Sei sulla pagina 1di 6

31+500

29+500
27+500
25+500
23+500

BOX CULVERT STA 27+519.54


BOX CULVERT STA 23+550
CSP STA 27+529.536 BOX CULVERT STA 25+550

31+600
29+600
27+600
25+600
23+600

CULVERT STA 31+671.23


UNDERBRIDGE STA
29+692.783

31+700
29+700
27+700
25+700
23+700
STRIP MAP STA 23+500 - 37+000

BOX CULVERT STA 25+786.59


BOX CULVERT STA 23+786.25

31+800
29+800
27+800
25+800
23+800

CSP STA 25+809.272

PERKERASAN BETON

PERKERASAN BETON
31+900
29+900
27+900
25+900
23+900

PERKERASAN BETON
BOX CULVERT STA 27+947.05
CULVERT STA 31+971.23
PERKERASAN BETON

32+000
30+000
28+000
26+000
24+000

BOX CULVERT STA 30+076.44


PERKERASAN BETON

32+100
30+100
28+100
26+100
24+100

UNDERBRIDGE STA
30+117.588
BOX CULVERT STA 26+131.43 BOX CULVERT STA 24+147.4

32+200
30+200
28+200
26+200
24+200

BOX CULVERT STA 28+210.03

CULVERT STA 32+271.23

32+300
30+300
28+300
26+300
24+300

CSP STA 26+300


PERKERASAN BETON

32+400
30+400
28+400
26+400
24+400

BOX CULVERT STA 28+420.31


BOX CULVERT STA 24+431.53

UNDERPASS STA 26+469

32+500
30+500
28+500
26+500
24+500

CULVERT STA 32+531.23


UNDERBRIDGE STA
30+533.364 CSP STA 28+550.487

32+600
30+600
28+600
26+600
24+600

BOX CULVERT STA 24+683.74


BOX CULVERT STA 28+688.5 CSP STA 24+695.295
32+700
30+700
28+700
26+700
24+700

BOX CULVERT STA 26+744.94


BOX CULVERT STA 30+750.02
CULVERT STA 32+783.69
32+800
30+800
28+800
26+800
24+800

CSP STA 30+890.981


32+900
30+900
28+900
26+900
24+900

PERKERASAN BETON

33+000
31+000
29+000
27+000
25+000

BOX CULVERT STA 29+096.36 BOX CULVERT STA 25+000


33+100
31+100
29+100
27+100
25+100

CULVERT STA 33+197.78


33+200
31+200
29+200
27+200
25+200

BOX CULVERT STA 27+200


33+300
31+300
29+300
27+300
25+300

PERKERASAN BETON

BOX CULVERT STA 25+371.75


33+400
31+400
29+400
27+400
25+400

PERKERASAN BETON

33+500
31+500
29+500
27+500
25+500
35+500
33+500

35+600
33+600

BOX CULVERT STA 31+671.2

35+700
33+700

BOX CULVERT STA 33+727.99

UNDERBRIDGE STA
35+761.477
35+800
33+800

35+900
33+900

BOX CULVERT STA 31+971.23


BOX CULVERT STA 35+998.75
36+000
34+000

BOX CULVERT STA 36+005.64


PERKERASAN BETON

36+100
34+100

BOX CULVERT STA 34+100


36+200
34+200

BOX CULVERT STA 32+271.23


PERKERASAN BETON
36+300
34+300

BOX CULVERT STA 36+355.27


36+400
34+400

BOX CULVERT STA 34+460.39


36+500
34+500

