Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
GONDANG
10 DI. Sirap
370.52 Ha 533.55 l/dt
K.Serut
DI.Mlokolegi 11 DI. Tempel
12
54.75 Ha l/dt
DI. Sidowayah SS. Jurangjero
KARANGANYAR 56.60 Ha 85.82 l/dt 629.39 Ha 185.37 l/dt 336.80 Ha 472 l/dt
7 Waduk Gembong
SS.Terban
SS.Mojodoyong DI. Mojodoyong K. Pungkruk DI.Terban
3 8
Suplesi
63.18 Ha 87.19 l/dt DI. Tritis DI. Wonorejo
DI. Jetis 599.26 Ha 862.93 l/dt
187.64 Ha 270.20 l/dt 69.60 Ha 100.22 l/dt
783.78 Ha 1246 l/dt
Waduk Botok
Suplesi SS.Nguwok K.Pungkruk K.Pungkruk
DI.Kd.Koplak
2 DI. Temantenan K.i 9 DI. Balekambang
119.261 l/dt
DI. Nguwok Waduk Terban Bd.Tritis
Bd.Wonorejo
Hm.0+00
24 Ha l/dt 78.46 Ha 88.47 Ha 121.25 l/dt
induk Jetis
3 169.12 Ha 268.90 l/dt
SS.Nguwok
Hm.0+00
K. Kemangi
DI. Kiringan 5
SS.
Kiringan 19.37 Ha 30.80 l/dt DI. Krikilan
Waduk Gondang 1030 Ha 1463 l/dt SS.Krikilan SS. Brambang
Bd.Sundangan 447.49 Ha 635.00 l/dt
Hm.0+00
KETERANGAN
6 DI. Pakel
A. DAERAH IRIGASI B. BENDUNGAN C. WADUK 48.95 Ha 36.51 l/dt
PELAKSANAAN
1 . DI SUNDANGAN (KARANGANYAR) 1 BENDUNG SUNDANGAN 1 WADUK GONDANG (9.050.000 M³
TA : 2019
2 BENDUNG TEMANTENAN 2 WADUK BOTOK (513.540 M³
2 . DI TEMANTENAN (KARANGANYAR)
3 BENDUNG JETIS 3 WADUK BRAMBANG (103.000 M³ TA : 2021
3 . DI JETIS (KARANGANYAR) - SS MOJOGEDANG 4 - WADUK TERBAN
TA : 2022
4 . DI KEREP (KARANGANYAR) - SS KIRINGAN 5 - WADUK GEMBONG (33.900 M³
5 . DI KRIKILAN (SRAGEN) - SS NGUWOK TA : 2023
4 BENDUNG KEREP
6 . DI PAKEL (SRAGEN)
5 BENDUNG KRIKILAN
7 . DI TRITIS (SRAGEN)
9 - SS SONO REKAPITULASI PEKERJAAN D.I GONDANG 2019-2023
8 . DI WONOREJO (SRAGEN)
10 - SS PILANGREJO
9 . DI BALAIKAMBANG (SRAGEN) 11 - SS BRAMBANG TAHUN
NO KEGIATAN TOTAL
10 . DI SIRAP (SRAGEN) 6 BENDUNG PAKEL
2019 2021 2022 2023
7 BENDUNG TRITIS
11 . DI TEMPEL (SRAGEN) 1 BENDUNG (BUAH) 3 4 3 2 12
8 BENDUNG WONOREJO
12 . DI SIDOWAYAH (SRAGEN) 9 BENDUNG BALAIKAMBANG 2 SALURAN PRIMER TOTAL (KM) 1.850 0 0 0 1.850
13 DI TERBAN (SRAGEN) 10 BENDUNG SIRAP 3 SALURAN SKUNDER TOTAL (KM) 10.457 14.432 14.677 8.000 47.566
11 BENDUNG TEMPEL
Waduk
(Gembong
LEGENDA
SD.11
10+50
SD.10
Z
BM.GMB.02
SD.20
19+50
SD.19
18+50
SD.18
17+50
SD.17
16+50
SD.16
15+50
SD.15
14+50
SD.14
13+50
SD.13
12+50
SD.12
11+50
CP.79
X
Y
B.Sadap+Terjun
B.Sadap
Gorong-gorong
B.Jembatan
B.Terjun
Corongan
Pemasukan
Bangunan
Gorong
Alat
Patok
Bench
U = 9174011.847
499200.00
9174400.00
9174200.00
499600.00
9173800.00
Ukur
+499642.071
116.548
117.563
116.685
115.585
117.294
118.263
117.319
116.183
117.682
117.523
118.851
118.527
117.621
118.517
119.901
121.285
121.536
121.308
118.204
121.746
123.311
121.775
122.587
121.262
122.517
122.738
122.611
122.394
121.579
121.206
122.245
120.608
119.028
118.444
117.201
118.436
119.786
119.746
118.890
119.376
117.891
120.880
122.356
121.911
117.423
123.325
120.068
118.819
120.447
122.325
121.970
121.525
111.441
113.059
112.794
111.587
112.732
113.588
114.748
112.522
114.979
115.311
113.928
114.187
113.342
114.281
114.876
113.551
114.854
115.593
115.427
114.343
113.350
115.148
114.561
114.731
113.091
111.524
112.891
113.712
111.897
113.148
113.256
114.152
112.074
112.777
113.910
113.765
112.923
111.986
113.692
116.046
114.758
115.766
115.605
116.554
115.244
116.243
115.516
116.365
115.338
114.300
115.954
114.836
116.083
116.242
116.917
116.719
115.126
116.716
DS. Poligon
122.642
Mark
Hm.13+50
Hm.13+13
Hm.11+57
Hm.17+53
Hm.19+82
Hm.15+18
Hm.18+95
Hm.18+31
Hm.17+86
Hm.17+11
Hm.16+33
Hm.15+81
Hm.14+87
Hm.14+58
Hm.14+00
Hm.11+14
Hm.12+57
Jembatan
KEC.
DK.
SD.16+33 - )Suplesi
B.Srd.1i
B.Srd.2
B.Srd.1e
B.Srd.1
B.Srd.2i
B.Srd.2h
B.Srd.2g
B.Srd.2e
B.Srd.2d
B.Srd.2c
B.Srd.2b
B.Srd.2a
B.Srd.2f
B.Srd.1f
B.Srd.1g
B.Srd.1h
B.Srd.1j
SARADAN
GEMBONG)Gorong
gorong
Debit
) Sadap
Check
Bagi
Kantor
KARANGMALANG Wd.Gembong
silang SD.25
24+50
SD.24
23+50
SD.23
22+50
SD.22
21+50
SD.21
20+50
SD.20
Z
X
CP.80
Y
B
B.Gorong-gorong
B.Sadap
B.Terjun
U(.Gorong-gorong
= 9174642.100
499200.00
9174800.00
+499368.610
Hm.23+93
Hm.21+11
Hm.20+05
Hm.20+50
Hm.24+24
Hm.22+36
+110.00
+105.00
104.564
104.554
103.852
104.106
105.279
103.728
105.955
103.561
104.201
104.028
102.879
104.367
105.237
103.259
104.637
105.615
103.550
101.964
102.351
104.089
102.548
104.843
104.799
104.189
104.102
109.513
108.201
108.119
106.415
107.123
108.740
106.622
108.247
108.952
107.677
107.602
107.926
108.077
108.840
107.358
109.057
104.484
108.552 112.029
B.Srd.3a
B.Srd.3b
B.Srd.3c
B.Srd.3
B.Srd.4b
B.Srd.4a
105.028
105.932
106.485
105.315
105.407
106.045
107.011
105.580
104.489
105.627
110.326
108.360
110.140
111.441
111.437
110.112
111.532
110.518
105.719
105.295
106.707 )) LEGENDA
Z( =
CP.81
25+71
25+50
X
Y
26+24
SD.30
29+50
SD.29
28+50
SD.28
27+50
SD.27
26+50
SD.26
B.Check
B.Gorong-gorong
B.Sadap
Corongan
Pemasukan
Bangunan
Gorong
Alat
Patok
Bench9175230.019
499200.00
9175600.00
Ukur
+499391.619
Hm.28+06
Hm.28+95
Hm.26+24
+100.00
103.701
103.101
102.268
103.098
103.272
102.185
101.518
102.322
103.981
104.256
101.808
103.061
102.282
103.206
101.394
102.542
103.204
102.621
102.813
102.278
102.099
104.074
102.460
103.223
101.353
99.565
100.532
102.455
98.623
100.328
99.326
101.051
99.947
99.454
99.440
98.397
99.698
99.869
99.155
99.925
99.711
101.745
99.622
98.325
99.283
99.363
98.583
99.312
99.209
100.145
98.213
100.543
98.604
100.986
98.991
97.980
96.715
96.173
97.339
97.449
98.590
96.753
99.151
98.837
98.155
98.783
98.727
99.121
97.354
102.418
100.823
101.645
101.425
99.753
100.678
100.505
100.760
100.020
100.884 Poligon
104.558
Mark
- )&
B.Srd.5a
B.Srd.4c
B.Srd.4
B.Srd.5
100.524
98.340
98.690
97.355
97.531
96.899
97.741
98.619
97.269 gorong
Gorong
Debit
) Sadap
Check
Bagi
Terjunsilang
90.455
+95.00
U( =
37+28
SD.37
36+50
SD.36
35+50
SD.35
34+50
SD.34
33+50
SD.33
32+50
SD.32
31+50
SD.31
30+50
SD.30
X
Y
Z
B.Sadap
CP.88
B.Inlet
B.Pelimpah
B.Corongan
9175600.00
499200.00
9176200.00
9176371.512
+499452.340
Hm.31+22
Hm.37+28
Hm.34+68
Hm.37+00
95.665
93.221
96.785
92.345
92.073
96.173
97.339
97.449
96.909
95.933
96.961
94.558
95.676
93.635
94.219
94.512
93.411
94.063
93.150
93.986
92.416
91.459
92.185
91.971
91.176
91.500
91.663
90.967
91.589
96.329
95.279
93.556
93.400
92.763
96.473
95.805
96.527
96.168
95.043
96.091
96.549
96.179
96.702
96.594
96.591
95.916
96.371
96.147
97.354
95.579
95.029
96.221
93.802
92.819
93.692
96.095
95.482
95.960
95.714
94.273
93.815
94.282
93.941
93.570
92.761
93.618
93.019
91.884
93.648
93.117
93.661
93.504
93.231
92.631
93.118
92.891
94.753
94.333
93.984
90.897
91.263
90.549
91.279
88.382
91.199
90.507
91.682
91.288
91.618
91.989
91.573
90.425
88.578
90.913
90.221
90.939
90.420
90.697
90.459
97.531
96.899
97.741
97.269
97.233 91.102
Drain
Cr.Srd.2
Cr.Srd.3
97.207
96.363
95.549
95.082
95.697
96.955
95.310
95.195
94.686
95.243
94.843
94.183
94.778
94.876
94.527
92.734
92.182
92.664
92.288
91.861
92.244
92.451
92.068
91.342
92.017
91.824
92.046 Akhir
) &&Talang
Corongan LEGENDA
Corongan
Pemasukan
Bangunan
Gorong
Alat
Patok
BenchUkur
Poligon
Mark
( B.Srd.6- )Gorong
B.Srd.6a gorong
Debit
) Sadap
Check silang
Bagi GAMBAR CROSS SARADAN
SD.0+00
SD.0+50
ELEVASI
ORIGINAL
JARAK
DISTANCE
bidang
126.00
reference
125.00
130 persamaan
128.945
128.999
128.867
128.290
128.840
129.290
129.210
129.972
129.969
128.993
129.970
129.992
2.50
1.00
0.30
0.70
2.80
0.90
0.80
1.50
0.50
5.00 (m)
TANAH
level
GROUND
(m) ASLI
LEVEL ELEVASI
ORIGINAL
JARAK
DISTANCE
bidang
reference
114.00
120 persamaan
119
118.898
119.323
0.50
5.00 (m)
TANAH
level
GROUND
(m) ASLI
LEVEL SD.9+50
SD.10+00
118.020
118.094
118.580
118.992
118.697
118.614
117.187
116.822
117.057
118.994
118.864
5.00
1.90
1.20
0.30
7.40
0.50 SD.20+00
SD.20+50
ELEVASI
ORIGINAL
JARAK
DISTANCE
102.00
bidang
reference
101.00
107 persamaan
105
106
2.00
0.80
0.60
0.30
2.50
1.80
0.20
1.20
5.00
106.911
106.868
106.073
106.047
105.395
105.390
105.376
106.396
106.441
106.477
106.719
106.738
106.907
106.899
106.329
104.981
105.056
106.130
0.50 (m)
TANAH
level
GROUND
(m) ASLI
LEVEL SD.27+50
SD.28+00
ELEVASI
ORIGINAL
JARAK
DISTANCE
bidang
reference
92.00
98
95
97
2.10
1.05
0.60
1.90
0.40
1.50
1.60
0.30
5.00
96.471
96.454
96.724
94.973
94.815
94.787
95.775
97.008
96.799
97.000
96.992
96.819
95.883
96.028
96.648
96.443
0.50 persamaan
(m)
TANAH
level
GROUND
(m) ASLI
LEVEL SD.36+83
SD.37+00
ELEVASI
ORIGINAL
JARAK
DISTANCE
bidang
reference
84.00
88
87.561
87.605
87.423
87.431
86.971
87.471
87.761
2.10
0.80
0.90
0.30
5.00 persamaan
(m)
TANAH
level
GROUND
(m) ASLI
LEVEL 87.846
87.881
87.091
86.342
87.113
87.882
87.527
5.00
1.50
0.40
1.10 SRD.1A
GAMBAR BANGUNAN BANG.
Hm.
