Department: Chemical and General Safety Program: Hoisting and Rigging Owner: Program Manager Authority: ES&H Manual, Chapter 41, Hoisting and Rigging 1 The requirements of Chapter 41, Hoisting and Rigging, will be phased in according to the following schedule.
Section Number 5 5.1 5.1.1 Section Title Requirements General Equipment Cranes & hoists Miscellaneous lifting fixtures and rigging hardware & accessories 5.1.1.1 Equipment Custodian Cranes & hoists Miscellaneous lifting fixtures and rigging hardware & accessories Review of Cranes & hoists Conformance Miscellaneous lifting fixtures and rigging hardware & accessories Equipment Cranes & hoists Submit Review of Conformance (ROC) Submit ROC Existing Existing Immediate 12/31/2007 1910.179(e)(4), 1910.179(i) 1926.251(b)(3) Requirement Note Status Existing Effective Date Immediate Schedule Note (*29 CFR unless otherwise noted) ES&H Chap 1,2

Designate custodian for all equipment Remove non-compliant equipment from service

Existing Existing

Immediate 12/31/2007

1910.179(b)(8)

5.1.1.2

Submit ROC for new equipment Submit ROC documentation for existing compliant equipment to HR database manager Prior approval from the Earthquake

New New

5/18/2008 5/18/2008

1910, 1915,1926 1910, 1915,1926

5.1.1.3 1

Existing

Immediate

1910.179(b)(2)

SLAC Environment, Safety, and Health Manual (SLAC-I-720-0A29Z-001), Chapter 41, Hoisting and Rigging, http://wwwgroup.slac.stanford.edu/esh/hazardous_activities/hoisting_rigging/policies.htm

15 May 2007 (updated 15 May 2007)

SLAC-I-730-0A21M-004-R000

1 of 6

Hoisting and Rigging: Implementation Plan

Section Number

Section Title Procurement and Fabrication Miscellaneous lifting fixtures and rigging hardware & accessories Cranes & hoists Miscellaneous lifting fixtures and rigging hardware & accessories Cranes & hoists Miscellaneous lifting fixtures and rigging hardware & accessories Cranes & hoists Miscellaneous lifting fixtures and rigging hardware & accessories Cranes & hoists

Requirement Note Safety Citizen Committee and the H&R Citizen Committee

Status

Effective Date

Schedule Note (*29 CFR unless otherwise noted)

Existing

Immediate

1910.179(b)(2)

5.1.1.4

Identification

CEF CRN# CEF CRN# or unique identification number CEF crane database H&R database

Existing New

12/31/2007 05/31/2008

1926.251(b)(1)

5.1.1.5

Registration

Existing Existing

Immediate 12/31/2007

1910.179(b)(2) 1910.179(b)(2)

5.1.1.6

Tracking

CEF crane database

Existing

5/18/2008 12/31/2007

CEF H&R database or custodian records New

5.1.1.7

Inspections

Only equipment bearing a current SLAC Existing H&R inspection tag may be used New

12/31/2007 05/31/2008

1910.179(j)(1)(ii)(a) & 1910.179(j)(1)(ii)(b) 1926.251(b)(6)(i), 1910.179(j)(2)(iii)

Miscellaneous Hooks lifting fixtures and rigging hardware & accessories 5.1.1.8 Testing Cranes & hoists Miscellaneous lifting fixtures and rigging hardware

Existing New

12/31/07 05/18/2008

1910.179(k)(1), 1926.251(c)(15)(ii) 1910.179(k)(1), 1926.251(c)(15)(ii)

15 May 2007 (updated 15 May 2007)

SLAC-I-730-0A21M-004-R000

2 of 6

Hoisting and Rigging: Implementation Plan

Section Number 5.1.1.9 5.1.1.10

Section Title & accessories Rented Equipment Maintenance, Modification, Repair Cranes & hoists

Requirement Note

Status Existing Existing New

Effective Date Immediate 12/31/2007 05/18/2008

Schedule Note (*29 CFR unless otherwise noted) 8 CCR Article 98, 99 1910.179(b)(3) 1910.179(k)(1), 1926.251(c)(15)(ii)

Miscellaneous Perform inspections. Rigging hooks not lifting fixtures and part of assembly rigging hardware & accessories No free rigging

5.1.1.11 5.1.1.12 5.1.2 5.1.2.1 5.1.3 5.1.3.1 5.1.3.2 5.1.3.3 5.1.3.4 5.1.3.5 5.1.4

Approval to Use a Forklift as a Hoist Storage Loads Manufacturer-provided Lift Points Lifts Initiating Classifying Planning Performing Lifting Personnel Subcontractors

Existing New Existing Existing Existing Existing Existing Existing New Existing Existing

Immediate 5/18/2009 Immediate Immediate Immediate Immediate Immediate Immediate 12/31/2007 Immediate 12/31/2007

