Submitted BY
Acknowledgement
No significant achievement can be solo performance especially. It took many very especial people to enable it and support it. Here I would like to acknowledge their precious co-operation and express my sicere gratitude to them.
I greatly thank to MR. k. VERABABU SIR (G.M. of Mechanical at JRC) has been very supportive and helping. it was his support that helped to complete the project , he always made that we were provided everything we needed.
My sincere thanks to MR. R.G. NIGAM SIR (Senior GM of Mechanical at JRC) and Raja Ram sir, Devendra Sharma sir and L.D. Kalwani sir who are always available for their kind help. Finally I thank to all the operator and attendant who also help us in field.
With a single minded focus to pioneer a myriad of feats in civil engineering, shri jaiprakash gaur , the founding father of jaiprakash associates limited acquired a diploma in civil engineering in 1950 from the university of roorkee. After a stint with government of U. P. he branched off on his own , to start as a civil contractor in 1958 with the steadfast determination to contribute in nation building. This has been possible with the active support of his honest colleagues such as shri s. k. jain, shri n. c. Sharma, shri raj kumar singh, shri rajendra singh shri p.v. vora, s. p. joshi, shri g. p. gaur, shri p. k. jainand young Generation ably headed by shri manoj gaur and sunil k. Sharma.
Milestones:Jaypee Group:
year 1958: Undertook first entrepreneurial work as contractor in mangrol in Kota. Year1979 : jaiprakash associates private ltd.(JAPL) formed. : uttra rasayan udyog ltd. Was formed for setting up malathion Technical plant in sikandrabad(U.P.), which was changed as Jaiprakash enterprises ltd.
Year1980: Hotel siddharth was set up. Year1982: Hotel vasant continental was set up. Year1986: commissioning of 1st unit of 1 Mn TPA Jaypee Rewa Plant. : formation of jaiprakash industries ltd(JIL) by amalgamating JAPL into Jaypee rewa cement plant. Year1991: commissing of 2nd unit of 1.5 Mn TPA Jaypee Rewa plant(JRP) in District rewa (M.P). Year1992: Formation of Jaiprakash hydro power Ltd (JHPL). Year1995: Formation JAiprakash power ventures Ltd (JPVL). : Hotel Jaypee residency manor set up. Year1996: commissioning of 1.7Mn TPA Jaypee Bela Plant (JBP) in Distric Rewa ,M.P Year1999: Jaypee palace Hotel, Agra set up. Year2000: Acquisition of land Jaypee Greens Ltd. Year 2001: Commissioning of .6 Mn TPA Jaypee Blending Unit in district Allahabad in u.p. , The first of it s kind in the country. : Jaypee institute of information technology (Deemed University Since November 1, 2004) at Noida U.P. Year2002: Commissioning of 1.0 Mn TPA grinding unit in district Ambedkar Nagar in U.P.
: Jaypee university of information technolog (State university), Waknagha set up. Year2003: commissioning of 25MW capative Thermal Power plant-1 At JRP. : Formation of Jaiprakash Associates Ltd (JAL) Formed by Merging JIL with Jaypee cement Ltd. Year2004: Commissioning of 25MW capative Thermal Power Plant-2 At JRP. : Commencement of Work for setting up 3MnTPA cement Plant at Baga& Baghri in District Solan in H.P. and 1.5 MnTPA Year2005: Successful completion of upgradation scheme enhancing The total capacity of Rewa Operation to 7.0MnTPa. : Shares of JHPL Listed on bse/nse. First hydro power company to be listed in the country. Year2006: setting up of Madhya Pradesh Jaypee Minerals Corporation Ltd. (MPJMCL). : commissioning of 38.5MW capative Thermal Power Plant-3 At Jaypee rewa plant. : Railway siding operational at Jaypee bela plant. : commencement of work for setting up a new green field
1.5 MnTPA cement plant in district sidhi,M.P. : Acquistion of cement plants & Assets of U.P. state cement Corporation limited (in Liquidation) of 2.5 MnTPA capacity. : Acquistion of Gujrat Anjan Cement Limited for setting up a Green field cement plant of 1.2 MnTPA capacity Bhuj,District Kutch,Gujrat. Year2007: Signing of MOU With Gujrat Mineral Devlopment Corporation(GMDC) for setting up a new green Field cement Plant of 1.2 MnTPA capacity, in JV in District Kutch, Gujrat. : Signing of MOU with Government of H.P, or seting up a new green field cement plant of 2.o MnTPA capacity in District Chamba, H.P. Mineral Development.