A
P
DENAH
+127.500
+126.300
+127.200
+128.200
+127.000
Saluran
Skala
DETAIL
+126.800
+127.600
+126.400
+127.200
128.200
+127.400
+127.000
Plasteran
Siaran
Suling-Suling
B
½ OTONGAN
Wiremesh
Pasangan
TERJUNAN
ANGGELAN
SKALA
0.7
1
2
3.6
1.35
1.5
2.5
0.8
0.9
0.2
0.3
0.5
0.05
0.1
1.2
.5
.35 03+60
1:100
eton K-175
1:75 TERJUN
1:100
1:2Batu
1:3 B.Srd.1a
Sekunder
SALURAN
ANGGELAN
M7 Ø11:4 &ATERJUNAN
Saradan
HULU
HILIR -BANGUNAN
(BANGUNAN
A
B.Srd.1b ) SKEMA SISTEM DI. GONDANG
SITUASI BANGUNAN SKALA 1:2000
Hm.03+60
B.Terjun
SD.4
4+50
JJ.3
5+50
SD.5
3+50
SD.3
U ( B.Srd.1b )
B.Terjun
127.585
126.974
125.948
126.945
127.370
127.293
126.067
127.008
126.311
126.657
126.453
126.109
127.141
125.449
126.930
128.425
128.523
127.454
124.338
124.238
127.228
126.662
128.270
127.581
127.823
126.667
127.719
128.705
128.919
127.702
127.692
126.362
127.948
127.861
126.643
128.237
127.888
127.254
127.270
JJ.3+30 1:3
Plasteran
1.5
2.5
0.3
0.05
0.1 SD. 1
1
8
20m
16
(SKALA
Tangga
Z
Y
50.0
105.39
106.87
106.74
105.79
106.09
106.44
107.38
106.94
108.10
108.02
107.80
108.56
108.25
109.18
108.45
109.07
109.75
108.41
109.44
110.08
109.34
109.30
110.53
109.59
110.18
110.94
110.16
111.92
111.20
110.61
111.54
112.14
111.10
112.53
112.54
113.09
113.16
112.13
113.39
113.35
112.86
115.10
114.72
113.53
114.81
115.18
114.64
116.16
116.17
116.39
117.65
117.24
116.45
117.87
117.43
117.60
118.11
117.71
105.38
105.63
106.58
106.00
106.25
107.20
106.42
106.67
107.62
106.51
107.71
106.76
107.01
107.96
108.36
108.61
109.56
108.44
108.69
109.64
108.62
108.87
109.82
109.32
109.57
110.52
109.62
109.87
110.82
110.17
110.42
111.37
110.62
110.87
111.82
111.17
111.42
112.37
112.22
112.47
113.42
112.25
112.50
113.45
112.97
113.22
114.17
113.88
114.13
115.08
115.26
115.51
116.46
116.42
116.67
117.62
116.55
116.80
117.75
116.75
117.00
117.95
Dex.
a.
a
111.437
SD.20+00
SD.19+50
SD.19+00
SD.18+50
SD.18+00
SD.17+50
SD.17+00
SD.16+50
SD.16+00
SD.15+50
SD.15+00
SD.14+50
SD.14+00
SD.13+50
SD.13+00
9
8
7
6
5
4
3
2RUAS
200m
160
80
120
X
TITIK
A
Q
b
h
iv
SV
1
0
SHm1=
m2=
k
w
m
CP.80
T
Tempat
Timbunan
Siphon
Sawah
Desa
Sal.
Tegalan
Arah
Talang
Bang.
Galian
Linning
Jembatan
Hm.11+14
Hm.11+57
Hm.13+13
Hm.12+57
Hm.13+50
Hm.19+82
Hm.18+95
Hm.18+31
Hm.17+86
Hm.17+53
Hm.17+11
Hm.16+33
Hm.15+81
Hm.15+18
Hm.14+58
Hm.14+00
bidang
+
100
90
80
70
60
50
40
30
20
2000.0
1950.0
1900.0
1850.0
1800.0
1750.0
1700.0
1650.0
1600.0
1550.0
1500.0
1450.0
1400.0
1350.0
1300.0
1250.0
1200.0
1150.0
1100.0
1050.0
B.JEMBATAN
GORONG-GORONG
Hm
PATOK
HECTOMETER
B.
B.TERJUN
Hm.12+30
Hm.12+50
P.0 RUAS
2=B.Srd.1e
DI
:==499600.00
(angga
SD.12+50
SD.12+00
SD.11+50
SD.11+00
SD.10+50
SD.10+00 +166.18
81.11
0.1419
0.2919
0.40
0.379
0.00066
0.649
0.00162
45
0.25
1.50
0.30
504
112.97
+
RENCANA
YANG
NOMOR
EXISTING
PROFILE
JARAK
ACCUMULATED
LEFT
RIGHT
GROUND
BANK
DESIGN
ELEVASI
BED
TIPE
TYPE
LINING
105
110
115
119
0100.00
SADAP 0WADUK
JEMBATAN IKAT 21 :KOORDINAT
3
881.900
9173890.178
9174642.100
Tersier
499671.289
499368.610
Aliran
123.100
Terjun
Pelimpah
Penguras
Tanah
Baru
Lama
Mandi
Cuci
HV)Orang
Tanah
1
117.62
116.46
113.42
114.17
112.37
109.56
SADAP+TERJUN
TERJUN
=10.00
11
12
13
14
15
16
17
18
19
20112.22
111.17
108.36
+persamaan
LEVEL
1116.42
115.26
BANGUNAN
BANK
OF
LEVEL
ADA
:BANK : 2000
PROFIL/DISTANCE
KIRI
KANAN
HEKTOMETER
100
1000
PROFIL
WATER
meter
TANAH
TANGGUL
MUKA
DASAR
NUMBER
STRUCTURE
LEVEL
SUPLESI
(B.SRD.1)
/(B.
(B.SRD
DESIGN
LEVEL
INLEVEL
(B.
SRD.2F)
(B.SRD.1F)
KANTOR
(B.SRD 3Ha
2
BOTOK
Hewan
200 m³/dt
m/dt
m Y ): 9DAN
Samping
(B.SRD.2B)
(B.SRD.2C)
(B.SRD.2D)
(B.SRD.2H)
(B.SRD.2I)
CENTER
STONE
AIR
DISTANCE
LEVEL
IN
SRD.2E)
ASLI
SALURAN
/ 1I)
reference
CENTER
WD.GEMBONG
(B.SRD.2)
RENCANA
KIRI
KANAN 168KETINGGIAN
(B.SRD.1J)
(B.SRD.2G)
1H)
PADA 155.221 Z :DI+AMBIL
(B.SRD.1G)
LINE
BETWEEN
PADA
AS
level
LINE
SALURAN
AS
(B.SRD.1E) 281.754
TWO PROFILE DARI GPS GEODETIK BM.BTK.01 1
8
16
160
80
(1202DI
98.33
98.88
99.06
98.99
99.41
99.47
99.56
99.64
99.79
100.35
100.65
100.16
100.94
100.24
+
9
8
7
6
5
4
3
2X
TITIK
A
Q
b
h
SV
1
0
SHRUAS
iv
m1=
m2=
k
w
m
SKALA
Hm.24+24
Hm.23+93
Hm.22+36
Hm.21+11
Hm.20+50
Hm.20+05
bidang
100
90
80
70
60
50
40
30
20 RUAS
:== 40.98
101.51
101.34
103.19
103.10
101.91
103.47
103.56
102.84
104.71
103.54
105.29
105.70
105.39
106.87
106.74
14.0
36.0
50.0
98.01
98.26
99.21
98.49
98.74
99.69
97.93
98.18
99.13
99.75
100.00
100.95
99.77
100.02
100.97
99.90
100.15
101.10
100.28
100.53
101.48
101.81
102.06
103.01
102.00
102.25
103.20
102.78
103.03
103.98
103.60
103.85
104.80
105.38
105.63
106.58
a
SD.25+00
SD.24+36
SD.24+00
SD.23+50
SD.23+00
SD.22+50
SD.22+00
SD.21+50
SD.21+00
SD.20+50
SD.20+00
2500.0
2450.0
2436.0
2400.0
2350.0
2300.0
2250.0
2200.0
2150.0
2100.0
2050.0
B.
Hm
PATOK 53.7
48.75
44.01
0.049
0.0853
0.077
0.0717
0.40
0.251
HECTOMETER
SD.20
RENCANA
YANG
NOMOR
EXISTING
PROFILE
JARAK
ACCUMULATED
LEFT
RIGHT
GROUND
BANK
DESIGN
ELEVASI
BED
TIPE
TYPE
LINING
90
95
100
105
107
087.00
SADAP
TERJUN 41 :KOORDINAT
5
0.00029
0.228
0.00024
45
0.19
0.00026
0.177
0.00022
35
1.50
0.25
504
0WADUK
0.5
IKAT
HV881.900
GORONG-GORONG
=20.00
21
22
23
24
25
LEVEL
1
BANGUNAN
BANK
OF
LEVEL
ADA
persamaan
:BANK1 : 2000
200 4Ha
5
6
7
BOTOK
PROFIL/DISTANCE
KIRI
KANAN
meter
HEKTOMETER
100
1000
PROFIL
WATER
TANAH
TANGGUL
MUKA
DASAR
NUMBER
STRUCTURE
LEVEL
(B.SRD.3)
/(B.SRD.4A)
(B.SRD.3C)
DESIGN
LEVEL
INLEVEL
CENTER
STONE
AIR m³/dt
m/dt
m Y ): 9DAN
DISTANCE
LEVEL
IN
ASLI
SALURAN
/ reference
CENTER
RENCANA
KIRI
KANAN
PADA 168KETINGGIAN
155.221 Z :DI+AMBIL
(B.SRD.3A)
(B.SRD.3B)
(B.SRD.4B)
LINE
BETWEEN
PADA
AS
level
LINE
SALURAN 281.754
AS TWO PROFILE DARI GPS GEODETIK BM.BTK.01 RUAS
20m
200m
X
Y
92.88
93.06
92.97
94.15
93.35
93.14
93.67
94.20
95.00
94.38
95.28
95.23
94.82
96.72
95.78
94.77
96.14
95.62
96.30
97.55
96.98
98.32
98.33
97.52
98.10
98.25
97.80
97.92
97.90
97.786
7
Tangga
Tempat
Timbunan
Siphon
Sawah
Desa
Sal.
Tegalan
Arah
Talang
Bang.
Galian
Linning
Jembatan
=93.99
97.70
50.0
26.0
24.0
32.0
18.0
92.11
92.36
93.11
92.91
93.16
93.91
93.09
93.34
94.09
93.99
94.24
94.99
94.12
94.37
95.32
94.43
94.68
95.63
94.79
95.04
95.99
94.93
95.18
96.13
96.49
96.74
97.69
97.36
97.61
98.56
97.49
97.74
98.69
98.02
98.27
99.22
97.76
98.01
98.96
97.79
98.04
98.99
3000.0
2950.0
2900.0
2850.0
2800.0
2750.0
2700.0
2650.0
2624.0
2600.0
2568.0
2550.0
B.
Hm +9175200.00
Hm.26+24
Hm.28+06
Hm.28+95
Hm.25+71
b.
a.
Dex.
b
a
SD.30+00
SD.29+50
SD.29+00
SD.28+50
SD.28+00
SD.27+50
SD.27+00
SD.26+50
SD.26+24
SD.26+00
SD.25+68
SD.25+50
+30
25+71
CHECK499600.00
Tersier
97.36
93.09Aliran
98.56
94.99Lama
Mandi
Cuci
GORONG-GORONG
SADAP
26
27
28
29 & Terjun
Pelimpah
Penguras
Tanah
BaruOrang
Tanah
(B.SRD.4C)
TERJUN Hewan
(B.SRD.4)
(B.SRD.5) Samping
(B. SRD.5A) 12DI
8
20m
(16
X
25.0
17.0
33.0
50.0
86.70
86.72
86.22
87.94
87.88
86.69
87.40
87.18
86.90
87.79
87.32
88.25
88.02
87.89
88.56
88.49
89.27
89.29
88.68
89.43
88.88
89.80
89.95
89.42
90.21
90.25
89.59
90.62
90.49
90.03
90.97
90.98
90.79
91.91
91.58
92.28
91.69
92.95
92.88
93.06
85.99
86.14
86.99
86.62
86.77
87.62
+
9
8
7
6
5
4
3
2200m
160
80
120
X
TITIK
A
Q
b
h
iv
SV
1
0
SHRUAS
m1=
m2=
k
w
m
bidang
100
90
80
70
60
50
40
30
20
3725.0
3700.0
3683.0
3650.0
3600.0
3550.0
3500.0
3450.0
3400.0
3350.0
3300.0
3250.0
3200.0
3150.0
3100.0
3050.0
B.
Hm
RENCANA RUAS
:== 35.00
36+85
Y
SKALA
86.34
86.49
87.34
86.74
86.89
87.74
86.87
87.02
87.87
87.36
87.51
88.36
87.85
88.00
88.85
88.50
88.65
89.50
88.61
88.86
89.61
88.76
89.01
89.76
88.96
89.21
89.96
89.38
89.63
90.38
89.72
89.97
90.72
90.06
90.31
91.06
90.70
90.95
91.70
91.50
91.75
92.50
91.59
91.84
92.59
91.71
91.96
92.71
92.11
92.36
93.11
YANG
PATOK 40.98
37.87
0.0717
0.0663
0.0613
0.40
0.177
=LEVEL
Hm.34+68
Hm.31+22
Hm.37+00
Hm.37+28
a.
Dex.
a
SD.37+25
SD.37+00
SD.36+83
SD.36+50
SD.36+00
SD.35+50
SD.35+00
SD.34+50
SD.34+00
SD.33+50
SD.33+00
SD.32+50
SD.32+00
SD.31+50
SD.31+00
SD.30+50
SD.30+00
EXISTING
HECTOMETER
NOMOR
PROFILE
JARAK
ACCUMULATED
LEFT
RIGHT
GROUND
BANK
DESIGN
ELEVASI
BED
TIPE
TYPE
LINING
85
90
94 +=30.00
081.00
CORONGAN
INLET
PELIMPAH
SADAP
31
32
33
34
35
36
37
186.62
85.999 KOORDINAT
7
8
0.00022
0.163
0.00019
0.528
0.00539
35
1.50
0.25
1.00
0.11
504
0.5
WADUK
IKAT 7Ha
8
9
881.900
BOTOK
499600.00
+persamaan
BANGUNAN
BANK
OF
LEVEL
ADA m³/dt
m/dt
mm³/dt
9175800.00
87.62
86.99
:BANK Y ): 9DAN
PROFIL/DISTANCE
KIRI
KANAN
meter
HEKTOMETER
100
1000
PROFIL
WATER
DRAIN
TANAH
TANGGUL
MUKA
DASAR
NUMBER
STRUCTURE
LEVEL
AKHIR H
/ DESIGN
LEVEL
INLEVEL
&CENTER
STONE 168KETINGGIAN
(CR.SRD.2)
TALANG
AIR
&V
DISTANCE
LEVEL
IN
ASLI
SALURAN
(B. 155.221 Z :DI+AMBIL
1PADA
1LINE
::BETWEEN
/CORONGAN 2000
reference
CENTER
RENCANA
KIRI
KANAN
SRD.6)
(B. 200
PADA
SRD.6A)
AS
level
LINE 281.754
(CR.SRD.3)
SALURAN DARI GPS GEODETIK
AS TWO PROFILE BM.BTK.01 Tangga
Tempat
Timbunan
Siphon
Sawah
Desa
Sal.
Tegalan
Arah
Talang
Bang.
