Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Cardboard Clones
Marbles Machines
The marble machine was built of balsa wood strips, strings, and paper. It needs to support the transfer of two different sizes marbles from start, which a loop, a jump and a drop need to occur between the two marbles before they stop at the same time.
Geometric Horizon
Conceptual translation of three spatial concepts by constructing through geometric languages: with lines; lines and planes; with lines planes and solids. All lines are black. All planes are grey. All solids are white.
Cartesian Grids
Three-dimensional spaces derived from coordinate axis. The spaces are divided as residential programs while dened by the coordinate units. This is the nal stage from the Geometric Horizon
Housing Matters
In this project, the process begin with creating a elds into masses, through the negative and positive environment of the shadow, lines, and spaces. We derive spaces from different scales for the ideal space for the ve imaginery clients, whom would occupy these spaces. The end product is the Barrio Logan mixed-use residential apartments at Cesar E. Chaves Pkwy and Newton Avenue.
Drawing, Collage, & Sectional Structural Model Birds Nest Olympic Stadium Beijing, China 2008 Herzog & de Meuron Understanding the structural integrity through drafting and making.
1/16
5/16
2/16
5/16
3/16
5/16
4/16
5/16
5/16
5/16
2/16 5/16
3/16 5/16
5/16 5/16
5/16
5/16
5/16
Y5
1/16
4/16
2/16
4/16
3/16
4/16
4/16
4/16
5/16
4/16
4/16
5/16 4/16
Y4
1/16
3/16
2/16
3/16
3/16 5/16
3/16
3/16
5/16 3/16
Y3
1/16
2/16
2/16
2/16
3/16
2/16 4/16
2/16 5/16
2/16
5/16 2/16
Y2
1/16
1/16
2/16
1/16
3/16
1/16
1/16
1/16 1/16
5/16 1/16
Y1
1/16
1/16
2/16
2/16
3/16
3/16
4/16
4/16
5/16
5/16
Y X
X1
X2
X3
X4
X5
Isochoric System
Material Trajectories
Case Study: Birds Nest Beijing Olympic Stadium
Exploring structure connection variations through material trajectories, in the isochoric system, the modules are shifted in x, y, z axis while keeping their volumes.
SITE PLAN
31 0
110 100
190 176
230
60
80
120
40
30
50 40
184 170
330
250
78
212 208
290
0 32
280
278
30 0
286 282
160
328
200
70
60
152
222
40
230 220
190
2 304
150
210
20
30
90
70
11
14 0
10
25 0
100
31
80
10
20
130
12
30
120
280
22 8 24 0
170
334
21
33 0
27
22 6
300
230
80
84
290
340
336
30
50
160
20 20
190
130
314
140
330 330
338
70
100
80 80 90
250 270
160
90 130 120
210 230
34 30
80
0 18
32 2
100
32 0
200
26 0
290
20
LEGEND
SECTION LINES HYDROLOGY POINT OF INTEREST
40
150
310
70
0 30
310
29 0
10
310
50
20
90
30
250
270
260
2
0 30
80
27
0 28
0 28
290
6 29
26 0
18
27
60
4
0
5
332
0 32
50
0 18
0 20
18
24 0
6
330
0 16
0 20
23 2
60
90
40
70
110
320 320
220
40
60
234
290
330
150
312
68 64 66 52 50 48 40
180 170
220
318
280
238
10
20 10
31
10
0 33
70 60
320
0 15
270 274
0 32
72
0 30
280
276
140
260
310
170
322
11
0 24
30
32 30
50
332
11 0
60
300
296
320
12
GLIDER PATHS
DEPARTURE LANDING
298
VEGETATION
1 2 3 4 5 6 7 8 9 10 11 12
2 A104
1 A104
4 A104 DN
DN
3 A104
Floor Plans
UP UP
Section
2 Section - 2
Floor 1
Elevations
DN DN UP
Floor 2
UP
South
DN
DN
Floor 3
West
CLIENTS: CALIFORNIA REAL ESTATE INVESTMENT GROUP & ZHEJIANG SINHOO CO., LTD.