Sei sulla pagina 1di 34

MAYTAS NAFTOGASBUD JV GSPL203-73-1506

Rev 1

CONTENTS PAGE NO
1.0 INTRODUCTION........................................................................................................................................................... 3
1.1 GENERAL ....................................................................................................................................................................... 3
1.2 DESIGN PHILOSOPHY ..................................................................................................................................................... 3
1.3 REFERENCES .................................................................................................................................................................. 3
2.0 INPUT LOAD CALCULATION................................................................................................................................... 4
2.1 DEAD LOAD ......................................................................................................................................................................... 4
2.2 LIVE LOAD (LL) ............................................................................................................................................................ 4
2.3 WIND LOAD (WL) ......................................................................................................................................................... 5
2.4 SEISMIC LOAD ............................................................................................................................................................... 8
3.0 VIEWS ................................................................................................................................................................................. 10
3.1 ISOMETRIC VIEW ............................................................................................................................................................... 10
3.2 NODE NUMBERS & BEAM NUMBERS ................................................................................................................................. 10
3.4 STAAD INPUT ..................................................................................................................................................................... 11
4.0 DESIGN CALCULATION ................................................................................................................................................ 16
4.1 SLAB DESIGN .................................................................................................................................................................... 16
4.2 DESIGN OF BEAM ......................................................................................................................................................... 19
4.2.1 PLINTH BEAM @ EL +99.95 (PB1) ................................................................................................................................ 19
4.2.2 PLINTH BEAM @ EL +99.95 (PB2) ................................................................................................................................ 20
4.2.3 ROOF BEAM @ EL +103.00 (RB1) .......................................................................................................................... 20
4.2.4 ROOF BEAM @ EL +103.00 (RB2) ......................................................................................................................... 20
4.3 DESIGN OF FOOTING ................................................................................................................................................... 21
5.0 STAAD OUTPUT ............................................................................................................................................................... 26
5.1 DESIGN OF COLUMNS......................................................................................................................................................... 26
5.2 SUPPORT REACTIONS ................................................................................................................................................... 30
5.3 BEAM – SECTION FORCES ............................................................................................................................................ 33
6.0 CONCLUSION ................................................................................................................................................................... 34

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 2 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

1.0 INTRODUCTION

1.1 General
The objective of this document is to define the minimum requirements for the design and
engineering of the BHARUCH JAMNAGAR PIPELINE PROJECT. The general scope of work is for
engineering procurement and construction of the Bharuch Anand– GSPL pipeline system and
related facilities including Despatch Station, SV Stations, Tap-off station and receiving station.
This pipeline broadly consists of approximately 103.50 KMs of 30” line pipe from existing station
(Receiving Station) at rajkot on GSPL 24” Anand Rajkot Pipe-line to village Pipli at chainage
89.67 Km (Receiving Station at Jamnagar) and subsequently to Reliance Receiving Station (at
Reliance premises)

The purpose of this document is for providing the Design and Details of Guard Room for SV1
Station in Bodi Ghodi at Chainage 21.75 Km.

1.2 Design Philosophy

The Guard Room Building is a simple RCC structure comprising of Columns,


Beams at different levels, Slab and Footings. This structure has been designed using Staad-Pro
Computer Software. The height of the building is 3.00 m from FFL. The Column Foundations has
been designed as Isolated Footing at a depth of 0.85m below NGL. The Safe Bearing Capacity has
been taken as 50 T/m2 as per Soil Investigation Report. Wind Pressure Calculation shall be based
on basic wind speed of 50m/s and Wind Load Analysis has been done accordingly. Seismic
Analysis has been done for Zone IV and it is found to be critical and has been designed accordingly.

1.3 References
IS : 456-2000 Code of practice of plain and reinforce concrete.
IS 1905-1987 Code of Practice for Structural Use of Un-reinforced Masonry
SP -16 Design Aids for Reinforced Concrete to IS:456-1978
. IS : 875-1987 (Parts I to V) Code of practice for Design loads (other than earthquake) for
Buildings and Structures
IS : 1893 Pt.I-2002 Criteria for Earthquake Resistant Design of Structure.
IS :13920 Code of practice for ductile detailing of RCC Structures subjected to
Seismic forces
Job 7/06-07 Geotechnical/Soil Investigation Report of M. K.. Soil Test Laboratory,
Ahmedabad-7

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 3 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

2.0 Input Load Calculation

The loads applied on the structure are Dead Loads, Live Loads , Wind Loads & Seismic loads in
both the directions

2.1 Dead Load

At Plinth Level (At EL: +99.95 (TOC)):


Self Wt. of wall over the Plinth Beam = 0.23x2.7x1x20
= 12.42 KN/m

At Roof Level (At EL: +103.00 (TOC)):


Self Wt. of Slab = 0.12x25
2
= 3 KN/m
2
Roof Water Proofing Load = 2 KN/m
2
Total Load = 5 KN/m
Parapet wall load = 0.6x0.1x1x25
= 1.5 KN/m
2
BM due to Parapet and Slab on overhang = 1.5x0.6+5x0.6 /2
= 1.80 KN.m
Reaction due to parapet and slab = 1.5+5x0.6
= 4.5 KN.m
Break -up Details of Roof Water Proofing:
2
PCC 0.05x24 = 1.2 KN/m
2
Bitumen I Course = 0.004 KN/m
2
Bitumen (3 Layers) @ 0.012 KN/m
2
(2nd, 4th, 6th) = 0.036 KN/m
APP membrane 2 Nos x 0.15 KN/m2
2
(3rd, 5th) = 0.308 KN/m
2
12mm tk. Plaster 0.012x24 = 0.288 KN/m
2
Brick tiles - 3mm tk. 0.03x20 = 0.1 KN/m
Total = 1.936
2
Say 2 KN/m

2.2 Live Load (LL)

At Roof Level (At EL: +103.00 (TOC)):


2
Live load = 0.75 KN/m (For Non- accessible roof)
2
BM due to Slab LL on overhang = 0.75x0.6 /2
= 0.135 KN.m
Reaction due to LL on overhang = 0.75*0.6
= 0.45 KN

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 4 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

2.3 Wind Load (WL)

Wind Load Calculation:


Basic Wind Speed Vb = 50 m/s
Risk Cofficient K1 = 1.05
Terrain height and structure Size Factor K2 = 1.05
Topography Factor K3 = 1
Length of Building L = 3.5 m
Width of Building W = 2.5 m
Height to parapet h = 3.58 m
Width of column B = 0.3 m
Depth of column D = 0.3 m
Design Wind Speed = Vb X K1 X K2 X K3
= 55.125 m/s
2
Design Wind Pressure Pz = 0.6 Vz
2
Pz = 1823.259 N/m
2
= 1.823 KN/m
Consider the wind acting on the longitudinal face of building
External pressure Co-efficient
From Code IS : 875 (part 3)- 1987 table 4

θ
A B
Windward Leeward
Side Side
X

Z D
h/w (3.58/2.5 ) = 1.432
l/w (3.5/2.5) = 1.4
0.5 < h/w < 1.5
1< l/w < 1.5

Wind Angle = 0'


A = 0.7
B = -0.25

Wind Angle = 90'


C = 0.7
D = -0.25

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 5 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

Load Case 1:WL: +Z (0'IS)


Wind Angle = 0
B C

0.7 -0.5 -0.25

1.2 0.25
A D

Influence width = 1.75 m


Force on member AB = Pressure coefficient x A x wind pressure
= 1.2x1.75x1.823
= 3.83 KN/m
Force on member CD = 0.25 *1.75*1.823
= 0.80 KN/m
2
BM due to wind on parapet = 1.823*0.6 /2*1.2 = 0.39 KN.m
Force due to wind = 1.823*0.6*1.2 = 1.31 KN/m

Load Case 2:WL: +Z (0'IP)


Wind Angle = 0
B C

0.7 -0.25
+0.5

0.2 0.75
A D

Influence width = 1.75 m


Force on member AB= Pressure coefficient x A x wind pressure
= 0.2x1.75x1.823
= 0.64 KN/m
Force on member CD= Pressure coefficient x A x wind pressure
= 0.75x1.75x1.823
= 2.39 KN/m
BM due to wind on parapet = 0.39 KN.m
Force due to wind = 1.31 KN/m

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 6 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1
Load Case 3: WL: +X (90' IS)
Wind Angle = 90'
B C

0.7 -0.5 -0.25


1.2 0.25

A D

Influence width = 1.25 m


Force on member AB= Pressure coefficient x A x wind pressure
= 1.2x1.25x1.823
= 2.73 KN/m
Force on member CD= Pressure coefficient x A x wind pressure
= 0.25x1.25x1.823
= 0.57 KN/m
BM due to wind on parapet = 0.39 KN.m
Force due to wind = 1.31 KN/m

Load Case 4: WL: +X (90' IP)


Wind Angle = 90'
B C

0.7 +0.5 -0.25

0.2 0.75
A D

Influence width = 1.25 m


Force on member AB= Pressure coefficient x A x wind pressure
= 0.2x1.25x1.823
= 0.46 KN/m
Force on member CD= Pressure coefficient x A x wind pressure
= 0.75x1.25x1.823
= 1.71 KN/m
BM due to wind on parapet = 0.39 KN.m
Force due to wind = 1.31 KN/m

