Date of last update: December 27, 2010 To start a new search, be certain to un-filter your results by pointing to Filter

on the Data menu, and then click Show All. The drop-down buttons will appea In the "Shutdown date" and "Restart date" columns, "*-" indicates an unknown month, day, or year. See "Key" sheet for additional notes. *For refineries that have multiple unit shutdowns, an entry was created for each unit. **Regions: (1) United States, (2) Canada, (3) Latin America & Caribbean, (4) Western Europe, (5) Eastern Europe, (6) Middle East, (7) Africa, (8) Asia-Pac Shutdown date Restart date Region** M D Y M D Y Refiner City State or Country Refinery Refinery process province capacity, K b/d 1 01 01 11 **- 11 Citgo Lake LA US 440 Fluid Catalytic Cracking Petroleum Charles

11

25

10

12

25

10 Holly

Tulsa

OK

US

125

Fluid Catalytic Cracking

09

25

10

12

20

10 ExxonMobi Beaumon l t

TX

US

345

Hydrocracking

09

25

10

12

20

10 ExxonMobi Beaumon l t

TX

US

345

Catalytic Reforming

03

01

10

12

23

10 PDVSA

Refineria Isla Curazao

Netherlan ds Antilles

320

Crude Distillation

03

01

10

12

23

10 PDVSA

Refineria Isla Curazao

Netherlan ds Antilles

320

Fluid Catalytic Cracking

Hydrocarbon Publishing Co. Copyright protected. 2008

71

03

01

10

12

23

10 PDVSA

Refineria Isla Curazao

Netherlan ds Antilles

320

Crude Distillation

01

*-

11

02

*-

11 Reliance Jamnagar Industries 10 Kashima Kashima Oil 10 Chalmette Chalmett Refining e 10 Cosmo Oil Yokkaichi

India

660

Fluid Catalytic Cracking

8 1

12 12

07 04

10 10

12 12

20 18

Japan LA US

210 193

Fluid Catalytic Cracking General outage, turnaround, or closure Crude Distillation

12

07

10

12

18

Japan

147

12

07

10

12

18

10 Cosmo Oil Yokkaichi

Japan

147

Crude Distillation

12

07

10

02

*-

11 Valero Energy

Benicia

CA

US

140

Fluid Catalytic Cracking

Hydrocarbon Publishing Co. Copyright protected. 2008

71

12

17

10

12

19

10 Valero Energy

Port Arthur

TX

US

250

Sulfur Plant

12

20

11

*-

*-

*- SK Energy Ulsan

South Korea

817

Hydrotreating

8 8

12 01

24 *-

10 11

12 02

28 *-

10 Cosmo Oil Yokkaichi 11 Reliance Jamnagar Industries *- Naftec Arzew

Japan India

147 660

Fluid Catalytic Cracking Hydrotreating

12

19

10

*-

*-

Algeria

060

General outage, turnaround, or closure

12

22

10

*-

*-

*- Nigerian Kaduna National Petroleum

Nigeria

110

General Equipment

12

22

10

*-

*-

*- Nigerian Port National Harcourt Petroleum

Nigeria

150

General Equipment

12

18

10

12

19

10 BP

Ferndale

WA

US

222

General outage, turnaround, or closure

12

20

10

12

20

10 ConocoPhi Wood llips River

IL

US

306

Fluid Catalytic Cracking

Hydrocarbon Publishing Co. Copyright protected. 2008

71

12

20

10

12

20

10 Motiva Convent Enterprise s

LA

US

227

General outage, turnaround, or closure

12

20

10

12

20

10 ExxonMobi Torrance l

CA

US

150

Fluid Catalytic Cracking

12

20

10

12

20

10 ExxonMobi Torrance l

CA

US

150

Alkylation

12

23

10

12

*-

10 ExxonMobi Joliet l 10 Alon USA Big Energy Spring

IL

US

238

General outage, turnaround, or closure General Equipment

12

23

10

12

23

TX

US

070

12

23

10

12

23

10 San Joaquin Refining

Bakersfiel d

CA

US

015

General outage, turnaround, or closure

12

23

10

12

23

10 US Oil & Refining

Tacoma

WA

US

039

General outage, turnaround, or closure

*-

*-

10

12

23

10 Imperial Oil 10 Valero Energy

Sarnia

ON

Canada

121

General Equipment

12

22

10

12

24

Corpus Christi

TX

US

205

Hydrocracking

03

*-

11

*-

*-

11 Marathon Oil

Robinson

IL

US

204

General outage, turnaround, or closure

Hydrocarbon Publishing Co. Copyright protected. 2008

71

12

10

10

12

15

10 JX Holdings

Negishi

Japan

340

Crude Distillation

8 8 8 8 6

11 11 05 09 10

17 17 25 *30

10 10 11 11 10

12 12 06 10 12

25 25 **18

10 Bharat Mumbai Petroleum 10 Bharat Mumbai Petroleum 11 S-Oil Onsan 11 GS Caltex Yosu 10 Oman Refinery Sohar

India India South Korea South Korea Oman

240 240 520 680 116

Crude Distillation Fluid Catalytic Cracking Crude Distillation Crude Distillation General outage, turnaround, or closure

12

03

10

12

17

10 Ceska Litvinov Rafinerska

Czech Republic

101

Hydrocracking

12

13

10

12

27

10 Petroplus Ingolstadt

Germany

110

12

16

10

12

22

10 Tamoil

Cremona

Italy

094

H2 Production/Purification/Rec overy General outage, turnaround, or closure Catalytic Reforming

10

25

10

12

14

10 Oil Haifa Refineries Ltd. 10 Oil Haifa Refineries Ltd. 11 ExxonMobi Fos-surl Mer 11 ERG Priolo

Israel

130

10

25

10

12

14

Israel

130

H2 Production/Purification/Rec overy General outage, turnaround, or closure General outage, turnaround, or closure

4 4

01 *-

13 *-

11 11

02 *-

17 *-

France Sicily Italy

119 225

Hydrocarbon Publishing Co. Copyright protected. 2008

71

12

09

10

12

11

10 Tesoro

Martinez

CA

US

161

General outage, turnaround, or closure

1 1 1 1

12 12 12 12

10 11 14 14

10 10 10 10

12 12 12 12

10 11 14 14

10 ConocoPhi Wilmingt llips on 10 Frontier Oil El Dorado 10 Sunoco 10 Valero Energy Marcus Hook Memphis

CA KS PA TN

US US US US

139 135 175 180

General outage, turnaround, or closure General outage, turnaround, or closure General Equipment General outage, turnaround, or closure

12

15

10

12

15

10 Citgo Lake Petroleum Charles

LA

US

440

General outage, turnaround, or closure

12

15

10

12

15

10 Flint Hills Corpus Resources Christi 10 LyondellB Houston asell 10 Valero Energy Houston

TX

US

279

General outage, turnaround, or closure General outage, turnaround, or closure Fluid Catalytic Cracking

12

15

10

12

15

TX

US

268

12

08

10

12

14

TX

US

090

12

10

10

12

14

10 Alon USA Big Energy Spring 10 Valero Energy 11 BP Corpus Christi Carson

TX

US

070

Utilities Production

12

14

10

12

16

TX

US

205

Hydrocracking

1 3 8

12 *03

15 **-

10 11 11

01 *03

05 **-

CA

US

252 022 270

11 ExxonMobi Acajutla l 11 Sinopec Jinling

El Salvador Jiangsu China

General outage, turnaround, or closure General outage, turnaround, or closure Crude Distillation

Hydrocarbon Publishing Co. Copyright protected. 2008

71

03

*-

11

03

*-

11 Sinopec

Jinling

Jiangsu China

270

Coking

01

*-

11

*-

*-

*- Motor Oil Hellas

Aghii Theodori

Corinth Greece

110

Crude Distillation

11

29

10

12

07

10 Valero Energy 10 PDVSA

Memphis

TN

US

180

Fluid Catalytic Cracking

12

02

10

12

07

Cardon

Venezuel a

940

General outage, turnaround, or closure

12

04

10

12

04

10 Chevron

Pascagou la

MS

US

330

General Equipment

12

04

10

12

04

10 ExxonMobi Beaumon l t

TX

US

345

General outage, turnaround, or closure

1 1

12 12

05 08

10 10

12 12

07 08

10 Citgo Lemont Petroleum 10 Citgo Lemont Petroleum

IL IL

US US

159 159

General outage, turnaround, or closure Hydrotreating

1 1 1

12 12 12

05 09 05

10 10 10

12 12 12

05 09 05

10 ConocoPhi Sweeny llips 10 ConocoPhi Sweeny llips 10 LyondellB Houston asell

TX TX TX

US US US

247 247 268

General Equipment General outage, turnaround, or closure General Equipment

Hydrocarbon Publishing Co. Copyright protected. 2008

71

12

06

10

12

06

10 Tesoro

Anacorte s

WA

US

113

General outage, turnaround, or closure

12

07

10

12

07

10 Chevron

El Segundo Paulsbor o

CA

US

269

General outage, turnaround, or closure General outage, turnaround, or closure General Equipment

12

08

10

12

08

10 Valero Energy

NJ

US

166

12

08

10

12

08

10 ConocoPhi Westlake llips 10 Petroecua dor 10 Motiva Enterprise s 10 Motiva Enterprise s Esmerald as Norco

LA

US

239

3 1

12 12

08 03

10 10

12 12

09 03

Ecuador LA US

110 220

General outage, turnaround, or closure Sulfur plant

12

07

10

12

07

Norco

LA

US

220

General Equipment

1 1 1

09 12 *-

17 05 *-

10 10 *-

12 12 12

06 08 08

10 BP 10 Tesoro 10 BP

Whiting Wilmingt on Texas City

IN CA TX

US US US

385 100 451

Fluid Catalytic Cracking General outage, turnaround, or closure Hydrocracking

*-

*-

*-

12

08

10 BP

Texas City

TX

US

451

Hydrotreating

11

*-

10

11

30

10 Cosmo Oil Yokkaichi

Japan

147

Crude Distillation

02

25

11

*-

*-

*- Sinopec

Guangzh Guangdo China ou ng

210

Crude Distillation

Hydrocarbon Publishing Co. Copyright protected. 2008

71

11

10

10

12

01

10 AB Nynas Dundee Petroleum

Scotland UK

012

General outage, turnaround, or closure

11

29

10

11

29

10 IES

Mantova

Italy

069

General Equipment

4 6

11 02

30 *-

10 11

11 03

30 *-

04

25

11

05

31

10 AB Nynas Petroleum 11 Saudi Aramco Shell Refinery 11 Saudi Aramco

Nynasha mn Al-Jubail

Sweden Saudi Arabia

028 290

General outage, turnaround, or closure Crude Distillation

Rabigh

Saudi Arabia

400

General outage, turnaround, or closure

11

23

10

11

30

10 ConocoPhi Belle llips Chasse

LA

US

247

Fluid Catalytic Cracking

11

23

10

11

30

10 ConocoPhi Belle llips Chasse

LA

US

247

Alkylation

Hydrocarbon Publishing Co. Copyright protected. 2008

71

11

24

10

11

30

10 ExxonMobi Torrance l

CA

US

150

General outage, turnaround, or closure

2 1

11 11

26 27

10 10

11 11

26 27

10 Imperial Oil 10 Coffeyville Resources

Edmonto n Coffeyvill e

AB KS

Canada US

187 114

General outage, turnaround, or closure Sulfur Plant

11

27

10

11

27

1 1 1 1

11 11 11 11

28 28 29 29

10 10 10 10

11 11 11 11

28 28 29 29

10 Motiva Norco Enterprise s 10 Holly Tulsa 10 ConocoPhi llips 10 LyondellB asell 10 Valero Energy Sweeny Houston Corpus Christi

LA

US

220

General outage, turnaround, or closure General outage, turnaround, or closure Fluid Catalytic Cracking Fluid Catalytic Cracking Isomerization

OK TX TX TX

US US US US

125 247 268 205

11

29

10

12

02

10 PDVSA

Amuay

Venezuel a MS TX LA US US US

640

General outage, turnaround, or closure Fluid Catalytic Cracking General Equipment General outage, turnaround, or closure

