Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
PROYECTO:
UBICACIN:
ELABORA:
FECHA:
ITEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
DESCRIPCION
Limpieza y desbroce
Replanteo y nivelacin
Excavacin en roca
Excavacin a mquina (Prof. 0 a 2)m
Excavacin a maquina (Prof. 2.00 a 4.00)
Excavacin sin clasificar
Razanteo en fondo de zanja
Colchn de arena
Relleno compactado (material de excavacin)
Pozo de revisin (Prof. 0 a 2 m) inc. tapa
Pozo de revisin (Prof. 0 a 4 m) inc. tapa
Instalacin de tubera serie 6 PVC d=160mm
Instalacin de tubera serie 6 PVC d=200mm(pr. 0.8
Instalacin de tubera serie 6 PVC d=200mm(pr. 2.0
Instalacin de tubera serie 6 PVC d=250mm(pr. 0.8
Instalacin de tubera serie 6 PVC d=250mm(pr. 1.0
Excavacin a mano
Desalojo de material sobrante
Caja de revisin (0.60x0.60x0.80)m
Hormign Simple f'c=210kg/cm2
Rotura de aceras
Reconexin de acometidas de aa.pp.
Reconexin de tubera principal de aa.pp.
Acero de refuerzo
Paso elevado
REACTOR ANAEROBICO
Limpieza y desbroce
Replanteo y nivelacin
Excavacin y desalojo
Replantillo Hormign simple
Acero de refuerzo
Hormign simple fc= 210 kg/cm2
Hormign simple para cerram. y canaletas de inf
Enlucido liso
Enlucido impermeabilizado
Caja de revisin para drenes (0,70 x 0,70 x 1.00)m
Accesorios de filtros
Rejilla de desarenador filtro
Compuerta de desarenador - filtro
Grava para zanja de infiltracin
Cerramiento de tubo y malla H= 2.00m
Puerta peatonal
Bodega y guardiana
Letrero de Identificacin (1,22x 2,44)m
R E F E R E N C I A L
UNIDAD CANTIDAD PRECIO UNIT
m2
ml
m3
m3
m3
m3
m2
m3
m3
u
u
ml
ml
ml
ml
ml
m3
m3
u
m3
m2
u
u
kg
mL
3088.12
1900.12
57.12
2800.1
236.32
1900.12
3088.49
412.25
2624.17
50
5
714.4
200.1
50
2000.99
123
120.13
120.13
125
15.12
45.35
34.12
14
456.13
56.14
0.8
0.75
30.89
2.71
3.04
1.65
1.16
4.68
2.58
169.4
228.44
0.79
0.81
0.82
0.82
0.84
11.13
3.38
53.82
61.53
2.26
5.86
32.5
0.12
45.38
m2
m2
m3
m3
kg
m3
m3
m2
m2
u
glb
u
u
m3
ml
u
glb
u
80
45
80.12
4.12
6200.04
27.12
10.34
66.34
78.13
6
1
1
1
4.5
78.13
1
1
1
0.8
0.73
3.25
61.08
0.12
61.53
61.08
2.82
3.04
61.28
177.05
14.8
11.7
4.04
13.12
108.3
812.15
150.68
INSTITUCION:
PROYECTO:
UBICACIN:
ELABORA:
FECHA:
ITEM
45
46
47
48
49
50
51
52
53
54
55
55
57
58
59
60
61
62
63
64
65
66
67
68
69
R E F E R E N C I A L
m2
m2
m3
m3
m3
m3
m2
m2
m2
u
u
u
glb
m2
m
u
m2
9.86
4.56
0.92
0.46
0.32
0.46
4.56
5.04
14.43
1
1
1
1
26.51
3.5
2
26.51
0.8
0.73
11.13
7.55
61.08
61.53
0.66
3.39
2.07
3.27
11.96
99.69
32.6
2.82
3.2
0.83
0.92
m2
m2
m3
m3
kg
m3
u
m2
2.89
1.44
4.9
0.12
26.64
0.18
1
11
0.8
0.73
11.13
61.53
0.12
43.39
0.4
3.49
TOTAL =
Son:
A L
PRECIO TOTAL
2,470.50
1,425.09
1,764.44
7,588.27
718.41
3,135.20
3,582.65
1,929.33
6,770.36
8,470.00
1,142.20
564.38
162.08
41.00
1,640.81
103.32
1,337.05
406.04
6,727.50
930.33
102.49
199.94
455.00
54.74
2,547.63
64.00
32.85
260.39
251.65
744.00
1,668.69
631.57
187.08
237.52
367.68
177.05
14.80
11.70
18.18
1,025.07
108.30
812.15
150.68
A L
PRECIO TOTAL
7.89
3.33
10.24
3.47
19.55
28.30
3.01
17.09
29.87
3.27
11.96
99.69
32.60
74.76
11.20
1.66
24.39
2.31
1.05
54.54
7.38
3.20
7.81
0.40
38.39
61,529.46
DESCRIPCIN
1
2
3
4
5
6
PRELIMINARES
MOVIMIENTO DE TIERRA
RED DE ALCANTARILLADO
REACTOR
U.B. SANITARIA
POZO ABSORVENTE
TOTAL
MONTO
3,895.59
13,206.32
37,166.85
6,763.35
382.27
115.08
61,529.46
%
6.33%
21.46%
60.40%
10.99%
0.62%
0.19%
100.00%
1
3,895.59
2,641.26
7,433.37
1,352.67
TIEMPO EN MESES
2
3
28.77
28.77
3,961.90
9,291.71
1,352.67
172.02
34.52
PARCIAL
ACUMULADO
PARCIAL
ACUMULADO
15,351.66
15,351.66
16,493.39
31,845.05
14,812.83
46,657.88
14,871.58
61,529.46
PARCIAL
PORCENTAJE PROGRAMADO
ACUMULADO
DE
PARCIAL
INVERSIONES
EJECUTADO
ACUMULADO
24.95%
24.95%
26.81%
51.76%
24.07%
75.83%
24.17%
100.00%
PROGRAMADO
INVERSIONES
EJECUTADO
3,961.90
11,150.05
1,352.67
4
2,641.26
9,291.71
2,705.34
210.25
23.02
B
E
G
M
R
X
MANO DE OBRA
EQUIPO
COMBUSTIBLE
MADERA ACERRADA
REPUESTOS
VARIOS MATERIALES
36,237.90
11,589.34
1,685.72
5,123.07
5,478.59
1,414.84
===============
=====
61,529.46
61,529.46
0.589
0.188
0.027
0.083
0.089
0.023
1
0.00