By : Ajai Tyagi GM Electrical Natural Gas for Clean, Green and Cost-effective Power Generation
1
IGL has started supply of CNG and PNG to sub-urban towns of Delhi, viz Noida, Greater Noida and Ghaziabad
More than 2,50,000 customers Wide spectrum of customers across domestic, commercial and industrial Steel pipelines More than 400 kms MDPE pipelines More Than 4000 kms Sales of ~ 3 mmscmd
IGLs Vision:
To be the leading clean energy solutions provider, committed to stakeholder value enhancement, through operational excellence and customer satisfaction
CNG
PNG
3
mmscmd
Installed Base
Approx. 60 Mw
Diversified client base for CPP comprising FMCG, Auto, PV, Packaging etc.
As on Dec10 17456 Mw
Potential Diff. 6059 Mw
-11.6%
-13.7%
-6.4%
-15.4%
-17.7% -9.4%
-11.1%
Source: CEA
Captive Power Plants in India Key observations & projected repercussions 1 to 10 Mw largest installed category Steam based & liquid fuel leading the CPP generation mix Gas based CPP accounts for 15% CPP - prime business mover for a CGD With expansion in CGD network, share of gas based power will supersede
Hotels, Restaurants
Domestic
Residential supply
Power generates highest volumes Gas based power creates avenues for Co- Gen, Trigen, Quadgen or Zero Waste ; mechanism for saving energy
Industrial Fuel
Power
Decentralised Power
A CGD company can offer gas for power generation upto a limited quantity as per the prevailing norms Various end users from diversified fields can have the captive power plant Small power plants can be another area of business potential
Hospitals Industries
Malls
Hotels
Comparison of available prime energy source with gas based captive power
Option I
Grid + DG SET +
Back - up
Captive Power
HFO
Unreliable primary source Unscheduled Roasting Unaccountable Batch Loss Transformers, DGs & UPS need more space
Operational
Reliable as primary source Planned maintenance Interruption free power Covers minimal space
T&D, commercial losses Coal 1.09 tons Co2 / Mwh Diesel 0.63 tonsCo2 / Mwh Oil 0.73 tons Co2 / Mwh Extra investment for back up power vis. UPS High cost of energy
Logistics
Socio - Ecological
Economy
No extra investment for power back up equipments Faster ROI & growth
7
Comparison of available prime energy source with gas based captive power
Option II
DG SET
Captive Power
HFO
Space Constraint High Maintenance Ash Disposal Manpower deployment Adulteration & Pilferage Transportation issues
Operational
Logistics
Coal 1.09 tons Co2 / Mwh Diesel 0.63 tonsCo2 / Mwh Oil 0.73 tons Co2 / Mwh
Socio-Ecological
Economy
Co2 Recovery
Centralised power
Distributed power
Distributed power is beneficial for industry for critical load applications, and preventing breakdowns
Waste heat recovery further increases the efficiency of the plant & reduces the overall energy cost
Distributed power reduces burden on the Grid as well Zero Waste can be achieved by doing Quad generation
Future Potential
Industries
Industries face huge amount of power cuts Power shortage is a limitation for industry expansion Ghaziabad & Gr. Noida a major industrial hub in NCR
Observations from industry Cannot expand business due to unavailability of power from EB
IPP
Small power plants can be a good potential for CGDs 10 Ha proposed for power plant in Noida SEZ as per master plan
Challenges
Price of alternate fuels Availability & price of Grid power High Capital Cost of equipments ; demanding new business models from stakeholders
10
Thank You