PROFESSIONAL PROFILE

KHURRAM MASOOD
STATIC EQUIPMENT AND STEAM BOILER DESIGN ENGINEER jaankhurram@gmail.com, +92-312-

7748279

(Bridging the Gap between Technology and Design)

Professional Review
More than 4 years experience in Conceptual Studies, Basic Engineering/Front End Design Engineering, Designing, Operation and Fabrication of Steam Boilers, Pressure vessels, Storage Tanks, Columns, Separators, LPG Bowsers, Design-Erection of Biomass Fired Power Plants Sound practical knowledge of design considerations, operation procedures, and maintenance issues of Biomass Fired Steam Boilers and RO Plants

Objective
To obtain mid career level position, requiring strong analytical and organizational skills in Engineering department that may help me further develop my engineering knowledge and practical experience

Skill Summary
Design & Detailed Engineering, Greenfield as well as Brownfield Experience Solid modeling and product design by using software like PRO-E, SOLID WORKS,3D STUDIO MAX Preparation of Mechanical design data sheet for Boiler, Pressure vessels, Heat exchangers, And Storage tanks Preparation of Technical Specifications, MR and PR for Boiler, Pressure Vessels, Heat exchangers & Storage tanks Design & Detailed Engineering of Boiler & Pressure vessel with U and S Stamp Requirement Performing Strength calculations & Analysis of Pressure vessels Heat exchangers & Storage Tanks both manually and by PV-Elite, Tank3.2 software Performing Thermal Design Calculation, Manual Strength Calculation By Using ASME, PD5500, API 650,620 Reviewing vendors Drawing/Documents and preparing Technical Queries Preparation of General arrangement drawings and detailed fabrication drawings Reviewing and Approval of Pressure vessel & Tank Internals & Externals attachment drawings Co-ordinate with Process/Project System/Piping/Civil/Instrumentation/Electrical in Finalizing Conceptual Studies of ASME, API, TEMA, BS 5500, EN13445 & client reference standard to fulfill Client & code requirements (U, S-Stamp) Field of Experience: Mechanical Design & Detailing of Boiler (ASME SEC I), Pressure Vessel (ASME SEC III) Div-1,2),Tanks(API 650,620), Heat Exchanger (ASME), with Software like PVElite, Tank 3.2, KED: Process Plant/Boiler Thermal Design Software

Operation and maintenance of power boilers (RETROFITTING AND OPTIMISATION OF Biomass BOILERS)

Work Experience
Worked as Lead Design/ Project Engineer from October, 2010 to April 2011 in Prestige Mechanical
Complex Lahore (Biomass Fired Steam Boiler and Power Solution Provider)

Worked as Design/Production Engineer (Fabrication) in PETROSIN Ravi Industries (Pvt) Limited


from Jan, 2009 to August,2010

Worked as Design Engineer for Steam Boilers and Pressure vessels in Descon Engineering Limited
from 2nd of October, 2007 to Dec 2008

Two months internship in MS Industries Sahiwal Three month practical work for my final year project in Packages Private Limited

Design Expertise Areas


I have the following responsibilities as design engineer at PMC Group, Petrosin Ravi Industries and Descon Engineering Limited Technically evaluate quotations / specifications / drawings / data sheets of all equipments and arrange design data required from vendor Boiler Complete Mechanical Design which Includes Boiler Geometry Finalization Material Selection Pressure Parts Stress Calculation as per Code (ASME) Pressure Parts Specification Sheets Generation Ducting Design Support Structure Design (AISC) Stack Design (STS 2000) Assist in Preparation & Checking of fabrication and Erection Drawings Boiler House Layout Drawings Boiler Fabrication Drawings Structure and Platform Drawings Economizer, Air Pre-heater & De-aerator Drawings Air & Flue Gas Ducting Boiler Foundation Drawings Piping Plans and Isometrics Complete boiler Design including Stress Calculation of Pressure Parts, Non Pressure parts, Ducting, Structure, Civil Loadings and Piping along with complete drawings generation

Planning of schedule maintenance and shut downs. Record keeping and spare parts planning.

