2010 PRIORITY TRANSPORTATION PROJECTS The 2010 Priority Transportation Projects include candidate road, congestion management, multi-use

trail, transit, transportation regional incentive program (TRIP) and transportation enhancement projects as listed herein. These priority projects will be provided to the Florida Department of Transportation (FDOT) as input to the development of its Draft Tentative Fiscal Years 2011/12 - 2015/16 Work Program for Polk County.

Adopted

August 12, 2010

Priority Road, Congestion Management and Multi-Use Trail Projects


Candidate Project Phases for FY 2015/16
Rank 1 2 3 4 5 6 Project Congestion Management/Multi-Use Trail US 98 State Road 542 (Phase II) US 17/92 (Hinson Avenue) US 92 (New Tampa Highway) SR 563 Extension (North-South Route) Phase Boxed Funds Construction Design PD&E PD&E Construction Project Description Projects to be defined in FY 2013/14 4 to 6-Lane widening between Brooks Street and Edgewood Drive 2 to 4-Lane widening between Buckeye Loop Road and US 27 2 to 4-Lane widening between SR 17 (10th Street) to 17th Street Hillsborough County Line to Wabash Avenue New 4-Lane Road between West Pipkin Road and SR 570 (Polk Parkway) Total Cost ($1,000) $5,000 $5,189* $5,000 $600 $1,500 $93,813* $111,102

*Present day cost and include Phase 52 only, in-house support and CEI not included (CEI is typically around 15%).

Adopted

August 12, 2010

Priority Highway Projects Strategic Intermodal System (SIS)


Candidate Project Phases for FY 2015/16
Rank 1 2 3 4 5 US 98 US 98 State Road 570 (Polk Parkway Toll) US 27 US 27 Project Phase Construction Construction Construction Construction Construction Project Description 4 to 6-Lane widening from South of Manor Drive to CR 540A 4 to 6-Lane widening between CR 540A and SR 540 2 to 4-Lane widening from South of CR 546 to South of Pace Road 4 to 6-Lane widening from north of I-4 to Sand Mine Road 4 to 6-Lane widening from Sand Mine Road to US 192 (Lake County Line) Total Cost ($1,000) $12,603* $14,316* $34,100* NA NA $61,019

*Present day cost and include Phase 52 only, in-house support and CEI not included (CEI is typically around 15%).

Adopted

August 12, 2010

Candidate Congestion Management Projects for FY 2012/13


Road/Project
CR 540 (Clubhouse Road)

Description
Tillery Road to Ninth Street. Resurface and add 4 paved shoulders. Add WB left turn lane at Yarborough Lane and upgrade traffic signal. Add sidewalk between Tillery and US 98 (south side). SR 544 approach west of SR 17. Addition of a WB thru lane west leg of intersection; MultiUse Trail west leg of intersection; mill and resurface west leg of intersection; and install new box-strain pole traffic signal system. Extend SB right-turn lane and resurface SB intersection approach. 350 with 11 foot lane due to ROW constraints. Software upgrade for traffic management system installed by FDOT and operated by the City. Winston Ave to Polk Ave (3,806 west side) Dr JA Wiltshire Ave to East St (950 west side) Osceola Ave to Dr JA Wiltshire Ave (344 east side) Sessoms Ave to Kissimmee Ave (935 west side) N of Seminole Ave to Kissimmee Ave (162 E side) Construction of 20 5x8 Deployment Pads on SR 33 (Lakeland Hills Boulevard). Construction of 34 5x8 Deployment Pads on US 17, 1 Street, SR 544, SR 17, US 92, 6 Street and Central Avenue. 5 or 6 sidewalk on north side of US 92 between Eastside Dr and E Lake Parker Drive, then transition to the South side of 92 between E Lake Parker Drive and western approaches to 92/Gary Road intersection 6,300. Extension of fiber connectivity from the intersection at Hwy 98/Marcum to the intersections Hwy 98/Duff and Hwy 98/Banana Roads (which is currently connect to a fiber optic communications network). Fiber optic connectivity would allow for the addition of these signals to the Polk County ITS network. Connectivity of these signals would allow remote monitoring of these intersections. Sidewalks both sides of the road through the Polk Parkway Interchange (Bramble Ridge to North of the Parkway) to fill in the gaps (5,000). Construct Sidewalk on SR 17 from F St. to S of CR 630 (550 west side) & N of CR 630 to I Street (710 west side)
st th

Type
Intersection and Multi-modal improvements Intersection and Multi-modal improvements Intersection ITS Sidewalk

Cost
$1,179,656

SR 544 at SR 17

$1,000,000

Waring Road/SR 572 (Drane Field Rd) Lakeland ATMS Central Software Upgrade State Road 17 Lake Wales LAMTD Transit Improvements WHAT Transit Improvements US 92 (Memorial Blvd)