BOX CULVERT STA 34+531.19 BOX CULVERT STA 32+531.23


36+600
34+600

BOX CULVERT STA 36+639.35

UNDERPASS STA
34+699.821
36+700
34+700

BOX CULVERT STA 32+783.69


36+800
34+800

BOX CULVERT STA 34+803.41

UNDERBRIDGE STA
34+885.738
36+900
34+900

BOX CULVERT STA 36+889.84


37+000
35+000
PERKERASAN BETON

35+100

BOX CULVERT STA 35+113.74

BOX CULVERT STA 33+197.78


35+200
35+300
35+400

BOX CULVERT STA 35+445.35


BOX CULVERT STA 35+455.37
35+500
RESUME STATUS GAMBAR ZONA 3

NO ITEM PEKERJAAN RTA SD KETERANGAN STATUS LAHAN

A STRUKTUR

1 BOX CULVERT BEBAS

BC 24+432 1(2.0 x 2.0) √ √ BEBAS

BC 24+684 1(2.5 x 2.5) √ √ BEBAS

BC 25+372 2(2.0 x 2.0) √ √ BEBAS

BC 25+550 2(2.0 x 2.0) √ √ BEBAS

BC 26+175 1(2.0 x 2.0) √ √ BEBAS

BC 26+745 2(2.0 x 2.0) √ √ BEBAS

BC 27+520 1(2.0 x 2.0) √ √ BEBAS

BC 28+205 2(3.0 x 3.0) √ √ BEBAS

BC 28+420 1(2.0 x 2.0) √ √ BEBAS

BC 28+689 1(2.0 x 2.0) √ √ BEBAS

Perubahan Dimensi dari 2(3.0x3.0) menjadi 1(4.0x2.5)


BC 29+096 2(3.0 x 3.0) X X - Gambar RTA Submit HKJT BEBAS
- Gambar Shop Drawing Submit Konsultan Pengawas

BC 30+076 2(3.0 x 3.0) √ √ BEBAS

BC 30+750 2(2.0 x 2.0) √ √ BEBAS


BC 31+671 2(2.5 x 2.5) √ X BELUM BEBAS
BC 31+971 1(2.0 x 2.0) √ X BELUM BEBAS
BC 32+271 1(2.0 x 2.0) √ X BELUM BEBAS
BC 32+531 1(2.0 x 2.0) √ X BELUM BEBAS
BC 32+784 2(2.0 x 2.0) √ X BELUM BEBAS
BC 33+198 2(2.0 x 2.0) √ X Proses Penggambaran oleh HKI BEBAS
BC 33+728 2(2.0 x 2.0) √ X BELUM BEBAS
BC 34+100 1(2.0 x 2.0) √ X BELUM BEBAS
BC 34+460 2(2.0 x 2.0) √ X BELUM BEBAS
BC 34+531 1(2.0 x 2.0) √ X BELUM BEBAS
BC 34+803 2(2.0 x 2.0) √ X BELUM BEBAS
BC 35+114 2(3.0 x 3.0) √ X BELUM BEBAS
BC 35+445 1(2.0 x 2.0) √ X BELUM BEBAS
BC 35+455 1(2.0 x 2.0) √ X BELUM BEBAS
BC 35+999 2(2.0 x 2.0) √ X BELUM BEBAS
BC 36+006 1(2.0 x 2.0) √ X BELUM BEBAS
BC 36+355 2(2.0 x 2.0) √ X BELUM BEBAS
BC 36+639 2(2.0 x 2.0) √ X BELUM BEBAS
BC 36+890 2(3.0 x 3.0) √ X BELUM BEBAS
BC 37+110 1(3.0 x 3.0) √ X BELUM BEBAS
BC 38+144 1(2.5 x 2.5) √ √ BELUM BEBAS
BC 39+212 1(1.5 x 1.5) √ X BELUM BEBAS
BC 39+526 1(2.0 x 2.0) √ X BELUM BEBAS
BC 39+910 2(3.0 x 3.0) √ X BELUM BEBAS
BC 40+243 1(2.0 x 2.0) √ X BELUM BEBAS
BC 40+475 1(2.0 x 2.0) √ X BELUM BEBAS
BC 40+678 2(2.5 x 2.5) √ X BELUM BEBAS
BC 41+000 2(2.5 x 2.5) √ X BELUM BEBAS
BC 41+387 2(2.0 x 2.0) √ X BELUM BEBAS
BC 41+684 1(1.5 x 1.5) √ X Proses Penggambaran oleh HKI BEBAS