Galian
Linning
Jembatan
Tersier
Aliran
Terjun
Pelimpah
Penguras
Tanah
Baru
Lama
Mandi
Cuci
Orang
Tanah
Hewan
Samping SD.1+00
SD.1+50
SD.2+00
SD.2+50
SD.3+00
SD.1+01
124.00
123.00
bidang
reference
ELEVASI
ORIGINAL
JARAK
DISTANCE
125.00
129 persamaan
128
125
127
130
128.853
128.820
129.048
128.531
128.595
128.990
128.926
127.567
127.504
127.556
129.054
128.998
0.40
126.716
126.668
126.965
126.571
127.212
127.144
125.758
125.661
125.801
127.036
126.804
127.872
127.758
127.943
127.294
127.603
127.543
126.028
126.128
127.787
127.716
128.424
128.256
128.425
127.953
128.252
128.428
128.248
126.178
126.026
126.160
128.647
128.433
0.70
1.20
1.10
0.60
1.70
1.30
2.00
4.40
126.390
126.715
126.290
126.735
126.699
125.400
125.315
125.480
126.770
126.743
128.804
128.953
128.318
128.320
128.735
128.890
128.590
127.229
127.110
127.317
128.878
128.715
128.725
129.355
128.521
129.644
0.90
1.80
1.50
5.00
1.00
0.30
3.00
128.522
0.50 (m)
TANAH
level
GROUND
(m) ASLI
LEVEL SD.12+00
SD.12+50
SD.10+50
112.00
111.00
110.00
bidang
reference
ELEVASI
ORIGINAL
JARAK
DISTANCE
114.00
117 persamaan
119
115
116
114
118
117.666
118.020
116.691
116.766
116.626
116.161
115.056
114.721
114.638
115.141
116.165
113.756
113.529
113.504
115.177
115.349
115.656
115.614
115.645
113.510
112.869
112.864
112.906
114.219
114.416
114.719
112.132
113.355
113.403
113.557
113.844
113.944
1.30
2.90
0.20
0.40
0.70
0.10
1.00
116.552
116.452
116.692
117.182
117.427
116.419
117.024
117.244
117.204
116.764
0.90
0.30
0.80
0.60
128.774
5.00
0.50 (m)
TANAH
level
GROUND
(m) ASLI
LEVEL SD.13+00
SD.11+00
SD.11+50
117.796
117.871
118.211
118.328
118.094
118.106
116.684
116.751
117.708
117.661
2.90
118.058
118.061
117.986
117.881
116.624
116.861
116.783
116.786
116.309
114.812
115.104
112.605
112.787
113.342
113.472
113.392
112.145
112.127
1.00
1.60
3.20
2.50
2.10
0.60
0.70
116.951
116.972
117.547
117.599
117.859
117.872
117.157
116.668
116.882
117.207
117.374
117.644
117.654
116.924
116.399
116.394
2.40
5.00
3.00
0.30
0.15
0.40
1.30
1.40 SD.21+00
SD.21+50
SD.22+00
SD.22+41
SD.21+16
SD.20+83
100.00
97.00
bidang
reference
ELEVASI
ORIGINAL
JARAK
DISTANCE
99.00
104 persamaan
100
102
105
103
1.70
0.45
1.90
0.20
2.30
1.30
0.80
103.059
103.053
103.185
101.875
101.805
101.810
103.100
103.274
103.046
103.184
103.528
103.517
103.095
102.615
102.311
102.312
103.183
102.908
103.398
103.407
103.471
102.011
101.914
101.972
103.560
103.754
103.498
103.640
104.208
104.036
103.909
103.181
102.480
102.537
103.705
103.571
104.692
104.672
104.942
102.837
102.782
102.780
104.422
104.709
104.567
104.795
104.850
104.922
104.594
102.802
103.134
104.447
104.167
105.952
105.425
105.520
105.287
105.363
103.604
103.539
104.593
105.698
105.782
105.773
105.685
105.490
105.250
103.509
103.679
105.366
105.192
1.05
0.65
0.75
0.60
4.50
100.192
99.884
100.728
100.724
100.038
100.019
100.048
100.718
100.714
100.755
101.045
101.299
1.10
0.70
1.20
0.30
0.90
1.50
3.00
1.00
0.40
1.80
5.00
103.000
102.985
103.139
103.151
101.893
101.900
101.910
103.143
103.207
103.537
103.636
103.983
103.988
104.017
102.568
102.557
102.569
104.014
104.043
104.333
104.418
104.414
103.638
1.40
0.50
1.45 (m)
TANAH
level
GROUND
(m) ASLI
LEVEL SD.28+50
SD.28+96
SD.29+00
SD.29+50
SD.30+00
SD.30+50
92.00
91.00
bidang
90.00
reference
ELEVASI
ORIGINAL
JARAK
DISTANCE
89.00
96
95
94
1.60
95.028
94.953
95.364
94.988
94.358
94.199
94.273
95.000
95.810
95.552
95.786
95.747
95.308
95.060
94.601
94.668
95.287
95.083
95.722
95.687
95.751
95.277
94.427
94.377
94.472
95.227
96.353
96.124
96.361
96.379
96.115
95.737
95.019
95.027
95.749
95.611
97.989
0.60
0.90
1.30
2.20
1.50
0.70
0.80
0.20
3.00
3.30
1.20
1.00
0.30
5.00
1.10
0.40
1.80
1.40
2.00
5.50
92.804
92.811
91.901
91.692
91.805
92.707
93.207
93.086
93.189
93.197
93.033
92.349
92.331
93.098
92.716
92.987
92.931
92.880
92.207
92.107
92.183
93.062
93.842
93.499
93.810
93.797
93.647
92.722
92.827
93.309
93.149
94.671
94.145
92.948
92.966
92.909
93.352
94.398
94.150
94.410
94.490
94.425
94.201
93.508
93.510
94.055
93.915
94.444
94.334
93.904
94.007
94.442
94.542
94.432
93.162
93.142
93.093
93.671
95.084
94.852
95.010
95.063
94.662
94.127
94.113
94.540
94.815
94.419
94.415
94.811
94.812
94.015
94.049
93.989
94.832
94.970
95.320
95.097
0.50
0.45
1.13 persamaan
(m)
TANAH
level
GROUND
(m) ASLI
LEVEL SD.37+07
SD.37+25
bidang
84.00
reference
ELEVASI
ORIGINAL
JARAK
DISTANCE
83.00
85
88
87.602
87.890
87.745
87.756
85.993
86.143
86.715
87.026
86.739
86.895
86.906
86.652
86.327
85.784
86.282
86.107
87.301
87.548
87.263
86.617
86.609
86.616
87.294
87.939
87.266
87.626
0.80
1.10
1.70
0.40
0.10
0.30
3.00
1.85
0.85
0.75
0.65
1.00
5.00
86.219 persamaan
(m)
TANAH
level
GROUND
(m) ASLI
LEVEL 87.562
87.133
87.140
87.485
87.135
86.723
85.978
85.223
85.973
86.783
86.696
5.00
3.00
0.50
0.30
1.10
1.40
1.00 GAMBAR BANGUNAN DENAH
DENAH
POTONGAN
Hm.06+50
POTONGAN
+125.591
+126.791
+125.590
+125.790
+124.390
+124.590
PELIMPAH
Hm.04+62
B
+126.570
+126.950
+125.750
+125.570
+125.970
+125.770
+126.970
A
+127.200
+126.000
+125.780
+126.980
+127.980
+126.780
+128.000
+126.800
SKALA
Saluran
DETAIL
Skala1:501:100
SKALA
+125.791
+125.790
+124.390
+124.590
+126.791
+125.591
+127.280
+126.080
125.780
127.980
+126.780
+126.980
+127.200
+128.000
+126.800
SKALA
4iaran
Beton
P
S3.1
Plasteran
Pasangan
Siaran
Suling-Suling
B
½
Wiremesh
SKALA
3.45
0.35
0.49
0.74
2.7
3
0.45
0
3.5
0.4
2
1
0.18
0.12
1.1
0.6
1.5
2.5
0.3
0.5
0.05
0.1
1.2
2.00
ANG.TERJUNB.Srd.1c
B.Srd.1d
B.Srd.1b
DANA -(A
1:100
1:75
lasteran
eton K-175
.8
.3
.1
.2
.5 1:75
1:2Batu
1:3 TERJUN
A-A
B.Srd.1d
Sekunder
A
SALURAN
M7 Ø11:4 () B.Srd.1c )
Saradan
HULU BANGUNAN
HILIR BANGUNAN POTONGAN
DETAIL
SITUASI BANGUNAN
SITUASI
DETAIL
B.Jembatan
SD.9
8+50
SD.8
Hm.08+09
Hm.06+50
B.Terjun
SD.7
6+50
SD.6
B.Pelimpah
SD.4
4+50
JJ.3
5+50
SD.5
3+50
SD.3
Hm.04+62
U
Skala
:6
L
m
SKALA
+126.570
+125.570
+126.950
+125.750
+124.970
+125.970
+126.970
+125.770
Makam
125.631
124.996
123.772
125.814
123.884
123.992
123.834
122.427
124.146
123.361
125.044
124.246
123.237
124.336
124.684
124.044
124.064
123.624
121.918
123.165
123.563
127.393
127.212
126.256
126.243
124.735
124.885
126.822
126.795
125.970
124.988
126.369
124.883
125.678
126.097
125.079
124.927
123.102
124.544
124.388
125.309
123.115
123.112
B.Terjun
127.585
126.974
125.948
126.945
127.370
127.293
126.067
127.008
126.311
126.657
126.453
126.109
127.141
125.449
126.930
128.425
128.523
127.454
124.338
124.238
127.228
126.662
128.270
127.581
127.823
126.667
127.719
128.705
128.919
127.702
127.692
126.362
127.948
127.861
126.643
128.237
127.888
127.254
127.270
Beton
P
S0.9
W (.10
Pasangan
JJ.3+30
1.45
0.6
0.35
1.95
0.2 A PELIMPAH
Cr.Srd.1
B.Srd.1d
B.Srd.1c
1:75
1:20
Suling-Suling
B
½
Wiremesh
SKALA
Plasteran
Siaran
2
3iaran
lasteran
eton
0.45
0
1
0.5
1.5
2.5
0.05
0.1
1.2
0.3iremesh
.3
.1 K-225
K-175
1:75
1:3Batu
1:2 1:2
1:3BSKALA
A -BANGUNAN
M7 Ø11:4B 1:2000
A
SALURAN
HULU
HILIR BANGUNAN
Hm.08+20 BAWAH
))&& Terjun
Corongan
SKEMA JARINGAN SALURAN
F F
A = 209.40 Ha
Q = 0.297 m3/dt B. Kr. 2
L = 0.400 m Hm. 07+83
A = 205.60 Ha
Q = 0.292 m3/dt B. Kr. 3
L = 0.630 m
Kr.3.Ka Hm. 10+64
30.58 Ha 43.42 l/dt
S A L. S E K. KRIKILAN
Waduk Brambang
Sn.1.Ka B. Sn. 1 B.Br.0
Su
pl
5.00 Ha 7.10 l/dt Hm. 15+08 Kr.5.Ka
Hm.00+00
es
i
A = 252.33 Ha 7.55 Ha 10.72 l/dt
A = 423.74 Ha
Q = 0.358 m3/dt Q = 0.602 m3/dt
L = 5.020 m L = 2.050 m
Pr.1.Ki
A = 200.20 Ha
Q = 0.284 m3/dt 7.60 Ha 10.79 l/dt
L = 1.350 m B. Pr. 1
Hm. 05+02 A = 405.98 Ha
Q = 0.576 m3/dt
Pr.1.Ka
Br.1.Ka L = 1.810 m
5.05 Ha 7.17 l/dt
A = 239.68 Ha 17.76 Ha 25.22 l/dt .1 05 Br.2.Ki
Sn.2.Ka Sn.2.Ki 3
Q = 0.340 m /dt . Br 02+ 14.60 Ha 20.73 l/dt
B m.
28.15 Ha 39.97 l/dt 172.05 Ha244.31 l/dt L = 3.730 m H
B. Sn. 2
Hm. 16+43 Pr.2.Ka B. Pr. 2
15.60 Ha 22.15 l/dt Hm.08+75 Br.2.Ka
A = 371.98 Ha
.2 86
Br 03+ Q = 0.528 m3/dt
S A L. S E K. PILANGREJO
B. Pr. 3
Hm. 15+72
Pr.3.Ka Pr.3.Ki A = 354.54 Ha
166.08 Ha235.83 l/dt 4.25 Ha 6.04 l/dt Q = 0.503 m3/dt
L = 4.260 m
Pr.4.Ki
53.75 Ha 76.33 l/dt Br.7.Ki Br.9.Ki Br.10.Ki
Br.4.Ki
B. Br. 4 A = 192.25 Ha B. Br. 6 A = 112.55 Ha 12.55 Ha 17.82 l/dt
A = 64.84 Ha A = 51.64 Ha 28.75 Ha 40.83 l/dt
A = 22.89 Ha 12.39 Ha 17.59 l/dt
46.49 Ha 66.02 l/dt B. Br. 8
Hm. 12+50 Q = 0.273 m3/dt Q = 0.160 m3/dt Q = 0.092 m3/dt Q = 0.073 m3/dt Q = 0.033 m3/dt
L = 8.760 m Hm. 24+36 L = 12.590 m L = 8.000 m Hm.44+95 L = 2.250 m L = 1.320 m
LEGENDA
X = 499800.00
X = 9173171.423
Y
Z +500068.458
128.969 CP.76 JJ.4
B.Sadap
JJ.4+37
125.773
4+50
JJ.5
126.185
126.414
126.380
125.484
126.354
B.Terjun
JJ.5+21 JJ.6
5+50
125.799
125.621
126.070
125.492
Sadap
JJ.5+92
125.440
126.025
6+50
X
Y
Z = 9173366.171
+499762.660
124.586
125.615
123.847
124.627
124.772
125.600
125.775
125.492
124.623
124.084
124.591 126.373 CP.77 U Bangunan Sadap
Bagi
X = 9173125.548
Y
Z
BM.SDW.2
+500215.431
130.070 12+50
0+50
B.Ukur JJ.1
128.793
126.925
128.863
128.285
128.661
129.800
129.609
129.406
129.159
128.419
128.665
JJ.2
1+50
128.221
126.151
128.491
127.731
127.619
128.321
128.916
128.124
127.313
128.508
127.815
128.932
128.222
129.044
128.519
B.Sadap
JJ.1+13 JJ.3
2+50
128.310
127.370
127.293
126.067
127.008
127.936
Awal
B.Terjun
pas.