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 7 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

2.4 Seismic Load

For Seismic Analysis, following factors has been considered as per IS 1893-2002 Pt.I

Seismic Zone factor for Zone IV = 0.24


Perfomance Factor RF = 3
Importance Factor I = 1.5
Soil Interaction factor SS = 1 (For Hard soil, SS =1)
Type of Structure ST = 1 (For RCC Framed Structure)
Damping Ratio DM = 0.05

2.5 Load Combination

Factored Load
1.5DL+1.5LL
1.5DL+ 1.5EQ:+X
1.5DL+ 1.5EQ:+Z
0.9DL+ 1.5EQ:+X
0.9DL+ 1.5EQ:+Z
1.5DL+ 1.5WL:+Z (0' IS)
1.5DL+ 1.5WL:+Z (0' IP)
1.5DL+ 1.5WL:+X (90' IS)
1.5DL+ 1.5WL:+X (90'IP)
0.9DL+ 1.5WL:+Z(0' IS)
0.9DL+ 1.5WL:+Z(0' IP)
0.9DL+ 1.5WL:+X(90' IS)
0.9DL+ 1.5WL:+X(90' IP)
1.2DL+1.2LL+1.2EQ:+X
1.2DL+1.2LL+1.2EQ:+Z
1.2DL+1.2LL+1.2WL:+Z(0' IS)
1.2DL+1.2LL+1.2WL:+Z(0' IP)
1.2DL+1.2LL+1.2WL:+X(90' IS)
1.2DL+1.2LL+1.2WL:+X(90' IP)
1.5DL+ 1.5EQ:-X
1.5DL+ 1.5EQ:-Z
0.9DL+ 1.5EQ:-X
0.9DL+ 1.5EQ:-Z
1.5DL+ 1.5WL:-Z (0' IS)
1.5DL+ 1.5WL:-Z (0' IP)

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 8 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

1.5DL+ 1.5WL:-X (90' IS)


1.5DL+ 1.5WL:-X (90'IP)
0.9DL+ 1.5WL:-Z(0' IS)
0.9DL+ 1.5WL:-Z(0' IP)
0.9DL+ 1.5WL:-X(90' IS)
0.9DL+ 1.5WL:-X(90' IP)
1.2DL+1.2LL+1.2EQ:-X
1.2DL+1.2LL+1.2EQ:-Z
1.2DL+1.2LL+1.2WL:-Z(0' IS)
1.2DL+1.2LL+1.2WL:-Z(0' IP)
1.2DL+1.2LL+1.2WL:-X(90' IS)
1.2DL+1.2LL+1.2WL:-X(90' IP)

Un Factored Load
1.0DL+1.0LL
1.0DL+ 1.0EQ:+X
1.0DL+ 1.0EQ:+Z)
1.0DL+ 1.0WL:+Z(0'IS)
1.0DL+ 1.0WL:+Z(0'IP)
1.0DL+ 1.0WL:+X(90'IS)
1.0DL+ 1.0WL:+X(90'IP)
1.0DL+1.0LL+1.0EQ:+X
1.0DL+1.0LL+1.0EQ:+Z
1.0DL+1.0LL+1.0WL:+Z(0'IS)
1.0DL+1.0LL+1.0WL:+Z(0'IP)
1.0DL+1.0LL+1.0WL:+X(90'IS)
1.0DL+1.0LL+1.0WL:+X(90' IP)
1.0DL+ 1.0EQ -X
1.0DL+ 1.0EQ:-Z)
1.0DL+ 1.0WL:-Z(0'IS)
1.0DL+ 1.0WL:-Z(0'IP)
1.0DL+ 1.0WL:-X(90'IS)
1.0DL+ 1.0WL:-X(90'IP)
1.0DL+1.0LL+1.0EQ:-X
1.0DL+1.0LL+1.0EQ:-Z
1.0DL+1.0LL+1.0WL:-Z(0'IS)
1.0DL+1.0LL+1.0WL:-Z(0'IP)
1.0DL+1.0LL+1.0WL:-X(90'IS)
1.0DL+1.0LL+1.0WL:-X(90' IP)

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 9 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

3.0 VIEWS
3.1 Isometric View

Y
X
Z Load 1

3.2 Node Numbers & Beam Numbers

10

9 12
9
12
11 10 17

11
13
19
2

14 1 4
1 23
4
3 2
21 14
3 24

Y 13
22
X 16
Z Load 1
15

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 10 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

3.4 Staad Input


STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 18-Jun-07
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0 0; 2 3.27 0 0; 3 0 0 2.27; 4 3.27 0 2.27; 9 0 3.05 0; 10 3.27 3.05 0;
11 0 3.05 2.27; 12 3.27 3.05 2.27; 13 0 -2.05 0; 14 3.27 -2.05 0;
15 0 -2.05 2.27; 16 3.27 -2.05 2.27;
MEMBER INCIDENCES
1 1 2; 2 3 4; 3 1 3; 4 2 4; 9 9 10; 10 11 12; 11 9 11; 12 10 12; 13 1 9;
14 3 11; 17 2 10; 19 4 12; 21 13 1; 22 15 3; 23 14 2; 24 16 4;
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.5e+007
POISSON 0.2
DENSITY 25
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
MEMBER PROPERTY INDIAN
13 14 17 19 21 TO 24 PRIS YD 0.3 ZD 0.3
MEMBER PROPERTY INDIAN
9 TO 12 PRIS YD 0.3 ZD 0.23
1 TO 4 PRIS YD 0.5 ZD 0.23
CONSTANTS
MATERIAL CONCRETE MEMB 1 TO 4 9 TO 14 17 19 21 TO 24
SUPPORTS
13 TO 16 FIXED
***************************************************************************
DEFINE 1893 LOAD
ZONE 0.24 RF 3 I 1.5 SS 1 ST 1 DM 0.05
SELFWEIGHT
MEMBER WEIGHT
1 TO 4 UNI 12.42
9 TO 12 UNI 4.5
FLOOR WEIGHT
YRANGE 3.05 3.05 FLOAD 5
****************************************************************************
LOAD 1 SEISMIC LOAD X DIRN
1893 LOAD X
****************************************************************************
LOAD 2 SEISMIC LOAD Z DIRN
1893 LOAD Z
****************************************************************************
LOAD 3 DEAD LOAD
SELFWEIGHT Y -1
MEMBER LOAD
*******************LOAD ON PLINTH BEAM*****************************************
1 TO 4 UNI GY -12.42
****************LOAD ON ROOF**********************************************
****************LOAD DUE TO PARAPET****************************************
9 TO 12 UNI GY -4.5
****************LOAD DUE TO ROOF SLAB****************************************
FLOOR LOAD
YRANGE 3.05 3.05 FLOAD -5 GY
MEMBER LOAD
10 UMOM GX 1.8
9 UMOM GX -1.8
12 UMOM GZ -1.8
11 UMOM GZ 1.8
*****************************************************************************
LOAD 4 LIVE LOAD
FLOOR LOAD
YRANGE 3.05 3.05 FLOAD -0.75 GY
MEMBER LOAD

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 11 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1
10 UMOM GX 0.135
9 UMOM GX -0.135
12 UMOM GZ -0.135
11 UMOM GZ 0.135
9 TO 12 UNI GY -0.45
****************************************************************************
LOAD 5 WL:+Z(0'IS)
MEMBER LOAD
17 UNI GZ 3.83
13 UNI GZ 3.83
19 UNI GZ -0.8
14 UNI GZ -0.8
9 UMOM GX 0.39
10 UMOM GX 0.39
9 10 UNI GZ 1.31
****************************************************************************
****************************************************************************
LOAD 6 WL:+Z(0'IP)
MEMBER LOAD
17 UNI GZ 0.64
13 UNI GZ 0.64
19 UNI GZ 2.39
14 UNI GZ 2.39
9 UMOM X 0.39
10 UMOM X 0.39
9 10 UNI GZ 1.31
****************************************************************************
****************************************************************************
LOAD 7 WL:+X(90'IS)
MEMBER LOAD
14 UNI GX 2.73
13 UNI GX 2.73
19 UNI GX -0.57
17 UNI GX -0.57
11 UMOM GZ -0.39
12 UMOM GZ -0.39
11 12 UNI GX 1.31
****************************************************************************
LOAD 8 WL:+X(90'IP)
MEMBER LOAD
14 UNI GX 0.46
13 UNI GX 0.46
19 UNI GX 1.71
17 UNI GX 1.71
11 UMOM GZ -0.39
12 UMOM GZ -0.39
11 12 UNI GX 1.31
***************************************************************************
**************FACTORED LOAD COMBINATION************************************
***************************************************************************
LOAD COMB 9 (1.5DL+1.5LL)
3 1.5 4 1.5
LOAD COMB 10 (1.5DL+ 1.5EQ:+X)
3 1.5 1 1.5
LOAD COMB 11 (1.5DL+ 1.5EQ:+Z)
3 1.5 2 1.5
LOAD COMB 12 (0.9DL+ 1.5EQ:+X)
3 0.9 1 1.5
LOAD COMB 13 (0.9DL+ 1.5EQ:+Z)
3 0.9 2 1.5
LOAD COMB 14 (1.5DL+ 1.5WL:+Z(0'IS))
3 1.5 5 1.5
LOAD COMB 15 (1.5DL+ 1.5WL:+Z(0'IP))
3 1.5 6 1.5
LOAD COMB 16 (1.5DL+ 1.5WL:+X(90'IS))

