug 0 0 0
6-Aug 0 0 0
7-Aug 0 0 0
8-Aug 0 0 0
9-Aug 0 0 0
10-Aug 0 0 0
11-Aug 0 0 0
12-Aug 0 0 0
13-Aug 0 0 0
14-Aug 0 27 27 54 54
15-Aug 0 0 0
16-Aug 0 190 190 380 380
17-Aug 0 771 771 1542 1542
18-Aug 0 837 837 1674 1674
19-Aug 0 427 427 427
20-Aug 0 136 136 272 272
21-Aug 0 39 39 78 78
22-Aug 0 0 0
23-Aug 0 0 0
24-Aug 111 111 111 0 111
25-Aug 306 306 306 0 306
26-Aug 230 230 230 0 230
27-Aug 181 181 181 0 181
28-Aug 0 0 0
29-Aug 0 0 0
30-Aug 0 0 0
31-Aug 0 0 0
Total 828 828 0 0 828 2000 2000 494 4494 5322
In DZ 69 69 0 0 69 167 167 41 375 444

____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY
For The Month Of July '07

5GG
Ttl Ttl Ttl
D.T Quelle Sears Leas Line
3835 3835 1504 5G 8703 8703 47902 7G (5G+7G)
1-Jul 205 205 12 217 0 217
2-Jul 257 257 257 0 257
3-Jul 335 335 335 0 335
4-Jul 315 315 315 0 315
5-Jul 367 367 367 0 367
6-Jul 361 361 361 0 361
7-Jul 374 374 374 0 374
8-Jul 214 214 214 0 214
9-Jul 0 7 7 7
10-Jul 0 24 24 24
11-Jul 0 0 0 0
12-Jul 0 90 90 90
13-Jul 0 174 174 174
14-Jul 0 284 284 284
15-Jul 0 31 31 334 396 396
16-Jul 0 215 215 365 795 795
17-Jul 0 202 202 249 653 653
18-Jul 0 191 191 410 792 792
19-Jul 0 191 191 410 792 792
20-Jul 0 219 219 431 869 869
21-Jul 0 596 596 422 1614 1614
22-Jul 0 692 692 443 1827 1827
23-Jul 0 492 492 456 1440 1440
24-Jul 0 533 533 533
25-Jul 0 0 0
26-Jul 0 562 562 562
27-Jul 0 430 430 430
28-Jul 0 465 465 465
29-Jul 0 468 468 468
30-Jul 0 489 489 489
31-Jul 0 508 508 508
Total 2428 2428 0 12 2440 2829 2829 7554 13212 15652

In DZ 202 202 0 1 203 236 236 630 1101 1304

____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY
For The Month Of June '07

5GG
Ttl Ttl Ttl
D.T N.Mann Sears
138/751 138/751 327/052 1537 5G 3544 3544 7G (5G+7G)
1-Jun 78 78 0 78
2-Jun 51 132 183 0 183
3-Jun 112 123 235 0 235
4-Jun 16 16 136 149 301 0 301
5-Jun 14 14 134 147 295 0 295
6-Jun 0 0 0
7-Jun 12 12 47 137 196 0 196
8-Jun 32 32 137 169 0 169
9-Jun 47 47 10 134 191 0 191
10-Jun 61 61 155 216 0 216
11-Jun 0 0 0
12-Jun 24 24 35 59 0 59
13-Jun 0 0 0
14-Jun 41 41 95 136 0 136
15-Jun 35 35 83 118 0 118
16-Jun 48 48 41 89 0 89
17-Jun 51 51 51 0 51
18-Jun 29 29 29 0 29
19-Jun 23 23 23 0 23
20-Jun 12 12 12 0 12
21-Jun 10 10 10 0 10
22-Jun 5 5 5 0 5
23-Jun 11 11 11 0 11
24-Jun 9 9 9 0 9
25-Jun 4 4 4 0 4
26-Jun 0 0 0
27-Jun 0 0 0
28-Jun 0 0 0
29-Jun 0 17 17 34 34
30-Jun 46 46 46 143 143 286 332
0 0 0
Total 530 530 490 1446 2466 160 160 0 320 2786
In DZ 44 44 41 121 206 13 13 0 27 232

____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG
BUYER WISE PRODUCTION SUMMERRY
For The Month Of May '07

5GG
Ttl Ttl Ttl
D.T Quelle Quelle G.U G.U G.U Euro
3212 3212 8480 1500 5G 1603 1603 10394 7G (5G+7G)
1-May May Day 0 0 0
2-May 106 106 293 137 536 349 349 885
3-May 51 51 418 291 760 361 361 1121
4-May 0 0 0
5-May 58 58 407 263 728 405 405 1133
6-May 200 200 423 97 720 373 373 1093
7-May 201 201 354 40 595 384 384 979
8-May 158 158 460 30 648 429 429 1077
9-May 138 138 412 38 588 408 408 996
10-May 258 258 379 637 436 436 1073
11-May 0 0 0
12-May 132 132 429 561 491 491 1052
13-May 249 249 377 626 535 535 1161
14-May 246 246 274 520 543 543 1063
15-May 263 263 305 568 630 630 1198
16-May 0 0 0
17-May 249 249 394 643 630 630 1273
18-May 132 132 267 399 617 617 1016
19-May 188 188 286 474 704 704 1178
20-May 90 90 358 448 165 165 616 946 1394
21-May 54 54 357 411 298 298 607 1203 1614
22-May 15 15 470 485 462 462 484 1408 1893
23-May 0 0 0
24-May 2 2 527 529 505 505 361 1371 1900
25-May 4 4 524 528 604 604 368 1576 2104
26-May 596 596 647 647 457 1751 2347
27-May 626 626 646 646 464 1756 2382
28-May 570 570 354 354 482 1190 1760
29-May 556 556 376 376 932
30-May 0 0 0
31-May 731 731 0 731
Total 2794 2794 10793 896 14483 3681 3681 11510 18872 33355

In DZ 233 233 899 75 1207 307 307 959 1573 2780

____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY


For The Month Of April '07

5GG
Ttl Ttl Ttl
D.T Quelle Quelle Quelle Quelle
3733 3733 3835 3212 5G 3885 3885 8711 7G (5G+7G)
1-Apr 150 150 66 216 231 231 462 678
2-Apr 367 367 168 535 661 661 1322 1857
3-Apr 409 409 400 809 870 870 1740 2549
4-Apr 415 415 568 983 964 964 1928 2911
5-Apr 428 428 397 825 690 690 33 1413 2238
6-Apr 0 0 0
7-Apr 371 371 405 776 306 306 370 982 1758
8-Apr 360 360 378 738 138 138 709 985 1723
9-Apr 311 311 88 399 704 704 1103
10-Apr 124 124 124 773 773 897
11-Apr 8 8 8 6 6 616 628 636
12-Apr 0 530 530 530
13-Apr 0 182 182 182
14-Apr 0 0 0
15-Apr 0 204 204 204
16-Apr 0 164 164 164
17-Apr 0 137 137 137
18-Apr 0 17 17 17
19-Apr 0 34 34 34
20-Apr 0 0 0
21-Apr 0 7 7 7
22-Apr 0 0 0
23-Apr 0 0 0
24-Apr 51 51 0 51
25-Apr 120 120 0 120
26-Apr 205 205 0 205
27-Apr 0 0 0
28-Apr 251 251 0 251
29-Apr 239 239 0 239
30-Apr 369 369 0 369
0 0 0
Total 2943 2943 2470 1235 6648 3866 3866 4480 12212 18860

In DZ 245 245 206 103 554 322 322 373 1018 1572

____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY


For The Month Of March '07

5GG
Ttl Ttl Ttl
D.T G.Uni G.Uni
1612 1612 17200 5G 7613 7613 1613 7G (5G+7G)
1-Mar 493 493 493 15 15 508
2-Mar 0 0 0
3-Mar 609 609 609 56 56 665
4-Mar 734 734 734 40 40 774
5-Mar 730 730 730 113 113 843
6-Mar 243 243 243 166 166 409
7-Mar 74 74 74 159 159 233
8-Mar 111 111 111 164 164 275
9-Mar 0 0 0
10-Mar 102 102 17 119 232 232 351
11-Mar 8 8 120 128 48 48 215 311 439
12-Mar 267 267 61 61 304 426 693
13-Mar 7 7 372 379 62 62 251 375 754
14-Mar 185 185 35 35 212 282 467
15-Mar 426 426 90 90 269 449 875
16-Mar 0 0 0
17-Mar 408 408 98 98 338 534 942
18-Mar 359 359 108 108 235 451 810
19-Mar 391 391 138 138 255 531 922
20-Mar 467 467 218 218 299 735 1202
21-Mar 326 326 268 268 243 779 1105
22-Mar 455 455 301 301 27 629 1084
23-Mar 154 154 252 252 504 658
24-Mar 349 349 562 562 1124 1473
25-Mar 368 368 585 585 1170 1538
26-Mar 0 0 0
27-Mar 309 309 627 627 1254 1563
28-Mar 236 236 816 816 1632 1868
29-Mar 258 258 760 760 1520 1778
30-Mar 67 67 571 571 1142 1209
31-Mar 155 155 523 523 1046 1201
Total 3111 3111 5689 8800 6123 6123 3593 15839 24639