JJ.3+30
JJ.2+46
126.667
3+50
128.270
127.581
126.311
127.585
126.974
125.948
126.945
125.729
126.487
126.486
126.467
126.009
B.Terjun
JJ.3+89 126.453
126.109
127.141
125.449
126.930
128.425
128.523
127.454
124.338
124.238
127.228
126.662
126.026
125.117
125.738
125.387
124.283
5+50
125.970
124.988
126.369
124.883
126.822
126.795
127.393
127.212
126.256
126.243
124.735
124.885
123.563
125.230
125.893
125.600
124.528
Jembatan
JJ.5+82
125.079
6+50
SD.6
126.097
SD.7
B.Terjun
( B.Srd.1d )
Hm.06+50
X = 499600.00
0+50
Y = 9173200.00
128.535
128.636
128.924
127.511
129.214 SD.2
1+50
128.545
126.921
128.851
128.661 SD.3
2+50
127.254
127.270
127.702
127.692
126.362
127.948
128.058
126.667
128.127
127.461
126.657
126.836
127.743
126.741
127.719
127.823
B.Terjun
3+50
( B.Srd.1a )
Hm.03+19
127.861
126.643
128.237
127.888
128.705
128.919 B.Pelimpah
B.Terjun
SD.5
SD.4
4+50
( B.Srd.1b )
Hm.03+60
Hm.04+62 & Terjun ( B.Srd.1c ) 124.927
123.102
124.544
124.388
125.309
123.115
123.112
125.678 SD.8
7+50
125.044
125.631
124.996
123.772
125.814
123.884 B.Jembatan
Hm.08+09 & Corongan
Hm.08+20 ( Cr.Srd.1 ) Talang - Gorong
Gorong gorong silang
Y = 9173400.00
Hm.0+00
B. BAGI B.Bagi Sadap
X( =B.Sw.2
500200.00
Hm.0+00 ) X = 500000.00 123.361
124.246
123.237
124.336
124.684
123.834 SD.9
8+50
124.064
123.624
121.918
123.165
124.044
122.427
124.146
123.992
9+50
Siphon
Jembatan Orang
Dex.
a. + 129.65
b. + 128.00
128.15
cc.
b
a
125
130+ 129.00 Hm.03+19
Dex.
b
a + 126.60
B. TERJUN (B.SRD.1A) Hm.03+60
Dex.
b.
a.
a + 125.40
124.59
+ 126.60
B. TERJUN (B.SRD.1B) Hm.04+62
b.
a.
Dex.
+ 122.44
122.71
+ 123.64
B. PELIMPAH & TERJUN (B.SRD.1C) B. TERJUN (B.SRD.1D) Hm.06+50
a. + 120.60
Dex. + 121.80 122.936
121.292
122.960
122.772 SD.10SARADAN
SEK.
120.608
122.356
121.911
121.970
121.525
123.364 Bang. Penguras
Terjun
Pelimpah Samping
CORONGAN
(CR.SRD.1)
120 b a a
B.
aHm.08+20
JEMBATAN
&
Tangga Mandi
Tempat
Desa Cuci Hewan
bidang
1
0
20
PATOK persamaan
HECTOMETER
NOMOR
PROFILE
0 STONE/
HEKTOMETER
PROFIL
NUMBER reference level +0111.00
1
9
8
7
6
5
4
3
2
SV
SH
100
90
80
70
60
50
40
30 meter
= 1 : 100
1000 SD.0+50
SD.0+19
Hm
1150 SD.1+50
SD.1+00
Hm 1 SD.2+00
Hm 2 SD.3+00
SD.2+50
Hm 3 SD.4+00
SD.3+50
Hm 4 RUAS 1
SD.4+50 SD.5+50
SD.5+00
Hm 5 SD.6+42
SD.6+00
Hm 6 SD.7+00
Hm 7 SD.8+16
SD.8+00
SD.7+50
Hm 8 SD.9+00
SD.8+50
Hm 9 RUAS 2
SD.9+50 SD.10+00
Hm 10 Sawah
Tegalan
Arah Aliran
JARAK
ACCUMULATED
LEFT
ELEVASI
RIGHTBANK
BANK
PROFIL/DISTANCE
TANGGUL
LEVEL
LEVEL
DISTANCE
KIRI BETWEEN TWO PROFILE
KANAN 31.0
18.0
128.93
129.05
129.13
129.51
129.97
SD.0+50
SD.0+19
50.0
19.0
1.0
0.0 50.0
128.25
128.65
128.59
128.88
SD.1+50
SD.1+00
150.0
100.0 50.0
127.54
127.79
SD.2+00
200.0 50.0
126.70
126.77
127.14
127.04
SD.3+00
SD.2+50
300.0
250.0 33.0
50.0
125.49
124.84
125.84
125.22
125.72
125.20
125.75
125.29
125.80
125.30
SD.4+00
SD.3+50
400.0
367.0
361.0
357.0
350.0 50.0
123.41
123.05
SD.4+50
450.0 50.0
123.36
122.88
123.52
123.84
SD.5+50
SD.5+00
550.0
500.0 42.0
50.0
122.08
122.95
122.25
122.65
122.33
122.43
122.97
123.50
SD.6+42
SD.6+00
650.0
645.0
642.0
600.0 50.0
121.88
121.56
SD.7+00
700.0 16.0
50.0
119.67
120.03
119.98
120.08
120.66
121.59
SD.8+16
SD.8+00
SD.7+50
816.0
800.0
750.0 50.0
34.0
119.33
119.13
119.38
119.90
SD.9+00
SD.8+50
900.0
850.0 47.5
41.0
118.92
118.95
118.61
118.99
119.41
119.01
SD.9+50
952.5
950.0
909.0 118.11
117.71
SD.10+00
1000.0 Timbunan
Sal.
Galian
Tersier
Tanah
Tanah
YANG ADA
EXISTING
BED LEVEL
GROUND
ELEVASI
BANK LEVEL
DASAR
TANAH
TANGGUL
LEVEL
IN CENTER
IN
ASLI
SALURAN
CENTER
PADA
LINEPADA
AS
LINE
SALURAN
AS 127.50
128.11
128.99
128.47
129.00
129.65 126.03
127.11
127.38
127.74
128.10 126.03
127.01 125.32
125.66
125.79
126.60
126.64 123.09
123.78
124.33
124.49
124.36
124.40
125.75 122.31
123.91
123.64 122.02
122.51
123.53
123.70 120.61
120.28
121.87
121.99
121.80
123.37 119.99
121.37 118.80
118.84
119.52
120.14
120.86 SKEMA
117.95
119.26
119.37 JARINGAN SALURAN
116.82
117.97
118.36 117.60
117.95 SD. 2 Linning Lama
Baru
RENCANA
DESIGN
ELEVASI
BED
TIPE
TYPE
LINING
LEVEL
BANGUNAN
OF
KIRI
KANAN/ DESIGN
WATER
MUKA
DASAR
STRUCTURE
AIR
LEVEL
SALURAN
RENCANA
127.57
127.60
129.00
128.45
128.30
129.30
127.27
127.30
128.70
128.15
128.00
129.00
P.0
126.48
126.84
127.20
126.18
126.54
126.90
126.11
125.81
124.89
125.70
125.74
124.59
125.40
125.44
123.46
123.50
124.85
123.16
123.20
124.55
123.01
122.74
80
120
SKALA
122.71
122.44 H 1 : 2000
122.63
122.80
200m
160
122.33
122.50
120.90
122.47
120.60
122.17
Hm.06+25
120.47
120.17
Hm.06+50
119.19
119.96
118.94
119.66
118.31
118.42
118.06
118.17
117.41
117.16
117.00
116.75
LEGENDA
00 Bench Mark
0.
20 R
O
1 73 G
JE
9 N
= A Patok Poligon
Y U
R
.J
.7 K
JJ SE
X
Alat Ukur Debit
=
0
44
5. 15
49
12 5.6 586 7
98
12 24.3.84 27 2
50
0
1 2 4.6 7
0.
1 2 .7
6+ 1 24
00
1
Bangunan Bagi
0
60 5
Sadap 5.
12 77 1
4+50 JJ.5+92 5. 59 4
12 24. .08 23
CP.76 JJ.5 .6 1 24 .6 92
CP.77
JJ
1 24 .4
5+50 1 25
1
U Bangunan Sadap
X = 500068.458 B.Sadap X = 499762.660
126.414 B.Terjun 1
62 0
Y = 9173171.423 JJ.4+37
126.3544 5. Y = 9173366.171
125.48
JJ.5+21
12 6.07 92 3
.4
Z = + 128.969 126.3803 126.185 4
12 25. .28 87
JJ
125.77 126.025
125.117 125.799 1 24 .3
1 25
Z = + 126.373 Bangunan Check
126.026 125.893 1
1+5 124.528
12 26.5.72487 6
125.738
0
1 2 6 . 48
125.600
6. 46 9
1 2 6.
BM.SDW.2
00 7
125.230
1 2
9
J.1
1
B.Sadap
X = 500215.431 J JJ.1+13 Jembatan
n
Corongan
rju
128 JJ.5+82 12
00
89
.91 JJ. SD
e
Y = 9173125.548 6 6 1 7.
B.T
12
50
.3+
128.523
40
9. 09 12 9.04 2 1 27 21 .6 0.
JJ
12 8.22 4 5 1 26 .3 2
128.4254
60
3+
12 9.6419 9 1 24 .25 93 B.Terjun
Z = + 130.070 1228. .15 1288.9322 127.4 09 3
2+50 12 26.2.735 6 12
( B.Srd.1d )
17
.51 126.1 8
1225.6.94 5
1 29 3 9 JJ.3 127.141 12 6.8
58
127.22 4. 43
50
1 86 5 Awa 88 1 6.79 22 Hm.06+50 9
12 6.9948 5
128
7.
8 . 92 3 .4 12 l pas. 126.662 126.930 5 1 26 6+5 = Pemasukan
12
6 . 74
12 91 5
12+50 0+ 12 26. .7985 1 8.3 B.Terjun 125.449 1 24 .3
JJ.2
12 6.15 0 Y
1
1 28.5 21
+46
1 2
1 28 .2 61 1278.2211 12 25. .98 69
31
126.453
0
1 28 .6 1227.3 08 JJ.3+30
12 4.8 970 8
27
1 28 127 .731 127.370 124.338
12 8.1213
12 7.8.667 1
8.
r 0 1 .61 128.310 124.238 3. 83
12 26 .58
ku 80 7.8 4
12
56
9. 59 7
9 15 127.008 5+ 126 SD
7. 23
.U 1 3
1 27
+1 126.067 .09
B 12 9.9.71 4 127.936 50 .7
9
7
1
.0 12 127.293 12
SW .11+
71
JJ 12 28 .53 1 8.6 12 5.0
X
126.741 Gorong - gorong
130.449
.0 1228.8 65 126.657
12 3.1 79
SD
. 1 29 4 127.743
4+50
JJ 13 50
=
129.629 1 1 1
2 1286.9251 126.836 1235.3015 12
49
128.518 9. .51 4 .5 1 .11 9 5.6
SEK. SIDOWAYAH 129.838 29 12 27 8.92 35 128 45 128.127 2 78
127.702 SD.5
96
.9 18
.4
1 1 2 .5 36 .66 126.667 05 1
1 29 29 .9 42 1 28 .6 1 127.948 8.7 1224.5
SD
128.058
1 29 .44 1 28 .9 12 8.91397
00
129.355
1228.5.6113 1 129 1 28
1
126.362
127.692 1228.2 43
B.Pelimpah & Terjun 12 3.1044
.0
12 9.6630 129129.797 127.461
1 6.6 61
( B.Srd.1c ) 12 4.92 2 Gorong - Gorong silang
0
50
9.4 6 127.254 4.3 7
60 128.9558
.93 1227.8 88 Hm.04+62 88
12
8.7 129.941 0+ . 00 127.270 1 7.8
12 B.Terjun
81 129.593
00 SD ( B.Srd.1b )
32 .2 B.Jembatan & Corongan
7+50
7 2+50 Hm.03+60
( Cr.Srd.1 )
91
125. 4
50
125. 772
0 Talang
123. 996
124.
SD.3 3+ .0 SD Hm.08+09 Hm.08+20
123.
=
631
13+9
00 .8
81
Y 4
884
SD.0 B.Terjun
+1
( B.Srd.1a ) 73
30
91
.00
Hm.03+19 12
= 5.0
Y 44 Siphon
X
1
1224.3 8+
=
12 3.2336 50
50
4 7
12 .246
4.6
02
84
00
X
12
12 3.9
=
.0
1 4. 92 Jembatan
50
0
B.Bagi Sadap 1222. 146 SD
12 3.8427
00
( B.Sw.2 ) 3. 34 .9
00
Hm.0+00 36
1 12
.0
4.
0
1 0
44
1 2 Jembatan Orang
12 21 3.16
AG
I
00 5 12 3. .91 5
.0+ 29.6
B.
B
4. 62 8
9+
06 4
Hmx. + 18.00 4
50
De + 12 8.150
12
a. + 1229.0
3.
b. + 1 Bang. Terjun
36
12 21. .93 2
c.
1 22 77
4
2. 29 6
A)
1 2.
96 2
D.1
12
.SR )
0
.1B
N (B RD
JU 9
130 ER +1 0 (B.S C)
.03126.6 60
T N .1
B. JU RD
R + 0 .S
Hmex. + 25.409 TE 122.356
.03 26.6 Bang. Penguras
(B
c B. UN
a b D + 1 4.5 Hmx. + 15.40 TE
RJ
.1D
) 121.911
a. + 12 De + 12 4.59 PA
H& .SR
D 120.608
b. 2 (B 121.970 SEK. SARADAN
a. + 12 EL +6 4
IM
UN
50
.04 23.6 RJ
P
b. B. TE + 121.525
Hm + 1 4 B.