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 12 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1
3 1.5 7 1.5
LOAD COMB 17 (1.5DL+ 1.5WL:+X(90'IP))
3 1.5 8 1.5
LOAD COMB 18 (0.9DL+ 1.5WL:+Z(0'IS))
3 0.9 5 1.5
LOAD COMB 19 (0.9DL+ 1.5WL:+Z(0'IP))
3 0.9 6 1.5
LOAD COMB 20 (0.9DL+ 1.5WL:+X(90'IS))
3 0.9 7 1.5
LOAD COMB 21 (0.9DL+ 1.5WL:+X(90'IP))
3 0.9 8 1.5
LOAD COMB 22 (1.2DL+1.2LL+1.2EQ:+X)
3 1.2 4 1.2 1 1.2
LOAD COMB 23 (1.2DL+1.2LL+1.2EQ:+Z)
3 1.2 4 1.2 2 1.2
LOAD COMB 24 (1.2DL+1.2LL+1.2WL:+Z(0'IS))
3 1.2 4 1.2 5 1.2
LOAD COMB 25 (1.2DL+1.2LL+1.2WL:+Z(0'IP))
3 1.2 4 1.2 6 1.2
LOAD COMB 26 (1.2DL+1.2LL+1.2WL:+X(90'IS))
3 1.2 4 1.2 7 1.2
LOAD COMB 27 (1.2DL+1.2LL+1.2WL:+X(90'IP))
3 1.2 4 1.2 8 1.2
LOAD COMB 28 (1.5DL+1.5EQ:-X)
3 1.5 -1 1.5
LOAD COMB 29 (1.5DL+1.5EQ:-Z)
3 1.5 -2 1.5
LOAD COMB 30 (0.9DL+1.5EQ:-X)
3 0.9 -1 1.5
LOAD COMB 31 (0.9DL+1.5EQ:-Z )
3 0.9 -2 1.5
LOAD COMB 32 (1.5DL+ 1.5WL:-Z(0'IS))
3 1.5 -5 1.5
LOAD COMB 33 (1.5DL+ 1.5WL:-Z(0'IP))
3 1.5 -6 1.5
LOAD COMB 34 (1.5DL+ 1.5WL:-X(90'IS))
3 1.5 -7 1.5
LOAD COMB 35 (1.5DL+ 1.5WL:-X(90'IP))
3 1.5 -8 1.5
LOAD COMB 36 (0.9DL+ 1.5WL:-Z(0'IS))
3 0.9 -5 1.5
LOAD COMB 37 (0.9DL+ 1.5WL:-Z(0'IP))
3 0.9 -6 1.5
LOAD COMB 38 (0.9DL+ 1.5WL:-X(90'IS))
3 0.9 -7 1.5
LOAD COMB 39 (0.9DL+ 1.5WL:-X(90'IP))
3 0.9 -8 1.5
LOAD COMB 40 (1.2DL+1.2LL+1.2EQ:-X)
3 1.2 4 1.2 -1 1.2
LOAD COMB 41 (1.2DL+1.2LL+1.2EQ:-Z)
3 1.2 4 1.2 -2 1.2
LOAD COMB 42 (1.2DL+1.2LL+1.2WL:-Z(0'IS))
3 1.2 4 1.2 -5 1.2
LOAD COMB 43 (1.2DL+1.2LL+1.2WL:-Z(0'IP))
3 1.2 4 1.2 -6 1.2
LOAD COMB 44 (1.2DL+1.2LL+1.2WL:-X(90'IS))
3 1.2 4 1.2 -7 1.2
LOAD COMB 45 (1.2DL+1.2LL+1.2WL:-X(90'IP))
3 1.2 4 1.2 -8 1.2
**********************************************************************************************
***
*UNFACTORED LOAD
**********************************************************************************************
***
LOAD COMB 46 (1.0DL+1.0LL)
3 1.0 4 1.0

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 13 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1
LOAD COMB 47 (1.0DL+ 1.0EQ:+X)
3 1.0 1 1.0
LOAD COMB 48 (1.0DL+ 1.0EQ:+Z)
3 1.0 2 1.0
LOAD COMB 49 (1.0DL+ 1.0EQ:+X)
3 1.0 1 1.0
LOAD COMB 50 (1.0DL+ 1.0EQ:+Z)
3 1.0 2 1.0
LOAD COMB 51 (1.0DL+ 1.0WL:+Z(0'IS))
3 1.0 5 1.0
LOAD COMB 52 (1.0DL+ 1.0WL:+Z(0'IP))
3 1.0 6 1.0
LOAD COMB 53 (1.0DL+ 1.0WL:+X(90'IS))
3 1.0 7 1.0
LOAD COMB 54 (1.0DL+ 1.0WL:+X(90'IP))
3 1.0 8 1.0
LOAD COMB 55 (1.0DL+ 1.0WL:+Z(0'IS))
3 1.0 5 1.0
LOAD COMB 56 (1.0DL+ 1.0WL:+Z(0'IP))
3 1.0 6 1.0
LOAD COMB 57 (1.0DL+ 1.0WL:+X(90'IS))
3 1.0 7 1.0
LOAD COMB 58 (1.0DL+ 1.0WL:+X(90'IP))
3 1.0 8 1.0
LOAD COMB 59 (1.0DL+1.0LL+1.0EQ:+X)
3 1.0 4 1.0 1 1.0
LOAD COMB 60 (1.0DL+1.0LL+1.0EQ:+Z)
3 1.0 4 1.0 2 1.0
LOAD COMB 61 (1.0DL+1.0LL+1.0WL:+Z(0'IS))
3 1.0 4 1.0 5 1.0
LOAD COMB 62 (1.0DL+1.0LL+1.0WL:+Z(0'IP))
3 1.0 4 1.0 6 1.0
LOAD COMB 63 (1.0DL+1.0LL+1.0WL:+X(90'IS))
3 1.0 4 1.0 7 1.0
LOAD COMB 64 (1.0DL+1.0LL+1.0WL:+X(90'IP))
3 1.0 4 1.0 8 1.0
LOAD COMB 65 (1.0DL+1.0EQ:-X)
3 1.0 -1 1.0
LOAD COMB 66 (1.0DL+1.0EQ:-Z)
3 1.0 -2 1.0
LOAD COMB 67 (1.0DL+1.0EQ:-X)
3 1.0 -1 1.0
LOAD COMB 68 (1.0DL+1.0EQ:-Z )
3 1.0 -2 1.0
LOAD COMB 69 (1.0DL+ 1.0WL:-Z(0'IS))
3 1.0 -5 1.0
LOAD COMB 70 (1.0DL+ 1.0WL:-Z(0'IP))
3 1.0 -6 1.0
LOAD COMB 71 (1.0DL+ 1.0WL:-X(90'IS))
3 1.0 -7 1.0
LOAD COMB 72 (1.0DL+ 1.0WL:-X(90'IP))
3 1.0 -8 1.0
LOAD COMB 73 (1.0DL+ 1.0WL:-Z(0'IS))
3 1.0 -5 1.0
LOAD COMB 74 (1.0DL+ 1.0WL:-Z(0'IP))
3 1.0 -6 1.0
LOAD COMB 75 (1.0DL+ 1.0WL:-X(90'IS))
3 1.0 -7 1.0
LOAD COMB 76 (1.0DL+ 1.0WL:-X(90'IP))
3 1.0 -8 1.0
LOAD COMB 77 (1.0DL+1.0LL+1.0EQ:-X)
3 1.0 4 1.0 -1 1.0
LOAD COMB 78 (1.0DL+1.0LL+1.0EQ:-Z)
3 1.0 4 1.0 -2 1.0
LOAD COMB 79 (1.0DL+1.0LL+1.0WL:-Z(0'IS))
3 1.0 4 1.0 -5 1.0

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 14 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1
LOAD COMB 80 (1.0DL+1.0LL+1.0WL:-Z(0'IP))
3 1.0 4 1.0 -6 1.0
LOAD COMB 81 (1.0DL+1.0LL+1.0WL:-X(90'IS))
3 1.0 4 1.0 -7 1.0
LOAD COMB 82 (1.0DL+1.0LL+1.0WL:-X(90'IP))
3 1.0 4 1.0 -8 1.0
*********************************************************************************
*********************************************************************************
*********************************************************************************
PERFORM ANALYSIS
PRINT ANALYSIS RESULTS
START CONCRETE DESIGN
CODE INDIAN
FC 25000 MEMB 1 TO 4 9 TO 12 21 TO 24
FYMAIN 415000 MEMB 1 TO 4 9 TO 12 21 TO 24
DESIGN BEAM 1 TO 4 9 TO 12
DESIGN COLUMN 13 14 17 19 21 TO 24
END CONCRETE DESIGN
FINISH

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 15 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