Introduction: Jaypee Rewa Cement:Jaypee rewa cement is sub division of Jaiprakash Associates Ltd. Jaiprakash Associates is one of the biggest construction company in india. Mr. Manoj Gaur is the Executive chairman of this company and its head office is in New Delhi. Jaypee Rewa cement is single largest production Unit. Its annual production is about 3.3 Million ton. There are two units installed for the production of clinker namely U-1 &U-2 . Unit-1: Supplied by Krupp. Plysious (Germany) . 1.5 million ton capacity was commission in dec. 1986. Unit-2: Supplied by F. L. Smidth (Denmark) 1.8 million ton capacity was commission in April 1991. Jaypee cement produce following type s of cement with different brand name. it s all products are very popular in the market. Brand Name: 1.Master builder(OPC 43) 2.OPC53S/T40 3.JAypee cement(PPC)
2-Crushing Stacking & Reclaiming of Limestone: The l/s crusher crush the Limestone to minus 80mm size and discharge the material onto a belt conveyer which take it to the stacker via the bulk material analyser. The material is stacked in longitudinal stockpiles . Limestone is extract transversely from the stockpiles by the reclaimers and conveyed to the Raw Mill hoppers for grinding of raw meal.
3-Crushing Stacking & Reclaiming of coal: The process of making cement clinker requires heat . coal is used as the fuel for providing heat. Raw coal receive from the collieries is stored in a coal yard. Raw coal is drop on a belt conveyer from a hopper and is taken to and crushed in a crusher. Crushed coal discharge is stored in a longitudinal stockpiles from where it is reclaimed by a reclaimer and taken to the coal mill hopper grinding of fine coal.
4-Raw Meal Drying/Grinding & Homogenisation: Reclaimed l/s along with some laterite stored in their respective hoppers is fed to the Raw mill for fine grinding. The hot gasses coming from the clinkerisation section are used in raw mill for drying and transport of the ground raw meal to the electrostatic precipitator /Bag house, where it is collected and then stored and homogenized in the concrete silo. Raw meal extracted from the silo(ne called kiln feed ) is feed to the top of the preheater for pyroprocessing. 5-Clinkerisation: Cement clinker is made by pyroprocessing of kiln feed in the preheater and the rotary kiln. Fine coal is fires as fuel to provided the necessary heat in the kiln and the precalciner located at the bottom of the 5/6 stage preheater. Hot clinker discharged from the kiln drops on the gate cooler and gets cooled. The cooler discharged the clinker onto the pan / bucket conveyer and it is transported to the clinker stockpiles/silp. The clinker is taken from the stockpiles/silo to the ball mill hoppers for cement grinding. 6-Cement Grinding & Storage: Clinker and Gypsum(for OPC) and also Pozzolana(for PPC) are extracted from their respected hoppers and feed to the cement mill. These ball mills ground the feed to a fine powder and the mill discharge is feed to an elevator, which takes the material to a separator, which separates fine product and the coarse the latter is sent to the mill inlet for regrinding and the fine product is stored in concrete silo. 7-Packing: Cement extracted from silos is conveyed to the automatic electronic packers where it is packed in 50 Kgs polythene bags and dispatched in trucks.
Mining
The major raw material for cement manufacturing is limestone. Limestone is excavated from open cast mines after drilling and blastin and loaded onto the dumper which is transported the material and unloaded into hopper of the limestone crusher.
Equipment Used in mining: 1. Compressor drilling machine. 2. Shovels/Excavators-for lifting material onto dampers. 3. Dumper- for carrying material. 4. Buildozers. 5. Payloaders. Explosive: 1. Amonium nitrate(Fuel oil) 2. Nitroglycerine. 3. Amonium nitrate and slurry explosive. Steps of Mining: 1. The first step of mining l/s the l/s has been located. 2. Limestone mining is to remove the mines. 3. The third step is to be taken as drilling. 4. After drilling blasting is done.
Drilling and Blasting: 1. The large hole blasting method is not pre-dominated in quarrying
in open pit.
