COSTS FOR GENERAL CONDITIONS WORK MATRIX


Direct Costs/GC Work Costs Matrix
Construction costs/Paid by Owner Description Direct Cost of the Work General Conditions Work X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X N X X X X X X X X X X X X X X X X X X X X X X X X X Costs included in CM/G C Fee

Misc. Costs Paid by Owner

Costs Related to CM Staffing & Job Office 1 Project Superintendent 2 Area Superintendents 3 Project Executive (for project specific time only) 4 Senior Project Manager (for project specific time only) 5 Project Manager 6 Project Engineers 7 Field Engineers 8 Project Admin 9 Scheduler (for project specific time only) 10 MEP Coordinator (for project specific time only) 11 LEED Coordinator (for project specific time only) 12 Safety Coordinator (for project specific time only) 13 Detailer 14 Accounting/Data Processing 15 Payroll Accountant 16 Surveying 17 Benefits 18 Vacation Time 19 Travel, Hotel, Meals, etc. (in accordance with OUS 20 Sick Leave 21 Bonuses 22 Jobsite Office material costs and expendables 23 Warranty 24 Corrective/Non-conforming repair 25 Corrective work not due to contractor default 26 PM auto rental 27 PM auto fuel/maintenance 28 Project Superintendent truck rental 29 Project Superintendent truck fuel/maintenance 30 Office Trailer Rental 31 A/E Temp Office Rental 32 Office Furniture/Equipment 33 Blueprints for sub bidding 34 Blueprints for day-to-day job operations 35 Postage/FedEx 36 Project Photos 37 Personal Comupters/software 38 General Contractor Bond 39 Subcontractor Bonds 40 Insurance GL (in accordance with OUS contract only) 41 Insurance All Risk 42 Soils report 43 Testing and Inspections 44 Facility training 45 Building Permits/Fees 46 Development Permits/fees 47 Principal in Charge 48 Estimating 49 Value engineering 50 Corporate accounting 51 Corporate safety officer 52 Main office administration 53 Corporate IT director 54 Legal 55 Main office payroll costs 56 Main office fringe/bonus costs Costs Related to COW Activities & Craft Labor 57 Construction Wages for trade labor 58 Labor Burden for trade labor 59 Subcontracts 60 Material & Equipment related to craft labor & site logistics 61 Rental-Contractor Owned equip (less than $2000 will be purchased)

X* X* X X X*

CM/GC Contract Form (4/09)

(574022)

62 Small Tools (less than $2000 will be purchased) 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 Flatbed truck rental/operation Flatbed truck fuel/maintenance Water truck Air Compressor Water pumping equipment Other dewatering equipment Equipment rental -third party Storage Trailer rental Temporary Toilets Project Signage Temporary Fencing Barricades Temporary Enclosures Temporary Stairs Opening Protection Safety railing and nets Drinking water (NOT coffee) Safety equipment for CMGC personnel. Subs provide own in COW.

X* X X X X X X X X X X X X X X X X X X X

81 First Aid supplies for CMGC personnel. Subs provide own in COW. 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 Security Weather protection Mobilization/Demobilization Parking/Shuttles Telephone Installation Telephone Bills Temp utilities hookup Temp utility bills Periodic Cleanup Final cleanup Dump permits/fees Trash removal/Hauling Flagging/Traffic control Dust Control Trash chute Trade permits Manlift Materials and Rental Manlift Erect/Dismantle Manlift operator Crane rental X* X X

X X X X X X X X X X X X X X X X X