4.0 DESIGN CALCULATION

4.1 Slab Design


Thickness of slab, Thk = 120 mm
Clear cover = 20 mm
Top Reinforcement:
Assumed Dia of Main bar = 8 mm
Assumed Dia of secondary bar = 8 mm
Effective length in shorter-direction, Eff Lx = 2.27 m
Effective length in Longer direction, Eff Ly = 3.27 m
2
Dead load 3.00 kN/m
2
Finished load, FL = 2.00 kN/m
2
Live load, LL = 1.50 kN/m
3
Unit weight of concrete = 25.00 kN/m
2
Grade of concrete,fck = 25.00 N/mm
2
Grade of steel,fy = 415.00 N/mm
Factor of Saftey = 1.50

2
Total Factor Load = 9.75 kN/m

Consider One meter breadth of the slab.


coefficient calculations for Moments :
Ratio of eff.Ly/ eff.Lx,r = 1.44
Condition = = All edges Discontinuous
shorterside of edge2,α x + = 0.0870 (IS 456-2000 -Annexure-D-Table-26)
longer side of edge2,α y+ = 0.0560

Select sides of the slab :


DL+LL+FL

discontinuous discontinuous
2.27 m in lx-direction

DL + LL+FL

discontinuous discontinuous

3.27 m in ly-direction

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 16 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1
cl2

discontinuous

cs1 cs2
y
discontinuous 2.27 discontinuous
x

3.27

discontinuous
cl1

Note: Refer to Text Book "R.C Design by unnikrishna pillai & devdas menon"

αx x w x Lx
+ 2
Dead load '+ve' beinding moment, Mx+ =
= 4.37 kN m
αy x w x Lx
+ 2
Dead load '+ve' beinding moment, MY+ =
= 2.81 kN m
Dead load Shear force in X-dir Vu = w x lx /2
= 11.07 kN
Dead load Shear force in Y-dir Vu = w x ly /2
= 15.94 kN

Check for Slab Thickness


Assume dia of bar = 8 mm
Effective Thickness of the Slab = 120 - 20 - 8-8 / 2
for shorter direction = 88 mm
Effective depth required for Slab = v (Mux/0.138xfckx1000))
d-reqd = 35.59 mm
Provided depth is ok
Calculation of main steel

Effective Depth of slab in X dir dx = 96.000 mm


(150-20-8/2)
Effective Depth of slab in Y dir dy = 88.000 mm
(150-20-8-8/2)

2
(a) Area of Steel Mx+ = ( 0.5 fck/fy ) x [ 1-v( 1 - (4.6Mu/(fck x 1000 x d )) ) ] x 1000d
AstR = 129.05 mm2 / m

Required spacing of steel S 389.31 mm

2
(b) Area of Steel My+ AstR = ( 0.5 fck/fy ) x [ 1-v( 1 - (4.6Mu/(fck x 1000 x d )) ) ] x 1000d
2
= 90.13 mm / m

Required spacing of steel S = 557.43 mm

Minimum percentage of steel is = 0.12


Minimun area of the steel = 0.12 % x b x D
= 0.12x 1000 x 120/ 100
AstM = 115.2 mm2 / m

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 17 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

Higher value of Ast is provided, AstP = 129.05 mm2 / m


provide 8 mm dia bar at 250 mm c/c on +ve and -ve reinforcement
Maximum allowable spacing = 3d or 300 mm whichever is lesser Cls 26.3
Spacing is less than maximum spacing, OK
Provide 8mm Dia bar @ 250 mm c/c as Main steel
Provide 8mm Dia bar @ 250 mm c/c as Distribution Steel

Shear Check

Check for shear in X-direction:


Designed Shear Force = k τc bd , k and τc are calculated below (IS 456-2000-Table -23)
2
Ast Provided = 250 mm
Percentage of Steel Provided Pt = 100xAst/bxd
= 0.26041667
k = 1.300 Refer Cls 40.2

τc = 0.212 N/mm2 (Refer IS 456-2000-Table 23)

Vult = 24.25 KN
Depth k
300 1.00
275 1.05
Vu = 15.94 KN 175 1.25
150 1.30

Vult > Vu Therefore No shear reinforcement is required

Check for Deflection


(Refer RCC Design by Unnikrishnapillai and devodos menon)

Basic span depth ratio for S.S slab = 20 (From IS 456-2000 Clause :23.2.1.a)
fs = 0.58 x fy x Ast required / Ast provided
= 240.7 (Ast provided = Ast required)

Effective Span length = 2.27

Percentage of Steel Provided Pt = 0.147

Modification Factor kt = 2 (From IS 456-2000-Fig-4 )

(l/d)max = 40
(20x2.0)

(l/d)provided = 25.80
(2.27 X 1000)/88

(l/d)provided < (l/d)max Hence it is Safe.

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 18 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

Design of Parapet wall/Slab:


2
BM due to Wind Load on Parapet 1.412x0.6 /2x1.2 = 0.30 KN.m
D=100mm; Effective Depth = 100-20-8/2 =76mm
2
Mu/bd 1.5x0.3x10^6/1000x76^2 = 0.08
From SP16, Tab 3, For M25 & Fe415, Pt = 0.084
Provide Min. Reinforcement = 0.12%
2
= 91.2 mm
Provide #8 @ 200 c/c

Design of Cantilever Slab:


Dead Load
Self Wt. of Slab = 0.12x25
2
= 3 KN/m
2
Floor Finish load = 2 KN/m
2
Total Load = 5 KN/m
Parapet Wall Load 0.6x0.1x1x25 = 1.5 KN/m
2
BM due to Parapet and Slab = 1.5x0.6+5x0.6 /2
= 1.8 KN/m

2
Live Load = 0.75 KN/m
2
BM due to Slab LL on overhang = 0.75x0.6 /2
= 0.135 KN.m
Total BM due to DL & LL = 1.935 KN.m
Depth of Slab =120 mm Eff. Depth = 120-20-8/2
= 96 mm
Mu/bd2 = 0.315
From SP 16, Tab 3, For M25, Pt = 0.099
Provide Min. Reinforcement = 0.12%
2
Reinforcement reqd. = 115.2 mm
Hence, # 8 @ 200 c/c is sufficient.

4.2 DESIGN OF BEAM

4.2.1 Plinth Beam @ EL +99.95 (PB1)


INPUT SECTION MOMENT DESIGN
req
Effective tension
Mu b D d 2
fck fy Pt Ptmini Check for
SL NO cover Mu/bd Mulimit/bd2 reinforce
KN-m mm mm mm N/mm2 N/mm2 % % pt
ment
mm
mm2
1 53.10 48 230 500 452 1.14 25 415 3.45 0.33 0.20 OK 347.54 Top Reinf At Support
2 31.57 48 230 500 452 0.68 25 415 3.45 0.19 0.20 Astmini 202.34 Bottom Reinf at Mid Span

SHEAR DESIGN
Ast Pt
Vu at provided provided
τc τv τc max Check Stirrup Spacing Mini
Shear legs 0.75*d 300
SL NO support at at Dia Of stirrup Spacing Spacing Provided mm
KN support support N/mm
2
N/mm 2
N/mm 2 for τc mm
(Nos)
mm mm
mm mm
mm2 mm2
1 61.756 400 0.38 0.44 0.59 3.1 O.K 8 2 300.00 -- 339.00 300 300.00

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 19 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1
.
4.2.2 Plinth Beam @ EL +99.95 (PB2)

INPUT SECTION MOMENT DESIGN


Req
Effective tension
Mu b D d fck fy Pt Ptmini Check for
SL NO cover Mu/bd2 Mulimit/bd2 reinforce
KN-m mm mm mm N/mm2 N/mm2 % % pt
ment
mm
mm2
1 44.76 48 230 500 452 0.96 25 415 3.45 0.28 0.20 OK 289.84 Top Reinf
2 36.61 48 230 500 452 0.78 25 415 3.45 0.22 0.20 OK 233.29 Bottom Reinf

SHEAR DESIGN
Ast Pt
Vu at provided provided
τc τv τc max Check Stirrup Spacing Mini Spacing
Shear legs 0.75*d 300
SL NO support at at Dia Of stirrup Spacing Provided
KN support support N/mm
2
N/mm 2
N/mm 2 for τc mm
(Nos)
mm mm
mm mm
mm
2 2
mm mm
1 60.987 400 0.38 0.44 0.59 3.1 O.K 8 2 300.00 -- 339.00 300 300.00

4.2.3 Roof Beam @ EL +103.00 (RB1)


INPUT SECTION MOMENT DESIGN
req
Effective tension
Mu b D d fck fy Pt Ptmini Check for
SL NO cover Mu/bd2 Mulimit/bd2 reinforce
KN-m mm mm mm N/mm2 N/mm2 % % pt
ment
mm
mm2
1 31.24 38 230 500 462 0.64 25 415 3.45 0.18 0.20 Astmini 194.26 Top Reinf
2 13.95 38 230 500 462 0.29 25 415 3.45 0.08 0.20 Astmini 86.52 Bottom Reinf

SHEAR DESIGN
Ast Pt
Vu at provided provided
τc τv τc max Check Stirrup Spacing Mini
Shear legs 0.75*d 300 Spacing
SL NO support at at Dia Of stirrup Spacing
KN support support N/mm
2
N/mm 2
N/mm 2 for τc mm
(Nos)
mm mm
mm mm Provided mm
2 2
mm mm
1 36.189 400 0.38 0.43 0.34 3.1 O.K 8 2 -- 394.33 347.00 300 300.00