2. The depth of the holes are more then 12m and 100-150mm dia.
Equipment Used in Crushing: 1. Crusher. 2. Apron conveyer for feeding l/s to crusher. 3. Bag filter for collecting dust. 4. Belt conveyer- for transporting crushed material.
Material Inlet size =1-1.5m Material outlet size=75-80mm Technical Specification of limestone crusher: Unit-1 Capacity Type Motor(KW) Rpm Make
650TPH APPM/1822 780 1000 L&T
Unit-2
900TPH APPM/1822 1200 1000 L&T
This section is worked with Following equipment: 1. Impact crusher. 2. Magnetic separator 3. Limestone stacker& reclaimer 4. Bag filtor 5. Apron feeded 6. Limestone hopper & laterite hopper The important mode of transportation in this section is belt conveyer.
y Blow bar: Blowbar is made from high quality alloyes steel. After
the certain period in operation the blow bar can be taken out from the rotor and turned to other side or exchange.
y Impact Arm: The impact crusher is fitted with the impact arm.
The impact arms are each suspended in the housing parts by means of knock out spindle and can be adjusted the desire gap setting from out side.
and a continually moving belt beinfin use.magnetic materials are attached by magnet due to cont. rotating of belt , material get seprated on removal of magnetic field.
Stacking Of Lime stone: There are two main method being used
for stacking of lime stone in cement industry. They are 1. Chevron Method 2. Windrow Method ..
Capacity=1400TPH Reclaimer:
Reclaimer which is used in our industry is bridge type scrapping reclaimer. The bridge on which the racking down device is mounted accommodates a scraper chain conveyer whose blades shift the dis lodged material along to collacting belt conveyer that extent along one edge of stackpile. Reclaimer having harrow assembly. Reclaimer moves on a track for fast travel A.c. Motor being used and for slow traveling
d.c. moter being used. Harrow are moves to and fro motion on an rack car which is driven by a motor. A limit sensor is installed for reverse and forword motion of harroe assembly. According to pile we can adjust the inclination of harrows. When harrows are moves they are scrap the material of each layer of stockpiles and material slides down due to gravity. A scraper chain take out the material and fed to belt conveyor material now get transported forwords limestone hoppers.
Raw mill:
This section is working with the fine grinding of raw material up to 90 microne for proper burning & proper calcinations of raw material. Jaypee Rewa Plant have two raw mill. In Unit-1 krupp polusius mill has the capacity of 320TPH and unit-2 loesche mill has capacity of 440TPH installed for grinding of raw material. The mill are designed in a modular fashion and can be equipped as required with four rollers. Each roller together with rocker arm which is rigigly clamped the pedestal in whch the rocker arm is mounted and a hydro-pneumatic spring system represent a power unit.
Technical Specification of VRN unit-1: Make Type Capacity Classifire Gearbox Speed Ratio Motor Feed Size Product Size Number of Rollers Storage Silo
Krupp polysius LM K 54/27 320 TPH LNV RENK AG(2003) 990/23.53 RPM 3600KW(BHEL) 90mm+2% 90micron -12% 2,In pair C.B. Silo
Grounded material falling through the nozzle ring is transported from discharge ring via an air lock in to recalculating bucket elevator. After passing through trap iron separator these return are passed back to grinding table via mill feed chute. Materisl of table is cast steel and interchanging grinding rings are made of wear resistance material. Grinding on material bed of grinding table which is rotate by motor and gear box. Each grinding roller is mounted on anty friction bearing on excel firmly clamped in to roller supports. The roller pair are guided bypins in corresponding guides on housing in such a way that they can move vertically and tilt about horizontal axis. This allows good adaptation to any changes in grinding bed height and means that the entire grinding area remains effective all time.
Raw Mill unit-2: Raw mill is one of the most important section of
cement plant. In raw mill raw material is grounded enough to increase sufficient reactive surface area. So that,material can burn fasily. The roller grinding mill can be delivered in various sizes. The characterization is described in smart form. For example:-LM50.40 In JRP vertical roller mill is used to grind the raw material. VRM consist of four roller, which on functioning rolls over a circular table. This table is rotated with the help of a shaft attached to motor.material is introduced from the top of the VRM. Material falls down on table,and on coming in b/w roller and table get crushed. Roller and table have some specified minimum clearance b/w them, any material of large size than that clearance gets crushed inside VRM. Rollers are hydraulically supported to exert specified force on material. Crushed material gets lifted with the highly pressurized air and is taken out through an outlet to ESP.
