Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
THE INFORMATION CONTAINED IN THIS DOCUMENT IS THE PROPERTY OF SPEEL PRAHA, LTD., AND MAY NOT BE
DISCLOSED OR REPRODUCED IN ANYWAY WITHOUT THE WRITTEN CONSENT OF SPEEL PRAHA, LTD.
ALL RIGHTS RESERVED.
2006-11-22
Change
2006-11-22
Change
Change
Change
Change
Change
Change
Changes
Date
Chapter
Page
Title page
Contents
Content
Abbreviations, acronyms
Safety regulations and
precautions
Chapter 1
Chapter 2
Chapter 3
Chapter 4
Chapter 5
2006-11-22
i
ii
iii
iv
v
vi
2006-11-22
BLANK
2006-11-22
BLANK
2006-11-22
BLANK
vii
viii
2006-11-22
BLANK
1-1
1-2
1-3
1-4
2-1
2-2
3-1
3-2
4-1
4-2
5-1
5-2
0
0
0
0
0
0
0
2006-11-22
2006-11-22
2006-11-22
2006-11-22
2006-11-22
2006-11-22
2006-11-22
BLANK
2006-11-22
BLANK
2006-11-22
BLANK
0
0
0
0
ii
CONTENTS
LIST OF EFFECTIVE PAGES............................................................................................................................................i
CONTENTS.......................................................................................................................................................................iii
ABBREVIATIONS AND AcRONYMS............................................................................................................................v
SAFETY REGULATIONS AND PRECAUTIONS ........................................................................................................vii
technical Description...........................................................................................................................................................1
1.1PUrPOse.....................................................................................................................................................................1
1.2Technical parameters..................................................................................................................................................1
1.2.1Size and weight....................................................................................................................................................1
1.2.2Functional parameters.........................................................................................................................................1
1.2.3Power supply and power consumption................................................................................................................1
1.2.4Temperature and altitude.....................................................................................................................................1
1.2.5Reliability............................................................................................................................................................1
1.2.6Lifecycle, Warranty.............................................................................................................................................1
1.3technical description...................................................................................................................................................2
1.3.1System design......................................................................................................................................................2
1.3.2Functional description.........................................................................................................................................3
1.4connector connection .................................................................................................................................................3
1.5 aircraft INSTALlAtion diagram................................................................................................................................4
PREPARATION FORE USE AND INSTALLATION INSTRUCTIONS........................................................................1
2.1Delivery content.........................................................................................................................................................1
2.2UNPACKING INSTRUCTIONS...............................................................................................................................1
2.2.1Domestic and close countries shipment .............................................................................................................1
2.2.2International and long distance shipment............................................................................................................1
2.3pReinstallation procedure...........................................................................................................................................1
2.3.1Test equipment requirements..............................................................................................................................1
2.3.2Personnel qualification........................................................................................................................................1
2.3.3 Functional test....................................................................................................................................................2
Maintenance and operation..................................................................................................................................................1
3.1Inspection...................................................................................................................................................................1
3.2troubleshooting...........................................................................................................................................................1
3.2.1Test equipment requirements .............................................................................................................................1
3.2.2Tools and accessories..........................................................................................................................................1
3.2.3Personnel qualification........................................................................................................................................1
3.2.4Functional test.....................................................................................................................................................1
3.3Repair.........................................................................................................................................................................1
RETURN MATERIAL INSTRUCTIONS..........................................................................................................................1
4.1Packing BEFORE RETURNING THE PRODUCT .................................................................................................1
4.1.1 MISCELLANEOUS TOOLS AND ACCESSORIES............................................................................................1
storage..................................................................................................................................................................................1
iii
iv
BUR-1
OAT
Product
RTD
vi
The RTD Condioner Unit OAT.2 contains no element susceptible of threatening health of operating staff and living
environment.
vii
viii
CHAPTER 1
TECHNICAL DESCRIPTION
1.1 PURPOSE
OAT.2 unit is intended for outside air temperature measurement utilizing Pt 500 RTD sensor.
1.2 TECHNICAL PARAMETERS
1.2.1
dimensions:
weight:
1.2.2
Functional parameters
operating voltage:
power consumption:
1.2.4
IB = 0,94 mA +/- 5%
G = 6,56 +/- 2%
5 V +/- 0,25 V
10 mW max
Reliability
Mean Time Between Failures (MTBF) is greater then 20 000 flight hours.
