trail, transit, transportation regional incentive program (TRIP) and transportation enhancement projects as listed herein. These priority projects will be provided to the Florida Department of Transportation (FDOT) as input to the development of its Draft Tentative Fiscal Years 2011/12 - 2015/16 Work Program for Polk County.
Adopted
*Present day cost and include Phase 52 only, in-house support and CEI not included (CEI is typically around 15%).
Adopted
*Present day cost and include Phase 52 only, in-house support and CEI not included (CEI is typically around 15%).
Adopted
Description
Tillery Road to Ninth Street. Resurface and add 4 paved shoulders. Add WB left turn lane at Yarborough Lane and upgrade traffic signal. Add sidewalk between Tillery and US 98 (south side). SR 544 approach west of SR 17. Addition of a WB thru lane west leg of intersection; MultiUse Trail west leg of intersection; mill and resurface west leg of intersection; and install new box-strain pole traffic signal system. Extend SB right-turn lane and resurface SB intersection approach. 350 with 11 foot lane due to ROW constraints. Software upgrade for traffic management system installed by FDOT and operated by the City. Winston Ave to Polk Ave (3,806 west side) Dr JA Wiltshire Ave to East St (950 west side) Osceola Ave to Dr JA Wiltshire Ave (344 east side) Sessoms Ave to Kissimmee Ave (935 west side) N of Seminole Ave to Kissimmee Ave (162 E side) Construction of 20 5x8 Deployment Pads on SR 33 (Lakeland Hills Boulevard). Construction of 34 5x8 Deployment Pads on US 17, 1 Street, SR 544, SR 17, US 92, 6 Street and Central Avenue. 5 or 6 sidewalk on north side of US 92 between Eastside Dr and E Lake Parker Drive, then transition to the South side of 92 between E Lake Parker Drive and western approaches to 92/Gary Road intersection 6,300. Extension of fiber connectivity from the intersection at Hwy 98/Marcum to the intersections Hwy 98/Duff and Hwy 98/Banana Roads (which is currently connect to a fiber optic communications network). Fiber optic connectivity would allow for the addition of these signals to the Polk County ITS network. Connectivity of these signals would allow remote monitoring of these intersections. Sidewalks both sides of the road through the Polk Parkway Interchange (Bramble Ridge to North of the Parkway) to fill in the gaps (5,000). Construct Sidewalk on SR 17 from F St. to S of CR 630 (550 west side) & N of CR 630 to I Street (710 west side)
st th
Type
Intersection and Multi-modal improvements Intersection and Multi-modal improvements Intersection ITS Sidewalk
Cost
$1,179,656
SR 544 at SR 17
$1,000,000
Waring Road/SR 572 (Drane Field Rd) Lakeland ATMS Central Software Upgrade State Road 17 Lake Wales LAMTD Transit Improvements WHAT Transit Improvements US 92 (Memorial Blvd)
ITS
$50,000
US 98 North Traffic Signal Upgrade CR 37B (Lakeland Highlands Road) State Road 17 Frostproof
Sidewalk Sidewalk
FY 2012/13 Total
$250,000 $100,000
$4,213,656
Adopted
Local $6,621
Total
Winter Haven Area Transit (WHAT)/Polk County Transit Services (PCTS) ($1,000) Project Federal Grant Operating Assistance $739 Replacement Vehicles $1,837 Purchase/Install Passenger Shelters $407 Miscellaneous Capital $85
Local $833
Total
Table 8.5, Adopted Polk Consolidated Transit Development Plan 2008-2017
Adopted
Construction
$1,000
$1,500
Construction
$800
$1,184
Adopted
6th St Lake Eva Park Complex Haines City Corridor Martin Luther King, Jr. Way Corridor US 17/92 Enhancement Haines City Davenport
Lakeland
$526
* Total Project Cost. ** This project replaces the City of Lakelands Interlachen Shore Acres Bikeway Project.
Adopted
SR 563
$565
US 17 and US 98
$936
Cost ($1,000)
US 17/92
$1,200
$909
Adopted