4.2.4 Roof Beam @ EL +103.00 (RB2)


INPUT SECTION MOMENT DESIGN
req
Effective tension
Mu b D d 2
fck fy Pt Ptmini Check for
SL NO cover Mu/bd Mulimit/bd2 reinforce
KN-m mm mm mm N/mm2 N/mm2 % % pt
ment
mm
mm2
1 25.94 38 230 500 462 0.53 25 415 3.45 0.15 0.20 Astmini 159.99 Top Reinf
2 16.38 38 230 500 462 0.34 25 415 3.45 0.10 0.20 Astmini 101.68 Bottom Reinf

SHEAR DESIGN
Ast Pt
Vu at provided provided
τc τv τc max Check Stirrup Spacing Mini
Shear legs 0.75*d 300 Spacing
SL NO support at at Dia Of stirrup Spacing
KN support support N/mm
2
N/mm2 N/mm2 for τc mm
(Nos)
mm mm
mm mm Provided mm

mm2 mm2
1 33.019 400 0.38 0.43 0.31 3.1 O.K 8 2 -- 394.33 347.00 300 300.00

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 20 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

4.3 DESIGN OF FOOTING

Fy
Fz
Foundation Dimension:
Fx
Base Lx (m) 1.50 FGLx h1 (m)= 0.00
Lz (m) 1.50
Pedestal Px (m) 0.30 h2 (m)= 2.00
Pz (m) 0.30
D (m)= 0.35
Design Summary:

2
Max Bearing Press.: 179.34 KN/m
2
Mz1
Min Bearing Press.: 92.19 KN/m
Min Contact Length: 100%
X-Axis
Mx1

Soil Properties Z-Axis


Safe Bearing Capacity of Soil q safe = 500.0 KN/m2
At depth h2 q q safe + γ x h2
all = 532.4 KN/m2
At depth h2 q all = 1.25 x q safe + γ x h2 657.4 KN/m2

Material Properties:
Minimum 28 Days Compressive of Concrete : FC 25000 KN/m2
Yield Strength of Reinforcing Steel : FY 415000 KN/m2
Density of Structural fill 16 KN/m3
Density of Concrete 25 KN/m3

Load Combination:
Unfactored Loads (in KN m)
LC No. Fx Fy Fz Mx Mz
Case I (DL+LL) 16/46 2.82 83.00 1.35 0.89 1.87
Case II (DL+LL+WL) 16/80 2.82 100.78 7.92 8.67 1.87
Case III (DL+LL+EQ-Z) 16/60 2.819 118.027 13.4 15.043 1.873

Factored Loads (in KN m)

LC No. Fx Fy Fz Mx Mz
Case I (DL+LL) 16/46 4.23 124.50 2.02 1.34 2.81
Case II (DL+LL+WL) 16/80 4.23 151.17 11.89 13.01 2.81
Case III (DL+LL+EQ-Z) 16/60 4.23 177.04 20.10 22.56 2.81

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 21 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

Check For Bearing Pressure:

Total Substructure Load:


Weight of Pedestal = 3.7 KN
Weight of Footing = 19.7 KN
Weight of Imposed Earth above footing = 57.7 KN
TOTAL = 81.1 KN
Case I:
Axial load P = Fy + SubStructure Load = 164.1 KN
Moment at base Mx1= Mx + Fz x (h1+h2) = 3.59 KNm
Moment at base Mz1= Mz + Fx x (h1+h2) = 7.51 KNm
Eccentricity,
ex = Mz1 / P = 0.046 m < Lx / 6 Contact Length= 3 x (Lx /2 - ex) / Lx = 100%
ez = Mx1 / P = 0.022 m < Lz / 6 Contact Length= 3 x (Lz /2 - ez) / Lz = 100%

ex / Lx = 0.031 From Table, K= 1.26 (From Handbook of concrete by Mark Fintel page 147 Fig 5-16)
ez / Lz = 0.015 Max. Bearing Press.=qmax =K x P / Lx * Lz = 92.19 KN/m2 < q all = q safe + γ x h2
=> Hence Satisfactory

Case II:
Axial load P = Fy + SubStructure Load = 181.9 KN
Moment at base Mx1= Mx + Fz x (h1+h2) = 24.52 KNm
Moment at base Mz1= Mz + Fx x (h1+h2) = 7.51 KNm
Eccentricity,
ex = Mz1 / P = 0.041 m < Lx / 6 Contact Length= 3 x (Lx /2 - ex) / Lx = 100%
ez = Mx1 / P = 0.135 m < Lz / 6 Contact Length= 3 x (Lz /2 - ez) / Lz = 100%

ex / Lx = 0.028 From Table, K= 1.69 (From Handbook of concrete by Mark Fintel page 147 Fig 5-16)
ez / Lz = 0.090 Max. Bearing Press.=qmax =K x P / Lx * Lz = 136.39 KN/m2 < q all =1.25* q safe + γ x h2
=> Hence Satisfactory
Case III:
Axial load P = Fy + SubStructure Load = 199.2 KN
Moment at base Mx1= Mx + Fz x (h1+h2) = 41.843 KNm
Moment at base Mz1= Mz + Fx x (h1+h2) = 7.51 KNm
Eccentricity,
ex = Mz1 / P = 0.038 m < Lx / 6 Contact Length= 3 x (Lx /2 - ex) / Lx = 100%
ez = Mx1 / P = 0.210 m < Lz / 6 Contact Length= 3 x (Lz /2 - ez) / Lz = 100%

ex / Lx = 0.025 From Table, K= 2.03 (From Handbook of concrete by Mark Fintel page 147 Fig 5-16)
ez / Lz = 0.140 Max. Bearing Press.=qmax =K x P / Lx * Lz = 179.34 KN/m2 < q all = 1.25*q safe + γ x h2
=> Hence Satisfactory

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 22 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

Design Of Base (Ref. IS-456)


Downward pressure on Base:
2
ws=(Weight of Footing + Weight of Imposed Earth above footing) / Lx . Lz= 34.41 KN/m

Cover to Main Reinf. = C = 65.00 mm


Effective Depth d =(D - C - φ/2)= 0.28 m
Projected Length of Base:
ax
ax = 0.6 m
az = 0.6 m
Flexure
Flexure d
Case I: Section Shear
Factor for Substructure Load = 1.5
2
Factored ws = fws = 51.62 KN/m
Axial load P = Fy + SubStructure Load = 246.2 KN
qm qs
Moment at base Mx1= Mx + Fz x (h1+h2) = 5.385 KNm qma
Moment at base Mz1= Mz + Fx x (h1+h2) = 11.267 KNm Base Pressure Distribution Diagram
Eccentricity,
ex = Mz1 / P (m) = 0.046 ex / Lx = 0.031 From Table, K= 1.26
ez = Mx1 / P (m) = 0.022 e z / Lz = 0.015 qmax = K x P / Lx * Lz (KN/m2)= 138.29
qmin = (KN/m2) = 79.82
Moment at face of Pedestal=
BM in X- Direction = (qm - fws) x ax 2/ 2 + ( qmax - qm ) x ax2/3 = 14.20 KNm / Unit Width
BM in Z- Direction = (qm - fws) x az 2/ 2 + ( qmax - qm ) x az2/3 = 14.20 KNm / Unit Width

Shear at 'd' distance from face of Pedestal=


SF in X- Direction = (qS - fws) x (ax -d) + ( qmax - qS ) x (ax -d)/2 = 25.81 KN / Unit Width
SF in Z- Direction = (qS - fws) x (az -d) + ( qmax - qS ) x (az -d)/2 = 25.81 KN / Unit Width
Case II:
Factor for Substructure Load = 1.5
2
Factored ws = fws = 51.62 KN/m
Axial load P = Fy + SubStructure Load = 272.9 KN
Moment at base Mx1= Mx + Fz x (h1+h2) = 36.7815 KNm
Moment at base Mz1= Mz + Fx x (h1+h2) = 11.2665 KNm
Eccentricity,
ex = Mz1 / P (m) = 0.041 ex / Lx = 0.028 From Table, K= 1.69
ez = Mx1 / P (m) = 0.135 e z / Lz = 0.090 qmax = K x P / Lx * Lz (KN/m2) = 204.59
qmin = (KN/m2) = 35.86
Moment at face of Pedestal=
BM in X- Direction = (qm - fws) x ax 2/ 2 + ( qmax - qm ) x ax2/3 = 23.49 KNm / Unit Width
BM in Z- Direction = (qm - fws) x az 2/ 2 + ( qmax - qm ) x az2/3 = 23.49 KNm / Unit Width
Shear at 'd' distance from face of Pedestal=
SF in X- Direction = (qS - fws) x (ax -d) + ( qmax - qS ) x (ax -d)/2 = 43.31 KN / Unit Width
SF in Z- Direction = (qS - fws) x (az -d) + ( qmax - qS ) x (az -d)/2 = 43.31 KN / Unit Width
Case III:
Factor for Substructure Load = 1.5
2
Factored ws = fws = 51.62 KN/m
Axial load P = Fy + SubStructure Load = 298.7 KN
Moment at base Mx1= Mx + Fz x (h1+h2) = 62.7645 KNm
Moment at base Mz1= Mz + Fx x (h1+h2) = 11.2665 KNm
Eccentricity,
ex = Mz1 / P (m) = 0.038 ex / Lx = 0.025 From Table, K= 2.03
ez = Mx1 / P (m) = 0.210 e z / Lz = 0.140 qmax = K x P / Lx * Lz (KN/m2) = 269.01
qmin = (KN/m ) 2
= 1.17

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 23 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

Moment at face of Pedestal=


BM in X- Direction = (qm - fws) x ax 2/ 2 + ( qmax - qm ) x ax2/3 = 32.70 KNm / Unit Width
BM in Z- Direction = (qm - fws) x az 2/ 2 + ( qmax - qm ) x az2/3 = 32.70 KNm / Unit Width

Shear at 'd' distance from face of Pedestal=


SF in X- Direction = (qS - fws) x (ax -d) + ( qmax - qS ) x (ax -d)/2 = 60.58 KN / Unit Width
SF in Z- Direction = (qS - fws) x (az -d) + ( qmax - qS ) x (az -d)/2 = 60.58 KN / Unit Width

Bottom Reinforcement:
X-Direction:
Maximum Moment Mx = 32.70 KNm / Unit Width
2
q n = Mu/bd =
Required 0.42 N/Sqmm.