06 .80
x. .4
De + 1222.71 H m. 121
+ 0 Bang. Pelimpah Samping
x. 0.6
a a. + 12 De + 12 SD.10
125 b. a. )
b a RD.1
R.S
(C
AN
b NG
RO Tempat Mandi Hewan
CO
a N&
TA
BA 0
.J
EM +2
B
.08
a
Hm
Tangga Cuci
120
Desa
115
0 1 2 3 4 5 6 7 8 9 10
Sawah
SV = 1 : 100
0 10 20 30 40 50 60 70 80 90 100
SH = 1 : 1000
RUAS 1 RUAS 2
bidang persamaan / reference level Tegalan
+ 111.00 meter
PATOK HEKTOMETER
Hm 0 Hm 1 Hm 2 Hm 3 Hm 4 Hm 5 Hm 6 Hm 7 Hm 8 Hm 9 Hm 10
HECTOMETER STONE
NOMOR PROFIL
SD.0+19 SD.0+50 SD.1+00 SD.1+50 SD.2+00 SD.2+50 SD.3+00 SD.3+50 SD.4+00 SD.4+50 SD.5+00 SD.5+50 SD.6+00 SD.6+42 SD.7+00 SD.7+50 SD.8+00
SD.8+16 SD.8+50 SD.9+00 SD.9+50 SD.10+00 Arah Aliran
PROFILE NUMBER
1000.0
100.0
150.0
200.0
250.0
300.0
350.0
357.0
361.0
367.0
400.0
450.0
500.0
550.0
600.0
642.0
645.0
650.0
700.0
750.0
800.0
816.0
850.0
900.0
909.0
950.0
952.5
19.0
50.0
18.0 31.0 50.0 50.0 50.0 50.0 50.0 50.0 33.0 50.0 50.0 50.0 50.0 42.0 50.0 50.0 50.0 16.0 34.0 50.0 41.0 47.5
0.0
1.0
SD.10+00
SD.0+19
SD.0+50
SD.1+00
SD.1+50
SD.2+00
SD.2+50
SD.3+00
SD.3+50
SD.4+00
SD.4+50
SD.5+00
SD.5+50
SD.6+00
SD.6+42
SD.7+00
SD.7+50
SD.8+00
SD.8+16
SD.8+50
SD.9+00
SD.9+50
Galian Tanah
129.97
129.51
129.05
128.88
128.65
127.79
127.04
126.77
125.30
125.29
125.20
125.22
124.84
123.05
123.84
122.88
123.50
122.43
122.65
122.95
121.56
121.59
120.08
120.03
119.90
119.13
119.01
118.99
118.95
117.71
ELEVASI TANGGUL KIRI
LEFT BANK LEVEL
129.97
129.13
128.93
128.59
128.25
127.54
127.14
126.70
125.80
125.75
125.72
125.84
125.49
123.41
123.52
123.36
122.97
122.33
122.25
122.08
121.88
120.66
119.98
119.67
119.38
119.33
119.41
118.61
118.92
118.11
ELEVASI TANGGUL KANAN
Timbunan Tanah
YANG ADA
128.11
127.50
127.11
126.03
126.03
125.66
125.32
124.49
124.33
123.78
123.09
122.31
122.51
122.02
121.99
121.87
120.28
120.61
119.99
119.52
118.84
118.80
117.95
117.97
116.82
117.60
ELEVASI TANAH ASLI PADA AS SALURAN
GROUND LEVEL IN CENTER LINE
Linning Baru
129.65
129.00
128.47
128.10
127.74
127.38
127.01
126.64
126.60
125.79
125.75
124.40
124.36
123.64
123.91
123.70
123.53
123.37
121.80
121.37
120.86
120.14
119.37
119.26
118.36
117.95
129.65
129.65
129.65
ELEVASI TANGGUL
BANK LEVEL
128.30
129.30
129.00
128.45
127.60
127.57
127.20
126.84
126.48
126.11
125.74
125.70
124.89
124.85
123.50
123.46
122.74
123.01
122.80
122.63
122.47
120.90
120.47
119.96
119.19
118.42
118.31
117.41
117.00
128.45
128.00
128.15
129.00
128.70
128.15
127.30
127.27
126.90
126.54
126.18
125.81
125.44
125.40
124.59
124.55
123.20
123.16
122.44
122.71
122.50
122.33
122.17
120.60
120.17
119.66
118.94
118.17
118.06
117.16
116.75
ELEVASI DASAR SALURAN
BED LEVEL
TIPE BANGUNAN
TYPE OF STRUCTURE
LINING KANAN
Bench Mark
X=
499
200
0
0.0
.00 Patok Poligon
440
0
917
0.0
B.Jembatan
380
( B.Srd.2b ) Alat Ukur Debit
Y=
Gorong-gorong Hm.15+18
B.Jembatan Kantor ( B.Srd.1j )
917
( B.Srd.1g ) Hm.14+00 B.Jembatan
Hm.12+57 B.Sadap ( B.Srd.2c )
Y=
( B.Srd.1 ) Hm.15+81
B.Jembatan Hm.14+58 Bangunan Bagi
( B.Srd.1h ) B.Jembatan
Hm.13+13 14+50 SD.15 ( B.Srd.2d )
X= B.Jembatan SD.14 DS. SARADAN 15+50 Hm.16+33
B.Jembatan
499 ( B.Srd.1f ) KEC. KARANGM
600 Hm.11+57 13+50 ALAN G
SD.16 Hm.17+11
( B.Srd.2e ) Bangunan Sadap
.00 SD.12 116.365 16+50
12+50 SD.13 117.563 115.516 Jembata
n Gorong-gorong
116.716 116.24
118.263 117.294 115.24 3 SD.16+33 SD.1 ( B.Srd.2g )
117.682 115.585 116.716
115.126
116.5544 115.766
7 Hm.17+86
117.891 118.851 116.183 116.685 116.08
120.880 118.517 117.319 116.548
116.719
116.917 114.8363
114.758
116.046 115.427 17+5 Bangunan Check
119.786 119.028 117.621 117.523 115.95 114.343 0 B.Jembatan
120.447 119.376 118.436 118.527 116.2424 115.605 115.593 114.97 ( B.Srd.2h )
118.819 118.204 114.300
11+50
118.890 117.201 115.148
120.068 115.338 113.92 9 Hm.18+31
119.746 118.444 MBONG 113.350
121.536
121.285
SD.1
119.901
DK. GE 8
121.308
10+50 115.31
121.746
123.311
122.325 114.561
117.423 114.85 1 113.58 8 B.Jembatan
SD.11 123.325 113.55 4 8 ( B.Srd.2i ) Corongan
0 114.87 1 112.52 18+5
SD.1 114.74 2 Hm.18+95
6
114.28 8
0
113
122.611 B.Terjun 113. 3421 .256
SD
( B.Srd.1i ) 114. 187 112
114 .074 .19
122.738 121.775
Hm.13+50 B.Jembatan 114.73 .1 B.Sadap+Terjun
356 121.579 122.51 ( B.Srd.2a ) 1 113 52 ( B.Srd.2 )
122. 122.394 121.26 7 11 .692 Pemasukan
9118 122.245 122.5872 Hm.14+87 1121.986 113. Hm.19+82
121. .923 113. 712
120.
121.
60 0
97
525
121.206 Waduk BM.GMB.02 111. 148
113. 897 113
19
+
X = 499642.071 76 50
121.
Gembong 113. 5
910 11 .091
11 2.89
.00
Y = 9174011.847 11 1.52 1 Gorong - gorong
1122.7774
0
B.Sadap Suplesi Wd.Gembong .77
420
7
( B.Srd.1e ) Z = + 122.642
Hm.11+14
1
1 13.0 SD
1 12 5 .20
917
1 11 .73 9
B.Terjun 1112.7.5872
( B.Srd.2f ) 2.7 94 Gorong - Gorong silang
Y=
94
CP.79 Hm.17+53 11
1
11 .44
11 1.5 1
X = 499671.289 1 0.1 32
X= 1111.4312
1.4 7
Y = 9173890.178 499 37 Talang
) 600
Z = + 123.100 e .00
d.1
Sr
( B.
CP.80 Siphon
X = 499368.610
Y = 9174642.100
Jembatan
)
.1E
RD
(B.S
G
ON
E MB
IW
D.G Jembatan Orang
ES
PL
SU
DA
P 14
.S
A
. 1 1+ .62 .1F)
B
17 RD
Hm +1 2
x. 6.4 A N (B.S
De + 11 AT 7 Bang. Terjun
a.
MB +5 6 )
.11 16.4 .1G
JE
B. D
.SR
Hmx. + 15.26 OR
(B
De + 11 NT
119 KA
a. AT
A
7
N
MB +5 7 Bang. Penguras
.12 14.1
JE .1 )
B. ) RD B)
Hmx. + 1 7 .SR
D
1H
1I) P (B.S
8 .SR
D.2
)
De 112.9 (B .SR
D
SA
DA +5 AN
(B D .2C )
.14 .SR .2D
N (B B. AT
a. TA N J) 8 RD
13 +1
a (B
A U
0 MB
JE
MB + TE
RJ
+5 2 .SR
D.1
Hm B.
JE
.15
TAN
1 (B.S .2E)
.13 G)
BA RD )
+8
N
B.
.13 13.4
B. TA F
a (B
Hm
EM 3 .S D.2 D.2
.15 +3
G J A
Hm MB R
ON B. N (B .SR
Hmx. + 12.22 OR JE
.16 TA
.S (B Bang. Pelimpah Samping
115 -G
0 Hm B. BA 1 JU
N (B 3
+5 .56 NG H)
De + 11 NG
+0 7 Hm EM +1 ER RO
.1+7109 6 NG-GO 86 .SR
D.2
a. GO
RO
.14 112.3
B.J
.17 B.T (B I)
a
a a
Desa
a
105
0 1 2 3 4 5 6 7 8 9 10
Sawah
SV = 1 : 100
0 10 20 30 40 50 60 70 80 90 100
SH = 1 : 1000
RUAS 2 RUAS 3
bidang persamaan / reference level Tegalan
+ 100.00 meter
PATOK HEKTOMETER
Hm 10.00 Hm 11 Hm 12 Hm 13 Hm 14 Hm 15 Hm 16 Hm 17 Hm 18 Hm 19 Hm 20
HECTOMETER STONE
NOMOR PROFIL
SD.10+00 SD.10+50 SD.11+00 SD.11+50 SD.12+00 SD.12+50 SD.13+00 SD.13+50 SD.14+00 SD.14+50 SD.15+00 SD.15+50 SD.16+00 SD.16+50 SD.17+00 SD.17+50 SD.18+00 SD.18+50 SD.19+00 SD.19+50 SD.20+00 Arah Aliran
PROFILE NUMBER
1050.0
1100.0
1150.0
1200.0
1250.0
1300.0
1350.0
1400.0
1450.0
1500.0
1550.0
1600.0
1650.0
1700.0
1750.0
1800.0
1850.0
1900.0
1950.0
2000.0
50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0
JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE
ACCUMULATED DISTANCE Sal. Tersier
SD.10+00
117.43 SD.10+50
117.24 SD.11+00
116.17 SD.11+50
115.18 SD.12+00
114.72 SD.12+50
113.35 SD.13+00
113.16 SD.13+50
112.54 SD.14+00
112.14 SD.14+50
111.20 SD.15+00
110.94 SD.15+50
110.53 SD.16+00
110.08 SD.16+50
109.75 SD.17+00
109.18 SD.17+50
108.56 SD.18+00
108.02 SD.18+50
107.38 SD.19+00
106.09 SD.19+50
106.74 SD.20+00
ELEVASI TANGGUL KIRI
Galian Tanah
LEFT BANK LEVEL
117.71
118.11
117.87
117.65
116.16
114.81
115.10
113.39
113.09
112.53
111.54
111.92
110.18
109.30
109.44
109.07
109.07
107.80
108.10
107.38
106.00
106.87
ELEVASI DASAR SALURAN PADA AS
BED LEVEL IN CENTER LINE Linning Lama
117.60
116.45
116.39
114.64
113.53
112.86
112.13
112.22
111.10
110.61
110.16
109.59
109.34
108.41
108.45
108.25
106.76
106.94
106.44
105.79
105.39
ELEVASI TANAH ASLI PADA AS SALURAN
GROUND LEVEL IN CENTER LINE
Linning Baru
117.95
117.75
117.62
116.46
115.08
114.17
113.45
113.42
112.37
111.82
111.37
110.82
110.52
109.82
109.64
109.56
107.96
107.71
107.62
107.20
106.58
ELEVASI TANGGUL
BANK LEVEL
117.00
116.80
116.67
115.51
114.13
113.22
112.50
112.47
111.42
110.87
110.42
109.87
109.57
108.87
108.69
108.61
107.01
106.76
106.67
106.25
105.63
ELEVASI MUKA AIR RENCANA
DESIGN WATER LEVEL
RENCANA / DESIGN
116.75
116.55
116.42
115.26
113.88
112.97
112.25
112.22
111.17
110.62
110.17
109.62
109.32
108.62
108.44
108.36
106.76
106.51
106.42
106.00
105.38
ELEVASI DASAR SALURAN
BED LEVEL
TIPE BANGUNAN
TYPE OF STRUCTURE
LINING KANAN
Y = 9174800.00
Y = 9175600.00
Patok Poligon
U
CP.80 Bangunan Bagi
X = 499368.610
B.Terjun CP.81
Y = 9174642.100 B.Gorong-gorong B.Terjun ( B.Srd.4a )
( B.Srd.3a ) ( B.Srd.3c ) Hm.23+93 X = 499391.619
Z = + 112.029 Hm.20+05 Hm.21+11 Bangunan Sadap
B.Sadap Y = 9175230.019
( B.Srd.3 )
Hm.22+36 B.Gorong-gorong B.Sadap & Terjun
( B.Srd.4b ) Z = + 104.558 ( B.Srd.4 )
SD.20 20+50 0 Hm.24+24 Hm.26+24 B.Gorong-gorong
SD.21 1 0.0 21+50 ( B.Srd.5a ) Bangunan Check
+1 SD.22 22+50 SD.23 23+50 SD.24 Hm.28+06
24+50 SD.25 B.Sadap & Terjun
25+50 ( B.Srd.5 )
108.952 SD.26 26+24 26+50
111.441 107.677 106.045 106.045
25+71 Hm.28+95
111.532 110.326 109.513 105.407 105.932 Corongan
110.112 110.140 109.057
108.740 108.119 105.407 105.028 105.615
104.637
104.367 104.028
103.204 102.282 SD.27 28+50
111.437 108.360 107.358 108.247 107.123 107.011 103.259
105.237 102.879 102.621 101.425 SD.28 SD.29
111.437 110.140
110.518 108.840 106.622
108.201 106.415 105.627
107.011 106.485 105.955 105.279
104.554 102.542
101.394 103.061 101.645 27+50 29+50 SD.30
108.552 108.077 107.926 104.489 105.627 104.564 101.808 100.823
105.315 104.106 103.852 103.981 103.206 100.505
107.602 105.580 104.489 104.201 104.256 103.272 103.701 102.418 99.209
106.707 105.580 104.484 103.728 102.455 100.678 99.711
105.295 103.561 102.548 102.099 102.322 103.098 99.312 98.619 Pemasukan
106.707 104.189 104.089 102.351 100.532 99.753 100.524 99.925 98.583 98.727 97.269
105.719 104.843 101.964 101.518 102.268 99.565 99.155 98.783
104.799 103.550 102.460 102.185 103.101 101.353 101.051 100.760 99.363 98.155 98.690
104.074 99.869 97.531
102.278 99.326 100.020 99.283 98.837 97.355 96.899
104.102 102.813 98.623 100.884 99.698 98.325 98.340
103.223 100.328 99.151 97.741
101.745 100.986 98.397 99.622 96.753 97.980
+11 100.145 98.604 99.440 99.454 98.590 96.715 97.339
0 100.543 98.991 96.173
.00
100.524
99.947
99.121 97.449 Gorong - gorong
97.354
98.213
B.Gorong-gorong +10
5.0
( B.Srd.3b ) 0
Hm.20+50 +1
00
.0
0 Gorong - Gorong silang
B.Check
( B.Srd.4c )
Hm.25+71
Talang
Siphon
Jembatan
Y = 9175200.00
)
.3B
5 .SR
D
+0 (B Jembatan Orang
. 20 ON
G
Hm NG
-G
OR
GO
RO
+ 50
B.
20
Hm.
.3C
)
Bang. Terjun
A) (B.S
RD X = 499600.00
D.3 JU
N 1
.SR ER +1 D.4
A)
21
(B T )
G B. .SR .4B
a OR
ON
H m. UN
(B
.SR
D
NG
-G RJ 3 (B
RO B.
TE +9 O NG
Bang. Penguras
.23
105 ) )
GO D.3 OR D.4
B. -G C)
.SR .SR
a
AP 6 (B Hm RO
NG
+2
4 .SR
D.4
UN
(B
AD +3 B.