1 1 1

11 11 12

30 30 01

10 10 10

11 11 12

30 30 01

10 Chevron

Pascagou la 10 ExxonMobi Beaumon l t 10 ExxonMobi Baton l Rouge

330 345 505

12

01

10

12

01

10 Flint Hills Corpus Resources Christi

TX

US

279

General Equipment

12

01

10

12

01

10 BP

Carson

CA

US

252

H2 Production/Purification/Rec overy

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1 3

12 12

01 02

10 10

12 12

01 02

10 Valero Energy 10 PDVSA

Benicia El Palito

CA

US Venezuel a

140 127

Fluid Catalytic Cracking General outage, turnaround, or closure

12

02

10

12

02

10 ExxonMobi Joliet l

IL

US

238

Utilities Production

10

*-

10

12

01

10 Pemex

Salina Cruz

Mexico

330

General outage, turnaround, or closure

1 1 1

10 11 11

25 26 29

10 10 10

11 *11

27 *29

10 BP *- ExxonMobi l 10 Alon USA Energy

Carson Beaumon t Big Spring

CA TX TX

US US US

252 345 070

Catalytic Reforming General outage, turnaround, or closure General outage, turnaround, or closure

11

30

10

11

30

10 Alon USA Big Energy Spring 10 Shell Chemical Saraland

TX

US

070

General Equipment

11

30

10

11

30

AL

US

085

General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure Fluid Catalytic Cracking General outage, turnaround, or closure

1 1

12 12

01 01

10 10

12 12

01 03

10 Valero Corpus Energy Christi 10 ExxonMobi Torrance l 10 Irving Oil 10 Tesoro St. John Wilmingt on

TX CA

US US

205 150

2 1

12 12

01 05

10 10

12 12

04 07

NB CA

Canada US

250 100

1 1 8

02 04 10

*20 22

11 11 10

03 05 11

*20 20

10 Shell Oil 10 Shell Oil 10 Idemitsu Kosan 10 Idemitsu Kosan

Martinez Martinez Chita

CA CA Aichi

US US Japan

145 145 152

Hydrotreating Hydrocracking Crude Distillation

11

15

10

11

20

Tomakom Hokkaido Japan ai

133

Crude Distillation

Hydrocarbon Publishing Co. Copyright protected. 2008

71

8 8

11 11

23 26

10 10

11 12

23 15

10 Pertamina Balongan 10 TonenGen Kawasaki eral

Indonesia Japan

125 296

General Equipment General outage, turnaround, or closure

09

*-

11

*-

*-

*- Toa Oil

Keihin

Kawasaki Japan

110

Crude Distillation

05

15

11

06

05

*-

*-

11

*-

*-

11 Tesiki Kubiki Japan Topping Plant *- Pertamina Balikpapa Kalimanta Indonesia n n *- Fuji Oil Sodegaur a Chiba Japan

005

Crude Distillation

260

General outage, turnaround, or closure Crude Distillation

*-

*-

13

*-

*-

192

11

15

10

*-

*-

*- Nigerian Kaduna National Petroleum

Nigeria

110

General Equipment

11

21

10

*-

*-

*- Nigerian Warri National Petroleum

Nigeria

125

General Equipment

09

*-

10

*-

*-

*- Royal Dutch Shell

Pernis, Rotterda m

Netherlan ds

406

Fluid Catalytic Cracking

11

10

10

11

19

10 Hess

Port Reading Carson

NJ

US

070

Fluid Catalytic Cracking

11

18

10

11

19

10 BP

CA

US

252

General outage, turnaround, or closure

Hydrocarbon Publishing Co. Copyright protected. 2008

71

11

20

10

11

20

10 ExxonMobi Baton l Rouge

LA

US

505

General outage, turnaround, or closure

11

20

10

11

23

10 LyondellB Houston asell

TX

US

268

General outage, turnaround, or closure

1 1 1

11 11 11

20 23 24

10 10 10

11 11 11

21 24 24

10 Frontier Oil El Dorado 10 ExxonMobi Joliet l 10 ConocoPhi Wood llips River

KS IL IL

US US US

135 238 306

General outage, turnaround, or closure General outage, turnaround, or closure Fluid Catalytic Cracking

11

24

10

11

24

10 ExxonMobi Beaumon l t

TX

US

345

General outage, turnaround, or closure

11

24

10

11

24

10 Big West Oil

Salt Lake City

UT

US

030

General Equipment

11

26

10

11

27

11

26

10

11

26

10 Total Petrochem icals 10 Valero Energy

Port Arthur Port Arthur

TX

US

174

Sulfur Plant

TX

US

250

General Equipment

11

26

10

11

26

10 Shell Oil

Martinez

CA

US

145

General outage, turnaround, or closure

Hydrocarbon Publishing Co. Copyright protected. 2008

71

11

26

10

11

26

10 Tesoro

Kapolei

HI

US

094

General outage, turnaround, or closure

11

27

10

11

27

10 ConocoPhi Borger llips

TX

US

146

General outage, turnaround, or closure

09

22

10

11

23

10 ConocoPhi Linden llips

NJ

US

238

General outage, turnaround, or closure

1 1 1 1 8

10 10 10 *11

15 15 15 *17

10 10 10 *10

11 11 11 11 11

20 22 22 24 17

10 Marathon Oil 10 Husky Energy 10 Husky Energy 10 Holly

Detroit Lima Lima

MI OH OH UT

US US US US Taiwan

102 162 162 030 270

General outage, turnaround, or closure Fluid Catalytic Cracking Coking General outage, turnaround, or closure Crude Distillation

Woods Cross 10 CPC Corp. Kaohsiun g

10

08

10

11

13

10

25

10

11

19

10 Showa Yokkaichi Shell Sekiyu 10 Reliance Jamnagar Industries 10 Sinopec Gaoqiao

Japan

193

Crude Distillation

India

660

Crude Distillation

11

20

10

12

*-

China

230

Crude Distillation

11

20

10

12

*-

10 Sinopec

Gaoqiao

China

230

Coking

Hydrocarbon Publishing Co. Copyright protected. 2008

71

11

20

10

12

*-

10 Sinopec

Gaoqiao

China

230

Hydrocracking

09

11

10

11

19

10 ExxonMobi Sarpom l

Trecate Italy

230

Crude Distillation

10

15

10

11

14

10 Abu Dhabi Ruwais National Oil *- Abu Dhabi Ruwais National Oil 11 MOL Szzhalo mbatta Szzhalo mbatta Bratislava

Abu Dhabi UAE

350

Vapor Recovery/Gas Plant

01

15

11

*-

*-

Abu Dhabi UAE

350

Vapor Recovery/Gas Plant

*-

*-

11

*-

*-

Hungary

161

General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure Fluid Catalytic Cracking

5 5

**-

**-

11 11

**-

**-

11 MOL 11 Slovnaft

Hungary Slovakia

161 115

*-

*-

11

*-

*-

11 INA

Rijeka

Croatia

090

*-

*-

11

*-

*-

*- INA

Sisak

Croatia

080

11

02

10

11

18

10 Citgo Lemont Petroleum

IL

US

159

11

12

10

*-

*-

*- Sunoco

Philadelp hia

PA

US

330

Hydrotreating

Hydrocarbon Publishing Co. Copyright protected. 2008

71

11

12

10

11

12

10 Motiva Port Enterprise Arthur s 10 Chevron Pascagou la

TX

US

285

Fluid Catalytic Cracking

11

13

10

11

13

MS

US

330

General outage, turnaround, or closure Fluid Catalytic Cracking

11

15

10

11

19

10 Alon USA Big Energy Spring

TX

US

070

11

15

10

11

15

10 Valero Energy 10 Imperial Oil

Corpus Christi Sarnia

TX

US

205

General outage, turnaround, or closure General outage, turnaround, or closure

11

15

10

11

15

ON

Canada

121

11

09

10

11

16

10 Coffeyville Coffeyvill Resources e

KS

US

114

General outage, turnaround, or closure

11

16

10

11

16

11

16

10

11

16

10 Motiva Convent Enterprise s 10 BP Texas City 10 US Oil & Refining *- Shell Oil Tacoma

LA

US

227

General outage, turnaround, or closure General Equipment

TX

US

451

11

17

10

11

17

WA

US

039

Sulfur Plant

11

17

10

*-

*-

Anacorte s

WA

US

149

General outage, turnaround, or closure

11

18

10

11

19

10 Chevron

Richmon d Woods Cross

CA

US

243

Hydrotreating

11

04

09

11

15

10 Silver Eagle Refining

UT

US

013

Crude Distillation

10

15

10

11

*-

10 Chevron

Richmon d

CA

US

243

Fluid Catalytic Cracking

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1 3

10 10

15 *-

10 10

11 10

**-

10 Chevron

Richmon d 10 Petrobras Cubatao

CA

US Brazil

243 170

Alkylation General outage, turnaround, or closure General outage, turnaround, or closure

11

25

10

12

21

10 BP

Carson

CA

US

252

10

*-

10

11

17

10 Petrobras Revap

09

22

10

11

11

Sao Jose Brazil dos Campos 10 Cosmo Oil Yokkaichi Japan

241

Visbreaking/Thermal Cracking Crude Distillation

147

10

15

10

11

*-

10 Kuwait Mina AlNational Ahmadi Petroleum

Kuwait

466

Hydrotreating

*-

*-

11

*-

*-

11 Saras

Sarroch

Sardinia Italy

300

Hydrotreating

*-

*-

11

*-

*-

11 Saras

Sarroch

Sardinia Italy

300

Alkylation

*-

*-

11

*-

*-

11 Saras

Sarroch

Sardinia Italy

300

Hydrocracking

*-

*-

11

*-

*-

11 Saras

Sarroch

Sardinia Italy

300

Visbreaking/Thermal Cracking

*-

*-

11

*-

*-

11 Saras

Sarroch

Sardinia Italy

300

Crude Distillation

*-

*-

11

*-

*-

11 Saras

Sarroch

Sardinia Italy

300

Crude Distillation

Hydrocarbon Publishing Co. Copyright protected. 2008

71

*-

*-

11

*-

*-

11 Saras

Sarroch

Sardinia Italy

300

Catalytic Reforming

11

05

10

11

05

10 Motiva Port Enterprise Arthur s

TX

US

285

Fluid Catalytic Cracking

1 1

11 11

06 06

10 10

11 11

07 06

10 ConocoPhi Borger llips 10 ExxonMobi Beaumon l t

TX TX

US US

146 345

Fluid Catalytic Cracking General outage, turnaround, or closure

11

08

10

*-

*-

*- Shell Oil

Martinez

CA

US

145

General outage, turnaround, or closure

11

09

10

11

09

10 Coffeyville Coffeyvill Resources e

KS

US

114

General outage, turnaround, or closure

11

10

10

11

10

11

10

10

11

11

10 Motiva Norco Enterprise s 10 Citgo Corpus Petroleum Christi

LA

US

220

General Equipment

TX

US

157

Aromatics Production/Recovery

11

10

10

11

10

10 Tesoro

Martinez

CA

US

161

General outage, turnaround, or closure

11

11

10

11

11

10 BP

Texas City

TX

US

451

Hydrotreating

11

12

10

11

12

10 ExxonMobi Joliet l

IL

US

238

General outage, turnaround, or closure

11

12

10

11

12

10 Valero Energy

McKee (Sunray)