1.2.6
Lifecycle, Warranty
Operation lifecycle:
10000 flight hours or 25 years, whichever occurs first. During this period, the product requires
no maintenance.
Warranty :
A product must be installed within 24 months after its delivery date. This period is not covered by the warranty duration.
After this 24-month period, the warranty duration is shortened accordingly.
It is necessary to keep a track record in the products attestation document in order for the manufacturer to accept a return
of material under warranty.
1.3.2
Functional description
OAT.2 unit converts RTD sensor signal to voltage level, suitable for processing in BSPI-4 Flight Data Acquisition Unit
from BUR-1 Flight Data Recorder System.
The unit consists of constant current source c. 1 mA and instrumentation amplifier, which converts input milivolt signal
to voltage range c. 5 V. RTD sensor is connected by four wires for elimination of attached conductors resistance. The unit
is also equipped with transient protection circuits as well as EMI filters.
The whole unit is powered by +5 V DC voltage from BSPI-4 unit.
OAT.2 schematic diagram is depicted in Figure 1.2.
+5V
OAT.2 unit
R
Excitation current
source
H
+
Output
RTD
L
G
Pin
Signal
Note
1
2
3
5
6
7
9
10
CASE
RTDH
RTDR
+5V
GND
OUT
RTDG
RTDL
Unit`s case
RTD sensing terminal (high)
RTD power terminal (+)
Power supply
ground
output
RTD power terminal (-)
RTD sensing terminal (low)
1.5
CHAPTER 2
PREPARATION FORE USE AND INSTALLATION INSTRUCTIONS
2.1
DELIVERY CONTENT
Standard:
1.
OAT.2 unit
2.
MS27467T11B35S connector incl. cable clamp (e.g. 8LT5-11B35SN from FCI)
3.
Attestation -CAA/F-TI-005-2/96
4.
Packing list
5.
Package
1 ea
1 ea
1 ea
1 ea
1 ea
UNPACKING INSTRUCTIONS
2.2.1
For domestic shipment the product is packed in a pasteboard box of (170 x 90 x 60) mm dimensions.
Unpacking consists of:
a.
b.
c.
d.
e.
f.
.
The product is not preserved. No un-preserving process is required.
2.2.2
Packing for international transit is done according to sales contract, where the transit conditions, classification and storage
must be compliant to SN 038205 specifications.
2.3
PREINSTALLATION PROCEDURE
2.3.1
2.3.2
Personnel qualification
Only a person skilled in electronic instruments handling is permited to perform functional test.
IB = U1/500 Ohm.
G = U2/U1.
NOTE
Unwanted reversing of power supply polarity doesn`t result in OAT.2 unit damage.
RTDR
TEST-OAT Cable
RTDH
V1
500 Ohm
resistor
OAT.2
RTDL
OUT
RTDG
+5 V
Power supply
POWER
5 V / 0.1 A
V2
GND
CHAPTER 3
MAINTENANCE AND OPERATION
3.1 INSPECTION
Procedure consists in visual inspection of the product. Check following items:
-
3.2 TROUBLESHOOTING
3.2.1
Personnel qualification
Only a person skilled in electronic instruments handling is permited to perform functional test.
3.2.4
Functional test
CHAPTER 4
RETURN MATERIAL INSTRUCTIONS
4.1 PACKING BEFORE RETURNING THE PRODUCT
Packing instructions:
a.
b.
The product is wrapped using a wrapping paper held together with adhesive tape.
c.
Put the wrapped product together with a Dehydrosil bag in a vacuumed PE bag. This operation isnt necessary in
case of short distance transit.
d.
Then put the product in pasteboard box and fill up the empty spaces with polystyrene foam. On the top put the
product attestation and a return-material report.
Close and girdle the box, append specified marks in accordance with SN 770105 norm.
4.1.1
CHAPTER 5
STORAGE
The Packed product must be stored in a heated and ventilated space. Storage temperature must remain between -20 and
+50C and 40 to 80 % of humidity.
Sudden temperature fluctuations are not permissible.
The storage room must be hazardous-gas free. Acids, lye or organic solvent materials may not be stored together with the
product.
It is recommended to perform a periodical visual inspection of the product once a month during the storage period.
Storage time is 2 years. Storage longer than 2 years requires unpacking of the product and packing it back again in
accordance with chapter 4.