Technical Specification of VRM unit-2: Make Type Capacity Classifier Gear box Speed ratio Motor Feed size Residue No of roller Storage silo Working of loesche Mill:
Raw material comes into raw mill from hopper through a belt conveyer via triple gate. The main function of triple gate is to prevent the entrance of falls air and to give air seales material flow. When material comes b/w rotor and roller they are crushed in to fine powder due to action of compression and alteration. Roller are hydraulically activated, a 65 bar pressure exerted by oil being used to operate the rollers. Hydraulic system is connected with rollers through connecting rod and rocker arm. Due to rotating of table, the material which is not crushed enough is rejected from mill and feed to reject bucket elevator through vibro feeder. Exit gasses from preheater Loeshe LM 50.4 450TPH LNV MAAG 990/26RPM 5000Kw/BHEL 100mm+2% 18%on 90 micron 4 C.F. silo
and pre-calciners fed to raw mill via setting chamber to dry the raw material and to lift the fines the nuzzling velocity of air is 40-50 m/sec. A classifier is installed just above the mill it classifies fines and course. Fineness of materials can be increased by increasing the speed of the classifier.
VRM is divided into three parts, they are: 1. Gas chamber. 2. Grinding chamber 3. Classifier Gas Chamber
In gas chamber, hot air from PC fan and PH fan enters lifts the material upward due to the counter flow. Material is taken to the cyclones by the air.
Grinding chamber
In grinding chamber, grinding of material takes place b/w four rollers and the rotating table. Material in grinding chamber is introduced from hopper by belt conveyer through triple gate.
Classifier
A classifier is the top most rotary part of the vertical roller mill. Here classification of material occurs. Fine particles pass through classifier and coarse particles are rejected and recycled for regrinding. According to the fineness required speed of the classifier rotor can be adjusted.
Electrostatic precipitator:
Electrostatic precipitator the dust loaded gas to flow through the chamber usally the horizontal direction in which it passes through one or more high voltage electric from by alternate discharge electrodes and plate type collective electrodes.
Under action of the electric fields the dust particle which have become electrically change by the negative gas ion which are formed the discharge electrodes and attached them to the particle fly to the collecting electrodes and are deposited there the dust is rust from this electrodes by rapping and thus fall into the receive hopper at the base of the precipitator the electric charge acquired by the dust particle depend sustainability on their specific electric resistance in the lower range of opting temperature the specific resistance increase with rising temp as a result of diminishing surface couductivity.
Silo: Silos are huge construction of concrete and iron with aeration
units to stone and blend the fine material such as raw material.
Preheater Tower:
As the name explains Preheater Tower is place to use for preheating the raw material. The material which comes from cf or cb silo. In other
words preheater is a device in which heat transfer takes place fron hot gases which comes from kiln due to counter current flow of material and hot gases. The raw mill is heated about 850oc before it enter it the kiln preheater with calcined system is most economical and hence the length of kiln is reduce preheater in Unit-1 and five stage in unit-2 with separator line calciner. These suspension preheaters are work in kiln string & pyro string with pre-calciner string successfully.
Reaction occurs in pre-heater:Temperature range 100-300oc 400-600oc 500-600oc 600-850oc Type of Reaction
Loss of water Removal of inherent gases Structural change in silicate phase Dissociation of carbonate
Main part of suspension Pre-heater: 1. Cyclone: The cyclone is use for separation of raw meal from gas
flow. For improving the separating efficiency of cyclones of top most preheater stage. We have designed as double separator.
2. Gas Duct: The gas duct are to join the individual cyclone stages
to each other. The raw meal coming from next higher stage end in the gas duct underneath. The raw meal particles are entering by the upward flowing gas stream and taken to the next cyclone. The heal exchange is achieved by con-current flow. The gas ducts b/w stage 1 and 2 consist of the cylindrical suction.
3. The Double Flow Box: These are used for raw meal pipes in
preheater system the flaps are consist in such a manner that a minimum flow of raw mill is always maintain. The full material causes a upward and downward moment of the pendulum flaps and thus and upward and downward rocking motion of the lever arm with counter weight penetrating the single flaps. The upward and downward forces of flaps is remains constant.