TX

US

167

Waste Water Treatment

Hydrocarbon Publishing Co. Copyright protected. 2008

71

1 1

*08

**-

*10

11 11

12 11

10 Imperial Sarnia Oil 10 ExxonMobi Baytown l

ON TX

Canada US

121 576

Utilities Production Crude Distillation

08

*-

10

11

11

10 ExxonMobi Baytown l

TX

US

576

Hydrotreating

08

*-

10

11

11

10 ExxonMobi Baytown l

TX

US

576

Hydrotreating

08

*-

10

11

11

10 ExxonMobi Baytown l

TX

US

576

Hydrotreating

08

*-

10

11

11

10 ExxonMobi Baytown l

TX

US

576

Solvent Extraction and Deasphalting

09

29

10

11

13

10 Irving Oil

St. John

NB

Canada

250

Crude Distillation

09

29

10

11

13

10 Irving Oil

St. John

NB

Canada

250

Catalytic Reforming

Hydrocarbon Publishing Co. Copyright protected. 2008

71

09

29

10

11

13

10 Irving Oil

St. John

NB

Canada

250

Fluid Catalytic Cracking

09

29

10

11

13

10 Irving Oil

St. John

NB

Canada

250

Sulfur plant

10

01

10

11

09

10 National McPherso Cooperativ n e Refining 10 ExxonMobi Joliet l

KS

US

083

General outage, turnaround, or closure

10

17

10

11

11

IL

US

238

General outage, turnaround, or closure

1 8

11 10

15 *-

10 10

11 11

26 *-

10 BP 10 Sinopec

Carson

CA

US

252 270

Maoming Guangdo China ng

General outage, turnaround, or closure Crude Distillation

10

*-

10

11

*-

10 Sinopec

Maoming Guangdo China ng

270

Coking

8 8 8 8 8 8 4

11 03 05 07 05 06 11

03 *05 15 *15 01

10 11 11 11 11 11 10

12 04 06 08 *07 *-

**05 25 *25 *-

10 CNOOC Huizhou 11 Hyundai Daesan Oil 11 SK Energy Ulsan 11 SK Energy Ulsan *- S-Oil Onsan

11 SK Energy Inchon *- Total Antwerp

China South Korea South Korea South Korea South Korea South Korea Belgium

240 310 817 817 520 270 357

Fluid Catalytic Cracking Crude Distillation Crude Distillation Crude Distillation Crude Distillation Crude Distillation Visbreaking/Thermal Cracking

Hydrocarbon Publishing Co. Copyright protected. 2008

71

11

04

10

11

20

10 Total

Vlissinge n

Netherlan ds

147

Hydrocracking

4 1

11 04

04 02

10 10

11 10

19 04

10 Total 10 Shell Oil

Donges Anacorte s

WA

France US

230 149

Fluid Catalytic Cracking General outage, turnaround, or closure

10

05

10

10

29

10 PDVSA

Amuay

Venezuel a

640

Fluid Catalytic Cracking

10

27

10

11

02

10 ConocoPhi Rodeo llips

CA

US

120

General outage, turnaround, or closure

10

26

10

*-

*-

*- ConocoPhi Linden llips

NJ

US

238

General outage, turnaround, or closure

11

02

10

11

02

10 ConocoPhi Linden llips

NJ

US

238

Utilities Production

10

28

10

11

01

10 Shell Canada

Sarnia

ON

Canada

071

General outage, turnaround, or closure

10

30

10

10

30

10 Valero Energy

Three Rivers

TX

US

096

Hydrotreating

11

01

10

11

01

10 Murphy Oil Superior

WI

US

033

General outage, turnaround, or closure

11

01

10

11

01

11 Valero Energy

Wilmingt on

CA

US

080

General Equipment

Hydrocarbon Publishing Co. Copyright protected. 2008

71

11

02

10

11

02

10 ExxonMobi Baytown l

TX

US

576

Fluid Catalytic Cracking

1 1

11 11

03 03

10 10

11 11

03 03

11

03

10

11

03

10 ConocoPhi llips 10 Motiva Enterprise s 10 ConocoPhi llips 11 Delek Refining 10 Tesoro

Wood River Norco

IL LA

US US

306 220

General Equipment General Equipment

Borger

TX

US

146

Fluid Catalytic Cracking

11

02

11

11

03

Tyler

TX

US

060

Sulfur Plant

11

04

10

11

04

Wilmingt on

CA

US

100

Hydrocracking

11

04

10

*-

*-

*- Alon USA Paramou Energy nt

CA

US

088

General outage, turnaround, or closure

09

07

10

11

06

10 ConocoPhi Belle llips Chasse

LA

US

247

Fluid Catalytic Cracking

1 1

10 *-

04 *-

10 *-

11 10

01 31

10 Suncor

Montral

QB TX

Canada US

130 285

10 Motiva Port Enterprise Arthur s

General outage, turnaround, or closure Fluid Catalytic Cracking

*-

*-

*-

10

31

10 ConocoPhi Wilmingt llips on

CA

US

139

Fluid Catalytic Cracking

Hydrocarbon Publishing Co. Copyright protected. 2008

71

11

01

10

11

15

10 ConocoPhi Wilmingt llips on

CA

US

139

Alkylation

2 1

11 11

02 05

10 10

**-

**-

*- Shell Canada *- Tesoro

Scotford Martinez

AB CA

Canada US

100 161

General outage, turnaround, or closure General outage, turnaround, or closure

1 1 1 1 6 3

11 11 01 *10 09

05 30 15 *23 07

10 10 11 11 10 10

11 12 **10 *-

12 ***25 *-

10 BP 10 Holly *- Western Refining *- Western Refining 10 Saudi Aramco 11 Pemex

Carson Tulsa El Paso Gallup Rabigh Cadereyt a

CA OK TX NM

US US US US Saudi Arabia Mexico

252 125 125 023 400 275

General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure Hydrotreating

10

22

10

10

22

10 ExxonMobi Joliet l

IL

US

238

General outage, turnaround, or closure

1 1

10 10

24 24

10 10

10 10

24 24

10 BP 10 Delek Refining

Whiting Tyler

IN TX

US US

385 060

Sulfur Plant Fluid Catalytic Cracking

10

24

10

10

24

10 Delek Refining

Tyler

TX

US

060

Alkylation

10

25

10

10

25

10 Citgo Lemont Petroleum

IL

US

159

General outage, turnaround, or closure

Hydrocarbon Publishing Co. Copyright protected. 2008

71

10

27

10

10

27

10 Citgo Lemont Petroleum 10 ConocoPhi Westlake llips 10 ConocoPhi Linden llips

IL

US

159

General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure

10

25

10

10

25

LA

US

239

10

26

10

10

27

NJ

US

238

1 1

10 10

26 26

10 10

10 11

26 02

10 Alon USA Energy 10 Valero Energy

Krotz Springs Port Arthur

LA TX

US US

083 250

General outage, turnaround, or closure Isomerization

10

22

10

10

27

10 ConocoPhi Rodeo llips

CA

US

120

General outage, turnaround, or closure

1 1 1 1

10 10 10 10

28 28 28 28

10 10 10 10

10 10 10 10

28 28 28 28

10 ConocoPhi llips 10 ExxonMobi l 10 Husky Energy 10 ExxonMobi l

Wood River Baton Rouge Lima Baytown

IL LA OH TX

US US US US

306 505 162 576

General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure Hydrocracking

Hydrocarbon Publishing Co. Copyright protected. 2008

71

10

28

10

10

28

10 Shell Canada

Scotford

AB

Canada

100

General outage, turnaround, or closure

10

29

10

10

29

10 Coffeyville Coffeyvill Resources e

KS

US

114

General outage, turnaround, or closure

2 1

09 10

11 04

10 10

10 10

27 29

10 Suncor

Sarnia

ON TX

Canada US

085 279

10 Flint Hills Corpus Resources Christi 10 Suncor 10 Marathon Oil 10 Valero Energy Edmonto n Robinson Corpus Christi

General outage, turnaround, or closure Hydrocracking

1 1 1

10 10 10

12 16 27

10 10 10

10 10 10

23 23 27

AB IL TX

Canada US US

135 204 205

General outage, turnaround, or closure Crude Distillation Crude Distillation

1 1 1 1 1 1

01 01 01 01 03 08

*****25

11 11 11 11 11 10

***02 *10

*****16

*- LyondellB asell *- Valero Energy *- Valero Energy 11 Valero Energy *- Valero Energy 10 ExxonMobi l 10 Idemitsu Kosan 10 CEPSA 10 JX Holdings

Houston Port Arthur Port Arthur Benicia McKee (Sunray) Baytown

TX TX TX CA TX TX

US US US US US US

268 250 250 140 167 576

Fluid Catalytic Cracking Crude Distillation Coking General outage, turnaround, or closure Hydrocracking Hydrotreating

8 4 8

09 10 10

21 03 12

10 10 10

10 10 10

21 18 19

Tokuyam a Cadiz Muroran

Japan Spain Japan

120 240 180

Crude Distillation Crude Distillation Catalytic Reforming

10

12

10

10

19

10 JX Holdings

Muroran

Japan

180

Hydrotreating

Hydrocarbon Publishing Co. Copyright protected. 2008

71

10

21

10

11

21

10 Idemitsu Kosan

Chita

Aichi

Japan

152

General outage, turnaround, or closure

08

*-

10

10

16

10 Cosmo Oil Sakai

Japan

076

Coking

08

*-

10

10

16

10 Cosmo Oil Sakai

Japan

076

Hydrotreating

08

*-

10

10

16

10 Cosmo Oil Sakai

Japan

076

Hydrotreating

10

25

10

11

*-

10 Reliance Jamnagar Industries 11 11 Eni Khartoum Gela

India

660

Coking

7 4

02 03

**-

11 11

*04

**-

Sudan Ragusa Italy

050 105

General outage, turnaround, or closure General outage, turnaround, or closure

08

31

11

09

*-

11 BP

Lingen

Germany

086

General outage, turnaround, or closure

10

*-

11

*-

*-

11 BP

Gelsenkir chen

Germany

264

General outage, turnaround, or closure

10

16

10

10

18

10 Petrotrin

Pointe-aPierre KS

10

19

10

*-

*-

10 Coffeyville Coffeyvill Resources e

Trinidad and Tobago US

168

General outage, turnaround, or closure General outage, turnaround, or closure

114

Hydrocarbon Publishing Co. Copyright protected. 2008

71

10

19

10

10

20

10 Valero Energy

Corpus Christi

TX

US

205

Isomerization

10

19

10

10

19

10 Valero Energy

Wilmingt on

CA

US

080

General Equipment

10

20

10

10

20

10 ExxonMobi Baytown l 10 ExxonMobi Joliet l 10 ExxonMobi Baytown l

TX

US

576

General Equipment

1 1

10 10

21 21

10 10

10 *-

21 *-

IL TX

US US

238 576

General outage, turnaround, or closure Crude Distillation

11

*-

10

*-

*-

*- ConocoPhi Belle llips Chasse *- Marathon Oil 10 Husky Energy 10 Husky Energy 10 Motiva Enterprise s Detroit Lima Lima Port Arthur

LA

US

247

Alkylation

1 1 1 1

10 10 10 10

15 15 15 18

10 10 10 10

*11 11 10

*25 25 18

MI OH OH TX

US US US US

102 162 162 285

General outage, turnaround, or closure Coking Fluid Catalytic Cracking Sulfur Plant

1 1

**-

**-

10 10

10 10

18 22

10 ConocoPhi Sweeny llips 10 BP Texas City

TX TX

US US

247 451

Sulfur plant Hydrotreating

10

22

10

11

08

10 BP

Carson

CA

US

252

General outage, turnaround, or closure

Hydrocarbon Publishing Co. Copyright protected. 2008

71

09

30

10

10

14

10 Tesoro

Martinez

CA

US

161

Fluid Catalytic Cracking

1 1

10 10

04 05

10 10

10 10

04 14

10 Shell Oil

Martinez

CA IL

US US

145 238

10 ExxonMobi Joliet l

General outage, turnaround, or closure Hydrotreating

10

09

10

10

09

10 Tesoro

Martinez

CA

US

161

General Equipment

10

06

10

10

10

10 Chalmette Chalmett Refining e

LA

US

193

General Equipment

10

06

10

10

16

10 Hovensa

St. Croix

Virgin US Islands

500

Fluid Catalytic Cracking

10

08

10

10

08

10 Flint Hills Corpus Resources Christi

TX

US

279

General Equipment

Hydrocarbon Publishing Co. Copyright protected. 2008

71

10

09

10

10

09

10 Sinclair Oil Sinclair

WY

US

066

Sulfur Plant

10

09

10

10

09

10 Sinclair Oil Sinclair

WY

US

066

Sulfur Plant

10

12

10

10

12

10 Valero Energy

Three Rivers

TX

US

096

Sulfur Plant

10

14

10

10

*-

10 ConocoPhi Linden llips

NJ

US

238

General Equipment

10

14

10

10

*-

10 Coffeyville Coffeyvill Resources e

KS

US

114

General outage, turnaround, or closure

10

14

10

10

*-

10 ExxonMobi Baton l Rouge 10 Delek Refining 10 Motiva Enterprise s 10 Imperial Oil 10 BP 10 Tesoro 10 Husky Energy Tyler

