Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
6)
Strategic Storage of Crude Oil Project Commercial Questionnaire
Civil Works for Underground Rock Caverns Page 1 of 5
SUB-SECTION A-1.6
COMMERCIAL QUESTIONNAIRE
Indian Strategic Petroleum Reserves Ltd. Part-A (Sub-Section-A-1.6)
Strategic Storage of Crude Oil Project Commercial Questionnaire
Civil Works for Underground Rock Caverns Page 2 of 5
S. BIDDER’s REPLY/
EIL’s QUERRY
No. CONFIRMATION
S. BIDDER’s REPLY/
EIL’s QUERRY
No. CONFIRMATION
included in your price as per
provisions of Bidding Document, has
been included by you in your
lumpsum quoted price
10. Confirm your acceptance for critical
stipulations of the Bidding Document
as per clause no. 23.3 of Instruction
to Bidders.
11. Confirm that your Bid is substantially
responsive to the requirements of the
Bidding Document, and you have not
stipulated any material deviation
and submitted all details as specified
in the Bidding Document.
12. Confirm that while proposing the list
of construction equipments, you
have considered the minimum
construction equipments as indicated
in Technical Bid Evaluation Criteria
under Special Instructions to
Bidders.
13. Confirm that you have proposed
adequate project/site organisation
with qualified supervisory personnel
having sufficient experience.
14. Confirm that all costs resulting from
safe execution of Work, such as
safety induction, use of protective
clothing, safety glasses and helmet,
safety precaution taken during
monsoon, or any other safety
measures to be undertaken by the
CONTRACTOR for execution of
Work are included in the Lumpsum
Price.
15. Please confirm that all safety rules &
regulations as mentioned in Bidding
Document or notified at later date by
OWNER during execution shall be
adhered by CONTRACTOR within
Quoted Price.
16. Confirm that the safety precautions
shall be followed by CONTRACTOR
as mandatory as per Section A-3.11
of Bidding Document.
17. Confirm the following: -
"The planning schedule, S-curves,
manpower estimates, construction
Indian Strategic Petroleum Reserves Ltd. Part-A (Sub-Section-A-1.6)
Strategic Storage of Crude Oil Project Commercial Questionnaire
Civil Works for Underground Rock Caverns Page 4 of 5
S. BIDDER’s REPLY/
EIL’s QUERRY
No. CONFIRMATION
equipment deployment schedule etc;
submitted by the bidder with his bid,
are indicative and shall not be basis
for extra compensation in case
actual needs are higher.
Detailed planning schedule
developed by CONTRACTOR after
Contract award may be subject to
fluctuations depending upon actual
progress of the project and available
Work front.
Co-ordination and making available
by CONTRACTOR of all staff,
manpower, construction equipment,
tools, cranes, etc. and materials as
required for a timely completion of all
Work as per OWNER's construction
and priority schedule and in
accordance with the available Work
front are to be included in the
pricing".
Notwithstanding the above provision,
the bidder shall submit these details
in accordance with the volume of
work, which may be reviewed and
commented by us during pre award
stage/ post award stage.
S. BIDDER’s REPLY/