In DZ 259 259 474 733 510 510 299 1320 2053

____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY


For The Month Of February '07

5GG
Ttl Ttl Ttl
D.T G.Uni G.Uni G.Union G.Union
7615 7615 7609 5G 7604 7604 7605 7G (5G+7G)
1-Feb 181 181 288 469 189 189 238 616 1085
2-Feb Fri Fri 0 0 0
3-Feb 275 275 279 554 189 189 369 747 1301
4-Feb 257 257 220 477 236 236 241 713 1190
5-Feb 169 169 312 481 157 157 280 594 1075
6-Feb 101 101 452 553 198 198 337 733 1286
7-Feb 73 73 417 490 154 154 383 691 1181
8-Feb 67 67 481 548 130 130 402 662 1210
9-Feb Fri Fri 0 0 0
10-Feb 403 403 14 14 310 338 741
11-Feb 492 492 358 358 850
12-Feb 528 528 266 266 794
13-Feb 523 523 354 354 877
14-Feb 541 541 357 357 898
15-Feb 598 598 0 598
16-Feb Fri Fri 0 0 0
17-Feb 527 527 43 43 20 106 633
18-Feb 627 627 0 627
19-Feb 637 637 0 637
20-Feb 543 543 69 69 612
21-Feb Fri Fri 0 0 0
22-Feb 704 704 0 704
23-Feb Fri Fri 0 0 0
24-Feb 597 597 0 597
25-Feb 632 632 0 632
26-Feb 602 602 0 602
27-Feb 404 404 0 404
28-Feb 0 0 0
0 0 0
0 0 0
0 0 0
Total 1123 1123 10807 11930 1310 1310 3984 6604 18534

In DZ 94 94 901 994 109 109 332 550 1545

____________
Prepared By
GLOBAL KNITWEAR LTD
269 DEWAN HAT CHITTAGONG

BUYER WISE PRODUCTION SUMMERRY


For The Month Of January '07
5GG
Ttl Ttl Ttl
D.T Quelle Quelle G.Union
7692 7692 3212 5G 8711 8711 7604 7G (5G+7G)
1-Jan 0 0 0
2-Jan 0 0 0
3-Jan 0 0 0
4-Jan 0 0 0
5-Jan 0 0 0
6-Jan 125 125 15 140 0 140
7-Jan 286 286 49 335 0 335
8-Jan 398 398 55 453 9 9 462
9-Jan 431 431 18 449 47 47 496
10-Jan 536 536 536 173 173 709
11-Jan 383 383 383 251 251 634
12-Jan Fri Fri 0 0 0
13-Jan 417 417 417 345 345 762
14-Jan 269 269 269 401 401 670
15-Jan 158 158 158 449 449 607
16-Jan 67 67 67 76 76 526 678 745
17-Jan 0 74 74 491 639 639
18-Jan 0 53 53 256 362 362
19-Jan Fri Fri 0 0 0
20-Jan 0 170 170 625 965 965
21-Jan 0 147 147 335 629 629
22-Jan 0 198 198 434 830 830
23-Jan 0 160 160 352 672 672
24-Jan 0 265 265 353 883 883
25-Jan 0 326 326 459 1111 1111
26-Jan Fri Fri 0 0 0
27-Jan 0 319 319 496 1134 1134
28-Jan 0 224 224 245 693 693
29-Jan 0 229 229 278 736 736
30-Jan 0 220 220 327 767 767
31-Jan 0 482 482 411 1375 1375
Total 3070 3070 137 3207 2943 2943 7263 13149 16356

In DZ 256 256 11 267 245 245 605 1096 1363


____________
Prepared By
148
25

239
269
939 260
376
311
385

362
374
375
382
530
505

272
454
342
183

5
25
15
3

3554
148
25

239
269
939 260
376
311
385

362
374
375
382
530
505

272
454
342
183

5
25
15
3

3554
148
25

239
269
939 260
376
311
385

362
374
375
382
530
505

272
454
342
183

5
25
15
3
3554

148
25

239
269
939 260
376
311
385

362
374
375
382
530
505

272
454
342
183

5
25
15
3
3554

148
25

239
269
939 260
376
311
385

362
374
375
382
530
505

272
454
342
183

5
25
15
3
3554

148
25

239
269
939 260
376
311
385

362
374
375
382
530
505

272
454
342
183

5
25
15
3

3554

148
25

7G)
239
269
939 260
376
311
385

362
374
375
382
530
505

272
454
342
183
5
25
15
3

3554

148
25

7G)
239
269
939 260
376
311
385

362
374
375
382
530
505

272
454
342
183
5
25
15
3

3554

148
25

7G)
239
269
939 260
376
311
385

362
374
375
382
530
505

272
454
342
183
5
25
15
3

3554

148
25

7G)
239
269
939 260
376
311
385

362
374
375
382
530
505

272
454
342
183

5
25
15
3

148
25

7G)

939
5
25
15
3

148
25

7G)

939
5
25
15
3

148
25

7G)
939

5
25
15
3
148
25
7G)

939

5
25
15
3
148
7G) 25

939
5
25
15
3

148
7G) 25

939
5
25
15
3

148
7G) 25

939
5
25
15
3

148
7G) 25
939

5
25
15
3
148
7G) 25

939

5
25
15
3
Required Manpower Status.
Date : 31.07.2007

SL Section Required Manpower Remarks

01 Winding 35
02 Knitting 365
03 1st Inspection 30
04 Linking 145
05 Stitching & Trimmining 50
06 Mending & Final 50
07 Wash & Iron 35
08 Label 30
09 Folding & Packing 20
10 Quality & Checker 30
11 Store 8
12 Maintainance 8
13 Cleaner 12
14 Security 14
15 D.G.M, Executive, Staff 18
Total Required Manpower 850

____________ ________________
Prepared By Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details Of Sears Order


Up To 19th August 2006

All Figure In DZ Date : 19.08.2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 Sears 60252-C 5G 432 416 -16 18-Jun

02 Sears 1500 5G 666 670 4 17-May

03 Sears 1500 7G 35 35 0 12-Jun

04 Sears 3538 5G 144 142 -2 17-Aug

05 Sears 60252-C 5G 432 415 -17 16-Jul


Sub Total (5GG) 1709 1678 -31

06 Sears 3533 7G 500 492 -8 8-Jun

07 Sears 3531 7G 625 619 -6 15-Jun

08 Sears 3534 7G 237 232 -5 18-Jun

09 Sears 3532 7G 334 332 -2 22-Jun

10 Sears 1511 7G 158 149 -9 13-Aug

11 Sears 3534 7G 667 667 0 10-Jul

12 Sears 3536 7G 417 407 -10 16-Jul

13 Sears 1502 7G 237 234 -3 26-Jul

14 Sears 1504 7G 399 396 -3 27-Jul


Sub Total (7GG) 3574 3528 -46

Total 5283 5206 -77

____________ ________________
Prepared By Plant-In-Charge
Production Details
All Figure In DZ Date : 01.01.2008
Month : December'2007

Total Production
SL Buyer Style No. GG Remarks
Order Qty Target Achive
01 Quelle 8912 5G 542 58 50
02 N.Mann 550/477 5G 125 125 128
03 G.Gold 9 J 020/12714 5G 110 110 112
04 G.Gold 9 J 020/12716 5G 24 24 27
05 G.Gold 9 J 020/12685 5G 280 280 287
06 G.Union 4000/CS-9659 5G 1000 1000 871
07 Atlantic 19056 5G 19 0 20
Sub Total (5GG) 2100 1597 1494
08 Quelle 4000 7G 667 250 286
09 Quelle 8832 7G 708 150 115
10 Quelle 8824 7G 258 258 261
11 Quelle 8832 7G 500 500 587
12 Quelle 8703 7G 333 333 349
13 Branex LM-862 7G 167 167 0
14 Branex LM-863 7G 83 83 0
15 Branex LM-861 7G 267 267 0
16 G.Union CS-6840 7G 700 700 445
17 G.Union ET-6840 7G 17
Sub Total (7GG) 3683 2708 2060