Calciner:
The main purpose of the precalciner is to let the calcinations process take place out side the rotary kiln. It causes in sufficient reduction of thermal load of the kiln burning as approximately 60% of total fuel is burn in to calciner. This has made possible to increase the production in the given size to about double compared to a conventional dry process kiln with suspension preheater. The calciner consist of a vessel lined with heat resistance bricks.Calcine has three inputs and one output.
Input1. Fuel as Pulverized coal. 2. Preheated material to approx 800oc 3. Hot gases from kiln/coolers at 800oc
OutputHot gases including combustion products and co2 from the calcinations process and material in form of dust carried with the hot gases.
Technical specification of Precalciner: Coal firing Temperature Calcination Burner Burner capacity Amount of coal fire
60% 1000oc 95% 2 nos 20TPH 18TPH
Rotary kiln:
Kiln is cylindrical rotary equipment rotating on supporting rollers at about 3.5 RPM. Discharge in its completing calcinations reaction. Firing is done from kiln outlet with the help of burner pipe.
Technical specification of Rotary kiln: Unit-1 Make Precalciner Diameter Length Capacity Rpm Burner pipe Slope Fuel Used Thrust roller Thermal Load Supporting Roller Construction: a. Kiln inlet (consist seal, grease pump, lines, cylinders etc) b. Girth gear(Gear, pinion, spray system) c. Thrust roller(Hydraulic cylinder, oil line)
Krupp Polysius SLC 4.4M 65M 4500TPH 4.0 Duflex 3.5oc Coal/pet coke Hydraulic 14.07 6nos
Unit-2
FLS SLC 4.75M 75M 5500TPH 3.8 Swirlex 4.ooc Coal Hydraulic 14.44 6nos
d. Supporting roller& tyre(Consist of bearing, chair plate, bolts etc) e. Kiln outlet seal(s.s shims, crown shell, seal) f. Burner pipe(consist of air pipe, coal pipe, diesel pipe etc) Kiln inlet: Kiln inlet is seated by sealing arrangement. Greasing is
done by pneumatic pump seal. It consist of 10-14 segment so it can be mounted and disassembled from kiln inside. A conical section forms an extension of the inlet ring. A brick retaining ring has been mounted at the end of conical section.
Kiln Outlet: There is a sealing arrangement in kiln outlet. Burner Pipe: It is for firing of fine coal into the kiln. Air is controlled
by damper and fine coal by solid flow meter. Duplex type of burner is used in kiln unit-1 and swirlex type burner is used in kiln burner unit-2.
Kiln cooler:
Technical Specification of Grate cooler: Type Make Capacity Size No. of gates No. of cooling Air fan
Folax FLS(Germany) 5500 TPD 37.8m length*5.1m width 4 nos 11 nos
Clinker cooler has two main function to perform. They are:1. To cool the hot clinker quickly. 2. To provide necessary air for burning of coal in precalciner and kiln. After introducing of red hot clinker into the cooler, mechanically driven gates moves it to the rear end of cooler. Three pair of gates are installed inside the cooler. A single pair consist of fixed gate and movable gate. Too and fro moment of movable gate pressurized which cools it quickly. Clinker cools down gradually as it moves, due to the air blow by the fans which is taken from the atmosphere. Air falling over clinker is highly pressurized which cools it quickly. Clinker escaping out of the cooler is fed to a hammer crusher, since lumpy material requires crushing. Crushed material is transported to clinker silo through deep bucket conveyor. Temperature of clinker escaping out of cooler is about 208oc.
Grate cooler consist of: Cooling grate Plates Standard Plates Cooling housing Drive unit Grate aeration system Clinker crusher Conveying unit(DBC) Cooling fan
Hammer Crusher:
In discharge of cooler hammer crusher is provided consisting of a rotor with shaft. Hammer are mounted on each row. Hammer are casted made of high chrome or manganese steel. Clinker is crushed to size 1525mm by hammer crusher.