ρ =
2
0.00121 Ast = ρ x b x d = 336.4 mm Providing Bar : # 12
ρmin =
2
0.0012 Ast (min) = 334.8 mm Spacing Required = 336.18 mm

Hence Adopt #12 @ 336mm c/c both sides


However, Provide #12 @ 200 c/c BW
Z-Direction:
Maximum Moment Mx = 32.70 KNm / Unit Width
2
q n = Mu/bd =
Required 0.42 N/Sqmm.

ρ =
2
0.00121 Ast = ρ x b x d = 336.4 mm Providing Bar : # 12
ρmin =
2
0.0012 Ast (min) = 334.8 mm Spacing Required = 336.18 mm

Hence Adopt #12 @ 336mm c/c both sides


However, Provide #12 @ 200c/c BW
One-way Shear Check :
Maximum Shear Force at 'd' distance from Pedestal face = V = 60.58 KN / Unit Width
2
Nominal Shear Stress 0.22 N/mm
2
Design Shear Srength of Concrete 0.26 N/mm

'=> Hence Satisfactory

Top Reinforcement:
Maximum fws = 51.62 KN/m2
BM in X - Direction = (fws x ax2/2) = 9.29 KNm
2
BM in Z - Direction = (fws x a z /2) = 9.29 KNm
X-Direction:
Maximum Moment Mx = 9.29 KNm / Unit Width
2
q n = Mu/bd =
Required 0.12 N/Sqmm.
ρ =
2
0.00035 Ast = ρ x b x d = 97.8 mm Providing Bar : # 10
ρmin =
2
0.0012 Ast (min) = 334.8 mm Spacing Required = 234.56 mm

Hence Adopt #10 @ 235mm c/c both sides


However, Provide #10 @ 200c/c

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 24 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1
Z-Direction:
Maximum Moment Mx = 9.29 KNm / Unit Width
2
q n = Mu/bd =
Required 0.12 N/Sqmm.
ρ =
2
0.00035 Ast = ρ x b x d = 97.8 mm Providing Bar : # 10
ρmin =
2
0.0012 Ast (min) = 334.8 mm Spacing Required = 234.56 mm

Hence Adopt #10 @ 235mm c/c both sides


However, Provide #10 @ 200c/c
Punching Shear Check :

Shear at 'd/2' distance from the col face = 258.80 KN


Punching Shear Stress (N/mm2) = 0.401
Allowable Shear Stress (N/mm2) = 1.25

'=> Hence Satisfactory.

STABILITY CHECK
Overturning Check
Case 1
Overturning moment in' Z' direction= 7.5 KNm
Restoring moment in' Z' direction= 123.1 KNm
Factor of safety= 16.4 >1.5 Hence Satisfactory
Overturning moment in' X' direction= 3.6 KNm
Restoring moment in' X' direction= 123.1 KNm
Factor of safety= 34.3 >1.5 Hence Satisfactory
Case 2
Overturning moment in' Z' direction= 7.5 KNm
Restoring moment in' Z' direction= 136.4 KNm
Factor of safety= 18.2 >1.5 Hence Satisfactory
Overturning moment in' X' direction= 24.5 KNm
Restoring moment in' X' direction= 136.4 KNm
Factor of safety= 5.6 >1.5 Hence Satisfactory
Case 3
Overturning moment in' Z' direction= 7.5 KNm
Restoring moment in' Z' direction= 149.4 KNm
Factor of safety= 19.9 >1.5 Hence Satisfactory
Overturning moment in' X' direction= 41.8 KNm
Restoring moment in' X' direction= 149.4 KNm
Factor of safety= 3.6 >1.5 Hence Satisfactory

Sliding check
Coefficient of friction= 0.5
Case 1
Total sliding force= 3.1 KN
Resisting frictional force= 82.1 KN
Factor of safety= 26.3 >1.5 Hence Satisfactory
Case 2
Total sliding force= 8.4 KN
Resisting frictional force= 91.0 KN
Factor of safety= 10.8 >1.5 Hence Satisfactory
Case 3
Total sliding force= 8.4 KN
Resisting frictional force= 99.6 KN
Factor of safety= 11.8 >1.5 Hence Satisfactory

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 25 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

5.0 STAAD OUTPUT

5.1 Design of Columns


C O L U M N N O. 13 D E S I G N R E S U L T S

M30 Fe415 (Main) Fe415 (Sec.)

LENGTH: 3050.0 mm CROSS SECTION: 300.0 mm X 300.0 mm COVER: 40.0 mm

** GUIDING LOAD CASE: 31 END JOINT: 1 SHORT COLUMN

REQD. STEEL AREA : 571.50 Sq.mm.


REQD. CONCRETE AREA: 89428.50 Sq.mm.
MAIN REINFORCEMENT : Provide 4 - 16 dia. (0.89%, 804.25 Sq.mm.)
(Equally distributed)
TIE REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 255 mm c/c

SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)


----------------------------------------------------------
Puz : 1385.16 Muz1 : 26.94 Muy1 : 26.94

INTERACTION RATIO: 1.00 (as per Cl. 39.6, IS456:2000)

SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)


----------------------------------------------------------
WORST LOAD CASE: 11
END JOINT: 1 Puz : 1454.46 Muz : 37.34 Muy : 37.34 IR: 0.78
============================================================================

============================================================================

C O L U M N N O. 14 D E S I G N R E S U L T S

M30 Fe415 (Main) Fe415 (Sec.)

LENGTH: 3050.0 mm CROSS SECTION: 300.0 mm X 300.0 mm COVER: 40.0 mm

** GUIDING LOAD CASE: 29 END JOINT: 3 SHORT COLUMN

STAAD SPACE -- PAGE NO. 100

REQD. STEEL AREA : 594.73 Sq.mm.


REQD. CONCRETE AREA: 89405.27 Sq.mm.
MAIN REINFORCEMENT : Provide 4 - 16 dia. (0.89%, 804.25 Sq.mm.)
(Equally distributed)
TIE REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 255 mm c/c

SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)


----------------------------------------------------------
Puz : 1392.08 Muz1 : 33.57 Muy1 : 33.57

INTERACTION RATIO: 1.00 (as per Cl. 39.6, IS456:2000)

SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)


----------------------------------------------------------
WORST LOAD CASE: 11
END JOINT: 3 Puz : 1454.46 Muz : 40.99 Muy : 40.99 IR: 0.82
============================================================================

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 26 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1
C O L U M N N O. 17 D E S I G N R E S U L T S

M30 Fe415 (Main) Fe415 (Sec.)

LENGTH: 3050.0 mm CROSS SECTION: 300.0 mm X 300.0 mm COVER: 40.0 mm

** GUIDING LOAD CASE: 28 END JOINT: 2 SHORT COLUMN

REQD. STEEL AREA : 625.59 Sq.mm.


REQD. CONCRETE AREA: 89374.41 Sq.mm.
MAIN REINFORCEMENT : Provide 4 - 16 dia. (0.89%, 804.25 Sq.mm.)
(Equally distributed)
TIE REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 255 mm c/c

SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)


----------------------------------------------------------
Puz : 1401.27 Muz1 : 34.13 Muy1 : 34.13

INTERACTION RATIO: 1.00 (as per Cl. 39.6, IS456:2000)

SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)


----------------------------------------------------------
WORST LOAD CASE: 10
END JOINT: 2 Puz : 1454.46 Muz : 40.39 Muy : 40.39 IR: 0.84
STAAD SPACE -- PAGE NO. 101

============================================================================

============================================================================

C O L U M N N O. 19 D E S I G N R E S U L T S

M30 Fe415 (Main) Fe415 (Sec.)

LENGTH: 3050.0 mm CROSS SECTION: 300.0 mm X 300.0 mm COVER: 40.0 mm

** GUIDING LOAD CASE: 28 END JOINT: 4 SHORT COLUMN

REQD. STEEL AREA : 625.59 Sq.mm.