Grand Total 5783 4306 3554

All Figure In DZ Date : 02.10.2007


Month : September'2007

Total Production
SL Buyer Style No. GG Remarks
Order Qty Target Achive
01 Eurofrente 10764 5G 143 143 19
02 Eurofrente 10877 5G 208 208 101
03 Quelle 3835 5G 150 150 154
04 Sfera 0766/8021 5G 161 164 148
Sub Total (5GG) 662 665 422
05 Quelle 8711 7G 133 67 70
06 Quelle 8711-B 7G 342 342 346
07 Quelle 8824 7G 583 483 501
08 Quelle 8824-B 7G 350 350 361
09 Quelle 8821 7G 373 343 397
10 Quelle 3885 7G 133 0 8
11 Quelle 8703 7G 133 133 140
12 Les. Line 18902 7G 412 412 413
13 Les. Line 5870 7G 457 0 18
14 G.Union 7603 7G 334 0 144
15 N.Mann 017/531 7G 200 200 206
Sub Total (7GG) 3451 2330 2603

Grand Total 4113 2996 3025

Production Details
All Figure In DZ Date : 01.09.2007
Month : August'2007

Total Production
SL Buyer Style No. GG Remarks
Order Qty Target Achive
01 Quelle 3835 5G 67 67 69
02 G.Gold 19H987 5G 250 83 87
03 G.Gold 19H542 5G 662 0 41
04 G.Gold 19H542 5G 80 0 27
05 G.Gold 19H542 5G 696 696 625
Sub Total (5GG) 1755 846 849
06 Sears 3547 7G 333 167 173
07 Quelle 8711 7G 133 0 67
08 Quelle 8824 7G 583 583 97
09 Quelle 8821 7G 1200 1200 57
10 Quelle 3885 7G 133 0 130
11 Quelle 8703 7G 192 192 167
12 L.Line 47902 7G 639 0 41
13 Zara 5747/246 7G 833 833 817
14 Zara 5747/296 7G 206 206 209
Sub Total (7GG) 4253 3181 1758

Grand Total 6007 4027 2607

Production Details
All Figure In DZ Date : 05.08.2007
Month : July'2007

Total Production
SL Buyer Style No. GG Remarks
Order Qty Target Achive
01 Quelle 3835 5G 200 200 202
02 Tiara 4H215 5G 162 0 75
03 K-Mart 9H049 5G 1564 1500 1550
04 Sears 1504 5G 167 0 1
05 Sears 1513 5G 233 0 15
06 G.Gold 19H542 5G 379 379 343
07 G.Gold 19H542 5G 80 80 54
08 G.Gold 19H542 5G 696 160 82
Sub Total (5GG) 3481 2319 2322
09 Sears 1535 7G 167 0 1
10 Sears 3544 7G 317 303 310
11 Sears 3547 7G 333 333 170
12 Quelle 8820 7G 443 443 762
13 Quelle 3885 7G 333 333 345
14 Quelle 8703 7G 225 225 236
15 Les. Line 47902 7G 639 622 630
16 Zara 5747/246 7G 458 0 19
Sub Total (7GG) 2915 2260 2473

Grand Total 6396 4579 4795

Production Details
All Figure In DZ Date : 01.07.2007
Month : June'2007

Total Production
SL Buyer Style No. GG Remarks
Order Qty Target Achive
01 N.Mann 138/751 5G 42 42 44
02 N.Mann 327/052 5G 42 42 41
03 G.Union 8480 5G 1000 0 51
04 Tiara 4H215 5G 1006 767 724
05 Sears 1537 5G 375 0 121
06 Sears 1504 5G 167 167 170
07 Sears 1513 5G 233 233 223
08 G.Gold(K-Mart) 9H 049 5G 1564 897 37
Sub Total (5GG) 4428 2148 1411
09 Sears 3543 7G 309 200 232
10 Sears 1535 7G 167 167 171
11 Sears 3544 7G 317 0 13
12 Quelle 3204 7G 667 125 160
13 Quelle 8820 7G 3010 3010 2317
14 Quelle 3885 7G 133 133 138
Sub Total (7GG) 4602 3635 3031

Grand Total 9030 5783 4442

Production Details
All Figure In DZ Date : 01.06.2007
Month : May'2007

Total Production
SL Buyer Style No. GG Remarks
Order Qty Target Achive
01 Quelle 3212 5G 333 225 233
02 Great Union 8480 5G 1000 933 899
03 Tiara 4H215/28813 5G 408 0 232
04 Sears VLF7-1537 5G 292 292 263
05 Sears VLF7-1500 5G 99 0 75
06 Sears VLF7-1513 5G 233 233 0
07 N.Mann 138/751 5G 42 42 0
08 N.Mann 327/052 5G 42 42 0
Sub Total (5GG) 2449 1767 1702
09 Sears TSF7-3542 7G 123 98 110
10 Sears TSF7-3543 7G 309 309 84
11 Sears TSF7-3544 7G 214 214 219
12 Sears VLF7-1535 7G 167 167 0
13 Quelle 2479 7G 142 100 109
14 Quelle 3204 7G 667 667 525
15 Great Union 1603 7G 300 300 307
16 Tiara 4H216/28659 7G 500 333 381
17 Eurofrente 10394 7G 1223 917 959
Sub Total (7GG) 3643 3103 2694

Grand Total 6092 4871 4396

Production Details
All Figure In DZ Date : 01.05.2007
Month : April'2007

Total Production
SL Buyer Style No. GG Remarks
Order Qty Target Achive
01 Quelle 3733 5G 333 333 245
02 Quelle 3885 5G 208 208 206
03 Quelle 3915 5G 133 133 136
04 Quelle 3212 5G 333 0 103
05 N.Mann 138/751 5G 83 83 62
06 N.Mann 327/052 5G 83 83 45
07 Sears VLF7-1500 5G 568 568 580
08 Sears VLF7-1500-B 5G 188 188 192
09 Sears VLF7-1500-C 5G 50 50 34
10 Sears VLF7-1504/44 5G 83 83 0
11 Sears VLF7-1513/50 5G 117 117 0
12 G.Union 17200 5G 500 0 34
13 G.Union 8480 5G 1000 0 61
Sub Total (5GG) 3680 1847 1698
14 G.Union 1604 7G 300 167 231
15 Quelle 3885 7G 333 333 322
16 Quelle 8711 7G 367 367 373
17 Quelle 2479 7G 142 142 146
18 Quelle 2479-B 7G 142 0 38
19 Tiara 28658 7G 500 500 505
20 Tiara 28659 7G 500 500 126
21 Eurofrente 10394 7G 1223 0 277
22 Sears TSF6-3542 7G 123 123 20
23 Sears TSF6-3544 7G 214 214 0
Sub Total (7GG) 3842 2344 2038

Grand Total 7522 4191 3736

Production Details
All Figure In DZ Date : 01.04.2007
Month : March'2007

Total Production
SL Buyer Style No. GG Remarks
Order Qty Target Achive
01 G.Union 1612 5G 300 300 259
02 G.Union 17200 5G 500 500 474
03 G.Union 17201 5G 500 500 507
04 G.Union 7600 5G 1000 208 255
05 N.Mann 327/052 5G 83 83 86
06 N.Mann 138/751 5G 83 83 74
05 Quelle 3733 5G 333 333 57
06 Quelle 3835 5G 208 0 40
Sub Total (5GG) 3008 2008 1752
08 G.Union 7606 7G 700 0 134
09 G.Union 7603 7G 700 533 575
10 G.Union 7613 7G 500 500 510
11 G.Union 1613 7G 300 300 299
12 G.Union 1603 7G 300 300 306
12 G.Union 1604 7G 300 300 81
13 Quelle 3885 7G 333 333 23
14 Eurofrente 10394(EX-09447) 7G 527 527 0
Sub Total (7GG) 3660 2794 1928

Grand Total 6668 4802 3680

Production Details
All Figure In DZ Date : 01.03.2007
Month : February'2007

Total Production
SL Buyer Style No. GG Remarks
Order Qty Target Achive
01 G.Union 1615 5G 700 208 94
02 G.Union 7609 5G 1000 542 901
03 G.Union 7600 5G 1000 1000 707
04 G.Union 1612 5G 300 0 42
Sub Total (5GG) 3000 1750 1743
08 Quelle 8711 7G 525 275 273
09 Quelle 8706 7G 150 150 154
10 G.Union 7604 7G 700 83 109
11 G.Union 7605 7G 1000 375 332
12 G.Union 7606 7G 700 700 574
12 G.Union 7603 7G 700 700 134
13 G.Union 1613 7G 300 0 7
Sub Total (7GG) 4075 2283 1583

Grand Total 7075 4033 3326

Production Details
All Figure In DZ Date : 01.02.2007
Month : January'2007

Total Production
SL Buyer Style No. GG Remarks
Order Qty Target Achive
01 N.Mann 550/477 5G 100 100 106
02 Quelle 7692 5G 333 258 256
03 Quelle 3212 5G 333 0 11
04 Quelle 3812 5G 100 100 104
05 G.Union 7615 5G 700 700 614
06 G.Union 7609 5G 1000 0 109
07 G.Union 7600 5G 1000 0 56
Sub Total (5GG) 3567 1158 1256
08 Quelle 8711 7G 833 525 245
09 Quelle 7452 7G 133 0 57
10 Quelle 3252 7G 267 0 73
11 Quelle 8706 7G 150 150 0
12 G.Union 7604 7G 700 333 605
13 G.Union 7605 7G 1000 1000 683
Sub Total (7GG) 3083 2008 1663