LA

US

505

General outage, turnaround, or closure Fluid Catalytic Cracking

10

14

10

10

14

TX

US

060

10

09

10

*-

*-

Convent

LA

US

227

Sulfur Plant

2 1 1 1

10 10 10 10

12 13 14 16

10 10 10 10

10 10 10 10

25 20 15 17

Edmonto n Carson Wilmingt on Lima

AB CA CA OH

Canada US US US

187 252 100 162

General outage, turnaround, or closure General outage, turnaround, or closure General outage, turnaround, or closure Utilities Production

Hydrocarbon Publishing Co. Copyright protected. 2008

71

08

*-

10

10

07

10 Petroecua Esmerald dor as 10 Kashima Kashima Oil 10 JX Negishi Holdings *- Cosmo Oil Sakai 10 JX Holdings 10 JX Holdings *- ConocoPhi llips Negishi Mizushim a Westlake

Ecuador

110

Crude Distillation

8 8 8 8 8 1

09 09 10 09 10 10

27 27 05 19 04 02

10 10 10 10 10 10

09 10 *10 11 *-

29 05 *15 02 *-

Japan Japan Japan Japan Japan LA US

210 340 076 340 250 239

Fluid Catalytic Cracking Fluid Catalytic Cracking Fluid Catalytic Cracking Crude Distillation Crude Distillation General outage, turnaround, or closure

10

02

10

10

02

10 ConocoPhi Sweeny llips

TX

US

247

General Equipment

10

04

10

10

05

10 Chevron

Salt Lake City

UT

US

045

Sulfur Plant

1 1

10 10

05 06

10 10

10 10

05 06

10 ConocoPhi Borger llips 10 BP Toledo

TX OH

US US

146 152

Coking General outage, turnaround, or closure H2 Production/Purification/Rec overy General outage, turnaround, or closure General Equipment

10

06

10

10

06

10 ConocoPhi Rodeo llips

CA

US

120

1 1

10 10

07 08

10 10

10 *-

07 *-

10 Deer Park Deer Park Refining 10 Valero Norco Energy

TX LA

US US

327 310

10

02

10

10

04

10 BP

Texas City

TX

US

451

Catalytic Reforming

10

04

10

*-

*-

*- Shell Canada

Montral

QB

Canada

121

General outage, turnaround, or closure

Hydrocarbon Publishing Co. Copyright protected. 2008

71

07

25

10

10

14

10 Formosa Mailiao Petrochem ical

Taiwan

540

Crude Distillation

8 8 8 8 8 8

10 10 11 12 11 12

05 09 01 ***-

10 10 10 10 10 10

10 11 12 *11 01

12 11 06 ***-

10 Cosmo Oil Sakai 10 CPC Corp. Talin 10 CPC Corp. Taoyuan *- CPC Corp. Taoyuan 10 Sinopec 11 Sinopec

Japan Taiwan Taiwan Taiwan

076 300 200 200 270 080

Fluid Catalytic Cracking Crude Distillation Hydrotreating Crude Distillation Coking Fluid Catalytic Cracking

Maoming Guangdo China ng Jiujiang Jiangxi China

03

*-

11

06

*-

11 Caltex

Kurnell

Australia

106

Fluid Catalytic Cracking

10

07

10

10

13

10 Engen Durban Petroleum

South Africa

119

General outage, turnaround, or closure

*-

*-

11

*-

*-

11 Royal Dutch Shell

Pernis, Rotterda m

Netherlan ds

406

General outage, turnaround, or closure

09

*-

10

10

*-

10 Royal Dutch Shell

Pernis, Rotterda m

Netherlan ds

406

General outage, turnaround, or closure

Hydrocarbon Publishing Co. Copyright protected. 2008

71

11

04

09

02

17

10 Silver Eagle Refining

Woods Cross

UT

US

013

Crude Distillation

10

01

10

11

15

10 Indeni Oil Ndola

Zambia

024

General outage, turnaround, or closure

8 8

08 03

27 *-

09 11

09 04

28 *-

09 Cosmo Oil Sakai 11 West Dalian Pacific Petrochem icals

Japan China

076 160

Crude Distillation General outage, turnaround, or closure

09

13

10

*-

*-

*- Chevron

Pascagou la

MS

US

330

Hydrocracking

1 1

09 09

24 25

10 10

09 *-

25 *-

10 Alon USA Big Energy Spring 10 Sunoco Philadelp hia

TX PA

US US

070 330

General outage, turnaround, or closure Hydrotreating

09

27

10

*-

*-

10 Valero Energy 10 Valero Energy

Texas City Port Arthur

TX

US

225

General Equipment

09

27

10

*-

*-

TX

US

250

General Equipment

09

27

10

09

27

10 Valero Energy

Benicia

CA

US

140

General outage, turnaround, or closure

Hydrocarbon Publishing Co. Copyright protected. 2008

71

09

27

10

09

27

10 ExxonMobi Torrance l

CA

US

150

General outage, turnaround, or closure

09

28

10

09

29

10 Murphy Oil Meraux

LA

US

125

General outage, turnaround, or closure

09

29

10

09

29

10 Flint Hills Corpus Resources Christi 10 BP Texas City

TX

US

279

Fluid Catalytic Cracking

09

30

10

09

30

TX

US

451

General Equipment

*-

*-

10

09

30

10 Hovensa

St. Croix

Virgin US Islands

500

Fluid Catalytic Cracking

09

27

10

09

27

10 BP

Texas City Carson

TX

US

451

Crude Distillation

09

28

10

10

04

10 BP

CA

US

252

General outage, turnaround, or closure

2 2 2 2 1

09 09 09 09 09

29 29 29 29 30

10 10 10 10 10

11 11 11 11 10

03 03 03 03 05

10 10 10 10 10

Irving Oil Irving Oil Irving Oil Irving Oil Shell Oil

St. John St. John St. John St. John Martinez

NB NB NB NB CA

Canada Canada Canada Canada US

250 250 250 250 145

Crude Distillation Catalytic Reforming Fluid Catalytic Cracking Sulfur plant Fluid Catalytic Cracking

10

01

10

10

01

10 Flint Hills Corpus Resources Christi

TX

US

279

Crude Distillation

Hydrocarbon Publishing Co. Copyright protected. 2008

71

10

01

10

10

01

10 Flint Hills Corpus Resources Christi

TX

US

279

Hydrotreating

10

01

10

10

01

10 Flint Hills Corpus Resources Christi

TX

US

279

Hydrotreating

10

01

10

10

01

10 Flint Hills Corpus Resources Christi

TX

US

279

Aromatics Production/Recovery

10

01

10

10

01

10 Flint Hills Corpus Resources Christi

TX

US

279

Isomerization

Hydrocarbon Publishing Co. Copyright protected. 2008

71

he drop-down buttons will appear in black.

dle East, (7) Africa, (8) Asia-Pacific Unit / plant Unit size, Production Additional details Planned/ Date of last K b/d impact, K unplanned update b/d N.A. N.A. An FCCU will be closed for p 27-Dec-10 around 40 days of planned work in early Jan. 2011. Another FCCU will be shut for maintenance in 2012. 024.0 024.0 A four-week turnaround that p 27-Dec-10 commenced at the end of Nov. is expected to be completed at the end of Dec. N.A. N.A. *Several units, including an p 27-Dec-10 HCU and a reformer, will undergo planned maintenance this autumn, according to sources close to the refinery. N.A. N.A. *Several units, including an p 27-Dec-10 HCU and a reformer, will undergo planned maintenance this autumn, according to sources close to the refinery. N.A. N.A. *The No. 2B CDU was u 27-Dec-10 restarted as of Nov. 22, and an FCCU, the No. 3 CDU, and secondary units are expected to be back online by mid-Dec. The entire refinery was knocked offline by a power outage. N.A. N.A. *The No. 2B CDU was u 27-Dec-10 restarted as of Nov. 22, and an FCCU, the No. 3 CDU, and secondary units are expected to be back online by mid-Dec. The entire refinery was knocked offline by a power outage.

FCCU

FCCU

HCU

Reformer

CDU

FCCU

Hydrocarbon Publishing Co. Copyright protected. 2008

71

CDU

N.A.

N.A.

FCCU

200.0

200.0

*The No. 2B CDU was restarted as of Nov. 22, and an FCCU, the No. 3 CDU, and secondary units are expected to be back online by mid-Dec. The entire refinery was knocked offline by a power outage. N.A.

27-Dec-10

27-Dec-10

FCCU Maintenance

035.5 N.A.

N.A. N.A.

N.A. Maintenance on an unspecified process unit slightly impacted production. *The refinery was temporarily halted by a power outage on Dec. 7. The No. 6, 75K-b/d CDU, which was shut down by the power failure, was restarted on Dec. 13, while the No. 5, 50K-b/d CDU and other primary refining units were restarted on Dec. 18. *The refinery was temporarily halted by a power outage on Dec. 7. The No. 6, 75K-b/d CDU, which was shut down by the power failure, was restarted on Dec. 13, while the No. 5, 50K-b/d CDU and other primary refining units were restarted on Dec. 18. The FCCU, which was taken down on Dec. 7 for a repair, was expected to be restarted earlier in the month; however, Valero reported on Dec. 20 that the FCCU will remain shut until after a refinery turnaround is completed. The maintenance is slated to start in Jan. 2011 and span 36 days.

u p

27-Dec-10 27-Dec-10

CDU

075.0

147.0

27-Dec-10

CDU

050.0

147.0

27-Dec-10

FCCU

N.A.

N.A.

27-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

SRU

N.A.

N.A.

HTU

045.0

045.0

FCCU VGO unit

031.0 100.0

031.0 100.0

Excess emissions occurred at the SCOT-4 SRU tail gas incinerator, due to a failed flame scanner at the unit's inline heater. Production was not affected. Emissions also occurred when the unit was restarted on Dec. 19. An explosion at a heavy oil upgrader hit a 45K-b/d HTU, killing one worker and injuring six others. The unit continued to operate, despite the impact, although rates at the related vacuum residue desulfurizing unit were lowered. Korean media reported that a gas leak during maintenance was the cause of the explosion, but the company did not confirm this report. The unit was shut for repairs. N.A.

27-Dec-10

27-Dec-10

u p

27-Dec-10 27-Dec-10

Fire

N.A.

N.A.

A fire occurred, due to a leak. Four workers were injured in the blaze, which was later extinguished. The incident did not impact production. The refinery was closed on or around Dec. 22, due to sabotage on Dec. 6 at a pipeline supplying crude to the plant. The refinery was closed on or around Dec. 22, due to sabotage on Dec. 6 at a pipeline supplying crude to the plant. Sulfur dioxide releases occurred at the refinery as a result of maintenance activity. A wet gas compressor tripped offline. The incident led to the release of sulfur dioxide.

27-Dec-10

Pipeline

N.A.

N.A.

27-Dec-10

Pipeline

N.A.

N.A.

27-Dec-10

Flare

N.A.

N.A.

27-Dec-10

WGC

N.A.

N.A.

27-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Fire

N.A.

N.A.

A small fire and a unit upset occurred late in the day. The blaze was quickly contained, with no impact to production. An FCCU and an alkylation unit were knocked offline, but the units were restarted and returned to normal operations later in the day. An FCCU and an alkylation unit were knocked offline, but the units were restarted and returned to normal operations later in the day. A unit upset and fire led to flaring of hydrogen sulfide and sulfur dioxide. Emissions were released from the SRU and a SCOT unit, due to a faulty solenoid valve. The glitch forced the closure of the process air valves. An explosion and fire at a tanker truck parked on refinery grounds threatened nearby tanks, but firefighters were able to extinguish the blaze before it spread to the tanks. Damage to the rest of the refinery was said to be minimal. Sulfur dioxide was released from a flare, due to an electrical malfunction. Power was restored, and affected units were restarted shortly thereafter. A propane leak on a gas cracker line was expected to be repaired on Dec. 23. A hydrocracker at the east plant was closed for repairs, leading to emissions. The unit has been closed several times in the past week for repairs on an exchanger and piping. N.A.

