2010-3-23 - R 0

Preliminary project time schedule


CUSTOMER
ACK PJ NO. NAME OF PJ

ASIA CEMENT PUBLIC COMPANY LTD.


Capacity

SENION MANAGER

MANAGER

ASST.MANAGER

21.2MW
WHRPP Project for Asia Cement Public Co.,Ltd.
Year

ANHUI CONCH KAWASAKI ENGINEERING CO., LTD.

Year 1
1st Month 2nd Month 3rd Month 4th Month 5th Month 6th Month 7th Month 8th Month 9th Month 10th Month 11th Month 12th Month 1st Month 2nd Month

Year 2
3rd Month 4th Month 5th Month

Month Description

Design Schedule
Basic design General layout drawing Thermodynamic system design

Effectiveness date of Contract

Process equipment and valve list

P&I diagram Outdoor steam and water pipeline Heat insulation and painting Process design
Interface and arrangement design of PH boiler Interface and arrangement drawing of AQC boiler

Civil construction design


Structural and civil design of T/G building Structural and civil design of AQC boiler system Structural and civil design of PH boiler system

Structural and civil design of cooling tower

Outdoor water and steam pipeline support Water demineralizer design Water supply and drainage design Electrical design Automation design

Design completion

Equipment procurement
Steam turbine procurement PH boiler procurement AQC boiler procurement Travelling crane procurement Cooling tower procurement Raw water and pure water equipment procurement Valve,expansion joint equipment procurement Other auxiliary equipment procurement Electric equipment procurement

Equipment Arrival at Thailand

Site construction preparation PH boiler installation


PH boiler civil construction Boiler steel struture assembly Casing,inlet and outlet installation Pipes hoisting and welding Upper Platform and drum installation Cooling water,steam,water feeding pipes installation and welding Small size pipes installation and welding Circulation pump installation Boiler water pressure test Hammering devices and conveyor installation Exhaust pipes assembly Heat insulation and painting

AQC boiler and filter installation


AQC boiler and filter civil construction Steel structure manufacture and installation Exhaust gas outlet shell assembly Heat surface installation Stairs, exhaust gas inlet casing installation Header installation and heat surface welding Upper platform and drum installation Steam,water feeding pipes installation and welding Small size pipes installation and welding Boiler water pressure test Casing accessories installation Exhaust pipes assembly Prededuster installation Heat insulation and painting

Steam turbine installation


Turbine civil construction Travelling crane installation Turbine installation Turbine accessary pipes installation and welding Auxiliaries installation in builiding

Cooling tower installation


Cooling tower civil construction Cooling tower equipment installation Raw water tank and pure water tank assembly Pure water devices installation Pure water devices surrounding pipes installation

Outdoor pipeline installation


Pipe bracket civil construction Outdoor pipe brackets manufacture and installation Steam,water feeding and other accessory pipes installation and welding Steam feeding water and other accessory pipes pressure test

2010-3-23 - R 0

Preliminary project time schedule


CUSTOMER
ACK PJ NO. NAME OF PJ

ASIA CEMENT PUBLIC COMPANY LTD.


Capacity

SENION MANAGER

MANAGER

ASST.MANAGER

21.2MW
WHRPP Project for Asia Cement Public Co.,Ltd.
Year

ANHUI CONCH KAWASAKI ENGINEERING CO., LTD.

Year 1
1st Month 2nd Month 3rd Month 4th Month 5th Month 6th Month 7th Month 8th Month 9th Month 10th Month 11th Month 12th Month 1st Month 2nd Month

Year 2
3rd Month 4th Month 5th Month

Month Description

Electric and instrument installation


Generator installation Electrical cabinet and controlling cabinet installation Cable tray and piping laying Instrument installation Cable laying Cable wiring

System commissioning and trial running


System commissioning and single equipment trial running Check electrical and automation signal Single test run Hot water cleaning Steam blowing out Steam turbine and generator test Whole system trial running and completion

Installation completion

Startup

72-hour Continuous running