1910.178(a)(4), 1910.178(a)(5) DOE-STD-1090

ES&H Chapter 2 DOE-STD-1090 ES&H Chapter 2 OSHA Field Operations Manual (FOM), Chapter V, Section F (Multi-employer Worksites) OSHA Field Operations Manual (FOM), Chapter V, Section F (Multi-employer Worksites)

5.1.4.1

Subcontractor Personnel

Existing

12/31/2007

15 May 2007 (updated 15 May 2007)

SLAC-I-730-0A21M-004-R000

3 of 6

Hoisting and Rigging: Implementation Plan

Section Number 5.1.4.2 5.1.4.3 5.1.4.4 5.1.5 5.1.5.1 5.1.5.2 5.1.5.3 5.1.6 5.1.6.1 5.1.6.2 5.1.6.3 5.1.6.4 5.1.6.5 5.1.6.6 5.1.6.7 5.1.6.8 5.1.6.9 5.1.6.10 5.1.6.11 5.1.6.12 5.1.6.13

Section Title Lift Classification and Planning Work Plan Approval Performing the Lift Personnel Qualifications Personal Protective Equipment Medical Surveillance Roles and Responsibilities H&R Program Manager Hoisting and Rigging Citizen Committee The Crane Maintenance and Inspection Group Line Management First-line Supervisor Load Owners Equipment Custodians Crane Custodians Persons-in-Charge Operators Designated Leader H&R Inspector Crane Inspectors

Requirement Note

Status Existing Existing Existing Existing Existing Existing Existing Existing Existing

Effective Date 12/31/2007 12/31/2007 Immediate Immediate Immediate Immediate Immediate Immediate Immediate Immediate Immediate 12/31/2007 Immediate Immediate Immediate 12/31/2007 12/31/2007 12/31/2007 Immediate

Schedule Note (*29 CFR unless otherwise noted) ES&H Chapter 2

1910.180(b)(3), ES&H Chapter 2 ES&H Chapter 19, ES&H Chapter 2 ES&H Chapter 2 1910.179(b)(8)

Clearly define roles & responsibilities for Existing H&R activities in their organization Existing Existing Existing Existing Existing Existing Existing Existing Existing

1910.179(b)(8), ES&H Chapter 2 1910.179(b)(8), ES&H Chapter 2

1910.179(n)(3)(ix)

15 May 2007 (updated 15 May 2007)

SLAC-I-730-0A21M-004-R000

4 of 6

Hoisting and Rigging: Implementation Plan

Section Number 5.1.6.14 5.1.6.15 5.1.6.16 5.1.6.17 5.1.6.18 5.2 5.2.1 5.2.1.1

Section Title Plate V Inspectors Crane Maintenance Supervisor Designers ES&H Building and Construction Safety Group University Technical Representatives Procedures and Specific Requirements Equipment Review of Conformance

Requirement Note

Status Existing Existing New Existing Existing

Effective Date Immediate Immediate 12/31/2007 Immediate 12/31/2007

Schedule Note (*29 CFR unless otherwise noted)

Updated training

Cranes & hoists Structural weld inspection Miscellaneous lifting fixtures and rigging hardware & accessories Structural weld inspection

New New

5/18/2008 5/18/2008

1910, 1915,1926 1910, 1915,1926

5.2.1.2

Equipment Cranes & hoists Purchasing Guidelines, ROC Procurement and Miscellaneous Purchasing Guidelines, ROC Fabrication lifting fixtures and rigging hardware & accessories Inspections Cranes & hoists Inspection and Maintenance Requirements Miscellaneous lifting fixtures and rigging

New New

5/18/2008 5/18/2007

DOE-STD-1090 DOE-STD-1090

5.2.1.3

Existing New

12/31/2007 5/18/2008

15 May 2007 (updated 15 May 2007)

SLAC-I-730-0A21M-004-R000

5 of 6

Hoisting and Rigging: Implementation Plan

Section Number

Section Title hardware & accessories

Requirement Note

Status

Effective Date

Schedule Note (*29 CFR unless otherwise noted)

5.2.1.4

Maintenance, Modification, Repair

Cranes & hoists Inspection and Maintenance Requirements Miscellaneous lifting fixtures and rigging hardware & accessories

Existing New

12/31/2007 05/31/2008

5.2.2 5.2.3 5.2.3.1 5.2.3.2 5.2.3.3 5.2.3.4 5.2.4 5.3 5.3.1 5.3.2 5.3.3 5.3.4 5.3.5 5.3.6

Loads Lifts Classifying Planning Performing Lifting of Personnel Subcontractors Training Operator and No-load Operator Mobile Crane Operator Professional Rigger H&R Inspector Crane Inspector Crane Maintenance Personnel Lift Planning and Control Guidelines

Existing Existing Existing Existing Existing Existing Existing Existing Existing Existing Existing Existing Existing

Immediate Immediate Immediate Immediate Immediate Immediate Immediate Immediate 12/31/2007 12/31/2007 12/31/2007 Immediate Immediate ES&H Chap 42, 49 DOE-STD-1090 DOE-STD-1090