Sei sulla pagina 1di 2

Transfield Philippines vs Luzon Hydro Electric Corp.

(GR No 146717, Nov 22, 2004, Tinga) Transfield entered into a turn-key contract with Luzon Hydro Corp. (LHC). Under the contract, Transfield were to construct a hydro-electric plants in Benguet and Ilocos. The contract provides for a period for which the project is to be completed and also allows for the extension of the period provided that the extension is based on justifiable grounds such as fortuitous event. In order to guarantee performance by Transfield, two stand-by letters of credit were required to be opened. During the construction of the plant, Transfield requested for extension of time citing fortuitous events brought about by typhoon, barricades and demonstration. LHC did not give due course to the extension of the period prayed for but referred the matter to arbitration committee. In the meanwhile, because of the delay in the construction of the plant, LHC called on the stand-by letters of credit because of default. However, the demand was objected by Transfield on the ground that there is still pending arbitration on their request for extension of time. LHC invoked the independence principle. On the other hand, Transfield claims fraud on the part of LHC on calling the stand-by letters of credit. Under the independence principle, a LC accommodation is entirely distinct and separate, independent agreement. It is not supposed to be affected by the main contract upon which it rests. The court held for the LHC. Following the independence principle, even granting that there is still issue to be resolved arising from the turn-key project. This issue is not supposed to affect the obligation of the bank to pay the letter of credit in question. The court stressed that a LC accommodation is intended to benefit not only the beneficiary therein but the applicant thereon. On the issue of fraud, the SC held that there is nothing in the turn-key contract which states that all issues between the parties must be resolved first before LHC can call on the stand-by LC but the contract provides that if Transfield defaults, then LHC can call on these stand-by LC.

Potrebbero piacerti anche