Analysis of plant problems and finding solutions by system modification for optimum operation of the plant

Projects Completed
Currently working on 3 MW Integrated Coal Gasification combined Cycle power Plant with cooperation of Hangzhou Boiler China and DRL Power China for business in Pakistan

Design Member of 10 THP, 825PSI Double Drum D, type, Travelling Grate Water tube Boiler
with Jinan Boiler China at Kashmir Par-Boiling Plant Sialkot Erection of 10 THP, 825PSI Double Drum D, type Water tube Boiler with Jinan Boiler China Commissioning of 10 THP, 825PSI Double Drum D, type Water tube Boiler with Jinan Boiler China Designing of 3 TPH x 150 PSI Fire tube Type Waste Heat Recovery Boiler for Generator Exhaust for Super Asia Gujranwala Pakistan Designing of 5 TPH, 150 PSI Fire Tube type Waste Heat Recovery Boiler for Gas Generator Exhaust for Hira Textile Mills Gulberg III Lahore Design of 12TPH x 60 Bar Coal fired Water tube boiler for Rehman Confectionary Hub Baluchistan for power generation Designing of 10 TPH x 150 Psi Husk fired boiler for Season Canola Pakistan Designing of 6 TPH x 150 Psi Husk fired boiler for National Feed Pakistan Designing of 7 THP Gas Fired wetback, fire tube boiler for Moosa Pak Chemical Industries Multan Designing of 15TPH x 250 Psi water Tube Boiler for Kashmir Banaspati Pakistan Designing of 8 TPH x 400 Psi package type Water tube, Fix Grate type Boiler for Mehmood Agro, Hoor Ghee Mill Multan, Pakistan Member of design team for 50 TPH 54 Bar D Type Bi-Drum Design @Descon

1 MW husk fired combined heat and power plant in cooperation with QNP China and Jinan Boiler Group
China at Kashmir Rice Parboiling Sialkot as Project Manager @PMC Performing all proposal activities comprises of cost estimation (by means of sending MR to vendors and receiving brief proposal), load and dimension estimation, Man Hour estimation, planning, etc. for following projects: Responsibilities: I performed following tasks for that project Feasibility study of the project Prepared Piping Plans, Piping Layout, Equipment Layout, Reviewing P & ID, Equipment Drawings and Structural Drawings Carried out Detail design of Plant piping and Pipe lines Matching the load demand for the power output of plant Flow diagrams of the plant and process Design inputs and requirements for 10 TPH x 725PSI husk fired D type, Fix Grate water tube boiler to Hangzhou boiler Group for Design Fabrication of the 10 TPH x 725 PSI Boiler designed by Hangzhou Boiler Group in workshop as fabrication in-charge Proposal Preparation of Whole Project (EPC) Design inputs for 1.0 MW back pressure steam turbine to QNP China Purchase of the required design and 3 MW Steam Turbine from China

Erection of 1.0 TPH x 725PSI husk fired D type water tube boiler as project manager Installation of 1.0 MW Steam Turbine with QNP Engineers Calculation and Design of feed water tank, RO Plant, feed water pumps, process steam lines Commissioning of the 1.0 MW Husk Fired Combined Heat and Power Plant

1.5 MW husk fired combined heat and power plant in cooperation with QNP China and Hangzhou Boiler
Group China at Al- Amin Rice Parboiling Mill Arifwala Pakistan as Project Manager @ PMC Responsibilities: I performed following tasks for that project Feasibility study of the project Matching the load demand for the power output of plant Flow diagrams of the plant and process Design inputs and requirements for 10 TPH x 825PSI husk fired D type water tube boiler to Hangzhou boiler Group for Design Fabrication of the 10 TPH x 825 PSI Boiler designed by Hangzhou Boiler Group in workshop as fabrication in-charge Proposal Preparation of Whole Project (EPC) Design inputs for 1.5 MW back pressure steam turbine to QNP China Purchase of the required design and 1.5 MW Steam Turbine from China Erection of 10 TPH x 825PSI husk fired D type water tube boiler as project manager Installation of 1.5 MW Steam Turbine with QNP Engineers

Production In-charge

Manufacturing of one number of 30 TPH x 450Psi baggaas fired water tube boiler for Ashraf Sugar Mill Bahawalpur Pakistan Manufacturing of fifteen 10TPH x 150PSI package type wet-back boilers as workshop Production-In charge @ PMC Manufacturing of six 8TPH x 150PSI package type wet-back boilers as workshop Production-In charge Manufacturing of two 3TPH x 150PSI WHRSG boilers as workshop Production-In charge