27-Dec-10

FCCU

N.A.

N.A.

27-Dec-10

Alkylation unit

N.A.

N.A.

27-Dec-10

Fire

N.A.

N.A.

27-Dec-10

Valve

N.A.

N.A.

27-Dec-10

Fire

N.A.

N.A.

27-Dec-10

Flare

N.A.

N.A.

27-Dec-10

Pipeline

N.A.

N.A.

27-Dec-10

HCU

N.A.

N.A.

27-Dec-10

Maintenance

N.A.

N.A.

27-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

CDU

150.0

150.0

The No. 4 CDU was restarted following a shutdown due to a minor leak. N.A. N.A. N.A. N.A. The refinery, which was taken offline for an unplanned shutdown on Oct. 30, was expected to restart late in the week to Dec. 18 or in the following week. A leak in the plant's cooling system resulted in damage to several units, including the coker. The Unipetrol-owned refinery suffered a small fire that damaged a hydrocracker. Two weeks of flaring could occur while repairs are made to a hydrogen unit. The entire refinery was knocked offline by a technical glitch. *Processing units, including a reformer and a hydrogen plant, were down for maintenance. *Processing units, including a reformer and a hydrogen plant, were down for maintenance. N.A. The southern part of the refinery will be shut for planned work in 1Q 2011.

20-Dec-10

CDU FCCU CDU CDU Outage

086.0 025.5 240.0 165.0 N.A.

086.0 025.5 240.0 165.0 116.0

p p p p u

20-Dec-10 20-Dec-10 20-Dec-10 20-Dec-10 20-Dec-10

HCU

N.A.

N.A.

20-Dec-10

Hydrogen unit

N.A.

N.A.

20-Dec-10

Outage

N.A.

094.0

20-Dec-10

Reformer

N.A.

N.A.

20-Dec-10

Hydrogen unit

N.A.

N.A.

20-Dec-10

Maintenance Maintenance

N.A. N.A.

119.0 N.A.

p p

20-Dec-10 20-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Fire

N.A.

N.A.

Power was fully restored over the weekend of Dec. 11-12, following a small fire at an electrical switching station on Dec. 9 that resulted in flaring and power outages in some areas of the refinery. The plant is expected to be back at planned rates by Dec. 14. Unplanned flaring was reported. H2S was released during a brief equipment failure. An outage at a wet gas compressor caused flaring. An equipment failure resulted in an emergency flare and the release of sulfur dioxide. A process unit overpressurized, leading to the release of "sour hydrocarbons." A flash fire erupted at the west plant. An operational upset resulted in the release of sulfur dioxide. The planned shutdown of an FCCU for compressor repairs was expected to require flaring. Emissions occurred during maintenance at an ESP boiler. The unit was shut for maintenance on an exchanger. The refiner warned of planned flaring. N.A. *The refiner postponed planned maintenance on a CDU and a coker from Dec. 2010 to March 2011, due to a delay in materials delivery and high diesel demand.

20-Dec-10

Outage Outage Compressor Outage

N.A. N.A. N.A. N.A.

N.A. N.A. N.A. N.A.

u u u u

20-Dec-10 20-Dec-10 20-Dec-10 20-Dec-10

Outage

N.A.

N.A.

20-Dec-10

Fire

N.A.

N.A.

20-Dec-10

Outage

N.A.

N.A.

20-Dec-10

FCCU

N.A.

N.A.

20-Dec-10

Boiler

N.A.

N.A.

20-Dec-10

HCU

N.A.

N.A.

20-Dec-10

Flare Maintenance CDU

N.A. N.A. 050.0

N.A. N.A. N.A.

p p p

20-Dec-10 20-Dec-10 13-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Coker

028.0

N.A.

CDU

045.0

N.A.

FCCU

070.0

N.A.

*The refiner postponed planned maintenance on a CDU and a coker from Dec. 2010 to March 2011, due to a delay in materials delivery and high diesel demand. The older, 45K-b/d CDU will be stopped for planned work in Jan. 2011. The work was delayed from 2Q 2010, as a new, 65K-b/d CDU commenced production in June. The unit was shut down to repair a wet gas compressor. Heavy rains on Dec. 2 caused a power outage and forced the refinery to close, but the plant was operating at 70% of capacity as of Dec. 7. An equipment failure on a pump caused a benzene release. XOM reported emissions of benzene and hydrogen sulfide due to an equipment failure. The refinery experienced instrumentation problems. Sulfur dioxide escaped from a flare due to cold weather. Citgo halted the flaring and performed a partial shutdown involving an HTU. A compressor tripped offline, causing a benzene release. A power outage occurred. Flaring occurred from a PSV on a tank. The refiner adjusted operations to decrease pressure in the tank.

13-Dec-10

13-Dec-10

13-Dec-10

Electrical

N.A.

N.A.

13-Dec-10

Pump

N.A.

N.A.

13-Dec-10

Outage

N.A.

N.A.

13-Dec-10

Outage HTU

N.A. N.A.

N.A. N.A.

u u

13-Dec-10 13-Dec-10

Compressor Electrical Tank

N.A. N.A. N.A.

N.A. N.A. N.A.

u u u

13-Dec-10 13-Dec-10 13-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Outage

N.A.

N.A.

Outage

N.A.

N.A.

Outage

N.A.

N.A.

Pipeline

N.A.

N.A.

Outage Sulfur plant

N.A. N.A.

110.0 N.A.

An upset in a process unit caused flaring and forced Tesoro to depressurize the unit, but was not expected to prevent the refinery from meeting supply commitments. Nitric oxide was released from the ammonia system on the C train. An emissions release occurred due to unknown causes. An unidentified unit was closed to repair a leaking pipe. N.A. Two sulfur plants tripped offline, resulting in flaring. Ethylene and nitrogen oxide were released from a flare, due to a failure at an electrical breaker, which led to the shutdown of a coker wet gas compressor. N.A. N.A. An Ultracracker and a catalytic feed hydrotreater resumed operations on Dec. 8. Flaring was expected to occur during the restarts and last until Dec. 12. An Ultracracker and a catalytic feed hydrotreater resumed operations on Dec. 8. Flaring was expected to occur during the restarts and last until Dec. 12. The No. 6 CDU was restarted following several days of minor repair work. The unit and related facilities will be shut in late Feb. 2011 for scheduled maintenance.

13-Dec-10

13-Dec-10

13-Dec-10

13-Dec-10

u u

13-Dec-10 13-Dec-10

Compressor

N.A.

N.A.

13-Dec-10

FCCU Maintenance Ultracracker

N.A. N.A. N.A.

N.A. N.A. N.A.

p p p

13-Dec-10 13-Dec-10 13-Dec-10

HTU

N.A.

N.A.

13-Dec-10

CDU

075.0

075.0

6-Dec-10

CDU

100.0

N.A.

6-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Fire

N.A.

012.0

A fire broke out at a distillation plant; the blaze was extinguished shortly thereafter. The fire was the third to occur at the refinery in the space of a year; in Dec. 2009, two tank fires broke out within five days of one another. An investigation into the most recent incident has been launched. An accident occurred at a bitumen tank, which must be cooled, emptied, and repaired. Refinery production was not impacted by the incident. Some production units were temporarily shut down. The unit will be closed for about 45 days of maintenance, according to a trade source. The refinery will be shut for maintenance from late April 2011 to the end of May. The closure will significantly impact the production and supply of naphtha. *Rates at the FCCU were cut to 60% of capacity on Nov. 23 as the restart of the alkylation unit was delayed by around two weeks, to the end of Nov. Maintenance on the units began in Aug.; the FCCU was restarted in Oct. and is expected to return to full rates over the weekend of Dec. 4-5. *Rates at the FCCU were cut to 60% of capacity on Nov. 23 as the restart of the alkylation unit was delayed by around two weeks, to the end of Nov. Maintenance on the units began in Aug.; the FCCU was restarted in Oct.

6-Dec-10

Tank

N.A.

N.A.

6-Dec-10

Maintenance CDU

N.A. 150.0

N.A. 150.0

p p

6-Dec-10 6-Dec-10

Maintenance

N.A.

N.A.

6-Dec-10

FCCU

102.0

061.0

6-Dec-10

Alkylation unit

N.A.

N.A.

6-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Electrical

N.A.

N.A.

A power outage occurred as a result of a glitch at a thirdparty electricity provider. The incident forced the temporary closure of some units. One of the units suffered an additional upset during a restart attempt. Flaring and steam venting occurred. SRU No. 3 tripped, leading to the release of hydrogen sulfide and sulfur dioxide. An equipment failure and unit malfunction resulted in the release of benzene. A malfunction resulted in the release of sulfur dioxide. Unplanned emissions at the unit were reported. N.A. Butamer unit No. 36 in the west plant was closed to repair a leak at the boiler feed water system. An electrical problem forced the temporary closure of the plant. N.A. A leaking valve at the coker gas plant resulted in flaring. The refiner isolated a failure at one of the plant's fuel gas treating units. The unit is being restored to normal rates, and all customer needs are being met. Emissions occurred after a leak was located on a line between the process units and a pump. The leak was isolated and workers blocked the line to stop the flaring. A hydrogen unit was briefly knocked offline, due to an electrical mishap.

6-Dec-10

Outage SRU

N.A. N.A.

N.A. N.A.

u u

6-Dec-10 6-Dec-10

Outage

N.A.

N.A.

6-Dec-10

Outage FCCU FCCU Butamer unit

N.A. N.A. N.A. N.A.

N.A. N.A. N.A. N.A.

u u u u

6-Dec-10 6-Dec-10 6-Dec-10 6-Dec-10

Electrical

N.A.

640.0

6-Dec-10

FCCU Valve Fuel gas treater

N.A. N.A. N.A.

N.A. N.A. N.A.

u u u

6-Dec-10 6-Dec-10 6-Dec-10

Pipeline

N.A.

N.A.

6-Dec-10

Hydrogen unit

N.A.

N.A.

6-Dec-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

FCCU Outage

N.A. N.A.

N.A. N.A.

Boiler

N.A.

N.A.

Maintenance

N.A.

N.A.

The unit tripped, resulting in flaring. Heavy rains forced refinery processing to a minimum, but later improvement in the weather allowed processing units to resume normal operations. A boiler malfunction resulted in overpressurization of another unit and flaring. The problem was isolated, and production was minimally impacted. Several units, including one of the catalytic units, an HDS, and a viscosity reducer, were restarted from maintenance. N.A. N.A. Excess opacity occurred. The refiner said the incident was the result of a test to see if a different configuration would lower opacity overall. Maintenance and emissions associated with a high-stage compressor were reported. Sulfur dioxide was released through an incinerator during a turnaround. A planned release from the flare and heaters occurred. Minor maintenance work and planned flaring occurred. N.A. Planned maintenance at select areas of the refinery will result in expected flaring. N.A. N.A. The unit was restarted following a closure related to poor margins. N.A.

u u

6-Dec-10 6-Dec-10

6-Dec-10

6-Dec-10

Reformer Maintenance Maintenance

N.A. N.A. N.A.

N.A. N.A. N.A.

p p p

6-Dec-10 6-Dec-10 6-Dec-10

Compressor

N.A.

N.A.

6-Dec-10

Maintenance

N.A.

N.A.

6-Dec-10

Maintenance Maintenance

N.A. N.A.

N.A. N.A.

p p

6-Dec-10 6-Dec-10

RFCCU Maintenance

N.A. N.A.

N.A. N.A.

p p

6-Dec-10 6-Dec-10

HTU HCU CDU

N.A. N.A. 160.0

N.A. N.A. 160.0

p p u

6-Dec-10 6-Dec-10 29-Nov-10

CDU

140.0

140.0

29-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Pump Outage

N.A. N.A.

N.A. N.A.