Coal Mill:
The raw mill is grounded dried swept away by fan through the separator to bag filter or ESP. finally it is stored in to the fine coal bin hot air for coal mill is supplied by cooler exhaust hot gases or preheater outlet gases before GTC circulation. The function of coal mill is to ground suitable grate coal and for feeding the same in to the kiln and calciner in fluidized form. Coal from stock yard is fed for stacking and reclaiming in to the stacker and re-claimer. Pre-homogenized raw coal is feed in to the coal mill hopper with the help of belt conveyer. The raw is then fed to the coal mill VRM via weigh feeder, drag chain and screw conveyer.
Technical Specification of Coal Mill: Unit-1 Make Type Capacity Gear box Motor(Kw) No. of roller
Krupp Polysius RM K 25/12 35TPH MAAG 700 2 in pair
Unit-2
Loesche 26.3 55TPH MAAG 750 3
Coal Mill Classifier: Unit-1 Make Gear Box Input rpm Motor(Kw) Coal Mill:LNV Sew 1480 37
Unt-2
LNV MAAG 1500 50
Coal Mill is an important integral part of cement plant. Here large size of approx size 600mm, is ground fine to the size of 90 micron. Coal from coal mill is used to feed kiln and calciner. Outlet tem of coal from coal mill is different in different seasons. It is 70-750c in dry season and 80-840c in rainy season. Coal from mines is initially crushed at crusher site. Coal is then sent to stacking making mixture homogenized. Reclaimer picks up the coal and coal is fed to the coal mill hopper through belt conveyer. Coal taken out from hopper is feed inside VRM with the help of a screw conveyer which is mounted just below the hopper. Coal inside VRM is grounded between roller and table. Hot air from cooler ESP fan is taken inside VRM and is used for drying of coal. Fine coal from VRM moves to the cyclone, where most of the coal is separated from air and the coal which does not get collected due to ultra fine size is separated with the help of ESP. LV separator is for separating coarse and fine particles.
Now, coal is fed to screw conveyer through rotary lock, which transport it to the FK pumps. Two FK pump delivers material to the storage bins.
There are two Storage bins, They are:1. Kiln Bin 2. Precalciner Bin Fine Coal is then transported to the kiln and precalciner by kiln firing FK pump and precalciner FK pump respectively.
Coal Mill(Unit-1):The material to be grounded is fed to the roller mill via weigh feeder and drag chain. It drops the material in to rotating grinding table thus transport under the grinding roller. The double groove grinding rand and the adjustable height dam rings cause formation of material bed. The crushed material is transport out ward over the edge of table, caught in to gas stream escaping from nozzle ring and conveyed to classifier locating directly above the grinding chamber. Classifier is classified the finished product and tailing. Tailing falls back in to middle of grounding table. Whereas finished material is conveyed to bag filter by gas flow. The reject of mill is fed towards the reject side and removed manually. Grinding is performed by total of two rollers, combined into two roller pair and rolling on material bed of grinding table which is rotating by motor and gear box. Each grinding roller is mounted on anti friction bearing on an excel firmly clamped in to the roller support. The roller pair are guided by pins in corresponding guides on housing in such a way that they can move vertically and tilt
about horizontal axis. This allows good adaptation to any changes in grinding bed height and means that the entire grinding area remains effective at all time.
Coal Mill(Unit-2):Raw coal comes in to coal mill from hopper through a drag chain and screw conveyor the entrance of fails air is avoid to give air sealed material flow .when material comes between rotor and roller they are crushed in to fine powder due to action of compression and alteration . Roller are hydraulically activated ,hydraulic system is connected with rollers through connecting rod and rocker arm .Due to rotation of table ,the material which is not crushed enough is reject and remove manually .Exhaust gasses from cooler is fed to the mill for the drying and lifting of fine coal. Fine material is then classified by classifier located directly above the table oh mill .Fines are then fed to the cyclone separator for separation of fines from contaminant gases ,and tailings are fall back on the table for further grinding ,Maximum separation takes place in the cyclone and the ultra fine material is get separated by ESP ,Now, coal is fed to screw conveyor through rotary lock ,which transport it to the FK pumps .Two FK pump delivers material to the storage bins. 1. Kiln bin
2. Precalciner bin
Classifier:
A classifier is the top most rotary part of the vertical roller Mill . Here classification of materials occurs .Fine particles pass through classifier and course particles are rejecter and recycled for regrinding. According to the fineness required speed of the classifier rotor can be adjusted.