DESIGN/FABRICATION ENGINEER @PETROSIN Ravi Industries (Pvt) Limited


Worked at (Kala Shah Kaku-Lahore) in Fabrication shop as Design cum Fabrication Engineer

Fabrication of SS material 110 Feet length Distillation Column for FFC Design, detailing and fabrication of Crude Oil Storage Tank (45m Dia) Mechanical design of Inlet Separator with design pressure internal 4500 KPa(g), Length 15000 mm, Dia 3500 mm, Horizontal, Semi Ellipsoidal heads 1st Stage 3-Phase Oil Separator 02nos 35mm Thickness for OGDC 20 MT 02nos LPG Bowzers for Eirad Gas Company 20MT 02nos LPG Bowzer for Pet Gas 25MT 10nos LPG Bowzer for Pet Gas Expansion project for POL Pindori site Oil Fields. 14 Vessels & column 50M-Ton LPG Bullets for POL (PRI-015) 3-Phase Low Temperature (33mm Thickness) Separator for OGDCL (PRI-008)

3-Phase Test Separator (44mm Thickness) Separator for OGDCL (PRI-010) 1st Stage 3-Phase Oil Separator (50mm Thickness) for OGDCL (PRI-011) 1st Stage 3-Phase Oil Separator 02 nos (50mm Thickness) for OGDCL (PRI-009) ASME Audit 2007 for PETROSIN workshop Structure Fabrication Of Kala Sha Kaku CNG Station Fabrication Of Vessels for OGDCL Qadir Pur Site

VARIOUS PROJECTS AS DESIGN ENGINEER



Design of Steel Structure improvement of the Rice Parboiling Plant Improvement of design of Husk firing System for Husk Fired package type Tube Boiler Pre-feasibility of production of electricity (Financial analysis, technical analysis, Emission analysis) through Multi fuel boiler & steam turbine (CHP) in Cooperation with DRL Power China Cost Evaluation of different fuels used in steam production Study on Fluidized-Bed-Combustion Boiler Exergy and Thermo-economic Analysis of Husk Fired power plant BAGASSE COMBUSTION IN SUGAR MILLS Study on recycling of municipal wastage for boiler firing for power generation Emission calculations of Husk fired power plant (Clean Development Mechanism) Feasibility study of two megawatt coal fire power plant for the replacement of Diesel fired generators in remote areas in co-operation with DRL Power Company China

Professional Strengths Include: AutoCAD 2010 2D-3D, 3D Max Studio Pro-E (wildfire 4)
Solid Edge

Ansys 10
Microsoft Office KED: Process Plant/Boiler Thermal Design Software

Fire Cad Steam Boiler design Software Certification of Pro-E Wildfire 3 from Pakistan Skill Development Council
Certification of AutoCAD 2D, 3D from PITAC Lahore Pakistan

Comprehensive knowledge of interpretation of ASME Section 1 Comprehensive knowledge of interpretation of ASME Section ix for welding and brazing

Study Projects

Final Project: Productivity measurement and enhancement of Lemanic Press (Packages Private Limited Lahore) with special reference to user complaints. TERM PROJECT 1: Analysis of energy utilization in service sectors using LEAP. Term project 2: Industrial Engineering: Internationalization of SMEs.

Codes & Standards Knowledge


ASME Section I ASME Section. VIII Division I ASME Section VIII Division II API 650 ASME B31.1, ASME B31.3 BS 5500 BS 2790 TRD (Technical Rules for Boiler Design - GERMAN Standard)

Educational Background B.E. Mechanical Engineering with specialization in Industrial and Manufacturing o (University of Engineering & Technology Lahore, Pakistan) 1St Div (2003 Fall Session) HSS (Pre Engineering) 2000-2002 o (Govt. College, Sahiwal) A+ Grade SSC (Science Group) 1998-2000
Availability Marital status Address Nationality N.I.C No. Passport No. Date of Birth Place of Birth Immediate Single Chak No. 90/6R, Sahiwal Pakistani 36502-4911173-7 BS0871731 11/08/1985 Sahiwal

References:
References will be provided on request