GO
24 K (B RJ
.22 m. 71 TE
S EC
B. CH + P& 4
a
Hm H B.
.25 AD
A
+2
.26 8.56
S
Hm B.
)
Bang. Pelimpah Samping
Hmx. + 9.36 RD
.5A
.5)
.S RD
De + 97 G
(B (B.S
107 a a. ON UN
OR RJ
-G TE
NG 6 P&
a
OR
O
+0 AD
A
+ 95
.28 .28 .99
.G S
B.
B
Hm
Tempat Mandi Hewan
a Hmx. + 94 9
a De 93.9 9
+ .0
a a. + 93
b.
Tangga Cuci
a
a
100
b Desa
0 1 2 3 4 5 6 7 8 9 10
Sawah
SV = 1 : 100 90
0 10 20 30 40 50 60 70 80 90
SH = 1 : 1000
100
95
RUAS 4 RUAS 5 RUAS 6 RUAS 7
bidang persamaan / reference level Tegalan
+ 87.00 meter
PATOK HEKTOMETER
Hm 20.00 Hm 21 Hm 22 Hm 23 Hm 24 Hm 25 Hm 26 Hm 27 Hm 28 Hm 29 Hm 30
HECTOMETER STONE
NOMOR PROFIL
SD.20+00 SD.20+50 SD.21+00 SD.21+50 SD.22+00 SD.22+50 SD.23+00 SD.23+50 SD.24+00 SD.24+36 SD.25+00 SD.25+50
SD.25+68 SD.26+00 SD.26+24 SD.26+50 SD.27+00 SD.27+50 SD.28+00 SD.28+50 SD.29+00 SD.29+50 SD.30+00 Arah Aliran
PROFILE NUMBER
2050.0
2100.0
2150.0
2200.0
2250.0
2300.0
2350.0
2400.0
2436.0
2450.0
2500.0
2550.0
2568.0
2600.0
2624.0
2650.0
2700.0
2750.0
2800.0
2850.0
2900.0
2950.0
3000.0
50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 36.0 14.0 50.0 50.0 18.0 32.0 24.0 26.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0
JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE
ACCUMULATED DISTANCE Sal. Tersier
SD.20+00
105.70 SD.20+50
104.71 SD.21+00
103.56 SD.21+50
103.10 SD.22+00
101.34 SD.22+50
100.95 SD.23+00
100.65 SD.23+50
100.35 SD.24+00
SD.24+36
SD.25+00
SD.25+50
SD.25+68
SD.26+00
SD.26+24
SD.26+50
SD.27+00
SD.27+50
SD.28+00
SD.28+50
SD.29+00
SD.29+50
SD.30+00
ELEVASI TANGGUL KIRI
Galian Tanah
LEFT BANK LEVEL
106.74
99.64
99.47
99.06
97.69
97.90
98.25
98.33
96.98
95.62
95.78
95.23
95.00
93.67
93.35
93.06
ELEVASI TANGGUL KANAN
Timbunan Tanah
YANG ADA
106.87
105.29
102.84
103.47
103.19
101.51
100.94
100.65
100.35
99.56
99.41
98.88
97.70
97.92
98.10
98.32
97.55
96.14
96.72
95.28
94.99
94.43
94.15
92.88
ELEVASI DASAR SALURAN PADA AS
BED LEVEL IN CENTER LINE Linning Lama
101.91
101.81
99.75
99.79
98.49
98.99
98.33
97.78
97.80
97.52
97.49
96.30
94.77
94.82
94.38
94.20
93.14
92.97
92.11
ELEVASI TANAH ASLI PADA AS SALURAN
GROUND LEVEL IN CENTER LINE
Linning Baru
106.58105.39
104.80103.54
103.98102.78
101.48100.24
101.10100.16
103.20
103.01
100.97
100.95
99.13
99.69
99.21
98.99
98.96
99.22
98.69
98.56
97.69
96.13
95.99
95.63
95.32
93.91
93.11
94.99
94.09
ELEVASI TANGGUL
BANK LEVEL
105.63
103.85
103.03
102.25
102.06
100.53
100.15
100.02
100.00
98.18
98.74
98.26
98.04
98.01
98.27
97.74
97.61
96.74
95.18
95.04
94.68
94.37
93.16
92.36
94.24
93.34
ELEVASI MUKA AIR RENCANA
DESIGN WATER LEVEL
RENCANA / DESIGN
105.38
103.60
102.78
102.00
101.81
100.28
99.90
99.77
99.75
97.93
98.49
98.01
97.79
97.76
98.02
97.49
97.36
96.49
94.93
94.79
94.43
94.12
92.91
92.11
93.99
93.09
ELEVASI DASAR SALURAN
BED LEVEL
TIPE BANGUNAN
TYPE OF STRUCTURE
SD.20 25+71
LINING KIRI
LINING KANAN
Bench Mark
X = 499200.00 X = 499200.00
Y = 9175600.00
Y = 9176200.00
Patok Poligon
Bangunan Bagi
U
Bangunan Sadap
Bangunan Check
CP.88
X = 499452.340
B.Corongan Y = 9176371.512 Corongan
( Cr.Srd.2 ) Z = + 91.102
Hm.31+22
B.Inlet Drain & Corongan
SD.30 ( Cr.Srd.3 )
30+50 SD.31 Hm.34+68 B.Pelimpah & Talang
31+50 SD.32 ( B.Srd.6a ) Pemasukan
32+50 SD.33 33+50 SD.34 Hm.37+00
97.269
96.594 34+50
96.955
97.531
96.702 96.147 95.714 SD.35 35+50 SD.36
96.899
97.741
97.207
96.363 96.179 96.371 95.960 95.310 94.876 36+50 SD.37 B.Sadap Akhir
97.339
97.233 96.549 95.916
96.591
95.482 95.697 95.243
94.527 93.941 93.504 37+28 ( B.Srd.6 ) Gorong - gorong
96.961 96.527 96.095 95.082 94.686 94.778 94.282 Hm.37+28
96.173 95.933 95.805 96.091 96.221 95.195 94.183 93.815 93.661 92.068
97.449 96.909 96.473 95.043 95.549 93.117 92.891 92.451
95.029 94.843 94.273 92.664 92.046 91.989
97.354 96.785 96.329 96.168 95.579 95.676 94.512 93.986 93.692 93.648 93.118 92.244
93.635 93.411 93.618 92.631 92.182 91.861 92.017 91.618 88.578 90.459
95.279 94.558 94.219 93.150 92.819 92.761 92.734 92.288 91.342
94.063 93.802 93.231 91.824 91.288 90.425 90.697
94.753 94.333 93.556 93.570 92.734 92.288 91.971 91.573 90.420
95.665 93.984 93.400 91.884 91.459 91.589 91.279 Gorong - Gorong silang
92.416 91.176 90.967 91.682 90.939
93.019 92.185 90.549 90.507 90.221
92.345 91.663 91.263
92.763 92.073 91.500 91.199 90.913
+95 93.221 90.897 88.382
.00 90.455
Talang
36+85
Siphon
Jembatan
Y = 9175800.00
Jembatan Orang
Bang. Terjun
X = 499600.00
.2)
R.S
RD Bang. Penguras
(C
G AN
OR
ON
+ 22
.31
C
B.
.3)
Hm R.S
RD
N (C Bang. Pelimpah Samping
GA
ON
OR
&C
RAIN
TD 8
94 INL
E
+6 .6A
)
B.
.34 .S
RD
Tempat Mandi Hewan
Hm AN
G
(B
AL
&T
H
a
LIM
PA
0 0 .6)
B.
PE
.3 7.62 7+ .S
RD
Hmx. + 8.62
(B
8 AK
HIR Tangga Cuci
90 De + 86 DA
P
+2
a. B.
SA
.37 6.99
a Hmx. + 8.99
De + 85
a.
Desa
a
a
85
0 1 2 3 4 5 6 7 8 9 10
Sawah
SV = 1 : 100
0 10 20 30 40 50 60 70 80 90 100
SH = 1 : 1000 RUAS 7 RUAS 8 RUAS 9
bidang persamaan / reference level Tegalan
+ 81.00 meter
PATOK HEKTOMETER
Hm 30.00 Hm 31 Hm 32 Hm 33 Hm 34 Hm 35 Hm 36 Hm 37
HECTOMETER STONE
NOMOR PROFIL
SD.30+00 SD.30+50 SD.31+00 SD.31+50 SD.32+00 SD.32+50 SD.33+00 SD.33+50 SD.34+00 SD.34+50 SD.35+00 SD.35+50 SD.36+00 SD.36+50 SD.36+83
SD.37+00 SD.37+25 Arah Aliran
PROFILE NUMBER
3050.0
3100.0
3150.0
3200.0
3250.0
3300.0
3350.0
3400.0
3450.0
3500.0
3550.0
3600.0
3650.0
3683.0
3700.0
3725.0
50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 33.0 17.0 25.0
JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE
ACCUMULATED DISTANCE Sal. Tersier
SD.30+00
SD.30+50
SD.31+00
SD.31+50
SD.32+00
SD.32+50
SD.33+00
SD.33+50
SD.34+00
SD.34+50
SD.35+00
SD.35+50
SD.36+00
SD.36+50
SD.36+83
SD.37+00
SD.37+25
ELEVASI TANGGUL KIRI Galian Tanah
LEFT BANK LEVEL
93.06
92.71
92.36
91.91
90.98
90.49
90.25
89.95
89.43
89.29
88.49
88.02
87.74
87.18
87.88
87.89
86.72
ELEVASI TANGGUL KANAN
Timbunan Tanah
YANG ADA
92.88
92.95
92.28
91.96
90.97
90.62
90.21
89.80
89.59
89.27
88.56
88.25
87.79
87.40
87.88
87.94
86.70
ELEVASI DASAR SALURAN PADA AS
BED LEVEL IN CENTER LINE Linning Lama
92.11
91.69
91.58
90.79
90.03
89.59
89.42
88.88
88.68
88.61
87.89
87.32
86.90
86.69
86.34
86.22
86.14
ELEVASI TANAH ASLI PADA AS SALURAN
GROUND LEVEL IN CENTER LINE
Linning Baru
93.11
92.71
92.59
92.50
91.70
91.06
90.72
90.38
89.96
89.76
89.61
89.50
88.85
88.36
87.87
87.74
87.34
87.62
86.99
ELEVASI TANGGUL
BANK LEVEL
92.36
91.96
91.84
91.75
90.95
90.31
89.97
89.63
89.21
89.01
88.86
88.65
88.00
87.51
87.02
86.89
86.49
86.77
86.14
ELEVASI MUKA AIR RENCANA
DESIGN WATER LEVEL
RENCANA / DESIGN
92.11
91.71
91.59
91.50
90.70
90.06
89.72
89.38
88.96
88.76
88.61
88.50
87.85
87.36
86.87
86.74
86.34
86.62
85.99
ELEVASI DASAR SALURAN
BED LEVEL
TIPE BANGUNAN
TYPE OF STRUCTURE
LINING KIRI
LINING KANAN
bidang persamaan
reference level
126.00
129.992
129.970
128.993
129.969
129.972
129.210
129.290
128.840
128.840
128.290
128.867
128.999
128.945
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.50
0.50
0.80
0.90
0.70
0.30
0.30
0.30
5.00 1.50 2.80 1.00 2.50
DISTANCE (m)
SD.0+50
130
bidang persamaan
reference level
125.00
128.998
129.054
129.054
127.556
127.504
127.567
128.926
128.990
128.595
128.531
129.048
129.048
128.820
128.853
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.70
0.70
0.40
0.60
0.40
0.30
0.30
5.00 1.00 1.30 2.00 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
bidang persamaan
reference level
125.00
129.644
128.521
128.522
128.522
129.355
129.355
128.725
128.715
128.878
128.878
127.317
127.110
127.229
128.590
128.890
128.735
128.320
128.318
128.953
128.953
128.804
128.774
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.30
0.30
0.50
0.90
0.30
0.30
0.30
3.00 1.00 5.00 1.50 1.50 1.50 1.50 1.80 5.00
DISTANCE (m)
SD.1+01
130
bidang persamaan
reference level
125.00
129.644
128.521
128.522
128.522
129.355
129.355
128.725
128.715
128.878
128.878
127.317
127.110
127.229
128.590
128.890
128.735
128.320
128.318
128.953
128.953
128.804
128.774
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.30
0.30
0.50
0.90
0.30
0.30
0.30
3.00 1.00 5.00 1.50 1.50 1.50 1.50 1.80 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
bidang persamaan
reference level
124.00
128.433
128.647
128.647
126.160
126.026
126.178
128.248
128.428
128.252
127.953
127.953
128.425
128.425
128.256
128.424
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.60
0.30
0.30
0.30
5.00 1.00 1.50 1.50 1.30 1.70 5.00
DISTANCE (m)
SD.2+00
0.50
128
bidang persamaan
reference level
124.00
127.716
127.787
127.787
126.128
126.028
127.543
127.603
127.294
127.294
127.943
127.943
127.758
127.872
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.60
0.50
0.30
0.30
5.00 1.10 1.20 1.00 1.50 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
128
125
bidang persamaan
reference level
123.00
126.804
127.036
127.036
125.801
125.661
125.758
127.144
127.212
126.571
126.571
126.965
126.965
126.668
126.716
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.70
0.90
0.50
0.30
0.30
0.30
0.30
5.00 1.00 1.00 1.50 5.00
DISTANCE (m)
SD.3+00
0.50
127
125
bidang persamaan
reference level
123.00
126.743
126.770
126.770
125.480
125.315
125.400
126.699
126.735
126.290
126.290
126.715
126.390
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.90
0.90
0.30
0.50
0.30
4.40 1.00 1.00 2.00 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
125
bidang persamaan
reference level
123.00
126.743
126.770
126.770
125.480
125.315
125.400
126.699
126.735
126.290
126.290
126.715
126.390
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.90
0.90
0.30
0.50
0.30
4.40 1.00 1.00 2.00 5.00
DISTANCE (m)
SD.3+50
127
125
bidang persamaan
reference level
122.00
126.063
126.163
125.535
125.298
124.833
124.493
124.553
125.803
126.234
126.553
126.278
125.977
126.003
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.50
0.60
0.50
0.60
0.30
5.00 1.00 1.00 1.40 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
125
bidang persamaan
reference level
122.00
126.063
126.163
125.535
125.298
124.833
124.493
124.553
125.803
126.234
126.553
126.278
125.977
126.003
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.50
0.60
0.50
0.60
0.30
5.00 1.00 1.00 1.40 5.00
DISTANCE (m)
127
SD.4+00
0.50
125
bidang persamaan
reference level
121.00
125.869
125.619
125.619
124.902
124.841
123.160
123.085
123.242
125.485
125.849
126.179
125.967
125.669
125.712
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.50
0.30
5.00 2.00 3.20 1.00 1.00 2.20 1.00 1.00 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
bidang persamaan
reference level
120.00
124.151
123.525
123.484
123.639
123.639
123.046
122.321
122.314
122.441
123.414
123.481
123.811
123.431
123.161
123.212
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.50
0.30
0.30
0.30
0.30
0.30
0.10
0.40
5.00 5.00 1.00 1.00 1.00 5.00
DISTANCE (m)
SD.5+00
125
0.50
bidang persamaan
reference level
119.00
124.174
124.307
124.307
123.725
123.704
123.844
123.844
122.755
122.505
122.587
123.518
123.811
123.546
121.646
121.623
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.40
0.30
0.30
0.80
0.60
0.70
5.00 1.90 1.30 1.00 2.30 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
bidang persamaan
reference level
120.00
124.094
124.314
124.314
123.802
123.788
124.076
124.076
123.255
122.875
122.233
122.018
122.248
123.358
123.703
123.415
122.550
122.488
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.40
0.30
0.30
0.30
0.70
0.80
0.80
0.80
5.00 3.20 2.10 1.40 1.30 5.00
DISTANCE (m)
SD.6+00
0.50
124
120
bidang persamaan
reference level
118.00
123.805
123.222
123.168
123.499
123.499
122.068
121.993
121.985
122.971
123.208
122.923
121.828
121.808
120.658
120.683
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.50
0.30
0.30
0.80
5.00 5.80 1.70 1.00 1.00 1.00 1.10 1.50 1.10 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
120
bidang persamaan
reference level
117.00
123.306
123.541
123.541
122.642
122.637
122.952
122.952
120.582
120.612
120.597
122.077
122.124
122.438
122.194
122.507
121.590
121.597
120.145
119.780
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.30
0.30
0.70
0.70
0.30
0.30
0.60
0.30
5.00 3.30 2.00 1.20 1.50 3.30
DISTANCE (m)
SD.7+00
123
0.50
120
bidang persamaan
reference level
117.00
122.869
122.374
122.338
121.491
121.558
120.141
119.991
120.051
121.875
121.921
122.286
121.911
121.441
121.383
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.40
0.50
0.80
0.80
0.80
0.30
0.30
5.00 4.00 3.00 1.80 1.30 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