A pumping unit was repaired. The refiner reported a problem with an unspecified secondary that is expected to reduce middle distillate exports. The CDU will be permanently closed by Sept. 2011, as a result of weak domestic demand. N.A.

u u

29-Nov-10 29-Nov-10

CDU

120.0

120.0

29-Nov-10

CDU

005.0

005.0

29-Nov-10

Maintenance

N.A.

260.0

CDU

140.0

140.0

Pipeline

N.A.

N.A.

The plant will be closed for scheduled maintenance in mid-2011. The unit will undergo planned work in 2013. Fuji decided to skip maintenance on the unit in 2011. The plant was forced to shut down after militant sabotage damaged the Warri-Escravos pipeline, which feeds crude to the refinery. The shutdown is not expected to impact supplies to fuel stations. The refinery was forced to shut down after militant activists blew up the WarriEscravos pipeline, which feeds crude to the plant. The shutdown is not expected to impact supplies to fuel stations. Shell has delayed the planned restart of an FCCU that was closed for maintenance in Sept., the company reported on Nov. 26. The unit was repaired after being knocked offline by a power outage. A process upset may have resulted in an H2S release the following day.

29-Nov-10

29-Nov-10

29-Nov-10

Pipeline

N.A.

N.A.

29-Nov-10

FCCU

N.A.

N.A.

29-Nov-10

FCCU

070.0

N.A.

29-Nov-10

Outage

N.A.

N.A.

29-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Outage

N.A.

N.A.

Electrical

N.A.

N.A.

Outage Maintenance FCCU

N.A. N.A. N.A.

N.A. N.A. N.A.

Fire

N.A.

N.A.

Pump

N.A.

N.A.

SRU

N.A.

N.A.

Compressor

N.A.

N.A.

A pinhole leak on a distillate line in a processing unit was discovered. The leak allowed light coker naphtha to escape. The refinery experienced a power outage on Nov. 20, due to an equipment failure at its electricity supplier, but the plant was restarted on Nov. 22. However, the refinery witnessed a small fire in an overhead line carrying diesel during the restart process on Nov. 23. The restart continued, despite the fire. Flaring of H2S occurred due to an equipment failure. Brief maintenance resulted in flaring. Operations at an FCCU were suspended after the unit tripped offline and emitted more than 500 lb (227 kg) of SO2. A small fire occurred at a processing area, but it was extinguished within half an hour, and the refinery continued to operate. Hydrogen fluoride was released due to a failure on a pump in an allocation unit. The pump was shut to contain the release. An air compressor trip forced the temporary shutdown of an SRU. Flaring from a wet gas compressor was reported after the unit, which is located at the saturated gas recovery plant, received light ends material from an unknown source. Production was not affected by the incident. Natural gas and smoke were released at the refinery.

29-Nov-10

29-Nov-10

u p u

29-Nov-10 29-Nov-10 29-Nov-10

29-Nov-10

29-Nov-10

29-Nov-10

29-Nov-10

Outage

N.A.

N.A.

29-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Electrical

N.A.

N.A.

Outage

N.A.

N.A.

Maintenance

N.A.

N.A.

Tesoro reported an SO2 release due to a power outage. Power was quickly restored, and refinery operations were not impacted. Emissions were reported after a process upset. The emissions were routed to a control device. The refinery was restarted after longer-than-anticipated maintenance was completed. N.A. N.A. N.A. N.A. A fire erupted at a pipe associated with the No. 7 CDU. The incident was quickly brought under control and operations were not impacted; however, two contract workers suffered slight burns. N.A.

29-Nov-10

29-Nov-10

29-Nov-10

Maintenance FCCU Coker Maintenance CDU

N.A. N.A. N.A. N.A. 100.0

N.A. N.A. N.A. N.A. N.A.

p p p p u

29-Nov-10 29-Nov-10 29-Nov-10 29-Nov-10 22-Nov-10

CDU

075.0

075.0

22-Nov-10

CDU

330.0

330.0

N.A.

22-Nov-10

CDU

160.0

160.0

Coker

N.A.

160.0

*A CDU will be taken offline for a maintenance program that will last at least 35 days. The start of the work was delayed from Nov. 8. Other units, including a coker and an HCU, will also be closed during the work. *A CDU will be taken offline for a maintenance program that will last at least 35 days. The start of the work was delayed from Nov. 8. Other units, including a coker and an HCU, will also be closed during the work.

22-Nov-10

22-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

HCU

N.A.

160.0

CDU

N.A.

150.0

*A CDU will be taken offline for a maintenance program that will last at least 35 days. The start of the work was delayed from Nov. 8. Other units, including a coker and an HCU, will also be closed during the work. XOM halted jet fuel output at the plant on Sept. 13 after the CDU caught fire on Sept. 11, marking the second blaze in less than two weeks. The refinery was gradually ramping up rates by Nov. 19. A condensate train and gasoline production plant were being restarted from maintenance. One of the two 140K-b/d condensate trains will be shut from mid-Jan. 2011 for planned work. Gasoline units will see planned maintenance in 2Q 2011. Diesel units will see planned maintenance in 3Q 2011. Maintenance will be carried out at gasoline and diesel units during 2Q 2011. Gasoline and diesel plants will see planned work in 2Q 2011. During 4Q 2011, gasoline and diesel units will undergo work. A brief fire knocked offline the FCCU. The unit remained offline until minor repairs were made. A worker was injured in a fire at an HDS unit. The unit, located in the Point Breeze section of the refinery, had been under turnaround for 10 days before the blaze erupted.

22-Nov-10

22-Nov-10

Condensate train

140.0

N.A.

22-Nov-10

Condensate train

140.0

N.A.

22-Nov-10

Maintenance

N.A.

N.A.

22-Nov-10

Maintenance Maintenance

N.A. N.A.

N.A. N.A.

p p

22-Nov-10 22-Nov-10

Maintenance

N.A.

N.A.

22-Nov-10

Maintenance

N.A.

N.A.

22-Nov-10

FCCU

N.A.

N.A.

22-Nov-10

HDS

N.A.

N.A.

22-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

FCCU

N.A.

N.A.

Various blowers shut down while circulating catalyst, causing opacity at an FCCU. An equipment failure resulted in a leak in a process line. Excess opacity was caused by an upset at the electrostatic precipitator (ESP). A restart of the ESP resulted in boiler emissions from an FCCU. Flaring was caused by excess pressure at a vessel in the east plant. A small fire broke out and was extinguished. No impact to production was seen. Emissions were released during a restart of the refinery on Nov. 16. It was previously reported that repairs to the plant were being made on Nov. 9. A unit upset led to the release of sulfur dioxide and hydrogen sulfide. A sour water leak from a compressor in Power Unit 2 did not affect production. An operator error at the SRU resulted in flaring of sulfur dioxide. Erosion on the flare line resulted in the release of hydrogen sulfide. Shell is preparing to install a clamp over the line. Flaring was reported due to a compressor outage, which knocked offline an HTU. The firm prepared to restart a VDU that has been shut since a pipe explosion on Nov. 4, 2009. Several other units are still offline following the blast. N.A.

22-Nov-10

Outage

N.A.

N.A.

22-Nov-10

ESP

N.A.

N.A.

22-Nov-10

Outage

N.A.

N.A.

22-Nov-10

Fire

N.A.

N.A.

22-Nov-10

Outage

N.A.

N.A.

22-Nov-10

Outage

N.A.

N.A.

22-Nov-10

Compressor

N.A.

N.A.

22-Nov-10

SRU

N.A.

N.A.

22-Nov-10

Flare

N.A.

N.A.

22-Nov-10

HTU

N.A.

N.A.

22-Nov-10

VDU

N.A.

N.A.

22-Nov-10

FCCU

N.A.

N.A.

22-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Alkylation unit Maintenance

N.A. N.A.

N.A. N.A.

N.A. Maintenance was carried out at distillation and hydrotreating units. Planned flaring is expected to occur from Nov. 25-Dec. 21. The refiner previously stated that flaring would also occur from Nov. 15-26. N.A.

p p

22-Nov-10 22-Nov-10

Flare

N.A.

N.A.

22-Nov-10

Cracker

N.A.

N.A.

22-Nov-10

CDU

050.0

050.0

Naphtha HDS

N.A.

N.A.

DSU

N.A.

N.A.

Alkylation unit

N.A.

N.A.

HCU

N.A.

N.A.

Visbreaker

N.A.

N.A.

Topping unit

N.A.

N.A.

VDU

N.A.

N.A.

The No. 5 CDU was be offline while planned work was carried out on secondary units. Two gasoline-making units that were shut for two weeks of planned work in mid-Oct. are still closed as of Nov. 10, as maintenance is taking longer than expected, the company said. *Maintenance will be performed in 1Q 2011 on two desulfurization units, an alkylation unit, and a mild hydrocracker. *Maintenance will be performed in 1Q 2011 on two desulfurization units, an alkylation unit, and a mild hydrocracker. *Maintenance will be performed in 1Q 2011 on two desulfurization units, an alkylation unit, and a mild hydrocracker. *In 2Q 2011, a visbreaker, a topping unit, and a vacuum unit will undergo planned work. *In 2Q 2011, a visbreaker, a topping unit, and a vacuum unit will undergo planned work. *In 2Q 2011, a visbreaker, a topping unit, and a vacuum unit will undergo planned work.

15-Nov-10

15-Nov-10

15-Nov-10

15-Nov-10

15-Nov-10

15-Nov-10

15-Nov-10

15-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Reformer

N.A.

N.A.

Regenerator

N.A.

N.A.

In 4Q 2011, runs will be cut at a catalytic reformer during scheduled work. Emissions occurred as the FCCU regenerator was being loaded with fresh catalyst and preheated, in preparation for startup. The catalyst loading was halted, and operations were returned to normal. A processing glitch at the unit led to emissions. Emissions and an instrumentation failure were reported during a startup at the refinery. VOCs were released from a tank. An equipment failure led to the release of SO2. The company said it was working to fix the problem. Emissions associated with repairs at the plant were reported. A compressor tripped offline, resulting in the release of SO2, NOX, and VOCs. The BTX unit was brought back online one day after being shut due to a benzene leak from a suction valve on a pump. A power outage abruptly shut down the refinery. Power was restored later that day, which allowed the refinery to begin the restart process. Flaring was reported due to a frozen propane line linked to the residual hydrotreater. Emissions occured due to a slight overpressurization in a vessel. Set point pressure was raised to stop the flaring. Sodium hydroxide was released from a water treatment system into the soil.

15-Nov-10

15-Nov-10

FCCU Outage

N.A. N.A.

N.A. N.A.

u u

15-Nov-10 15-Nov-10

Outage

N.A.

N.A.

15-Nov-10

Outage

N.A.

N.A.

15-Nov-10

Compressor

N.A.

N.A.

15-Nov-10

Aromatics unit

N.A.

N.A.

15-Nov-10

Electrical

N.A.

N.A.

15-Nov-10

RHTU

N.A.

N.A.

15-Nov-10

Flare

N.A.

N.A.

15-Nov-10

Water treatment system

N.A.

N.A.

15-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Boiler CDU

N.A. N.A.

N.A. N.A.

N.A. *A pipestill, a naphtha hydrotreater, a hydroformer, a hydrodesulfurization unit, and a deasphalter unit had been shut for planned work. *A pipestill, a naphtha hydrotreater, a hydroformer, a hydrodesulfurization unit, and a deasphalter unit had been shut for planned work. *A pipestill, a naphtha hydrotreater, a hydroformer, a hydrodesulfurization unit, and a deasphalter unit had been shut for planned work. *A pipestill, a naphtha hydrotreater, a hydroformer, a hydrodesulfurization unit, and a deasphalter unit had been shut for planned work. *A pipestill, a naphtha hydrotreater, a hydroformer, a hydrodesulfurization unit, and a deasphalter unit had been shut for planned work. *Six weeks of scheduled work were carried out on the No. 3 CDU, the No. 3 Rheniformer, the FCCU, and the sulfur plant. The turnaround cost $72MM, according to Irving. *Six weeks of scheduled work were carried out on the No. 3 CDU, the No. 3 Rheniformer, the FCCU, and the sulfur plant. The turnaround cost $72MM, according to Irving.

u p

15-Nov-10 15-Nov-10

HTU

N.A.