Grand Total 6650 3167 2919


GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG
Shipment Details
All Figure In DZ Date : 01.07.2008
Month : June' 2008

Total Shipped Short/Over Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Li & Fung RC-45 5G 23 Partial 6-Jan
665
02 Li & Fung RC-45 5G 140 Partial 18-Jun
03 G. Union 4000/CS-9659 5G 500 Partial 18-Jun
1000
04 G. Union 4000/CS-9659 5G 500 Balance Qty 19-Jun
05 G.Gold 9L446 5G 542 529 -14 18-Jun
06 Sears 3504 5G 257 255 -2 26-Jun Quality Problem
07 Sears 3517 5G 467 297 Partial 26-Jun
Sub Total (5GG) 2931 2243 -16
08 G.Gold 9L524 7G 283 136 6-Jun
09 Eurofrente 11447 7G 1100 1100 10-Jun
10 G.Gold 4004/CS-898 7G 500 400 22-Jun
11 Sears 3527 7G 166 110 Partial 26-Jun
12 Sears 3528 7G 126 84 Partial 26-Jun
Sub Total (7GG) 2175 1830 0

Grand Total (5+7) GG 5106 4073 -16

Month : May' 2008


Total Shipped Short/Over Ship
SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Branex LM-869 5G 133 133 27-May
02 Branex LM-870 5G 133 131 27-May
03 Branex LM-871 5G 133 133 27-May
04 Branex LM-874 5G 133 134 27-May
Sub Total (5GG) 533 532 0
05 Eurofrente 11447 7G 2500 Partial 20-May
4150
06 Eurofrente 11447 7G 550 Balance Qty 30-May
07 K-Mart 9L440 7G 2092 2083 -10 31-May
Sub Total (7GG) 6242 5133 -10

Grand Total (5+7) GG 6775 5664 -10

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 03.05.2008

Month : April' 2008


Total Shipped Short/Over Ship
SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
Ttl Qty 3900 Pcs
01 Quelle 7374 5G 269 92 Partial 17-Apr 3226 Pcs GKL
674 Pcs G.S.G.L-1

02 G.Union 84007/ET-8001 5G 500 424 Partial 18-Apr

03 G.Union 84007/ET-8001 5G 76 Balance Qty 19-Apr

04 G.Union 1011CV/CS-8000 5G 300 300 21-Apr

05 G.Gold 29L275 5G 300 296 -4 21-Apr Quality Problem

06 Quelle 7374 5G 102 Balance Qty 24-Apr

07 Quelle 3835 5G 357 355 -2 24-Apr Emb Problem

Knitting Qty. Can


08 Quelle 7374 5G 65 -10 30-Apr Not done For Yarn
Problem

Sub Total (5GG) 1726 1710 -16

09 Quelle 3423 7G 83 83 10-Apr

10 G.Union 4010/CS-8003/1 7G 1000 1000 13-Apr

11 G.Union 84016/ET-8037 7G 500 500 18-Apr


Sub Total (7GG) 1583 1583 0

Grand Total (5+7) GG 3309 3293 -16

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.04.2008

Month : March' 2008


Total Shipped Short/Over Ship
SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 G.Union 8400/ET-9659 5G 500 424 Partial 5-Mar

02 G.Union 4000GT/CS-9659 5G 300 300 10-Mar

03 G.Union 8400/ET-9659 5G 0 76 Balance Qty 10-Mar

04 G.Union 84006/ET-8000 5G 500 500 10-Mar

05 G.Union 4016/CS-8037 5G 1000 1000 25-Mar

06 N.Mann 500/477 5G 133 135 2 27-Mar

07 Atlantic 14256 5G 182 183 29-Mar

08 G.Union 3805/CK-8013 5G 300 300 31-Mar

Sub Total (5GG) 2915 2918 2

09 G.Union 84005/ET-6840 7G 500 424 Partial 5-Mar

10 G.Union 4004/CS-898 7G 700 400 Partial 10-Mar


11 G.Union 84004/ET-898 7G 300 200 Partial 10-Mar

12 G.Union 4005GT/CS-6840 7G 300 300 10-Mar

13 G.Union 84005/ET-6840 7G 0 76 Balance Qty 10-Mar

14 G.Union 4004/CS-898 7G 0 300 Balance Qty 10-Mar

15 G.Union 84004/ET-898 7G 0 100 Balance Qty 10-Mar

4036GT/
16 G.Union 7G 300 300 24-Mar
CS-8034
4036 P/
17 G.Union 7G 500 500 25-Mar
CS-8034
4036 Line
18 G.Union CS-8034
7G 200 200 25-Mar

19 Branex LBW-9060 7G 283 284 1 31-Mar

Sub Total (7GG) 3083 3084 1

Grand Total (5+7) GG 5998 6002 3

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.03.2008
Month : February' 2008

Total Shipped Short/Over Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 Atlantic 15684 5G 617 167 Partial 20-Feb

02 G.Union 4006/CS-8000 5G 500 432 Partial 23-Feb

03 Atlantic 15684 5G 450 451 1 24-Feb

04 G.Union 4000/CS9659 5G 700 700 0 25-Feb

05 G.Union 4006/CS-8000 5G 500 68 Balance Qty 26-Feb

Recvd from
06 G.Union 4006/CS-8000 5G 58 35 0 Orchid Swt.Knitting &
Linking Proces

07 Atlantic 19056 5G 25 13 0 Rcvd From


GSGL-1 Knitting
Sub Total (5GG) 2850 1866 1

08 Branex LM-861 7G 267 266 0 7-Feb

09 Branex LM-863 7G 83 82 -1 7-Feb Assortment Problem

10 G.Gold 9L-119/2770 7G 750 750 0 9-Feb

11 G.Gold 9L-120/2772 7G 600 600 0 11-Feb

12 Branex LM-862 7G 167 166 0 14-Feb

13 G.Union 4005/CS-6840 7G 400 400 0 25-Feb

14 Zara 5747/001 12G 48 48 0 15-Feb

Sub Total (7GG) 2315 2313 -1

Grand Total (5+7) GG 5165 4178 0


______________________ __________________ ________________ ______________
Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details

All Figure In DZ Date : 01.02.2008

Month : January' 2008

Total Shipped Short/Over Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 N.Mann 8912 5G 133 134 1 24-Jan

Sub Total (5GG) 133 134 1

07 Quelle 8832 5G 500 515 15 10-Jan

08 Quelle 8824 7G 258 259 1 10-Jan

09 Quelle 8703 7G 333 336 3 24-Jan

10 Zara 5747/521 12G 18 18 0 3-Jan

11 Zara 5747/522 12G 83 83 0 18-Jan


12 Safara 816/8007 12G 182 182 0 28-Jan

Sub Total (7GG) 1375 1393 18

Grand Total (5+7) GG 1508 1527 19

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details

All Figure In DZ Date : 02.12.2007

Month : November' 2007

Total Shipped Short/Over Ship


SL Buyer Style/P.O No GG Remarks
SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 Quelle 3835 5G 275 276 1 22-Nov

01 Eurofrente 10764 5G 143 143 0 29-Nov

02 Eurofrente 10877 5G 208 208 0 29-Nov

Sub Total (5GG) 626 627 1

03 Les. Line 5870 7G 441 441 0 3-Nov

04 Les. Line 5872 7G 483 483 0 13-Nov

05 Les. Line 5868 7G 119 119 0 13-Nov

06 Quelle 8820 7G 542 542 0 22-Nov

07 G.Gold 012630 7G 500 498 -2 29-Nov

08 Cellio V-Stripe 12G 83 33 Partial 6-Nov

Sub Total (7GG) 2168 2116 -2

Grand Total (5+7) GG 2794 2743 -1

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details

All Figure In DZ Date : 03.10.2007

Month : October' 2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 Sfera 0766/8021 5G 161 140 0 20-Oct

01 Sfera 0766/8021 5G 161 21 0 23-Oct

02 N.Mann 017/531 5G 200 200 0 4-Oct

Sub Total (5GG) 361 221 0

03 Quelle 8824 7G 350 357 7 10-Oct

04 Quelle 8703 7G 138 137 -1 10-Oct

05 Quelle 3512 7G 250 251 1 25-Oct

06 Quelle 8703 7G 267 271 4 31-Oct

07 Quelle 3204 7G 142 142 0 31-Oct

08 Les. Line 18902 7G 407 407 0 11-Oct

09 G.Union 7603 7G 334 334 0 31-Oct

Sub Total (7GG) 1888 1899 11

Grand Total (5+7) GG 2249 2120 11


______________________ __________________ ________________ ______________
Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.10.2007
Month : September' 2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 G. Gold 19H987 5G 258 176 Partial 2-Aug