REQD. CONCRETE AREA: 89374.41 Sq.mm.
MAIN REINFORCEMENT : Provide 4 - 16 dia. (0.89%, 804.25 Sq.mm.)
(Equally distributed)
TIE REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 255 mm c/c

SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)


----------------------------------------------------------
Puz : 1401.27 Muz1 : 34.13 Muy1 : 34.13

INTERACTION RATIO: 1.00 (as per Cl. 39.6, IS456:2000)

SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)


----------------------------------------------------------
WORST LOAD CASE: 10
END JOINT: 4 Puz : 1454.46 Muz : 40.39 Muy : 40.39 IR: 0.84
============================================================================

============================================================================

C O L U M N N O. 21 D E S I G N R E S U L T S

M25 Fe415 (Main) Fe415 (Sec.)

LENGTH: 2050.0 mm CROSS SECTION: 300.0 mm X 300.0 mm COVER: 40.0 mm

** GUIDING LOAD CASE: 31 END JOINT: 13 SHORT COLUMN

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 27 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1
STAAD SPACE -- PAGE NO. 102

REQD. STEEL AREA : 443.03 Sq.mm.


REQD. CONCRETE AREA: 55378.45 Sq.mm.
MAIN REINFORCEMENT : Provide 4 - 12 dia. (0.50%, 452.39 Sq.mm.)
(Equally distributed)
TIE REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 190 mm c/c

SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)


----------------------------------------------------------
Puz : 1145.41 Muz1 : 22.20 Muy1 : 22.20

INTERACTION RATIO: 1.00 (as per Cl. 39.6, IS456:2000)

SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)


----------------------------------------------------------
WORST LOAD CASE: 13
END JOINT: 13 Puz : 1148.22 Muz : 22.28 Muy : 22.28 IR: 0.99
============================================================================

============================================================================

C O L U M N N O. 22 D E S I G N R E S U L T S

M25 Fe415 (Main) Fe415 (Sec.)

LENGTH: 2050.0 mm CROSS SECTION: 300.0 mm X 300.0 mm COVER: 40.0 mm

** GUIDING LOAD CASE: 1 END JOINT: 15 SHORT COLUMN

REQD. STEEL AREA : 393.06 Sq.mm.


REQD. CONCRETE AREA: 49132.66 Sq.mm.
MAIN REINFORCEMENT : Provide 4 - 12 dia. (0.50%, 452.39 Sq.mm.)
(Equally distributed)
TIE REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 190 mm c/c

SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)


----------------------------------------------------------
Puz : 1005.36 Muz1 : 15.27 Muy1 : 15.27

INTERACTION RATIO: 0.99 (as per Cl. 39.6, IS456:2000)

SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)


----------------------------------------------------------
WORST LOAD CASE: 12
END JOINT: 15 Puz : 1148.22 Muz : 24.06 Muy : 24.06 IR: 0.87
STAAD SPACE -- PAGE NO. 103

============================================================================

============================================================================

C O L U M N N O. 23 D E S I G N R E S U L T S

M25 Fe415 (Main) Fe415 (Sec.)

LENGTH: 2050.0 mm CROSS SECTION: 300.0 mm X 300.0 mm COVER: 40.0 mm

** GUIDING LOAD CASE: 31 END JOINT: 14 SHORT COLUMN

REQD. STEEL AREA : 443.03 Sq.mm.


REQD. CONCRETE AREA: 55378.45 Sq.mm.
MAIN REINFORCEMENT : Provide 4 - 12 dia. (0.50%, 452.39 Sq.mm.)

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 28 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1
(Equally distributed)
TIE REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 190 mm c/c

SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)


----------------------------------------------------------
Puz : 1145.41 Muz1 : 22.20 Muy1 : 22.20

INTERACTION RATIO: 1.00 (as per Cl. 39.6, IS456:2000)

SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)


----------------------------------------------------------
WORST LOAD CASE: 13
END JOINT: 14 Puz : 1148.22 Muz : 22.28 Muy : 22.28 IR: 0.99
============================================================================

============================================================================

C O L U M N N O. 24 D E S I G N R E S U L T S

M25 Fe415 (Main) Fe415 (Sec.)

LENGTH: 2050.0 mm CROSS SECTION: 300.0 mm X 300.0 mm COVER: 40.0 mm

** GUIDING LOAD CASE: 30 END JOINT: 16 SHORT COLUMN

STAAD SPACE -- PAGE NO. 104

REQD. STEEL AREA : 295.57 Sq.mm.


REQD. CONCRETE AREA: 36946.10 Sq.mm.
MAIN REINFORCEMENT : Provide 4 - 12 dia. (0.50%, 452.39 Sq.mm.)
(Equally distributed)
TIE REINFORCEMENT : Provide 8 mm dia. rectangular ties @ 190 mm c/c

SECTION CAPACITY BASED ON REINFORCEMENT REQUIRED (KNS-MET)


----------------------------------------------------------
Puz : 1101.17 Muz1 : 25.82 Muy1 : 25.82

INTERACTION RATIO: 1.00 (as per Cl. 39.6, IS456:2000)

SECTION CAPACITY BASED ON REINFORCEMENT PROVIDED (KNS-MET)


----------------------------------------------------------
WORST LOAD CASE: 12
END JOINT: 16 Puz : 1148.22 Muz : 31.67 Muy : 31.67 IR: 0.81
============================================================================

Provided column reinforcement is 4 # 16 of Longitudinal reinforcement and lateral ties #8 @


150 c/c which is found to be more than the required.

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 29 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

5.2 Support Reactions


Force-X Force-Y Force-Z Moment-X Moment-Y Moment-Z
Node L/C kN kN kN kNm kNm kNm
13 46 2.819 83.002 1.349 0.892 0 -1.873
13 63 -1.532 74.405 1.349 0.892 -0.012 3.603
13 81 -1.532 74.405 1.349 0.892 -0.012 3.603
13 64 -2.14 74.383 1.349 0.892 -0.012 3.993
13 82 -2.14 74.383 1.349 0.892 -0.012 3.993
13 57 -1.456 71.767 1.362 0.901 -0.012 3.554
13 53 -1.456 71.767 1.362 0.901 -0.012 3.554
13 71 -1.456 71.767 1.362 0.901 -0.012 3.554
13 75 -1.456 71.767 1.362 0.901 -0.012 3.554
13 76 -2.063 71.745 1.362 0.901 -0.012 3.943
13 54 -2.063 71.745 1.362 0.901 -0.012 3.943
13 72 -2.063 71.745 1.362 0.901 -0.012 3.943
13 58 -2.063 71.745 1.362 0.901 -0.012 3.943
13 80 2.819 65.222 -5.601 -7.126 0.019 -1.872
13 61 2.819 65.222 -4.92 -6.692 0.019 -1.872
13 62 2.819 65.222 -5.601 -7.126 0.019 -1.872
13 79 2.819 65.222 -4.918 -6.692 0.019 -1.872
13 56 2.896 62.583 -5.587 -7.117 0.019 -1.922
13 74 2.896 62.583 -5.587 -7.117 0.019 -1.922
13 51 2.896 62.583 -4.905 -6.683 0.019 -1.922
13 52 2.896 62.583 -5.587 -7.117 0.019 -1.922
13 73 2.896 62.583 -4.905 -6.683 0.019 -1.922
13 55 2.896 62.583 -4.905 -6.683 0.019 -1.922
13 69 2.896 62.583 -4.905 -6.683 0.019 -1.922
13 70 2.896 62.583 -5.587 -7.117 0.019 -1.922
13 59 -9.236 58.949 1.349 0.892 0 12.704
13 77 -9.236 58.949 1.349 0.892 0 12.704
13 47 -9.159 56.311 1.362 0.901 0 12.654
13 65 -9.159 56.311 1.362 0.901 0 12.654
13 49 -9.159 56.311 1.362 0.901 0 12.654
13 67 -9.159 56.311 1.362 0.901 0 12.654
13 78 2.819 47.978 -10.706 -13.258 0 -1.873
13 60 2.819 47.978 -10.706 -13.258 0 -1.873
13 48 2.896 45.339 -10.692 -13.25 0 -1.922
13 66 2.896 45.339 -10.692 -13.25 0 -1.922
13 68 2.896 45.339 -10.692 -13.25 0 -1.922
13 50 2.896 45.339 -10.692 -13.25 0 -1.922

14 77 -14.874 107.056 1.349 0.892 0 16.449


14 59 -14.874 107.056 1.349 0.892 0 16.449
14 49 -14.951 104.417 1.362 0.901 0 16.498
14 67 -14.951 104.417 1.362 0.901 0 16.498
14 65 -14.951 104.417 1.362 0.901 0 16.498
14 47 -14.951 104.417 1.362 0.901 0 16.498
14 82 -7.452 91.622 1.349 0.892 -0.012 7.534
14 64 -7.452 91.622 1.349 0.892 -0.012 7.534
14 81 -8.029 91.599 1.349 0.892 -0.012 7.888
14 63 -8.029 91.599 1.349 0.892 -0.012 7.888
14 76 -7.529 88.983 1.362 0.901 -0.012 7.583
14 72 -7.529 88.983 1.362 0.901 -0.012 7.583

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 30 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