122
120
bidang persamaan
reference level
117.00
121.306
121.588
121.588
119.540
119.520
119.525
120.655
121.007
120.652
119.866
119.012
119.005
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.90
0.90
0.60
0.70
5.00 2.20 1.20 1.60 3.40
DISTANCE (m)
SD.8+00
0.50
121
120
bidang persamaan
reference level
116.00
120.831
120.546
120.529
120.634
120.634
120.079
120.079
119.188
118.839
118.939
119.984
119.984
120.035
120.231
120.564
120.564
120.406
120.402
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.30
0.60
0.90
0.90
0.60
0.30
0.30
0.30
0.40
0.30
5.00 2.10 2.20 2.30 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
bidang persamaan
reference level
115.00
119.690
119.902
119.902
118.167
117.945
118.235
119.380
119.642
119.558
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.90
0.90
0.90
5.00 1.00 3.50 5.00
DISTANCE (m)
SD.9+00
121
0.50
120
bidang persamaan
reference level
115.00
120.270
119.020
119.002
119.126
118.059
117.969
117.974
119.326
119.406
119.764
119.642
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
5.00 1.00 3.50 1.20 1.00 1.20 1.20 1.00 1.50 3.50 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
bidang persamaan
reference level
114.00
119.323
118.898
118.864
118.994
118.994
117.057
116.822
117.187
118.614
118.614
118.697
118.992
118.580
118.094
118.020
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.50
0.30
0.30
0.30
0.30
0.30
5.00 7.40 1.20 1.20 1.20 1.20 1.90 5.00
DISTANCE (m)
SD.10+00
119 0.50
bidang persamaan
reference level
114.00
118.020
117.666
117.661
117.708
117.708
116.751
116.684
116.751
118.106
118.094
118.328
118.211
117.871
117.796
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.60
0.30
0.30
0.60
0.40
0.30
5.00 2.90 1.00 1.00 1.00 2.90 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
118
bidang persamaan
reference level
114.00
117.427
117.182
116.692
116.452
116.552
117.157
117.157
117.872
117.859
117.599
117.547
116.972
116.951
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.50
0.80
0.90
0.40
0.15
0.30
0.30
5.00 2.40 5.00
DISTANCE (m)
SD.11+00
0.50
118
bidang persamaan
reference level
114.00
116.764
117.204
117.244
117.024
116.419
116.394
116.399
116.924
116.924
117.654
117.644
117.374
117.207
116.882
116.668
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.80
0.60
0.30
0.50
0.40
0.15
0.30
0.30
5.00 1.40 1.30 3.00 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
115
bidang persamaan
reference level
112.00
116.165
115.141
114.638
114.721
115.056
116.161
116.626
116.691
116.766
116.786
116.783
116.861
116.861
116.624
117.881
117.881
118.061
117.986
118.058
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.50
0.80
0.30
0.80
0.60
0.30
0.30
0.30
0.30
0.40
0.30
2.90 1.30 3.20 1.60 1.00 3.00
DISTANCE (m)
SD.12+00
117
115
bidang persamaan
reference level
111.00
115.645
115.614
115.349
115.656
115.177
115.177
113.504
113.529
113.756
114.812
116.309
116.309
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.40
0.30
0.20
0.60
0.60
0.30
5.00 2.50
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
115
bidang persamaan
reference level
110.00
114.719
114.416
112.906
114.219
112.864
112.869
113.510
115.104
115.104
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.40
0.20
0.60
0.60
0.30
0.30
5.00 2.50
DISTANCE (m)
SD.13+00
114
bidang persamaan
reference level
110.00
113.944
113.844
113.557
113.355
113.403
113.355
112.132
112.127
112.145
113.392
113.472
113.342
112.787
112.605
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.50
0.10
0.30
0.70
0.70
0.30
0.60
5.00 1.00 1.40 2.10 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
bidang persamaan
reference level
110.00
113.505
113.522
113.290
113.161
112.233
112.219
112.230
112.708
113.091
112.941
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.90
0.80
0.60
0.70
5.00 1.00 1.00 1.00 4.00
DISTANCE (m)
SD.14+00
114
0.50
bidang persamaan
reference level
109.00
113.113
113.008
112.538
112.653
112.538
111.075
111.099
111.068
112.528
112.423
112.375
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.90
0.30
0.30
0.10
0.90
5.00 1.00 1.20 1.00 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
113
110
bidang persamaan
reference level
108.00
112.619
112.713
112.878
112.648
112.498
112.143
112.143
110.621
110.613
110.648
111.541
111.488
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.60
0.40
0.40
0.30
0.75
0.75
0.80
1.20 5.00 1.00 1.40
DISTANCE (m)
SD.14+60
113
110
bidang persamaan
reference level
108.00
112.619
112.713
112.878
112.648
112.498
112.143
112.143
110.621
110.613
110.648
111.541
111.488
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.60
0.40
0.40
0.30
0.75
0.75
0.80
1.20 5.00 1.00 1.40
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
115
bidang persamaan
reference level
110.00
114.719
114.416
112.906
114.219
112.864
112.869
113.510
115.104
115.104
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.40
0.20
0.60
0.60
0.30
0.30
5.00 2.50
DISTANCE (m)
SD.13+00
114
bidang persamaan
reference level
110.00
113.944
113.844
113.557
113.355
113.403
113.355
112.132
112.127
112.145
113.392
113.472
113.342
112.787
112.605
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.50
0.10
0.30
0.70
0.70
0.30
0.60
5.00 1.00 1.40 2.10 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
110
bidang persamaan
reference level
107.00
110.617
110.914
110.927
110.817
110.725
110.532
109.317
109.337
109.302
110.197
110.207
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.20
0.50
2.20 1.40 5.00 1.40 1.20 1.20 1.50
DISTANCE (m)
SD.16+50
111
110
bidang persamaan
reference level
106.00
110.169
109.969
109.969
109.274
109.306
109.999
109.999
110.389
110.454
110.504
110.409
110.307
110.082
108.619
108.409
108.618
109.441
109.407
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.30
0.30
0.30
0.30
1.00 1.40 5.00 1.30 1.10 1.10 1.50
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
bidang persamaan
reference level
106.00
110.123
110.183
110.180
110.023
109.999
109.746
108.441
108.451
108.641
109.070
109.070
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.20
0.40
5.00 1.20 5.00 1.70 1.00 1.00 1.20
DISTANCE (m)
SD.17+50
110
bidang persamaan
reference level
105.00
108.851
108.903
108.903
107.569
107.411
109.138
109.566
109.676
109.727
109.504
109.671
109.399
109.179
109.179
108.356
108.249
108.366
109.073
109.076
109.885
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.50
0.30
0.60
0.70
0.30
0.90
0.90
0.30
0.40
5.00 1.20 1.00 5.00 1.40
DISTANCE (m)
LOKASI PEKERJAAN :
SALURAN
SALURANSEKUNDER
SEKUNDER SARADAN
SARADANSD.17+00
SD.17+00 - - SD.17+50
SD.17+50 SALURAN SEKUNDER SARADAN SD.17+00 - SD.17+50
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
bidang persamaan
reference level
104.00
108.272
108.410
108.410
107.073
107.075
108.552
108.552
108.904
109.050
109.055
108.984
108.880
108.562
106.592
106.763
106.915
107.795
107.720
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.30
0.40
0.30
0.20
0.40
0.40
5.00 1.20 1.30 1.00 5.00 1.90 1.60 1.60
DISTANCE (m)
SD.18+50
109
bidang persamaan
reference level
104.00
108.059
108.134
108.134
106.904
106.709
108.509
108.509
108.515
108.522
108.539
108.510
108.562
108.302
108.017
108.017
107.569
106.938
107.019
108.096
108.359
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.30
0.40
0.40
0.30
0.20
0.20
5.00 1.20 1.30 1.00 5.00 1.30 1.80 1.20 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
108
bidang persamaan
reference level
104.00
107.394
107.394
106.659
106.288
107.409
107.828
107.891
107.887
107.951
107.379
107.741
107.379
106.424
106.439
107.384
107.384
107.501
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.50
0.30
0.30
0.40
2.50 1.00 1.50 1.50 5.00 2.70 1.50 1.00
DISTANCE (m)
SD.19+50
108
105
bidang persamaan
reference level
103.00
107.265
107.265
106.440
106.066
107.338
107.365
107.390
107.472
107.425
107.556
107.322
107.226
106.525
106.093
105.890
105.789
105.995
107.821
107.821
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.50
0.90
0.60
0.90
0.70
0.80
0.20
2.50 1.00 1.30 1.50 5.00 1.40
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
107
105
bidang persamaan
reference level
102.00
106.130
105.056
104.981
106.329
106.899
106.907
106.738
106.719
106.441
106.477
106.396
105.376
105.390
105.395
106.047
106.073
106.073
106.868
106.911
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.50
0.20
0.20
0.30
0.30
0.30
0.50
0.60
0.30
0.30
0.80
0.50
5.00 1.20 1.80 5.00 2.50 2.00
DISTANCE (m)
SD.20+50
106
105
bidang persamaan
reference level
101.00
105.192
105.366
105.366
103.679
103.509
105.250
105.490
105.685
105.773
105.782
105.698
104.593
103.539
103.604
105.363
105.287
105.520
105.425
105.952
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.80
0.80
0.30
0.60
0.30
0.40
0.80
0.80
0.20
0.30
0.70
0.90
5.00 1.30 1.00 5.00 2.30
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
107
105
bidang persamaan
reference level
102.00
106.130
105.056
104.981
106.329
106.899
106.907
106.738
106.719
106.441
106.477
106.396
105.376
105.390
105.395
106.047
106.073
106.073
106.868
106.911
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.50
0.20
0.20
0.30
0.30
0.30
0.50
0.60
0.30
0.30
0.80
0.50
5.00 1.20 1.80 5.00 2.50 2.00
DISTANCE (m)
SD.20+50
106
105
bidang persamaan
reference level
101.00
105.192
105.366
105.366
103.679
103.509
105.250
105.490
105.685
105.773
105.782
105.698
104.593
103.539
103.604
105.363
105.287
105.520
105.425
105.952
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.80
0.80
0.30
0.60
0.30
0.40
0.80
0.80
0.20
0.30
0.70
0.90
5.00 1.30 1.00 5.00 2.30
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
bidang persamaan
reference level
99.00
104.414
104.418
104.333
104.043
104.014
102.569
102.557
102.568
104.014
104.017
103.988
103.983
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.40
0.50
5.00 1.80 1.10 1.00 1.00 3.00
DISTANCE (m)
SD.21+00
0.50
105
bidang persamaan
reference level
100.00
104.167
104.447
104.447
103.134
102.802
104.594
104.594
104.922
104.850
104.795
104.567
104.709
104.422
102.780
102.782
102.837
104.942
104.942
104.672
104.692
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.30
0.80
0.30
0.45
0.90
0.90
0.30
0.30
5.00 1.30 1.80 1.90 5.00 1.00 1.80 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
104 0.50
bidang persamaan
reference level
99.00
102.908
103.183
103.183
102.312
102.311
102.615
103.095
103.517
103.528
103.184
103.046
103.274
103.100
103.100
101.810
101.805
101.875
103.185
103.185
103.053
103.059
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.60
0.70
0.80
0.60
0.30
0.20
0.90
0.90
0.40
0.30
5.00 1.00 1.70 1.00 5.00 1.00 1.20 5.00
DISTANCE (m)
SD.22+41
102
100
bidang persamaan
reference level
97.00
101.299
101.045
100.755
100.714
100.718
100.048
100.019
100.038
100.724
100.728
100.192
99.884
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.60
0.75
0.65
0.40
5.00 4.50 1.05 1.05
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
100
bidang persamaan
reference level
98.00
101.998
102.018
102.018
101.148
101.260
102.491
102.708
102.968
102.921
102.578
101.122
101.235
101.473
101.340
100.336
100.238
100.278
101.508
101.973
101.855
101.565
101.425
102.328
102.328
102.218
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.80
0.70
0.50
0.55
0.55
0.50
0.30
0.40
0.30
0.30
3.00 1.20 1.00 1.00 1.00 5.00 2.30 2.30 1.20 2.30 1.20 1.00
DISTANCE (m)
103 SD.23+00
0.50
100
bidang persamaan
reference level
97.00
101.586
101.788
101.788
100.920
100.937
101.224
102.183
102.395
102.345
102.117
102.011
100.942
101.088
101.298
100.953
100.953
100.159
100.601
100.943
101.653
101.693
101.427
101.534
101.853
101.853
101.982
99.898
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.80
0.60
0.70
0.90
0.60
0.30
0.30
0.20
0.40
0.30
0.30
1.00 2.20 5.00 1.50 1.50 4.70 1.00 1.00 2.00 1.00 1.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
102
100
bidang persamaan
reference level
97.00
101.226
101.302
101.302
100.459
100.826
101.274
101.489
101.662
101.845
101.821
101.452
101.452
100.234
100.270
100.528
100.652
100.652
100.650
101.517
101.517
101.235
101.223
99.821
99.751
99.774
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.70
0.30
0.40
0.60
0.30
0.30
0.95
0.95
0.30
0.30
0.30
1.00 1.20 5.00 2.60 6.50 1.10 1.00 3.00
DISTANCE (m)
SD.24+00
102
100
bidang persamaan
reference level
97.00
101.384
101.273
100.980
100.862
100.354
100.584
100.392
100.657