02 Quelle 3835 5G 150 146 -4 26-Sep 1752

Sub Total (5GG) 408 322 -4

03 Quelle 8821 7G 1200 68 Prtial 6-Sep

04 Seras 3549 7G 250 125 Partial 7-Sep

05 Zara 5747/296 7G 206 46 Nill 1-Sep

06 Zara 5747/296 7G 160 27 Partial 7-Sep

07 Zara 5747/296 7G 160 133 12-Sep


08 Quelle 8821 7G 373 381 0 13-Sep

09 Quelle 8703 7G 192 196 0 13-Sep

10 Quelle 3885 7G 67 67 13-Sep

11 Quelle 8824 7G 583 567 -16 14-Sep

12 Quelle 8711 7G 342 329 -13 26-Sep

13 Quelle 8711 7G 133 134 0 26-Sep

14 Quelle 3885 7G 133 131 -2 26-Sep


Sub Total (7GG) 3799 2204 -31
15 Zara 5747/260 7G 954 236 Partial 20-Sep Rcvd. From Dhaka

16 Zara 5747/260 7G 954 233 Partial 23-Sep Rcvd. From Dhaka

17 Zara 5747/260 7G 954 321 Partial 23-Sep Rcvd. From Dhaka


Sub Total (12GG) 2862 790 0

Grand Total (5+7+12) GG 7069 3316 -35

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details

All Figure In DZ Date : 01.09.2007


Month : August' 2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 G.Gold 19H542 5G 459 461 12-Aug

02 G.Gold 19H542/12228 5G 696 657 Partial 19-Aug

03 G.Gold 19H542/12228 5G 696 39 Partial 27-Aug

Sub Total (5GG) 1851 1157 0

12 Les.Line 47902W 7G 639 626 -13 13-Aug

14 Sears 3547 7G 333 335 0 16-Aug

5747/246
15 Zara 7G 375 375 0 18-Aug
36362

5747/246
16 Zara 7G 458 458 0 18-Aug
36361

Sub Total (7GG) 1805 1794 -13

Grand Total (5+7) GG 3656 2951 -13


______________________ __________________ ________________ ______________
Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 05.08.2007
Month : July' 2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Sears 1537 5G 292 292 0 4-Jul

02 N.Mann 138/751 5G 42 42 0 6-Jul

03 N.Mann 327/052 5G 42 43 0 6-Jul

04 Tiara 4H215/28875 5G 162 162 0 8-Jul

05 Tiara 4H215/28803 5G 338 338 0 8-Jul

06 Quelle 3835 5G 200 192 8 13-Jul

07 Sears 1504 5G 167 165 2 18-Jul

08 Sears 1513 5G 233 231 2 18-Jul

09 K-Mart 9H049/12186 5G 1564 780 Partial 22-Jul


10 K-Mart 9H049/12186 5G 1564 784 Partial 29-Jul

11 Sears 1500 5G 50 50 0 29-Jul

12 Sears 1537 5G 83 84 0 29-Jul


Sub Total (5GG) 4736 3162 12
12 Quelle 8820 7G 879 872 7 6-Jul

14 Sears 1535 7G 167 167 0 8-Jul

15 Sears 3543 7G 309 309 0 11-Jul

16 Sears 3544 7G 317 318 0 12-Jul

17 Quelle 8820 7G 510 496 14 12-Jul

18 Quelle 8820 7G 283 293 0 27-Jul

19 Quelle 3885 7G 333 330 3 27-Jul

20 Quelle 8703 7G 225 231 0 27-Jul


Sub Total (7GG) 3024 3016 24

21 Eurofrente 10610 12G 108 108 0 31-Jul

Sub Total (12GG) 108 108 0

Grand Total (5+7+12) GG 7868 6286 36

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Shipment Details
All Figure In DZ Date : 01.07.2007
Month : June'2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 G.Union 8480 5G 1000 1000 0 12-Jun

02 Tiara 4H215/28813 5G 408 408 0 23-Jun

03 Tiara 4H215/28802 5G 100 100 0 23-Jun

Sub Total (5GG) 1508 1508 0

04 G.Union 1603 7G 300 300 0 2-Jun

05 Sears 3542 7G 123 124 0 12-Jun

06 Sears 3544 7G 214 215 0 12-Jun

07 Quelle 2479 7G 142 145 0 14-Jun

08 Quelle 3204 7G 667 661 7 14-Jun

09 Quelle 8820 7G 2500 1621 Partial 28-Jun

10 Quelle 3885 7G 133 134 0 28-Jun

Sub Total (7GG) 4079 3200 7

Grand Total 5587 4708 7

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01

02

03

04

05
Total
______________________ __________________ ________________ ______________
Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.06.2007
Month : May'2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 N.Mann 138/751 5G 42 42 0 9-May

02 N.Mann 327/052 5G 42 42 0 9-May 504

03 Sears VLF7-1500 5G 188 188 0 15-May

04 Quelle 3212 5G 333 329 4 29-May Quality Problem

05 Sears VLF7-1500 5G 50 50 0 31-May

Sub Total (5GG) 655 651 4

06 Tiara 4H216/28658 7G 500 500 0 7-May

07 Quelle 2479 7G 141 142 0 9-May

08 Eurofrente 10394 7G 800 800 0 22-May

09 Tiara 4H216/28659 7G 500 498 2 21-May Quality Problem

10 Eurofrente 10394 7G 423 423 0 31-May

Sub Total (7GG) 2364 2363 0

Grand Total 3019 3014 4


hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01

02

03

04

05
Total

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.05.2007
Month : April'2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 N.Mann 138/751 5G 83 83 5-Apr

02 N.Mann 327/052 5G 83 83 5-Apr

03 Quelle 3733 5G 333 333 12-Apr


04 Quelle 3835 5G 208 202 6 12-Apr Embd. Problem

05 Quelle 3915 5G 133 134 0 18-Apr

03 G.Union 17200 5G 500 500 22-Apr

04 Sears VLF7-1500 5G 568 569 28-Apr

Sub Total (5GG) 1908 1904 6

06 G.Union 7613 7G 500 500 9-Apr

07 G.Union 1603 7G 300 300 9-Apr

07 G.Union 1604 7G 300 300 22-Apr

08 Quelle 3885 7G 333 331 2 12-Apr Print Problem

09 Quelle 8711 7G 367 369 27-Apr

Sub Total (7GG) 1800 1800 2

Grand Total 3708 3704 8

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01

02

03

04

05
Total

______________________ __________________ ________________ ______________


Production-Co-Ordinator Finishing-In-Charge Knitting-In-Charge Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.04.2007
Month : March'2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 G.Union 7609 5G 1000 1000 0 1-Mar

02 G.Union 7615 5G 700 168 Partial 11-Mar

03 G.Union 7600 5G 1000 168 Partial 11-Mar

04 G.Union 7600 5G 832 832 Partial 16-Mar

05 G.Union 17201 5G 500 500 0 31-Mar

Sub Total (5GG) 4032 2668 0

06 G.Union 7606 7G 700 168 Partial 11-Mar

07 G.Union 7603 7G 700 168 Partial 13-Mar

08 G.Union 7606 7G 532 532 0 16-Mar

09 G.Union 7603 7G 532 532 0 29-Mar

10 G.Union 1613 7G 300 300 0 29-Mar

Sub Total (7GG) 2764 1700 0

Grand Total 6796 4368 0

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01

02

03
04

05

06

07

08
Total

____________ ________________
Prepared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.04.2007
Month : March' 2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 N.Mann 550/477 5G 100 103 1-Feb

02 G.Union 7615 5G 700 532 Partial 28-Feb

Sub Total (5GG) 800 635 0


Due To Printing
03 Quelle 8706 7G 833 818 -15 1-Feb
Problem
Due To Yarn Dying
04 Quelle 8711 7G 525 502 -23 22-Feb
Problem

05 Quelle 8706 7G 150 151 0 22-Feb

06 G.Union 7604 7G 700 700 0 21-Feb

07 G.Union 7605 7G 1000 1000 0 21-Feb

Sub Total (7GG) 3208 3171 -38

Grand Total 4008 3806 -38


hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01

02

03

04

05

06

07

08
Total

____________ ________________
Prepared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.03.2007
Month : February' 2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 N.Mann 550/477 5G 100 103 1-Feb

02 G.Union 7615 5G 700 532 Partial 28-Feb

Sub Total (5GG) 800 635 0


Due To Printing
03 Quelle 8706 7G 833 818 -15 1-Feb
Problem
Due To Yarn Dying
04 Quelle 8711 7G 525 502 -23 22-Feb
Problem