N.A.

15-Nov-10

Hydroformer

N.A.

N.A.

15-Nov-10

HDS

N.A.

N.A.

15-Nov-10

Deasphalting unit

N.A.

N.A.

15-Nov-10

CDU

N.A.

N.A.

15-Nov-10

Rheniformer

N.A.

N.A.

15-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

FCCU

N.A.

N.A.

*Six weeks of scheduled work were carried out on the No. 3 CDU, the No. 3 Rheniformer, the FCCU, and the sulfur plant. The turnaround cost $72MM, according to Irving. *Six weeks of scheduled work were carried out on the No. 3 CDU, the No. 3 Rheniformer, the FCCU, and the sulfur plant. The turnaround cost $72MM, according to Irving. N.A.

15-Nov-10

Sulfur plant

N.A.

N.A.

15-Nov-10

Maintenance

N.A.

083.0

15-Nov-10

Maintenance

N.A.

N.A.

Flare CDU

N.A. 050.0

N.A. 086.7

Maintenance was performed on a number of units. Production was slightly impacted. Planned flaring is expected. *The two were closed from end-Oct. for maintenance that will last about 20 days, according to industry sources. *The two were closed from end-Oct. for maintenance that will last about 20 days, according to industry sources. N.A. N.A. N.A. N.A. N.A. N.A. The refinery was evacuated following a gas leak at a naphtha cracker, which has been offline since the end of Sept. for maintenance.

15-Nov-10

p p

15-Nov-10 8-Nov-10

Coker

036.7

086.7

8-Nov-10

FCCU CDU CDU CDU CDU CDU Cracker

027.9 110.0 260.0 060.0 240.0 200.0 N.A.

N.A. 110.0 260.0 060.0 240.0 200.0 N.A.

p p p p p p u

8-Nov-10 8-Nov-10 8-Nov-10 8-Nov-10 8-Nov-10 8-Nov-10 8-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

HCU

N.A.

N.A.

FCCU Outage

N.A. N.A.

N.A. N.A.

An HCU will be ramped down from Nov. 4-8 for maintenance through Nov. 20. Work includes catalyst change, inspections, and cleaning. N.A. The refinery, which has been shut since an explosion that killed seven workers, began restarting on Oct. 4 and was partially restarted, including the CDU, as of Oct. 19, but was delayed due to a boiler problem over the weekend of Oct. 23-24. The plant is expected to reach planned rates by Nov. 13. The unit was taken offline for repairs to fix problems with the unit's air distributor and regenerator. The refinery was back to planned rates following the loss of steam and hydrogen supplies. A portion of the refinery was still being restarted following complications from a power outage. A transformer switched, forcing the refiner to reroute power to another transformer. A fire forced the closure of the refinery. The blaze, which occurred at an unspecified processing unit, was due to a failed gasket. A malfunction involving a valve at a DSU resulted in emissions. An external power failure knocked a unit offline and resulted in emissions of sulfur dioxide and hydrogen sulfide. The unit tripped offline.

8-Nov-10

p u

8-Nov-10 8-Nov-10

FCCU

104.0

N.A.

8-Nov-10

Outage

N.A.

N.A.

8-Nov-10

Electrical

N.A.

N.A.

8-Nov-10

Transformer

N.A.

N.A.

8-Nov-10

Fire

N.A.

071.0

8-Nov-10

DSU

N.A.

N.A.

8-Nov-10

Electrical

N.A.

N.A.

8-Nov-10

Compressor

N.A.

N.A.

8-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

FCCU

N.A.

N.A.

Compressor Pump

N.A. N.A.

N.A. N.A.

FCCU

N.A.

N.A.

Operations at an FCCU were briefly disrupted when oxygen from an outside provider was cut. A wet gas compressor went down. A release of ethylene occurred while pumps were being swapped. A process upset at an FCCU resulted in emissions. An isolated power blip at an SRU resulted in excess emissions of SO2. A breakdown led to flaring, Tesoro said. Trade sources said the unit involved was an HCU. Alon shut down the 40K-b/d Long Beach part of the refinery due to poor economics, trade sources said. The Paramount part of the complex remains in operation, but at reduced rates. The unit is expected to be restarted during the week to Nov. 6, according to sources close to the refinery. The unit, which went down for maintenance on or around Sept. 7, originally was expected to be restarted in the week Oct. 30. N.A. The No. 3 FCCU commenced a restart on Oct. 31. Emissions related to the restart could last through Nov. 7. *The refiner was wrapping up an overhaul at an FCCU and preparing to commence planned work at the FCCU's associated alkylation unit.

8-Nov-10

u u

8-Nov-10 8-Nov-10

8-Nov-10

SRU

N.A.

N.A.

8-Nov-10

HCU

N.A.

N.A.

8-Nov-10

Outage

N.A.

040.0

8-Nov-10

FCCU

120.0

N.A.

8-Nov-10

Maintenance FCCU

N.A. N.A.

130.0 N.A.

p p

8-Nov-10 8-Nov-10

FCCU

N.A.

N.A.

8-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Alkylation unit

N.A.

N.A.

*The refiner was wrapping up an overhaul at an FCCU and preparing to commence planned work at the FCCU's associated alkylation unit. N.A. The refiner said that maintenance is occurring at conversion units. The work is resulting in lower throughput. The refiner warned of planned flaring. N.A. N.A. Planned work will be performed during 4Q 2011. A power outage forced the plant to shut down. The coker gas oil HTU, which has been shut since a deadly explosion erupted at the refiner on Sept. 7, is expected to be restarted in early 2011. Previous reports stated that the unit was restarted later Sept. An equipment failure was related to scheduled maintenance that commenced earlier. The glitch led to the release of NOX to the flare stack. An SRU process frame tripped. *Power was lost during a thunderstorm, which triggered malfunctions at an FCCU and an alkylation unit. *Power was lost during a thunderstorm, which triggered malfunctions at an FCCU and an alkylation unit. Instrumentation issues caused intermittent flaring.

8-Nov-10

Maintenance Maintenance

N.A. N.A.

N.A. N.A.

p p

8-Nov-10 8-Nov-10

Flare Maintenance Maintenance Maintenance Electrical HTU

N.A. N.A. N.A. N.A. N.A. 054.0

N.A. N.A. N.A. N.A. 400.0 054.0

p p p p u u

8-Nov-10 8-Nov-10 8-Nov-10 8-Nov-10 1-Nov-10 1-Nov-10

Outage

N.A.

N.A.

1-Nov-10

SRU FCCU

N.A. N.A.

N.A. N.A.

u u

1-Nov-10 1-Nov-10

Alkylation unit

N.A.

N.A.

1-Nov-10

Outage

N.A.

N.A.

1-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Outage

N.A.

N.A.

Outage

N.A.

N.A.

A power outage led to equipment shutdowns and flaring. A unit upset was followed by the release of SO2 and SO3. A transformer failed on the afternoon of Oct. 26, cutting power to the undermaintenance plant. Electricity was restored the next day, and the plant was gradually powered up over the following days. The outage was expected to extend planned maintenance, delaying the restart of a CDU by about one month to late Nov. As of Oct. 29, the FCCU is still offline as the refiner assesses any damage that might have been caused by the power outage. A power outage caused flaring. A leak at a depropanizer cooler in a catalytic reformer did not impact production; the leak was quickly repaired. Emissions from the repairs are expected to continue for several days. Flaring was reported on Oct. 27; the plant was still recovering from a loss of hydrogen and steam on Oct. 22. A power blip led to flaring. An instrument failure led to flaring. An unspecified equipment failure led to acid gas flaring. A raffinate hydroconversion unit was taken offline to fix a leak. The shutdown of the unit resulted in flaring.

1-Nov-10

1-Nov-10

Electrical

N.A.

N.A.

1-Nov-10

Electrical Depropanizer

N.A. N.A.

N.A. N.A.

u u

1-Nov-10 1-Nov-10

Outage

N.A.

N.A.

1-Nov-10

Electrical Outage Outage Hydroconversion unit

N.A. N.A. N.A. N.A.

N.A. N.A. N.A. N.A.

u u u u

1-Nov-10 1-Nov-10 1-Nov-10 1-Nov-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Outage

N.A.

N.A.

Outage

N.A.

N.A.

A unit malfunction was accompanied by evacuation alarms, but the incident was quickly brought under control and production was not impacted. An equipment malfunction resulted in excess emissions.

1-Nov-10

1-Nov-10

Maintenance HCU

N.A. N.A.

N.A. N.A.

N.A. N.A.

p p

1-Nov-10 1-Nov-10

Maintenance CDU CDU

N.A. N.A. N.A.

N.A. N.A. N.A.

N.A. N.A. Planned work on a CDU compressor was not expected to impact production. N.A. N.A. N.A. The plant will be closed for 36 days of work. N.A. Planned work on several Gofiners is expected to last for several months. The unti was shut due to weak demand. N.A. *A reformer and a naphtha desulfurizer were closed due to a gas leak in the desulfurizer. *A reformer and a naphtha desulfurizer were closed due to a gas leak in the desulfurizer.

p p p

1-Nov-10 1-Nov-10 1-Nov-10

FCCU CDU Coker Maintenance HCU Gofiner

110.0 N.A. N.A. N.A. 030.0 N.A.

N.A. N.A. N.A. 140.0 N.A. N.A.

p p p p p p

1-Nov-10 1-Nov-10 1-Nov-10 1-Nov-10 1-Nov-10 25-Oct-10

CDU CDU Reformer

120.0 N.A. 036.0

120.0 N.A. N.A.

u p u

25-Oct-10 25-Oct-10 25-Oct-10

DSU

065.0

N.A.

25-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Maintenance

N.A.

152.0

The refinery commenced a one-month closure, prompted by sluggish domestic demand. Maintenance will be performed during the economic closure. *The unit was restarted, along with several others, following inspections that commenced in Aug. *The unit was restarted, along with several others, following inspections that commenced in Aug. *The unit was restarted, along with several others, following inspections that commenced in Aug. The coker will be offline for about 15 days of routine maintenance from late Oct. Major maintenance will be performed in Feb. 2011. Unspecified units will be closed from March-April 2011 for planned maintenance. The plant will be closed for around six weeks of inspections and maintenance from the end of Aug. 2011, according to sources close to the refinery. The refinery will be closed for maintenance sometime during 4Q 2011, according to industry sources. N.A.

25-Oct-10

Coker

025.0

067.0

25-Oct-10

Gas oil HDS

025.0

067.0

25-Oct-10

Naphtha HDS

017.0

067.0

25-Oct-10

Coker

160.0

N.A.

25-Oct-10

Maintenance Maintenance

N.A. N.A.

N.A. N.A.

p p

25-Oct-10 25-Oct-10

Maintenance

N.A.

N.A.

25-Oct-10

Maintenance

N.A.

264.0

25-Oct-10

Fire

N.A.

N.A.

25-Oct-10

Outage

N.A.

N.A.

An unspecified unit was shut down after an equipment malfunction led to the release of materials to the flare. The unit will require repairs.

25-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Butamer unit

N.A.

N.A.

Compressor

N.A.

N.A.

Compressor

N.A.

N.A.

Flare CDU

N.A. N.A.

N.A. N.A.

A leak at the butamer unit in complex 6 of the west plant was reported on Oct. 19 and fixed by Oct. 20. The incident and repair work was expected to have resulted in the release of butane, propane, VOGs, isobutene, CO, and NOX. A compressor tripped offline, triggering flaring. Production was not impacted. Flaring was reported, due to a compressor trip at Booster Station 4. An equipment failure resulted in flaring. Also, a CDU (dubbed Pipestill 3) was undergoing a turnaround. Throughput at the unit has been reduced while work is performed on a booster station. Work is expected to commence in Nov. on an alkylation unit. N.A. N.A. N.A. Tail gas treating unit 2 was shut for several hours for maintenance to remove sulfur from the distribution manifold. N.A. A residual hydrotreater resumed normal operations on Oct. 22. The unit had been down for maintenance. The refiner warned of planned flaring.