14 58 -7.529 88.983 1.362 0.901 -0.012 7.583


14 54 -7.529 88.983 1.362 0.901 -0.012 7.583
14 57 -8.106 88.961 1.362 0.901 -0.012 7.937
14 71 -8.106 88.961 1.362 0.901 -0.012 7.937
14 53 -8.106 88.961 1.362 0.901 -0.012 7.937
14 75 -8.106 88.961 1.362 0.901 -0.012 7.937
14 46 -2.819 83.002 1.349 0.892 0 1.873
14 61 -2.819 65.222 -4.918 -6.692 -0.019 1.872
14 80 -2.819 65.222 -5.601 -7.126 -0.019 1.872
14 62 -2.819 65.222 -5.601 -7.126 -0.019 1.872
14 79 -2.819 65.222 -4.918 -6.692 -0.019 1.872
14 70 -2.896 62.583 -5.587 -7.117 -0.019 1.922
14 69 -2.896 62.583 -4.905 -6.683 -0.019 1.922
14 52 -2.896 62.583 -5.587 -7.117 -0.019 1.922
14 55 -2.896 62.583 -4.905 -6.683 -0.019 1.922
14 73 -2.896 62.583 -4.905 -6.683 -0.019 1.922
14 74 -2.896 62.583 -5.587 -7.117 -0.019 1.922
14 51 -2.896 62.583 -4.905 -6.683 -0.019 1.922
14 56 -2.896 62.583 -5.587 -7.117 -0.019 1.922
14 78 -2.819 47.978 -10.706 -13.258 0 1.873
14 60 -2.819 47.978 -10.706 -13.258 0 1.873
14 50 -2.896 45.339 -10.692 -13.25 0 1.922
14 66 -2.896 45.339 -10.692 -13.25 0 1.922
14 68 -2.896 45.339 -10.692 -13.25 0 1.922
14 48 -2.896 45.339 -10.692 -13.25 0 1.922

15 60 2.819 118.027 -13.403 -15.043 0 -1.873


15 78 2.819 118.027 -13.403 -15.043 0 -1.873
15 48 2.896 115.389 -13.417 -15.052 0 -1.922
15 66 2.896 115.389 -13.417 -15.052 0 -1.922
15 50 2.896 115.389 -13.417 -15.052 0 -1.922
15 68 2.896 115.389 -13.417 -15.052 0 -1.922
15 62 2.819 100.783 -7.924 -8.673 0.019 -1.873
15 79 2.819 100.783 -8.607 -9.106 0.019 -1.873
15 80 2.819 100.783 -7.924 -8.673 0.019 -1.873
15 61 2.819 100.783 -8.607 -9.106 0.019 -1.873
15 55 2.896 98.145 -8.621 -9.115 0.019 -1.922
15 73 2.896 98.145 -8.621 -9.115 0.019 -1.922
15 70 2.896 98.145 -7.938 -8.681 0.019 -1.922
15 51 2.896 98.145 -8.621 -9.115 0.019 -1.922
15 74 2.896 98.145 -7.938 -8.681 0.019 -1.922
15 56 2.896 98.145 -7.938 -8.681 0.019 -1.922
15 52 2.896 98.145 -7.938 -8.681 0.019 -1.922
15 69 2.896 98.145 -8.621 -9.115 0.019 -1.922
15 46 2.819 83.002 -1.349 -0.892 0 -1.873
15 81 -1.532 74.405 -1.349 -0.892 0.012 3.603
15 63 -1.532 74.405 -1.349 -0.892 0.012 3.603
15 64 -2.14 74.383 -1.349 -0.892 0.012 3.993
15 82 -2.14 74.383 -1.349 -0.892 0.012 3.993
15 53 -1.456 71.767 -1.362 -0.901 0.012 3.554
15 75 -1.456 71.767 -1.362 -0.901 0.012 3.554
15 71 -1.456 71.767 -1.362 -0.901 0.012 3.554

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 31 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

15 57 -1.456 71.767 -1.362 -0.901 0.012 3.554


15 58 -2.063 71.745 -1.362 -0.901 0.012 3.943
15 72 -2.063 71.745 -1.362 -0.901 0.012 3.943
15 54 -2.063 71.745 -1.362 -0.901 0.012 3.943
15 76 -2.063 71.745 -1.362 -0.901 0.012 3.943
15 59 -9.236 58.949 -1.349 -0.892 0 12.704
15 77 -9.236 58.949 -1.349 -0.892 0 12.704
15 49 -9.159 56.311 -1.362 -0.901 0 12.654
15 47 -9.159 56.311 -1.362 -0.901 0 12.654
15 67 -9.159 56.311 -1.362 -0.901 0 12.654
15 65 -9.159 56.311 -1.362 -0.901 0 12.654

16 60 -2.819 118.027 -13.403 -15.043 0 1.873


16 78 -2.819 118.027 -13.403 -15.043 0 1.873
16 48 -2.896 115.389 -13.417 -15.052 0 1.922
16 66 -2.896 115.389 -13.417 -15.052 0 1.922
16 50 -2.896 115.389 -13.417 -15.052 0 1.922
16 68 -2.896 115.389 -13.417 -15.052 0 1.922
16 77 -14.874 107.056 -1.349 -0.892 0 16.449
16 59 -14.874 107.056 -1.349 -0.892 0 16.449
16 65 -14.951 104.417 -1.362 -0.901 0 16.498
16 49 -14.951 104.417 -1.362 -0.901 0 16.498
16 47 -14.951 104.417 -1.362 -0.901 0 16.498
16 67 -14.951 104.417 -1.362 -0.901 0 16.498
16 80 -2.819 100.783 -7.924 -8.673 -0.019 1.873
16 62 -2.819 100.783 -7.924 -8.673 -0.019 1.873
16 61 -2.819 100.783 -8.607 -9.106 -0.019 1.873
16 79 -2.819 100.783 -8.607 -9.106 -0.019 1.873
16 74 -2.896 98.145 -7.938 -8.681 -0.019 1.922
16 70 -2.896 98.145 -7.938 -8.681 -0.019 1.922
16 55 -2.896 98.145 -8.621 -9.115 -0.019 1.922
16 73 -2.896 98.145 -8.621 -9.115 -0.019 1.922
16 56 -2.896 98.145 -7.938 -8.681 -0.019 1.922
16 51 -2.896 98.145 -8.621 -9.115 -0.019 1.922
16 52 -2.896 98.145 -7.938 -8.681 -0.019 1.922
16 69 -2.896 98.145 -8.621 -9.115 -0.019 1.922
16 64 -7.452 91.622 -1.349 -0.892 0.012 7.534
16 82 -7.452 91.622 -1.349 -0.892 0.012 7.534
16 81 -8.029 91.599 -1.349 -0.892 0.012 7.888
16 63 -8.029 91.599 -1.349 -0.892 0.012 7.888
16 72 -7.529 88.983 -1.362 -0.901 0.012 7.583
16 54 -7.529 88.983 -1.362 -0.901 0.012 7.583
16 76 -7.529 88.983 -1.362 -0.901 0.012 7.583
16 58 -7.529 88.983 -1.362 -0.901 0.012 7.583
16 75 -8.106 88.961 -1.362 -0.901 0.012 7.937
16 53 -8.106 88.961 -1.362 -0.901 0.012 7.937
16 71 -8.106 88.961 -1.362 -0.901 0.012 7.937
16 57 -8.106 88.961 -1.362 -0.901 0.012 7.937
16 46 -2.819 83.002 -1.349 -0.892 0 1.873

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 32 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

5.3 Beam – Section Forces

Plinth Beam
Max Support BM Mz/ Max Fy
Beam
Beam LC Section Fx(KN) Fy(KN) Fz(KN) Mx(KN.m) My(KN.m) Mz(KN.m) Marking
1 28 1 -0.99 -61.756 0 0 0 53.1
Max Mid span BM Mz PB1
1 12 0 -0.594 -1.739 0 0 0 -31.565
Max Support BM Mz/Max Fy
4 11 1 0.793 -60.987 0 0 0 44.754
Max Mid span BM Mz PB2
3 13 0 0.476 -19.323 0 0 0 -36.612

Roof Beam
Max Support BM Mz/ Max Fy
Beam LC Section Fx(KN) Fy(KN) Fz(KN) Mx(KN.m) My(KN.m) Mz(KN.m)
10 28 1 5.333 -36.189 0 4.415 0 31.244
Max Mid span BM Mz RB1
9 10 0.333 5.333 -2.49 0 1.472 0 -13.945
Max Support BM Mz/Max Fy
11 29 1 1.25 -33.019 0 3.065 0 25.942
Max Mid span BM Mz RB2
11 13 0 0.75 -8.332 0 -1.839 0 -16.378

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 33 of 34
MAYTAS NAFTOGASBUD JV GSPL203-73-1506
Rev 1

6.0 CONCLUSION
SIZE (IN MM) AT BOTTOM AT TOP

FOOTING 1500 X 1500 X 350 # 12 @ 200 C/C BW #10 @ 200 C/C BW

COLUMNS 300 X300 4 # 16 Stirrups #8 @ 150 c/c

BEAMS
PLINTH BEAM 230 X500 2 #16 (TOP & Stirrups #8 @ 150 c/c
BOTTOM)
ROOF BEAM 230 X300 2#12 (TOP & Stirrups #8 @ 150 c/c
BOTTOM)

ROOF SLAB 120 TK. #8 @ 200 C/C (Main) #8 @ 200 C/C (Main)
#8 @ 200 C/C (Dist) #8 @ 200 C/C (Dist.)

DESIGN CALCULATIONS FOR GUARD ROOM - SV1 STATION AT BODI GHODI Page 34 of 34