05 Quelle 8706 7G 150 151 0 22-Feb

06 G.Union 7604 7G 700 700 0 21-Feb

07 G.Union 7605 7G 1000 1000 0 21-Feb

Sub Total (7GG) 3208 3171 -38

Grand Total 4008 3806 -38

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01

02

03

04

05

06

07

08
Total

____________ ________________
Prepared By Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.02.2007
Month : January' 2007

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 Quelle 3212 5G 333 328 -5 11-Jan

02 Quelle 7692 5G 333 322 -11 18-Jan

03 Quelle 3812 5G 100 100 0 25-Jan


Sub Total (5GG) 766 750 -16
05 Quelle 3252 7G 267 265 -2 11-Jan

06 Quelle 7452 7G 133 134 0 25-Jan

07 7G

08 7G

09 7G
Sub Total (7GG) 400 399 -2

Grand Total 1166 1149 -18

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01

02

03
04

05

06

07

08
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 06.01.2007
Month : December' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 N.Mann 550/477 5G 100 101 0 20-Dec

02 5G

03 5G

04 5G

05 5G
Sub Total (5GG) 100 101 0
05 Quelle 8703 7G 212 202 11 6-Dec Quality Problem
06 Quelle 8711 7G 833 781 52 28-Dec Due To Over Weight

07 7G

08 7G

09 7G

10 7G

11 7G

12 7G
Sub Total (7GG) 1045 983 63

Grand Total 1145 1084 63

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01

02

03
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Shipment Details
All Figure In DZ Date : 02.12.2006
Month : November' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date

01 N.Mann 550/477 5G 83 83 0 9-Nov

02 Eurofrente 09769 5G 487 487 0 16-Nov

03 Eurofrente 09770 5G 150 150 0 16-Nov

04 Eurofrente 09750 5G 521 513 8 18-Nov

05 Quelle 3795 5G 125 75 Partial 30-Nov


Sub Total (5GG) 1366 1308 8
05 Quelle 7392 7G 210 190 20 2-Nov

06 Quelle 7452 7G 175 165 Partial 9-Nov

07 Quelle 3955 7G 183 83 100 9-Nov 100 DZ Stock Lot

08 Quelle 3792 7G 58 59 0 9-Nov

09 Quelle 7452 7G 275 246 29 23-Nov

10 Quelle 7392 7G 58 62 0 23-Nov

11 Quelle 8703 7G 2083 1871 Partial 30-Nov

12 Leasure Line 17908 7G 63 23 Partial 5-Nov Rcvd. From Savar Swtr.


Sub Total (12GG) 3105 2699 149
15 Zara 5747/260 12G 102 7 Partial 9-Nov
Sub Total (7GG) 102 7

Grand Total 4573 4014 157

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised

01

02

03
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.11.2006
Month : October' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 G.Gold 1D159 3G 42 13 Partial 21-OctRcvd From SAVAR Swtr.
Sub Total (1.5GG) 42 13
02 G.Gold 1D158/10251 5G 546 216 Partial 2-Oct

03 G.Gold 1D158/10251 5G 268 200 Partial 10-Oct

04 G.Gold 1D158/10251 5G 130 36 Partial 11-Oct

05 G.Gold 1D158/10249 5G 100 98 2 11-Oct Assortment Problem


Sub Total (5GG) 1044 550 2
06 Sears VSL7-1500 7G 200 200 0 1-Oct

07 Sears TSF6-3534 7G 124 123 1 12-Oct

08 Quelle 3732 7G 367 132 Partial 5-Oct

09 Quelle 3905 7G 200 73 Partial 5-Oct

10 Quelle 3732 7G 234 100 Partial 6-Oct

11 Quelle 3905 7G 127 29 Partial 6-Oct

12 Quelle 7294 7G 208 74 Partial 6-Oct


13 Quelle 8609 7G 433 124 Partial 12-Oct

14 Quelle 3732 7G 134 122 13 12-Oct Printing Problem

15 Quelle 3905 7G 98 87 11 12-Oct Quality Problem

16 Quelle 3792 7G 408 129 Partial 12-Oct

17 Quelle 7294 7G 134 119 15 13-Oct


Quality & Printing Problem

18 Quelle 8609 7G 309 303 6 19-Oct Yarn Shading Problem

19 Quelle 3792 7G 344 345 19-Oct

20 Quelle 7392 7G 250 40 Partial 21-Oct

21 Leasure Line 17908 7G 185 34 Partial 20-OctRcvd From SAVAR Swtr.

22 Leasure Line 17908 7G 185 17 Partial 21-OctRcvd From SAVAR Swtr.


Sub Total (7GG) 3940 2051 46

Grand Total 5026 2614 48

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 03.10.2006
Month : September' 2006
Total Shipped Short Ship
SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Zara 5747/703 1.5G 409 134 0 19-Sep Savar Sweater

02 Zara 5747/703 1.5G 132 46 Partial 25-Sep Savar Sweater


Sub Total (1.5GG) 541 180
03 G.Gold 21D050CT/10074 5G 330 330 0 5-Sep

04 G.Gold 21D050CT/10075 5G 220 220 0 5-Sep

05 Rajan MK-413609 5G 400 400 0 6-Sep

06 Rajan MK-413612 5G 400 400 0 6-Sep

07 Rajan MK-413608 5G 300 300 0 6-Sep

08 Sears TSF6-3540 5G 200 201 0 11-Sep

09 Sears TSF6-3542 5G 217 216 1 13-Sep

10 Bay-City 303696/30 5G 161 56 Partial 18-Sep Savar Sweater

11 G.Gold 1D158/010251 5G 1380 834 Partial 30-Sep


Sub Total (5GG) 3608 2957 1
12 Quelle 3575 7G 150 147 3 8-Sep

13 Quelle 8602 7G 233 46 Partial 8-Sep

14 Rajan LK-41CROP 7G 300 104 Partial 11-Sep Savar Sweater

15 Quelle 8602 7G 187 181 6 15-Sep

16 Quelle 8609 7G 408 274 Partial 15-Sep

17 Quelle 8609 7G 135 130 5 21-Sep

16 Quelle 8602 7G 208 213 0 28-Sep

17 Sears 3534 7G 157 158 0 28-Sep


Sub Total (7GG) 1778 1253 14

Grand Total 5927 4390 15

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
Total
____________ ________________________ ________________
Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.08.2006
Month : July' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Tiara 4D-769 3G 400 160 3-Jul OSL
Sub Total (3GG) 400 160
02 Quelle 8614 5G 1008 540 Partial 7-Jul

03 Quelle 8614 5G 1680 469 Partial 13-Jul

04 Quelle 3795 5G 125 89 Partial 13-Jul

05 Quelle 3795 5G 36 37 0 20-Jul

06 Quelle 3595 5G 167 157 10 20-Jul

07 Quelle 8614 5G 1213 612 Partial 21-Jul

08 Quelle 8614 5G 600 589 11 28-Jul

09 Sears 60252-C 5G 432 415 17 16-Jul


Sub Total (5GG) 5261 2908 38
10 M.Hidary FGB06821 7G 42 17 0 3-Jul OSL

11 Sears 3534 7G 667 667 0 10-Jul

12 Sears 3536 7G 417 228 Partial 16-Jul

13 Sears 1502 7G 237 234 3 26-Jul

14 Sears 1504 7G 399 172 Partial 27-Jul

15 Quelle 8602 7G 152 124 Partial 13-Jul

16 Quelle 8602 7G 293 142 Partial 7-Jul


17 Quelle 3094 7G 500 112 Partial 21-Jul

18 Quelle 3094 7G 388 271 Partial 28-Jul

19 Quelle 3142 7G 67 66 1 20-Jul

20 Wehmeyer WR-08 7G 200 135 Partial 13-Jul

21 Wehmeyer WR-08 7G 65 63 2 20-Jul

22 N.Mann 017/477 7G 146 83 Partial 28-Jul


Sub Total (7GG) 3573 2314 6

Grand Total 9234 5382 44

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.07.2006
Month : June' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Quelle 8614 5G 1675 1253 Partial 1-Jun

02 Eurofrente 09181 5G 186 186 0 9-Jun

03 Eurofrente 09182 5G 113 107 6 9-Jun


04 Quelle 8614 5G 422 418 4 9-Jun

05 Quelle 3023 5G 150 142 8 15-Jun

06 Quelle 3033 5G 150 140 10 15-Jun

07 Quelle 7214 5G 150 141 9 15-Jun

08 Sears 60252-C 5G 432 416 16 18-Jun

09 Quelle 8614 5G 2021 337 Partial 22-Jun

10 Quelle 3795 5G 175 165 10 22-Jun

11 Quelle 8614 5G 2021 676 Partial 29-Jun


Sub Total (5GG) 7495 3981 63
01 Quelle 2667 7G 267 40 Partial 1-Jun

02 Sears 3533 7G 500 492 8 8-Jun

03 N.Mann 017/531 7G 271 263 7 9-Jun 3252

04 N.Mann 017/477 7G 146 140 6 9-Jun

05 Sears 1500 7G 35 35 0 12-Jun

06 Sears 3531 7G 625 619 6 15-Jun

07 Sears 3534 7G 237 232 5 18-Jun

08 Sears 3532 7G 334 332 1 22-Jun

09 Quelle 3732 7G 167 155 12 22-Jun

10 Eurofrente 09447 7G 460 460 0 26-Jun

11 Quelle 8602 7G 658 365 Partial 29-Jun


Sub Total (7GG) 3700 3133 45

Grand Total 11195 7114 108

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
Total
____________ ________________________ ________________
Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.06.2006
Month : May' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Scope 13463 5G 40 40 0 2-May