25-Oct-10

25-Oct-10

25-Oct-10

u u

25-Oct-10 25-Oct-10

Alkylation unit

N.A.

N.A.

25-Oct-10

Maintenance Coker FCCU TGTU

N.A. N.A. N.A. N.A.

N.A. N.A. N.A. N.A.

p p p p

25-Oct-10 25-Oct-10 25-Oct-10 25-Oct-10

Sulfur plant RHTU

N.A. N.A.

N.A. N.A.

p p

25-Oct-10 25-Oct-10

Flare

N.A.

N.A.

25-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

FCCU

N.A.

N.A.

Flare HTU

N.A. N.A.

N.A. N.A.

Tank

N.A.

N.A.

An unplanned overhaul at an FCCU was extended by at least one week, trade sources noted. Tesoro originally said the unit was taken offline on Sept. 30 for around one week of work. Flaring was reported amid repairs to the flare system. A diesel HTU was knocked offline by a compressor fire on Oct. 5; repairs to the damaged HTU began on Oct. 7. The incident at the compressor led to the release of SO2 and NOX. A fire at a sludge tank injured one worker. The blaze erupted while maintenance was being performed on the tank; production was not impacted. A hydrogen sulfide leak from a pipe was repaired; the leak was said to have affected production. A worker collapsed and died while in the process of repairing the leak on Oct. 6, but it has yet to be determined if the death was related to the leaking gas. Operations were back to normal as of Oct. 14. The 145K-b/d FCCU is anticipated to reach normal rates by the weekend of Oct. 16-17, after being closed on Oct. 6 by a weather-related power outage, and then later restarted on Oct. 8. Flaring occurred when a wet gas compressor tripped offline at a heavy oil cracker at the west plant. The unit was quickly returned to service, and production was not affected.

18-Oct-10

u u

18-Oct-10 18-Oct-10

18-Oct-10

Pipeline

N.A.

N.A.

18-Oct-10

FCCU

145.0

N.A.

18-Oct-10

Compressor

N.A.

N.A.

18-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

SRU

N.A.

N.A.

SCOT

N.A.

N.A.

SRU

N.A.

N.A.

Compressor

N.A.

N.A.

Outage

N.A.

N.A.

*Sinclair cut feed to the sulfur units and restarted the SCOT unit. The refiner stated in a regulatory filing, "Hydrocarbon carryover to the No. 3 and No. 4 SRUs caused the TTO on No. 3 to shut down, and the SCOT and TTO on No. 4 to shut down." *Sinclair cut feed to the sulfur units and restarted the SCOT unit. The refiner stated in a regulatory filing, "Hydrocarbon carryover to the No. 3 and No. 4 SRUs caused the TTO on No. 3 to shut down, and the SCOT and TTO on No. 4 to shut down." A glitch occurred at the No. 1 SRU; the upset did not impact production. Flaring was reported, due to the loss of a compressor. Operations were curbed to reduce the flaring. An unspecified equipment failure occurred after H2S was released. An unspecified unit was shut down, due to a jet fuel leak on a pipeline. The FCCU suffered a glitch. Workers stabilized the unit shortly thereafter. An SRU was closed, which caused SO2 flaring. Maintenance on unspecified units was scheduled. The refiner warned of planned flaring. The refiner warned of planned flaring. A boiler was replaced at the refinery over the weekend of Oct. 16-17 as part of routine maintenance.

18-Oct-10

18-Oct-10

18-Oct-10

18-Oct-10

18-Oct-10

Outage

N.A.

N.A.

18-Oct-10

FCCU

N.A.

N.A.

18-Oct-10

SRU

N.A.

N.A.

18-Oct-10

Maintenance Flare Flare Boiler

N.A. N.A. N.A. N.A.

N.A. N.A. N.A. N.A.

p p p p

18-Oct-10 18-Oct-10 18-Oct-10 18-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

CDU

N.A.

110.0

FCCU FCCU FCCU CDU CDU Outage

035.5 041.0 024.0 150.0 140.0 N.A.

N.A. N.A. N.A. 150.0 140.0 N.A.

The plant was closed down from Aug. to carry out a refurbishment at a CDU. N.A. N.A. N.A. N.A. N.A. An emergency shutdown of a unit was performed. The incident caused flaring, which resulted in a small grass fire. A gas compressor was shut to repair a leak in a hydrogen quench line supplying reactor No. 4. N.A.

11-Oct-10

u u u p p u

11-Oct-10 11-Oct-10 11-Oct-10 11-Oct-10 11-Oct-10 11-Oct-10

Compressor

N.A.

N.A.

11-Oct-10

SRU

N.A.

N.A.

11-Oct-10

Coker Outage

N.A. N.A.

N.A. N.A.

Hydrogen unit

N.A.

N.A.

Electrical Compressor

N.A. N.A.

N.A. N.A.

Ultraformer

N.A.

N.A.

Maintenance

N.A.

121.0

The unit malfunctioned, triggering flaring. A process unit upset resulted in the release of H2S and SO2. Flaring and a release of SO2 occurred due to the shutdown of a third-party hydrogen plant. A power outage caused flaring. A glitch with a coupling at a reformer hydrogen compressor impacted production. Ultraformer No. 3 was restarted, following a maintenance closure. The restart process was slated to last three days. A four-week maintenance closure commenced on or around Oct. 4.

u u

11-Oct-10 11-Oct-10

11-Oct-10

u u

11-Oct-10 11-Oct-10

11-Oct-10

11-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

CDU

180.0

180.0

FCCU CDU RDSU CDU Coker FCCU

024.0 100.0 030.0 100.0 036.7 023.3

N.A. 100.0 N.A. 100.0 N.A. N.A.

The last of the plant's three 180K-b/d CDUs was restarted after an oil leak sparked a fire at a residual desulfurization unit. N.A. N.A. N.A. N.A. N.A. The unit will be closed for more than 40 days of planned work. One of the two 21.5K-b/d FCCUs will be closed for scheduled work. The refinery suffered a power failure and saw complications during a restart attempt. Shell said on Oct. 15 that it has postponed maintenance on a hydrocracker to spring 2011; the work had been scheduled to take place in 4Q 2010. Units at the plant that were shut in Sept. will be restarted by the end of Oct., to boost fuel output in response to strikes over pension reforms in France, which have crippled the country's refining industry.

11-Oct-10

u p p p p p

11-Oct-10 11-Oct-10 11-Oct-10 11-Oct-10 11-Oct-10 11-Oct-10

FCCU

021.5

N.A.

11-Oct-10

Electrical

N.A.

119.0

11-Oct-10

Maintenance

N.A.

N.A.

11-Oct-10

Maintenance

N.A.

N.A.

11-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

CDU

013.0

N.A.

The No. 1 CDU, which was damaged in a pipe explosion, commenced a restart on Feb. 17. After the CDU reaches planned rates, the refiner will restart, one by one, the VDU, the SRU, and the reformer. The distillate dewaxing unit, where the explosion occurred, is expected to be restarted following the recent conclusion of an investigation into the incident, Silver Eagle said on Sept. 27. The plant will be shut for 45 days of annual maintenance. Stocks are said to be adequate to cover requirements. N.A. The refiner plans to carry out a major, 45-day turnaround in March and April 2011. The work is performed once every four years. The unit was hit by a fire; the fire was quickly extinguished, and no other units were impacted. Emissions occurred due to a heavy thunderstorm. A diesel hydrotreater unit was shut, due to an upset that resulted in the release of a diesel mist into the atmosphere. A compressor malfunction occurred in Complex 7 of the refinery, causing flaring. A wet gas compressor tripped in the delayed coker, but it did not impact production. A small fire was extinguished at the plant; the incident did not impact operations.

4-Oct-10

Maintenance

N.A.

024.0

4-Oct-10

CDU Maintenance

080.0 N.A.

080.0 160.0

p p

4-Oct-10 4-Oct-10

HCU

N.A.

N.A.

4-Oct-10

Flare HTU

N.A. N.A.

N.A. N.A.

u u

4-Oct-10 4-Oct-10

Compressor

N.A.

N.A.

4-Oct-10

Compressor

N.A.

N.A.

4-Oct-10

Fire

N.A.

N.A.

4-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Flare

N.A.

N.A.

Electrical

N.A.

N.A.

FCCU

N.A.

N.A.

Pipeline

N.A.

N.A.

FCCU

N.A.

N.A.

CDU

N.A.

N.A.

Flare

N.A.

N.A.

CDU Rheniformer FCCU Sulfur plant FCCU

N.A. N.A. N.A. N.A. N.A.

N.A. N.A. N.A. N.A. N.A.

Production was not affected by unplanned flaring. The flaring occurred due to surplus pressure on the plant's vapor recovery system. An overnight power outage was due to a transformer failure in a substation. Operations were returned to normal the next day. Flaring beyond permitted levels was reported from the FCCU in the east plant. A crude leak from a pipeline within the refinery was contained. The leak occurred when a piece of equipment struck the line. A malfunctioning FCCU was returned to operation on the afternoon of Sept. 30. The unit is expected to operate at a reduced rate for around two weeks while repairs are completed, the refiner said. Brief maintenance was to be carried out at the No. 1 FCCU. The refiner warned of planned flaring amid maintenance, which has been ongoing since early Sept. N.A. N.A. N.A. N.A. An FCCU was taken offline for around one week of work. *The rupture of a steam line in the east plant knocked offline a CDU, two diesel HTUs, a Hydrobon unit, a sulfolane unit, and a DIH unit. Excess emissions were also reported.

4-Oct-10

4-Oct-10

4-Oct-10

4-Oct-10

4-Oct-10

4-Oct-10

4-Oct-10

p p p p p

4-Oct-10 4-Oct-10 4-Oct-10 4-Oct-10 4-Oct-10

CDU

N.A.

N.A.

4-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

HTU

N.A.

N.A.

Hydrobon

N.A.

N.A.

Sulfolane

N.A.

N.A.

DIH

N.A.

N.A.

*The rupture of a steam line in the east plant knocked offline a CDU, two diesel HTUs, a Hydrobon unit, a sulfolane unit, and a DIH unit. Excess emissions were also reported. *The rupture of a steam line in the east plant knocked offline a CDU, two diesel HTUs, a Hydrobon unit, a sulfolane unit, and a DIH unit. Excess emissions were also reported. *The rupture of a steam line in the east plant knocked offline a CDU, two diesel HTUs, a Hydrobon unit, a sulfolane unit, and a DIH unit. Excess emissions were also reported. *The rupture of a steam line in the east plant knocked offline a CDU, two diesel HTUs, a Hydrobon unit, a sulfolane unit, and a DIH unit. Excess emissions were also reported.

4-Oct-10

4-Oct-10

4-Oct-10

4-Oct-10

Hydrocarbon Publishing Co. Copyright protected. 2008

71

Description of labels Shutdown Region** date

Restart date

Refiner

City

State

Country

Refinery capacity

Unit

Date of World region shutdown

Date of restart

Operator of the refinery at which the shutdown Location of Location of took place refinery refinery

Location of refinery

The type of problem The capacity encountered or of refinery in the unit at which barrels per the problem was day encountered

When a filter is in place, the dropdown arrows and the numbers appear in blue. To unfilter the results, click on the drop-down menu, scroll to the top, and select the (All) option. This will un-filter the column.

Please note: All shutdown and restart dates are considered approximate. Shutdown and restart information is primarily derived from Reuters, Platts, and Bloomsberg newswire services. Refinery and unit capacity figures may be derived from primary source material (stated above) or from Oil and Gas Journal 's a Some capacities for "Unit size" and "Production impact" are not available or not applicable and are therefore designated "N.A."

Unit size, K b/d

Production impact, K b/d

Details

Planned/unplanned

The size of the unit affected in thousand barrels per day

The capacity impact of the shutdown in Further details thousand barrels about the per day shutdown

Whether the shutdown was planned, symbolized by (p), or unplanned, symbolized by (u).

If you see no entries after you have applied a filter, scroll to the top.

swire services. r from Oil and Gas Journal 's annual Worldwide Refining Survey. re therefore designated "N.A."

ies after you e applied a r, scroll to the

Potrebbero piacerti anche