SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO INSPECTION CHECKLIST


Final Alignment of Pump & Driver
PROJECT TITLE

SAIC NUMBER

DATE APPROVED

QR NUMBER

SAIC-G-2022
WBS / BI / JO NUMBER

25-May-05

MECH-

CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) LAYOUT DRAWING NUMBER SCHEDULED INSPECTION DATE & TIME SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO INSPECTION LEVEL

EQUIPMENT DESCRIPTION REV. NO. PURCHASE ORDER NUMBER

EQPT CODE

SYSTEM ID.

PLANT NO.

EC / PMCC / MCC NO. QUANTITY INSP. MH's SPENT TRAVEL TIME

ACTUAL INSPECTION DATE & TIME SAUDI ARAMCO ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL

SAUDI ARAMCO USE ONLY


WORK PERMIT REQUIRED?

ITEM No. A. A1

ACCEPTANCE CRITERIA General Requirements Soft foot check is done with piping disconnected on each equipment foot. Note: Maximum permissible movement is 0.05 millimeter (2 mils) at each foot, or as specified by Manufacturer. Fixed and movable equipment shall be free to turn. Data of alignment are recorded in SATR-G-2004 or approved equivalent alignment form.

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

API 686, Chapter 7, Para. 5.4.4.1 API 686, Chapter 7, Para. 5.4.4.1 Contractor QP

A2

A3

A4

Provisions are made for doweling the pump and drive components to the 31-SAMMS-004, baseplate. Note: Dowels are furnished by the Vendor, but installed in the Para. 3.3.21 field at the time of final alignment. For all pumps, 3 mm (1/8 in) thick stainless steel shim packs shall be furnished. The maximum allowable number of shims under any equipment support foot is five. Alignment is within the Manufacturer's tolerances before pipes and conduit attached. Pipe strain checks have been made in accordance with the manufacturer's procedures. Alignment is within the Manufacturer's tolerances after pipes and conduit attached. 31-SAMMS-004, Para. 3.3.4 API 686, Chapter 7, Para. 5.4.2.1 API 686, Chapter 7, Para. 5.4.5 API 686, Chapter 7, Para. 5.4.5 API 686, Chapter 7, Para. 5.4.5

A5

A6

A7

A8

A9

REMARKS:

REFERENCE DOCUMENTS: 1. 31-SAMSS-004, Centrifugal Pumps, (30 September, 2003) 2. API 686, Recommended Practice for Machinery Installation and Installation Design, (First Edition, April 1996)

Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date: *Person Responsible for Completion of Quality Work / Test

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Y = YES

N = NO F = FAILED

Page 1 of 1