BC 42+024 2(2.0 x 2.0) √ X Proses Penggambaran oleh HKI BEBAS

BC 42+300 1(1.5 x 1.5) √ X Proses Penggambaran oleh HKI BEBAS

BC 42+600 1(1.5 x 1.5) √ X Proses Penggambaran oleh HKI BEBAS

BC 42+899 1(1.5 x 1.5) √ X Proses Penggambaran oleh HKI BEBAS

BC 43+096 2(2.0 x 2.0) √ X Proses Penggambaran oleh HKI BEBAS


BC 43+524 2(2.5 x 2.5) √ X BELUM BEBAS
BC 44+189 1(1.5 x 1.5) √ X BELUM BEBAS
BC 44+582 1(1.5 x 1.5) √ X BELUM BEBAS
BC 44+780 1(1.5 x 1.5) √ X BELUM BEBAS
BC 45+088 2(2.0 x 2.0) √ X BELUM BEBAS
BC 45+375 1(1.5 x 1.5) √ X BELUM BEBAS
BC 45+675 1(1.5 x 1.5) √ X BELUM BEBAS
BC 45+972 1(2.0 x 2.0) √ X BELUM BEBAS
BC 46+277 1(2.0 x 2.0) √ X BELUM BEBAS
BC 46+863 1(2.0 x 2.0) √ X BELUM BEBAS
BC 47+051 1(2.0 x 2.0) √ X BELUM BEBAS
BC 47+359 1(2.0 x 2.0) √ X BELUM BEBAS
BC 47+850 √ X BELUM BEBAS
BC 48+300 1(2.5 x 2.5) √ √ BEBAS

BC 48+690 1(2.5 x 2.5) √ √ BEBAS

BC 49+205 1(2.0 x 2.0) √ √ BEBAS

BC 49+395 1(2.0 x 2.0) √ √ BEBAS

2 JEMBATAN

UP 26+469 √ √ BEBAS

√ - Pengajuan Revisi Penulangan Footing dan Abutment ke Konsultan Pengawas


UB 29+693 X BEBAS
- Koordinat titik pancang Approve HKJT

- Pengajuan Revisi Penulangan Footing dan Abutment ke Konsultan Pengawas


UB 30+118 √ X - Koordinat titik pancang Approve HKJT BEBAS
- Plan Girder, Diafragma, Plan Bondeck Approve HKJT

UB 30+533 √ X BELUM BEBAS


UP 30+891 X X Review Desain Perubahan Struktur dari CSP menjadi Underpass oleh Konsultan Perencana BEBAS
UP 34+700 √ X BELUM BEBAS
UB 34+886 √ X BELUM BEBAS
UB 35+761 √ X BELUM BEBAS

- RTA Rangka Baja Approve


- RTA Koordinat Pondasi Tiang Baja Approve
UB 38+023 SEI BATANG SERANGAN X X - RTA Plan, Potongan Memanjang, dan Potongan Melintang Approve BELUM BEBAS
- RTA Sub Struktur tahap finalisasi BPJT
- Pengajuan Shop Drawing Koordinat Titik Pancang ke Konsultan Pengawas

UB 38+554 INTERCHANGE √ X BELUM BEBAS


UB 38+967 REL KAI √ X BELUM BEBAS

3 CORRUGATED STEEL PLATE

CSP 24+695 √ √ BEBAS

CSP 27+535 √ √ BEBAS

CSP 28+550 √ √ BEBAS


CSP 37+294 √ X BELUM BEBAS
CSP 39+495 √ X BELUM BEBAS
CSP 40+136 √ X BELUM BEBAS
CSP 40+573 √ X BELUM BEBAS
CSP 40+948 X X Review Desain Perubahan Struktur dari Underpass menjadi CSP oleh Konsultan Perencana BELUM BEBAS
CSP 42+015 √ √ BEBAS
CSP 44+250 √ X BELUM BEBAS
CSP 47+567 √ X BELUM BEBAS

4 BOX UNDERPASS

BUP 48+711 √ √ BEBAS

BUP 49+230 X X Review Desain Penyesuaian Kemiringan BUP terhadap Frontage Jalan Desa oleh Konsultan Perencana BEBAS

B MAINROAD

1 REST AREA X X Proses Penggambaran oleh Konsultan Perencana

2 PLAN PROFILE MAINROAD STA 23+525 S/D 49+450 √ X Plan Profile Approve STA 24+150 S/D 26+950
DAFTAR SHOP DRAWING APPROVED

ITEM PEKERJAAN URAIAN PROSES HKI KONSULTAN HKJT STATUS KETERANGAN


REV.0 REV.0 REV.0

BOX CULVERT
» STA 23+550
DENAH DAN POTONGAN MELINTANG BOX
DETAIL PENULANGAN BOX
DETAIL POTONGAN APRON
DETAIL PENULANGAN APRON
DETAIL POTONGAN WINGWALL
DETAIL PENULANGAN WINGWALL
DETAIL POTONGAN HEADWALL
DETAIL PENULANGAN HEADWALL
GRANULAR BACKFILL