02 N.Mann 550/477 5G 67 67 0 4-May

03 G.Union S-372 5G 100 98 2 7-May

04 G.Union S-373 5G 100 100 0 7-May

05 Rajan MK-413315 5G 300 294 6 8-May

06 Sears 1500 5G 666 670 0 17-May

07 N.Mann 550/477 5G 75 76 0 25-May


Sub Total (5GG) 1348 1345 8
01 Quelle 2627 7G 200 200 0 10-May

02 Quelle 2611 7G 200 202 0 10-May

03 Quelle 3295 7G 183 179 4 11-May

04 Quelle 2620 7G 233 231 2 11-May

05 Quelle 3792 7G 166 166 0 17-May

06 Quelle 2619 7G 233 229 4 17-May

07 Quelle 8602 7G 325 324 1 17-May

08 Quelle 2615 7G 292 289 3 19-May

09 Quelle 2667 7G 267 230 Partial 25-May

10 Quelle 2479 7G 200 202 0 25-May

11 Quelle 2670 7G 333 337 0 25-May

12 Eurofrente 09447 7G 900 500 Partial 27-May

13 G.Union CS-3029 7G 350 350 0 31-May


14 G.Union ET-6030 7G 104 104 Partial 31-May
Sub Total (7GG) 3986 3543 14

Grand Total 5334 4888 22

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.05.2006
Month : April' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Quelle 7214 5G 150 147 3 27-Apr

02 Quelle 3033 5G 150 150 0 27-Apr

03 Quelle 3023 5G 150 151 0 27-Apr

04 Scope 13463 5G 200 201 0 30-Apr

05 Scope 13465 5G 200 200 0 30-Apr


Sub Total (5GG) 850 849 3
01 G.Union 8497 7G 188 188 0 3-Apr

02 G.Union L-444 7G 300 299 1 10-Apr

03 Quelle 3732 7G 133 134 0 19-Apr

04 Quelle 3792 7G 167 167 0 27-Apr

05 Quelle 3792(B) 7G 342 339 3 27-Apr

Sub Total (7GG) 1130 1127 4

Grand Total 1980 1976 7

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
GLOBAL KNIT-WEAR LTD
269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.04.2006
Month : March' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Zara 5747/541 7G 201 201 0 7-Mar

02 Zara 5747/541 7G 100 100 0 9-Mar

03 Zara 5747/541 7G 241 241 0 16-Mar

Sub Total (5GG) 542 542 0


01 N.Mann 429/546 7G 308 311 0 2-Mar

02 Eurofrente 08997 7G 50 50 0 2-Mar

03 Quelle 3732 7G 192 192 0 16-Mar

04 Quelle 8602 7G 700 701 0 29-Mar

Sub Total (7GG) 1250 1254 0

Grand Total 1792 1796 0

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.03.2006
Month : February' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 5G

02 5G

Sub Total (5GG) 0 0 0


01 Quelle 8609 7G 900 852 48 3-Feb Yarn & Shading Problem

02 Quelle 7382 7G 100 93 7 8-Feb Printing Problem

03 Quelle 3732 7G 67 67 0 8-Feb


04 Quelle 8609 7G 708 709 1 17-Feb

05 Eurofrente 08997 7G 90 40 Partial 25-Feb

Sub Total (7GG) 1865 1761 56

Grand Total 1865 1761 56

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Shipment Details
All Figure In DZ Date : 01.02.2006
Month : January' 2006

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Zara 5747/504 5G 321 316 5 9-Jan

02 5G

Sub Total (5GG) 321 316 5


05 Quelle 8603(B) 7G 650 636 14 5-Jan Shading Problem

06 Quelle 7382 7G 100 99 1 5-Jan Assortment Problem

07 Quelle 3732 7G 67 67 0 5-Jan

08 Quelle 8609 7G 600 600 0 25-Jan

Sub Total (7GG) 1417 1402 15

Grand Total 1738 1718 20

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total
____________ ________________________ ________________
Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.12.2005
Month : December' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Zara 574/600 5G 596 596 0 1-Dec

02 Putteman RH3335TG 5G 100 100 0 12-Dec

Sub Total (5GG) 696 696 0


05 Sears 2486 7G 406 406 0 1-Dec

06 N.Mann 317/349 7G 708 700 8 8-Dec

07 Quelle 8602 7G 833 844 0 15-Dec

08 Quelle 8603 7G 1250 1250 0 29-Dec

Sub Total (7GG) 3197 3200 8


Grand Total 3893 3896 8

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.12.2005
Month : November ' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Eurofrente 9029 5G 16 16 0 7-Nov

02 5G
03 5G

04 5G

05 5G

06 5G

Sub Total (5GG) 16 16 0


05 Quelle 8602 7G 1333 1333 0 2-Nov

06 Bay-City 451 7G 1800 830 Partial 15-Nov

07 Bay-City 451 7G 1800 75 Partial 16-Nov

08 Bay-City 451 7G 1800 395 Partial 17-Nov

09 Bay-City 451 7G 1800 265 Partial 18-Nov

10 Quelle 8602 7G 1000 993 7 24-Nov

11 Bay-City 451 7G 35 35 26-Nov

12 Sears 07MCS6-2472 7G 267 267 0 27-Nov

13 7G
Sub Total (7GG) 9835 4193 7

Grand Total 9851 4209 7

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.11.2005
Month : October ' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Sears 1539 5G 153 155 0 10-Oct

02 Sears 1538 5G 112 113 0 10-Oct

03 Sears 1537 5G 99 99 0 10-Oct

04 Sears 1536 5G 137 137 0 10-Oct

05 Eurofrente 09209 5G 140 140 0 23-Oct

06 Eurofrente 08206 5G 360 360 0 23-Oct

Sub Total (5GG) 1001 1004 0


05 Bay-City 452 7G 1625 1625 0 1-Oct

06 Wal Mart 9106 7G 333 33 0 10-Oct

07 Wal Mart 9106 7G 333 100 0 10-Oct

08 Bay-City 449 7G 758 758 0 17-Oct

09 7G

10 7G

11 7G

12 7G

13 7G
Sub Total (7GG) 3049 2516 0

Grand Total 4050 3520 0


hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.10.2005
Month : September' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Sears 1516 5G 194 193 1 1-Sep Process Loss

02 Sears 1514 5G 382 382 0 1-Sep

03 G.Gold 7358 5G 300 300 0 6-Sep

04 Bay-City 452 5G 1625 0 0 29-Sep

Sub Total (5GG) 2501 875 1


05 Quelle 7610(B) 7G 917 860 Partial 1-Sep

06 Quelle 7610 7G 57 57 0 8-Sep

07 Quelle 7610 7G 63 63 0 8-Sep


08 Quelle 7610 7G 250 251 0 8-Sep

09 Rajan W515043 7G 268 266 2 22-Sep Process Loss

10 Rajan W515029 7G 216 212 4 22-Sep Process Loss

11 Rajan W515028 7G 133 129 4 22-Sep Process Loss

12 Rajan W515078-L 7G 13 12 1 22-Sep Process Loss

13 Quelle 3575 7G 133 64 Partial 22-Sep


Sub Total (7GG) 2050 1914 11
17 Zara 5747/800 1.5G 42 0 10-Sep
18
Sub Total (1.5G) 0 42 0
19

20

Grand Total 4551 2831 12

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG
Shipment Details
All Figure In DZ Date : 02.08.2005
Month : August' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Sears 3515 5G 750 752 1-Aug

02 Rajan MK-412651 5G 200 190 10 9-Aug Process Loss

03 Sears 3534 5G 517 518 29-Aug

04 Sears 1516 5G 362 167 Partial 29-Aug

Sub Total (5GG) 1829 1627 10


05 G.Gold 27750 7G 50 18 2-Aug GSGL-1

06 Rajan MK-412655 7G 200 198 2 6-Aug Process Loss

07 Rajan MK-412960 7G 250 248 2 6-Aug Process Loss

08 Rajan W-515048 7G 200 194 6 11-Aug Process Loss

09 Rajan W-515043 7G 222 218 4 11-Aug Process Loss

10 Quelle 7824 7G 67 66 1 11-Aug Process Loss

11 Zara 5747/830 7G 271 248 23 11-Aug Assortment Problem

12 Zara 5747/830 7G 271 4 13-Aug Shiped From Orchid

13 Rajan MK-516086 7G 226 223 3 17-Aug Process Loss

14 Rajan MK-516076 7G 66 66 17-Aug

15 Sears TSF5-3530 7G 500 504 21-Aug

16 Quelle 7610 7G 1000 1003 25-Aug

17

18 7G

19 7G

20 7G

Sub Total (7GG) 3323 2990 41

Grand Total 5152 4617 51

hipment Target Status


Total Shipment Target
SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.08.2005
Month : July' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Sears 1311 5G 228 226 2 4-Jul Process Loss