$500,000 $300,000 $300,000

Transit Transit Sidewalk

$100,000 $114,000 $320,000

ITS

$50,000

US 98 North Traffic Signal Upgrade CR 37B (Lakeland Highlands Road) State Road 17 Frostproof

Sidewalk Sidewalk
FY 2012/13 Total

$250,000 $100,000
$4,213,656

Adopted

August 12, 2010

Priority Transit Projects Candidate Project Phases for FY 2015/2016


Lakeland Area Mass Transit District (LAMTD) ($1,000) Project Operating Assistance Admin./Maintenance Operations Cost Purchase/Install Passenger Shelters ITS/AVL Upgrades Miscellaneous Capital/Bus Terminal Improvements Replacement Vehicles

Federal Grant $1,342 50 $407 $50 $680 $1,683

State Grant $976

Local $6,621

Total $8,939 $50 $407 $50 $680 $1,683 $11,809

Total

Winter Haven Area Transit (WHAT)/Polk County Transit Services (PCTS) ($1,000) Project Federal Grant Operating Assistance $739 Replacement Vehicles $1,837 Purchase/Install Passenger Shelters $407 Miscellaneous Capital $85

State Grant $819

Local $833

Total $2,391 $1,837 $407 $85 $4,720

Total
Table 8.5, Adopted Polk Consolidated Transit Development Plan 2008-2017

Adopted

August 12, 2010

Priority Transportation Regional Incentive Program Projects


Candidate Project Phases for FY 2013/14 and 2014/15
Priority Road Improvement Addition of a second northbound left-turn lane and construction of westbound departure lane on US 92. Project will include potential geometric improvements at the County Line/CR 542 intersection, due to its proximity to US 92. Intersection is currently operating at LOS D, the standards for County Line Road and US 92. LOS failures are projected by 2010 associated with growth in West Lakeland and Plant City areas. Add EB Left Lane approximately 600 feet in length and related improvements to Wabash Ave. approach with curb-and-gutter typical section improvements adjacent to the WB departure lane to accommodate future four-laning on US 92 west of Wabash Ave. without requiring reconstruction. Signal modifications to address the additional left-turn lane as necessary. This project is intended to be the first phase of an ultimate multi-laning project in the US 92 corridor to address future level-ofservice deficiencies. Candidate Phase TRIP Funds ($1,000) Local Funds ($1,000)

US 92 at County Line Road

Construction

$1,000

$1,500

US 92 (New Tampa Highway) at Wabash Avenue

Construction

$800

$1,184

Adopted

August 12, 2010

Priority Transportation Enhancement Projects


Priority 1 2 3 4 Project Chain of Lakes Trail Lake Howard Connector Location Winter Haven Improvement
Connect trail with Lake Howard Trail on Ave B NW from 1st St N to Lake Howard Trail. Enhance pedestrian and bike accessibility to Lake Eva Park Complex and connections to Downtown area. Sidewalk connections to Historic Downtown area. Enhancements to utilities, decorative lighting, irrigation and landscaping on approximately 1 miles segment of US 17/92 in Davenport. 0.57 mile long 10 asphalt multi-use pathway around Lake Beulah. Project also includes bicycle parking, two (2) pedestrian crossings, a bus shelter, four (4) benches and historic lighting.

Cost* ($1,000) $840 $1,240 $2,800 $460

6th St Lake Eva Park Complex Haines City Corridor Martin Luther King, Jr. Way Corridor US 17/92 Enhancement Haines City Davenport

Lake Beulah Multi-Use Trail and Transit Enhancements**

Lakeland

$526

* Total Project Cost. ** This project replaces the City of Lakelands Interlachen Shore Acres Bikeway Project.

Adopted

August 12, 2010

Priority Multi-Use Trail Projects


Local Multi-Use Trail Projects - Candidate Project Phases for FY 2012/2013
Priority Project Location US 17/92 to Downtown Lake Alfed Improvement
Extension of the Chain of Lakes Trail (Winter Haven) into Lake Alfred Construct 8 wide multi-use path along the west shore of Lake Hunter. Paterson Park to Peace River Trail @ Ft. Meade Rec. Area

Cost ($1,000) $220

Lake Alfred Trail

West Lake Hunter Trail

SR 563

$565

Patterson Park to Peace River Trail

US 17 and US 98

$936

Regional Multi-Use Trail Projects - Candidate Project Phases for FY 2015/2016


Priority Project Location Improvement
Construction of a trail bridge over US 17/92 that would connect with the Chain of Lakes Trail Ft. Meade Rec. Area to Peace River/Mt. Pisgah Rd

Cost ($1,000)

Lake Alfred Trail Bridge

US 17/92

$1,200

Peace River Trail

Fort Meade/Peace River 8

$909

Adopted

August 12, 2010