» STA 23+786
DENAH DAN POTONGAN MELINTANG BOX
DETAIL PENULANGAN BOX
DETAIL POTONGAN APRON
DETAIL PENULANGAN APRON
DETAIL POTONGAN WINGWALL
DETAIL PENULANGAN WINGWALL
DETAIL POTONGAN HEADWALL
DETAIL PENULANGAN HEADWALL
GRANULAR BACKFILL

» STA 24+432 APPROVED

» STA 24+684 APPROVED

» STA 25+372 APPROVED

» STA 25+550 APPROVED

» STA 26+175 APPROVED

» STA 26+745 APPROVED

» STA 27+520 APPROVED

» STA 28+205 APPROVED

» STA 28+420 APPROVED

» STA 28+689 APPROVED

» STA 29+096
DENAH DAN POTONGAN MELINTANG BOX
DETAIL PENULANGAN BOX
DETAIL POTONGAN APRON
DETAIL PENULANGAN APRON
DETAIL POTONGAN WINGWALL
DETAIL PENULANGAN WINGWALL
DETAIL POTONGAN HEADWALL
DETAIL PENULANGAN HEADWALL
GRANULAR BACKFILL

» STA 30+076 APPROVED

» STA 30+750 APPROVED

» STA 38+140 APPROVED

» STA 48+300 APPROVED

» STA 48+690 APPROVED

» STA 49+205 APPROVED

» STA 49+394.81 APPROVED

STRUKTUR
» UNDERPASS STA 26+468 APPROVED

» UNDERBRIDGE STA 29+693


PLAN PROFILE √ √ ASISTENSI HKJT Review Finish Grade, Revisi Potongan Memanjang (dibikin 3 potongan)
KOORDINAT TITIK PANCANG √ √ √ APPROVED
DENAH DAN POTONGAN ABUTMENT A1 √ ASISTENSI KONSULTAN Review Finish Grade
DETAIL PENULANGAN FOOTING ABUTMENT A1 √ ASISTENSI KONSULTAN Revisi Pembesian (pembesian footing diberi stek untuk sambungan dinding abutment)
DETAIL PENULANGAN DINDING ABUTMENT A1 √ ASISTENSI KONSULTAN Review Finish Grade
DETAIL PENULANGAN WINGWALL ABUTMENT A1 √ ASISTENSI KONSULTAN Review Finish Grade
DETAIL PENULANGAN PELAT INJAK A1 √ √ ASISTENSI HKJT
DENAH DAN POTONGAN ABUTMENT A2 √ ASISTENSI KONSULTAN Review Finish Grade
DETAIL PENULANGAN FOOTING ABUTMENT A2 √ ASISTENSI KONSULTAN Revisi Pembesian (pembesian footing diberi stek untuk sambungan dinding abutment)
DETAIL PENULANGAN DINDING ABUTMENT A2 √ ASISTENSI KONSULTAN Review Finish Grade
DETAIL PENULANGAN WINGWALL ABUTMENT A2 √ ASISTENSI KONSULTAN Review Finish Grade
DETAIL PENULANGAN PELAT INJAK A2 √ √ ASISTENSI HKJT
DENAH DAN POTONGAN PIER P1 √ ASISTENSI KONSULTAN Review Finish Grade
DETAIL PENULANGAN FOOTING PIER P1 √ ASISTENSI KONSULTAN Revisi Pembesian (pembesian footing diberi stek untuk sambungan kolom)
DETAIL PENULANGAN KOLOM PIER P1 √ ASISTENSI KONSULTAN Review Finish Grade
DETAIL PENULANGAN PIER HEAD P1 √ √ ASISTENSI HKJT
DETAIL OPRIT JEMBATAN
DENAH DAN POTONGAN ANGKUR (FIX DAN MOVE)
KOORDINAT ANGKUR (FIX DAN MOVE)
DETAIL ANGKUR (FIX DAN MOVE)
DETAIL MORTAR DAN BEARING PAD
DETAIL GIRDER
DENAH DAN POTONGAN DIAFRAGMA
DETAIL PENULANGAN DIAFRAGMA
DENAH BONDEK
DENAH DAN DETAIL BONDEK
DENAH DAN POTONGAN PELAT LANTAI
DETAIL PENULANGAN PELAT LANTAI
DENAH DAN POTONGAN PARAPET
DETAIL PENULANGAN PARAPET
DENAH EXPANSION JOINT
DETAIL EXPANSION JOINT
DENAH DAN POTONGAN PIPA DIA 20"
DENAH DAN POTONGAN PIPA DIA 15"
DENAH DECK DRAIN
SLOPE PROTECTION