100.698
100.243
100.354
100.228
100.237
99.800
99.800
99.834
99.786
99.749
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.60
0.60
0.30
0.70
0.70
0.30
0.30
5.00 1.20 1.30 1.30 7.70 1.60 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
100
bidang persamaan
reference level
95.00
100.530
100.026
100.109
100.326
100.507
100.462
100.804
100.893
100.903
100.660
100.167
100.048
99.636
99.130
98.486
98.207
98.043
97.934
99.562
99.978
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.20
0.30
0.60
0.90
0.70
0.20
0.30
0.70
0.30
2.00 5.00 2.00 1.40 7.20 2.00 1.20 1.20 4.00
DISTANCE (m)
SD.24+50
101
100
bidang persamaan
reference level
96.00
100.381
100.538
100.625
100.545
100.242
100.492
100.162
100.162
100.028
100.021
99.671
98.753
98.758
99.470
98.897
98.993
98.195
98.493
98.813
99.405
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.90
0.50
0.20
0.70
0.60
0.80
0.30
0.30
1.10 1.80 5.00 2.00 1.50 7.00 1.70 1.70 3.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
101
100
bidang persamaan
reference level
96.00
100.158
99.120
99.262
99.262
98.375
98.420
99.276
99.878
99.916
99.907
99.811
99.060
98.373
98.326
98.092
98.011
98.876
99.111
99.968
99.939
99.651
99.599
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.40
0.20
0.40
0.40
0.60
0.30
0.30
1.00 1.10 1.80 5.00 2.40 1.30 9.00 2.00 2.00 3.00
DISTANCE (m)
SD.25+50
100
bidang persamaan
reference level
95.00
98.485
98.667
98.052
97.988
98.556
98.816
99.216
99.274
99.314
99.445
99.737
99.297
97.686
97.775
97.699
99.410
99.749
99.864
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.50
0.40
0.80
0.70
0.70
1.00 1.40 1.30 5.00 2.00 6.00 6.00 1.20 2.50
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
100
bidang persamaan
reference level
95.00
98.410
97.900
98.009
98.516
98.851
99.071
99.075
99.466
99.156
97.901
97.804
97.924
99.201
99.555
99.550
98.571
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.80
0.30
0.80
1.00 1.20 1.30 5.00 1.70 1.50 6.00 6.00 1.00 1.70 1.50
DISTANCE (m)
SD.25+75
100
bidang persamaan
reference level
96.00
98.964
99.497
99.237
99.291
98.542
98.083
98.021
99.152
99.479
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.80
0.50
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
bidang persamaan
reference level
95.00
99.867
98.358
98.609
98.609
97.514
97.494
98.539
99.171
99.242
98.542
98.778
98.247
97.494
97.517
97.443
98.104
98.379
98.379
98.196
98.188
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.70
0.90
0.50
0.50
0.60
0.30
0.30
5.00 1.00 1.00 1.50 5.00 3.40 1.10 1.10 5.00
DISTANCE (m)
SD.26+28
99
bidang persamaan
reference level
95.00
98.897
98.709
98.469
98.334
98.327
97.407
97.485
97.364
98.317
98.317
97.465
97.467
98.066
98.306
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.90
0.50
0.50
5.00 2.80 1.40 1.90 1.30
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
bidang persamaan
reference level
94.00
97.593
97.593
96.752
96.769
97.958
97.958
98.286
98.433
98.483
97.640
97.931
96.979
96.350
96.302
96.493
97.549
97.822
97.822
97.402
97.444
98.042
98.042
97.365
97.365
98.239
98.239
97.986
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
0.20
0.30
0.50
0.10
0.30
0.30
0.30
0.30
0.30
0.50
0.30
0.30
0.30
1.70 1.00 1.20 5.00 2.00 1.60 1.00 1.00 1.60 6.00
DISTANCE (m)
SD.27+00
98
0.50
95
bidang persamaan
reference level
92.00
96.584
96.564
96.564
95.649
95.692
96.470
96.726
96.988
96.930
96.772
97.008
95.621
95.161
94.683
94.767
94.927
96.164
96.305
96.170
96.164
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.80
0.40
0.70
0.30
0.70
0.30
0.30
1.30 1.00 1.20 1.10 5.00 1.80 1.00 1.70 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
95
bidang persamaan
reference level
92.00
96.443
96.648
96.648
96.028
95.883
96.819
96.992
97.000
96.799
97.008
95.775
94.787
94.815
94.973
96.724
96.724
96.454
96.471
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.30
0.40
0.60
0.30
0.30
5.00 1.60 1.50 5.00 1.90 1.05 1.05 2.10 5.00
DISTANCE (m)
SD.28+00
97 0.50
95
bidang persamaan
reference level
92.00
97.989
95.611
95.749
95.749
95.027
95.019
95.737
96.115
96.379
96.361
96.124
96.353
95.227
94.472
94.377
94.427
95.277
95.751
95.751
95.687
95.722
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.60
0.40
0.60
0.30
0.60
0.70
0.70
0.30
0.30
5.00 1.60 1.50 5.00 2.00 1.20 1.00 1.00 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
95
bidang persamaan
reference level
92.00
95.083
95.287
95.287
94.668
94.601
95.060
95.308
95.747
95.786
95.552
95.810
95.000
94.273
94.199
94.358
94.988
95.364
94.953
95.028
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.60
0.30
0.40
0.60
0.90
0.80
0.90
0.30
5.00 1.00 1.80 5.00 1.00 2.00 1.00 5.00
DISTANCE (m)
SD.28+96
96
95
bidang persamaan
reference level
91.00
95.097
95.320
94.970
94.832
93.989
94.049
94.015
94.812
94.811
94.415
94.419
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.50
0.40
5.50 2.00 1.40 1.80 1.10
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
0.50
95
bidang persamaan
reference level
91.00
94.815
94.540
94.540
94.113
94.127
94.662
95.063
95.010
94.852
95.084
93.671
93.093
93.142
93.162
94.432
94.542
94.442
94.007
93.904
94.334
94.334
94.444
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.50
0.50
0.20
0.80
0.20
0.30
0.30
5.00 1.00 2.00 5.00 1.20 1.00 1.00 1.00 3.30 1.00 3.00
DISTANCE (m)
SD.29+50
95
bidang persamaan
reference level
90.00
93.915
94.055
94.055
93.510
93.508
94.201
94.425
94.490
94.410
94.150
94.398
93.352
92.909
92.966
92.948
94.145
94.671
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.70
0.70
0.30
5.00 1.00 2.00 5.00 1.50 2.20 1.00 1.00 1.20 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
bidang persamaan
reference level
90.00
93.149
93.309
93.309
92.827
92.722
93.647
93.797
93.810
93.499
93.842
93.062
92.183
92.107
92.207
92.880
93.142
92.931
92.987
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.70
0.80
0.70
0.90
0.90
0.70
0.30
5.00 1.20 1.30 5.00 1.00 1.00 3.30 5.00
DISTANCE (m)
SD.30+50
94
bidang persamaan
reference level
89.00
92.716
93.098
93.098
92.331
92.349
93.033
93.197
93.189
93.086
93.207
92.707
91.805
91.692
91.901
92.948
92.948
92.811
92.804
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.40
0.80
0.40
0.60
0.60
0.30
0.20
5.00 1.00 1.20 5.00 1.50 1.30 1.00 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
bidang persamaan
reference level
89.00
92.221
92.433
92.433
92.038
92.053
92.468
92.865
92.832
92.578
92.813
92.358
91.593
91.581
91.696
92.281
92.311
92.316
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.50
0.50
0.30
0.90
0.30
5.00 1.00 2.00 5.00 1.50 1.00 1.00 5.00
DISTANCE (m)
SD.31+23
93
bidang persamaan
reference level
89.00
92.632
92.823
92.533
92.123
91.909
91.712
91.853
92.253
92.254
91.842
91.843
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.60
0.80
0.70
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
93
90
bidang persamaan
reference level
88.00
91.898
92.091
92.091
91.548
91.587
91.758
92.255
92.444
92.356
92.280
92.148
92.388
91.909
91.909
90.696
90.787
90.821
91.956
91.956
91.691
91.777
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.70
0.80
0.90
0.30
0.25
0.65
0.65
0.30
0.30
0.30
5.00 1.40 1.70 5.00 5.00
DISTANCE (m)
SD.32+00
93
0.50
90
bidang persamaan
reference level
88.00
91.397
91.669
91.669
91.260
91.260
91.808
92.027
91.935
91.715
91.979
90.982
90.055
90.032
90.072
90.971
90.971
90.767
90.791
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.70
0.60
0.80
0.65
0.65
0.90
0.30
0.30
5.00 2.00 5.00 1.70 1.30 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
92
90
bidang persamaan
reference level
87.00
91.104
91.582
91.582
90.887
90.875
91.319
91.497
91.403
91.212
91.482
90.485
89.532
89.594
89.718
90.620
90.624
90.472
90.506
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.50
0.70
0.60
0.70
0.80
0.30
5.00 2.20 5.00 1.30 1.00 1.00 1.00 1.30 5.00
DISTANCE (m)
SD.33+00
92
0.50
90
bidang persamaan
reference level
87.00
90.588
91.013
91.013
90.475
90.524
91.036
91.056
90.914
90.774
90.618
90.890
90.253
89.450
89.415
89.382
90.209
90.140
90.140
90.048
90.095
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.40
0.70
0.70
0.70
0.90
0.65
0.65
0.50
0.60
0.30
0.30
5.00 2.30 5.00 1.20 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
91
90
bidang persamaan
reference level
86.00
90.322
90.460
90.460
90.060
90.052
90.597
90.541
90.495
90.289
90.550
89.950
88.961
88.880
88.967
89.800
89.800
89.660
89.677
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.80
0.40
0.80
0.80
0.75
0.75
0.50
0.30
0.30
5.00 2.30 5.00 1.20 5.00
DISTANCE (m)
SD.34+00
91
0.50
90
bidang persamaan
reference level
86.00
89.717
90.170
90.170
89.787
89.750
90.082
90.102
90.090
89.565
89.879
89.426
88.870
88.675
88.755
89.585
89.631
89.479
89.541
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.40
0.60
0.40
0.50
0.50
0.85
0.85
0.70
0.30
5.00 2.30 5.00 1.50 2.00 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
90
bidang persamaan
reference level
86.00
89.211
89.516
89.516
89.156
89.186
89.575
89.737
89.575
89.496
89.763
89.286
88.636
88.613
88.678
89.269
89.269
88.977
88.990
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.80
0.60
0.90
0.50
0.50
0.75
0.75
0.50
0.60
0.30
5.00 2.00 5.00 5.00
DISTANCE (m)
SD.34+65
90
bidang persamaan
reference level
86.00
89.684
89.374
89.611
88.497
88.542
88.573
89.192
89.193
89.102
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.40
0.30
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
bidang persamaan
reference level
85.00
88.643
88.923
88.923
88.418
88.460
88.988
89.238
89.175
89.041
88.773
89.054
88.487
87.848
87.886
88.003
88.558
88.558
88.433
88.483
88.892
88.892
88.713
88.713
88.928
88.928
88.673
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.60
0.80
0.70
0.50
0.50
0.50
0.50
0.30
0.30
0.30
0.40
0.30
0.50
0.30
0.30
0.30
5.00 2.00 5.00 1.10 8.30
DISTANCE (m)
SD.35+50
89
bidang persamaan
reference level
85.00
88.174
88.399
88.399
88.045
87.960
88.510
88.727
88.648
88.535
88.392
88.689
88.024
87.355
87.323
87.384
88.250
88.250
88.044
88.086
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.50
0.50
0.50
0.50
0.50
0.50
0.30
0.30
5.00 2.00 5.00 1.30 1.00 1.20 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
89
bidang persamaan
reference level
84.00
87.806
88.031
88.031
87.783
87.733
87.931
88.147
88.292
88.171
88.004
88.353
87.739
86.868
86.898
86.968
87.786
87.786
87.603
87.535
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.50
0.30
0.90
0.40
0.40
0.40
0.30
0.30
5.00 1.00 1.50 5.00 1.30 1.00 5.00
DISTANCE (m)
SD.36+50
88
bidang persamaan
reference level
84.00
87.916
87.618
87.377
87.593
87.751
87.754
87.696
87.601
87.841
87.184
86.744
86.686
86.794
87.401
87.401
87.281
87.304
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.40
0.50
0.50
0.90
0.50
0.50
0.50
0.50
0.50
0.30
5.00 2.50 5.00 1.50 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
88
bidang persamaan
reference level
84.00
87.761
87.471
86.971
86.971
87.431
87.423
87.605
87.561
87.527
87.882
87.113
87.113
86.342
87.091
87.881
87.846
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.90
0.80
0.90
0.40
0.40
0.40
5.00 2.10 5.00 1.10 1.50 5.00
DISTANCE (m)
SD.37+00
88
bidang persamaan
reference level
84.00
87.756
87.745
87.890
86.219
86.219
86.219
87.890
87.939
87.602
87.562
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.80
5.00 5.00 1.10 1.10 5.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo
88
bidang persamaan
reference level
84.00
87.626
87.266
87.939
87.294
86.616
86.609
86.617
87.263
87.548
87.301
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.65
0.75
0.85
5.00 1.00 1.85
DISTANCE (m)
SD.37+25
88
85
bidang persamaan
reference level
83.00
86.107
86.282
86.282
85.784
85.784
86.327
86.652
86.906
86.895
86.739
86.715
87.026
86.715
86.143
85.993
86.696
86.783
86.783
85.973
85.973
85.223
85.223
85.978
86.723
86.723
87.135
87.135
87.485
87.485
87.140
87.133
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
JARAK (m)
0.30
0.30
0.30
0.30
0.30
0.10
0.40
0.30
0.50
0.30
0.30
0.30
0.30
0.50
0.30
0.30
0.30
3.00 1.00 1.00 5.00 1.00 1.70 1.00 1.40 1.10 3.00
DISTANCE (m)
0 2 4 6 8 10m Purwadi, ST Ir. Widihardjo, M.P. Satriyo Wahyu Mahfudiyanto, S.T Nur Purnomo, S.T
TGL. KONTRAK : 12 JANUARI 2023
Diperiksa Disetujui
Direksi Teknik PPK Irigasi dan Rawa I NO. KONTRAK : HK.02.01-An/IRWA I-SPK-GDGLJTN/01
Irigasi dan Rawa I SNVT PJPA Bengawan Solo