02 Sears 3516 5G 501 495 6 10-Jul Process Loss

03 Sears 1330 5G 175 179 0 17-Jul

04 Bernardi 237/W 5G 180 180 0 31-Jul

Sub Total (5GG) 1084 1080 8


05 G.Gold 27822 7G 250 140 Partial 5-Jul

06 Sears 1304 7G 322 323 0 7-Jul

07 G.Gold 27822 7G 250 110 Partial 10-Jul

08 Bernardi 05/C-46W 7G 363 83 Partial 15-Jul

09 Bay-City 162979 7G 1000 500 Partial 17-Jul

10 Bay-City 162989 7G 750 413 Partial 17-Jul


11 G.Gold 17653/8039 7G 200 196 4 17-Jul

12 Bay-City 162979 7G 501 200 Partial 18-Jul

13 Bay-City 162989 7G 338 150 Partial 18-Jul

14 Bay-City 162979 7G 250 250 0 20-Jul

15 Bay-City 162989 7G 188 188 0 20-Jul

16 Rajan MK-412654 7G 200 140 60 20-Jul


Applique Dyeing Quality Rejec

17 G.Gold 17653/8040 7G 418 330 88 23-Jul Fack Fur Short.

18 G.Gold 17653/8041 7G 300 130 Partial 24-Jul

19 G.Gold 17653/8041 7G 300 150 Partial 26-Jul

20 Bernardi 05/C-46W 7G 280 280 0 31-Jul

Sub Total (7GG) 5910 3583 152

Grand Total 6994 4663 160

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.07.2005
Month : June' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Sears 1309 5G 272 273 0 4-Jun

02 Sears 50108 5G 594 585 9 26-Jun

03 Sears 3531 5G 500 486 14 26-Jun

04 Sears 1307 5G 276 274 2 14-Jun

05 G.Gold 7548 5G 100 94 6 28-Jun

Sub Total (5GG) 1742 1712 31


04 Sears 1304 7G 260 260 0 4-Jun

05 Bay-City 366/367 7G 2643 1280 Partial 9-Jun

06 Sears 1310 7G 342 338 2 12-Jun

07 Quelle 2479 7G 217 218 0 15-Jun

08 Quelle 2480 7G 167 167 0 15-Jun

09 Quelle 2481 7G 183 181 2 15-Jun

10 Bay-City 366/367 7G 2560 1264 Partial 15-Jun

11 Quelle 2482 7G 167 158 9 30-Jun

12 Quelle 2485 7G 167 159 8 30-Jun

13 Quelle 2486 7G 167 164 3 30-Jun

Sub Total (7GG) 6873 4189 24

Grand Total 8615 5901 55

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
06
07
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.06.2005
Month : May' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Rajan MK-412692 5G 200 200 0.00 15-May

02 G.Gold 007999 5G 500 400 Partial 15-May

03 Eurofrente 08206 5G 119 120 18-May

04 Eurofrente 08207 5G 219 220 18-May

05 Wehemer WR-01 5G 427 427 25-May

5G

Sub Total (5GG) 1465 1367 0.00


08 Rajan MK-413066 7G 200 200 0 15-May

09 Rajan Mk-412727 7G 300 260 Partial 15-May

10 Rajan MK-412727 7G 40 36 4 16-May

11 Rajan MK-413076 7G 300 298 2 16-May


Sub Total (7GG) 840 794 6

Grand Total 2305 2161 6

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
06
07
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.05.2005
Month : April' 2005
Total Shipped Short Ship
SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Bay-City 370 5G 567 567 0.00 24-Apr

02 Sears 1307 5G 271 269 2 28-Apr


P.Loss & Quality Rejection

03 Sears 1308 5G 140 138 2 28-Apr


P.Loss & Quality Rejection

04 5G

05 5G

06 5G

07
Sub Total (5GG) 978 974 4.00
08 Bay-City 380-44/49 7G 2086.5 1043 Partial 6-Apr

09 Bay-City 380-44/49 7G 1044 446 Partial 11-Apr

10 Bay-City 380-44/49 7G 599 599 Partial 21-Apr

11 Quelle 7824 7G 67 62 5 28-Apr Printing Problem

12 Scope 58417 7G 138 138 28-Apr

13 Scope 58413 7G 138 138 28-Apr

14 Scope 58415 7G 138 138 28-Apr

15 Scope 59403 7G 138 138 28-Apr

16

17

18
Sub Total (7GG) 4348.5 2702 5

Grand Total 5326.5 3676 9

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
06
07
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.04.2005
Month : March' 2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 G.Union C-603 5G 300 300 12-Mar

02 G.Union C-603 B 5G 125 125 12-Mar

03

04

05

06

07
Sub Total (5GG) 425 425 0
08 N.Mann 115/149 7G 356.25 356.92 10-Mar

09 G.Union 38497 7G 225 225 12-Mar

10 Casabawa Dec 04-A 7G 220 220 22-Mar

11 Casabawa Dec 04-B 7G 176.67 176.67 22-Mar

12 Bay-City 380-44/49 7G 2917.5 831 Partial 30-Mar

13 N.Mann 115/827 7G 152.92 155.17 30-Mar

14 G.Union 6596 7G 350 350 31-Mar

15 G.Union 38497 7G 350 350 31-Mar


16

17

18
Sub Total (7GG) 4748.34 2665 0

Grand Total 5173.34 3090 0

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
06
07
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.02.2005
Month :January'2005

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01

02
03

04

05

06

07
Sub Total (5GG) 0 0 0
08 N.Mann 115/827 7G 500 501 0 17-Jan

09 7G

10 7G

11 7G

12 7G

13 7G

14 7G

15 7G

16

17

18
Sub Total (7GG) 500 501 0

Grand Total 500 501 0

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
06
07
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 02.01.2005
Month :December'2004

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01

02

03

04

05

06

07
Sub Total (5GG) 0 0 0
08 Sears 2298 7G 433.33 419.83 13.5 5-Dec

09 N.Mann 115/149 7G 1250 1241.83 8.17 9-Dec

10 Karstadt K-03 7G 417 342 75 9-Dec

11 Seras 2300 7G 400 400.17 0 28-Dec

12 Zara 5747/001 7G 1566.7 1567 0 30-Dec

13 7G

14 7G

15 7G

16

17

18
Sub Total (7GG) 4067.03 3970.83 96.67

Grand Total 4067.03 3970.83 96.67


hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
06
07
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge

GLOBAL KNIT-WEAR LTD


269 DEWAN HAT CHITTAGONG

Shipment Details
All Figure In DZ Date : 01.12.2004
Month :November'2004

Total Shipped Short Ship


SL Buyer Style/P.O No GG Remarks
Order Qty Qty Shipped Qty Date
01 Eufrenty 08206 7G 250 244 6 11-Nov

02 Eufrenty 08207 7G 167 164.5 2.5 11-Nov

03 Eufrenty 08231 7G 78.5 78.42 0 11-Nov

04

05

06

07
Sub Total (5GG) 495.5 486.92 8.5
08 N.Mann 115/509 7G 132.92 133.17 0 4-Nov

09 N.Mann 115/667 7G 125 127.17 0 10-Nov

10 Hong Song YS-14214 7G 1179 1162 17 12-Nov

11 Quelle 3532 7G 33.33 33.33 0 11-Nov


12 Karstadt K-03 7G 417 4.5 Partial 27-Nov

13 Casabawa Nob-10 B 7G 83.33 92 27-Nov

14 Hong Song WS-14212 7G 332 320 12 29-Nov

15 Hong Song YS-14213-S 7G 604 599.17 4.83

16

17

18
Sub Total (7GG) 2906.58 2471.34 33.83

Grand Total 3402.08 2958.26 42.33

hipment Target Status

Total Shipment Target


SL Buyer Style/P.O No GG Remarks
Order Qty Actual Revised
01
02
03
04
05
06
07
Total

____________ ________________________ ________________


Prepared By Production-Co-Ordinator Plant-In-Charge
58
7980
8038
Problem
Weight
900

996

var Swtr.
VAR Swtr.

Problem
ng Problem

Problem

5688

VAR Swtr.

VAR Swtr.
10008
g Problem
Problem
Problem

Orchid
Quality Rejec
y Rejection

y Rejection