» UNDERPASS STA 30+112


PLAN PROFILE √ √ ASISTENSI HKJT Review Finish Grade, Revisi Potongan Memanjang (dibikin 3 potongan)
KOORDINAT TITIK PANCANG √ √ √ APPROVED
DENAH DAN POTONGAN ABUTMENT A1 √ ASISTENSI KONSULTAN Review Finish Grade
DETAIL PENULANGAN FOOTING ABUTMENT A1 √ ASISTENSI KONSULTAN Revisi Pembesian (pembesian footing diberi stek untuk sambungan dinding abutment)
DAFTAR SHOP DRAWING APPROVED

ITEM PEKERJAAN URAIAN PROSES HKI KONSULTAN HKJT STATUS KETERANGAN


REV.0 REV.0 REV.0

DETAIL PENULANGAN DINDING ABUTMENT A1 √ ASISTENSI KONSULTAN Review Finish Grade


DETAIL PENULANGAN WINGWALL ABUTMENT A1 √ ASISTENSI KONSULTAN Review Finish Grade
DETAIL PENULANGAN PELAT INJAK A1 √ √ ASISTENSI HKJT
DENAH DAN POTONGAN ABUTMENT A2 √ ASISTENSI KONSULTAN Review Finish Grade
DETAIL PENULANGAN FOOTING ABUTMENT A2 √ ASISTENSI KONSULTAN Revisi Pembesian (pembesian footing diberi stek untuk sambungan dinding abutment)
DETAIL PENULANGAN DINDING ABUTMENT A2 √ ASISTENSI KONSULTAN Review Finish Grade
DETAIL PENULANGAN WINGWALL ABUTMENT A2 √ ASISTENSI KONSULTAN Review Finish Grade
DETAIL PENULANGAN PELAT INJAK A2 √ √ ASISTENSI HKJT
DETAIL OPRIT JEMBATAN
DENAH DAN POTONGAN ANGKUR (FIX DAN MOVE) √ √ ASISTENSI HKJT
KOORDINAT ANGKUR (FIX DAN MOVE)
DETAIL ANGKUR (FIX DAN MOVE)
DETAIL MORTAR DAN BEARING PAD
DETAIL GIRDER √ √ √ APPROVED
DENAH DAN POTONGAN DIAFRAGMA √ √ √ APPROVED
DETAIL PENULANGAN DIAFRAGMA √ √ √ APPROVED
DENAH BONDEK √ √ √ APPROVED
DENAH DAN DETAIL BONDEK √ √ √ APPROVED
DENAH DAN POTONGAN PELAT LANTAI
DETAIL PENULANGAN PELAT LANTAI
DENAH DAN POTONGAN PARAPET
DETAIL PENULANGAN PARAPET
DENAH EXPANSION JOINT
DETAIL EXPANSION JOINT
DENAH DAN POTONGAN PIPA DIA 20"
DENAH DAN POTONGAN PIPA DIA 15"
DENAH DECK DRAIN
SLOPE PROTECTION

CSP
» STA 24+698 APPROVED

» STA 27+535 APPROVED

» STA 28+550 APPROVED

» STA 30+900 APPROVED DESAIN DIGANTI MENJADI UNDERPASS (NOTULEN RAPAT BERSAMA DINAS PU LANGKAT)

» STA 42+015 APPROVED

BUP
» STA 48+711 APPROVED

MAINROAD
MC-0 PLAN PROFILE MAINROAD STA 24+150 S/D 26+950 √ √ √ APPROVED
CROSS SECTION STA 24+150 S/D 25+375 √ √ √ APPROVED
CROSS SECTION STA 25+400 S/D 26+925 √ √ √ APPROVED
CROSS SECTION STA 26+950 S/D 28+000 √ √ √ APPROVED
CROSS SECTION STA 28+000 S/D 28+825 √ √ √ APPROVED
CROSS SECTION STA 41+000 S/D 48+000 √ √ ASISTENSI HKJT
CROSS SECTION STA 48+000 S/D 49+450 √ √ √ APPROVED
CROSS SECTION PRELOADING STA 24+750 S/D 25+000 √ √ √ APPROVED
DENAH PERKERASAN RIGID STA 24+100 S/D 29+300 √ √ √ APPROVED