Cement Mill:
In this section the clinker exerted from clinker silo through belt conveyer fed to the ball mill along with fly ash and gypsum to grind in powder form. For making OPC clinker grind along with gypsum and for PPC clinker is grounded along wiyh gypsum and fly ash. The homogenized product of cement mill is stored in to the specified cement storage silo.
o-sepa 225kw
o-sepa 225kw
o-sepa 300kw
o-sepa 250kw
Process:The material to ground is extracted in certain portion from storage hopper, this mixture is uniformly fed to the mill by means of feeding device. Feed material enters the first grinding chamber of ball mill through the inlet device.In this chamber the material is pre-crushed due to catering action of grinding media, the pre-crushed material flow through a slotted lifter wall in to a fine grinding chamber where it is ground in to end fineness. The material flow through the slot of lifter wall in to discharge device. The air sucked through the mill by the fan serve for material transport aeration and hence for cooling of grinding chamber. It contains a considerable amount of fines therefore, the dust laden gases is handle to the dedusting plant (bag house of ESP) via a pre separator called multi cyclone. Pre separator material is led together with the lifter dust to the finished mill product. It is mixed and handled as end product to the finished cement storage silo.
Liners for protecting the inside surface of the shell. Diaphragrms for driving the mill into two or more compartments. Grinding balls. Mill cooling system.
Details of Liners:
The line which protect the shell from wearing action of clinker and additives, also help in the grinding process. In the second compartment classifying liners are used which help to segregate the grinding media according to it s size larger balls towards the compartment. Small balls towards the discharge end.
Grinding Media: The mill chambers are partially filled with steel
ball having diameter ranging from 90mm to 60mm in 1st compartment and from 50mm ball to 17mm ball in 2nd compartment.
Heat Generation:
During grinding heat is generated in the mill which if not controlled would raise the temperature and effect cement quality. The grinding heat is dissipated by injecting atomized water in the mill chamber which on evaporation cools down the mill to acceptable.
plate to control the fineness of particles. The fan separator disc and counter vanes can be driven by single drive. The separator is preferred for coarse separation due to the lower specific consumption.
Second Chamber:
50mm=13.0 Tons 40mm=15.0 Tons 30mm=16.5 Tons 25-17mm=120.5Ton Total=165 Tons
separator with the flow of air and is collected in cyclone or in bag filter. Air entering at the bottom of sepol air separator can either fresh or dust loading and it permits any degree of recirculation. When fresh air is used. Fines and tailings are cooled down to 70-75 deg. There by reducing mill cooling requirement, the complete dispersion of material is riser duct combined with uniform distribution of air not only gives high efficiency but also produces low degree wear on the separator internal liner.
Packing Plant:
In this section the cement is extracted from several cement silos and fed to the rotary packer for packing in to the bags. The weight of each bag is 50kg.
Process:
There are six silos in JAYPEE REWA PLANT. Each silos heaving specified type of cement. Cement is extracted from silo at eight aeration fluidized points, there are 2-3 air slides are installed below each silo for transportation of cement in to packet bucket elevator. The cement from silo through air slides fed to the bucket elevator. Cement is then passes through the vibratory screen, these screens are used for retaining the over size material and reject it because the over size material is harm full for roto packer cement which passes through the screen comes into storage hopper above each packer. This hopper having minimum and maximum level indicator. A rotary feed valve is used to control the material level in packing machine. Cement is now fed to packer hopper and then to packing machine and spillage hopper is installed to collect the return of cement below the roto packer.
Packer-2
4.5-5 80-90TPH 6
Packer-4
4.5-5 80-90TPH 6
Packer-3
4.5-5 80-90TPH 6
Packer-6
4.5-5 100-120TPH 8 EEPL_HAVER
Packer-7
4.5-5 100-120TPH 8 EEPL_HAVER
Bag Holding and Release System:a) Bag chair cylinder- After releasing of a bag from spout as
spout advances, towards the operator the bag chain cylinder operators and the bag chair cylinder operates and
bring the bags in position. When targeted 50kg weight is reached this cylinder causes tilting of bag chair and bag discharge on belt conveyer.
c) Limit Switches:- Each spout has two limit switches one for
sensing the position of spout before discharge on belt and other for sensing the position of spout after the bag are discharge.