MAINROAD
MC-100 CROSS SECTION STA 24+100 S/D 29+000
CROSS SECTION CHANGE MATERIAL STA 24+100 S/D 29+000
CROSS SECTION GEOTEXTILE STA 24+100 S/D 29+000
CROSS SECTION PRELOADING STA 24+750 S/D 25+000

DRAINASE
DENAH DAN POTONGAN MEMANJANG SALURAN SAMPING STA 24+100-28+475 √ √ √ APPROVED
PLAN DRAINASE DAN LONG MAINROAD STA 28+500 - 47+575
PLAN DRAINASE DAN LONG MAINROAD STA 47+600 - 49+450 √ √ √ APPROVED
PLAN CROSS DRAIN STA 24+100 - 29+000 √ √ APPROVED
PLAN CROSS DRAIN STA 29+025 - 48+000
DETAIL CROSS DRAIN RCP 60 cm STA 24+185 - 29+932 √ √ √ APPROVED
PLAN DAN DETAIL RCP STA 48+100 √ √ √ APPROVED
PLAN DAN DETAIL RCP STA 48+350 √ √ √ APPROVED
PLAN DAN DETAIL RCP STA 48+850 √ √ √ APPROVED

ROW ROW PLAN JALAN UTAMA STA 23+800-29+400 √ √ √ APPROVED


PLAN DAN KOORDINAT ROW STA 28+700-49+700 √ √ ASISTENSI HKJT
ROW PLAN JALAN UTAMA STA 25+200 - 25+900 (JALAN DESA) √ √ √ APPROVED

LAIN-LAIN
FRONTAGE JALAN DESA STA 25+350 S/D 26+400 √ √ √ APPROVED
FRONTAGE CSP STA 28+550 √ √ ASISTENSI HKJT Melengkapi Data Eksisting
SALURAN PASANGAN BATU KALI UP STA 26+468 √ √ APPROVED Dilengkapi Bak Kontrolnya
CROSS DRAIN UTILITAS LIMBAH PT.LNK √ √ √ APPROVED
SALURAN PASANGAN BATU KALI STA 25+372-25+550 √ √ √ APPROVED
BOX CULVERT SALURAN BAWAH FRONTAGE STA 26+468 √ √ √ APPROVED
PERTEMUAN SALURAN TRAP, BAK KONTROL DAN SELUNCUR √ √ √ APPROVED
DETAIL PERTEMUAN RCP DIA 60 DENGAN DS-1 √ √ √ APPROVED
PLAN SETTLEMENT PLATE STA 24+750 - 25+000 √ √ √ APPROVED

PROVISIONAL SUM
PLAN RELOKASI KABEL PLN STA 24+689 (Titik 1) √ ASISTENSI KONSULTAN Sebagai Gambar Informasi
PLAN RELOKASI KABEL PLN STA 26+450 (Titik 2) √ ASISTENSI KONSULTAN Sebagai Gambar Informasi
PLAN RELOKASI KABEL PLN STA 28+420 (Titik 3) √ ASISTENSI KONSULTAN Sebagai Gambar Informasi
PLAN RELOKASI KABEL PLN STA 30+900 (Titik 4) Sebagai Gambar Informasi
PLAN RELOKASI KABEL PLN STA 36+950 (Titik 5) Sebagai Gambar Informasi

TIPIKAL
TYPICAL CROSS SECTION (SAMA DENGAN ZONA 2)
TYPICAL PERKERASAN RIGID (SAMA DENGAN ZONA 1)
TYPICAL SALURAN (ZONA 3) √ √ √ APPROVED
TYPICAL PAGAR RUMIJA (KAWAT BERDURI) SAMA DENGAN ZONA 1
TYPICAL PERTEMUAN GUARDRAIL DENGAN PARAPET SAMA DENGAN ZONA 1
TIPIKAL CONCRETE BARRIER TIPE A √ √ APPROVED
TIPIKAL SALURAN CSP √ √ √ APPROVED
TIPIKAL MEDIAN CROSS DRAIN √ √ APPROVED
DETAIL SPUNPILE √ √ APPROVED
Evaluasi Desain Box Culvert STA 23+500 - 37+000

DIMENSI STATUS GAMBAR


LEBAR SUNGAI TINGGI
PANJANG FINALISASI UPDATE STATUS 3 TGL
(bawah) TIMBUNAN DATA RENCANA SETELAH JOINT
NO URAIAN STA DED Qty x P x L ALASAN PENGAJUAN PROSES HKI HKJT
UKUR AWAL SURVEY
PLAN PLAN
m m m 15-01-20 FRAME BARLIST LAIN2 FRAME BARLIST LAIN2
PROFILE PROFILE

1 Drain Balance 23+550 1 x 2 x 2 - 8.69 BELUM 69.2 Ada

2 Drain Sawit 23+786 1 x 2 x 2 - 3.87 BELUM 50.7 Ada

Aliran air dari Sta kecil bisa


3 Drain Sawit 24+147 1 x 2 x 2 - 6.14 BELUM 62.5 Ada Dihilangkan dialirkan langsung ke
saluran samping
Panjang ujung Wingwall mengikuti
4 Drain Sawit 24+432 1 x 2 x 2 - 5.21 OK 57.76 Ada Tetap DIKERJAKAN √ √ √ Rev 2
dasar slope kaki timbunan
7/1/2021

Berubah dimensi Panjang ujung Wingwall mengikuti


5 Drain Sawit 24+684 1 x 2 x 2 - 6.61 OK 68.53 Ada
menjadi 1 x 2.5 x 2.5 √ √ √ Rev 2
dasar slope kaki timbunan
7/1/2021

Pengalihan aliran air dari


Rencana Geser ke
6 Drain Sawit 25+000 2 x 2 x 2 - 6.16 OK 59.88 Ada
Sta. 25+372
Sta 24+684 dibuang ke Sta √ √ √ Rev 2
25+372
Panjang ujung Wingwall mengikuti
7 Drain Sawit 25+372 2 x 2 x 2 - 2.48 OK 48.20 Ada Tetap DIKERJAKAN √ √ √ Rev 2
dasar slope kaki timbunan
7/1/2021

8 Drain Sawit 25+550 2 x 2 x 2 - 3.95 OK 54.06 Ada Tetap

Rencana Geser ke Sta


9 Drain Sawit 25+787 1 x 2 x 2 - 7.43 OK 74.3 Ada
25+550
Aliran air berada di Sta Panjang ujung Wingwall mengikuti
10 Drain Balance 26+131 1 x 2 x 2 - 4.45 OK 56.07 Ada Geser ke Sta 26+175
26+175
DIKERJAKAN √ √ √ Rev 1
dasar slope kaki timbunan
7/1/2021

Panjang ujung Wingwall mengikuti


11 Drain Sawit 26+745 2 x 2 x 2 - 4.55 OK 61.1 Ada Tetap DIKERJAKAN √ √ √ Rev 2
dasar slope kaki timbunan
7/1/2021

Hanya terdapat aliran air


12 Drain Balance 27+200 1 x 2 x 2 - 2.97 OK 43.8 Ada Dihilangkan
kecil
Berubah dimensi Panjang ujung Wingwall mengikuti
13 Drain Sawit 27+520 2 x 1.5 x 1.5 - 5.64 OK 62.2 Ada
menjadi 1 x 2 x 2 √ √ √ Rev 2
dasar slope kaki timbunan
7/1/2021

Hanya terdapat aliran air


14 Drain Sawit 27+947 1 x 2 x 2 - 2.86 OK 45 Ada Dihilangkan
kecil
Panjang ujung Wingwall mengikuti
15 Drain Sumber Rejo 1 28+210 2 x 3 x 3 7.15 4.17 OK 48.7 Ada Tetap DIKERJAKAN √ √ √ Rev 2
dasar slope kaki timbunan
7/1/2021

Panjang ujung Wingwall mengikuti


16 Drain Sawit 28+420 1 x 2 x 2 - 5.35 OK 70.7 Ada Tetap DIKERJAKAN √ √ √ Rev 2
dasar slope kaki timbunan
7/1/2021

Panjang ujung Wingwall mengikuti


17 Drain Sawit 28+689 1 x 2 x 2 - 5.83 OK 60.5 Ada Tetap DIKERJAKAN √ √ √ Rev 1
dasar slope kaki timbunan
7/1/2021

18 Drain Sawit 29+096 2 x 2 x 2 - 2.78 BELUM 47 Ada

Potrebbero piacerti anche