Sei sulla pagina 1di 27

SAP Consultant Certification SAP PLM

Certification - Solution Consultant


Certificate Name Duration (h)/ No. of questions 3 / 80 3 / 80 3 / 80 3 / 80 3 / 80 3 / 80 3 / 80 Software Components SAP ERP2005 (ECC 6.0) SAP ECC 5.0 SAP ERP Central Component 6.0 SAP R/3 Enterprise SAP R/3 Enterprise SAP R/3 Enterprise SAP R/3 Enterprise Booking Code (SAP internal) C_TPLM40_05 C_TPLM30_05 C_TPLM22_05 C_TPLM40_03 C_TPLM22_03 C_TPLM30_03 C_CS47_03

SAP PLM Quality Management (2005) PLM - Maintenance & Repair with SAP ERP 2005 PLM - Project Management with SAP ERP 2005 SAP PLM Quality Management (2003) SAP PLM - Project Management (2003) SAP PLM - Asset Life Cycle Management - Plant Maintenance (2003) SAP PLM - Asset Life Cycle Management - Customer Service (2003)

SAP Consultant Certification Solution Consultant PLM - Project Management with SAP ERP 2005
Software components: SAP ERP Central Component 6.0 Certification exam is included in course TPLM22 and is also offered in separate certification events at many SAP locations. Certification ID (Booking code): C_TPLM22_05 Certification duration: 3 hours Number of certification questions: 30 Required certificates for participation in this certification test: None Please note that you are not allowed to use any reference materials during the certification test (no access to online documentation or to any SAP system). The certification test Solution Consultant PLM Project Management with SAP ERP 2005 verifies the knowledge in the area of the SAP Product Lifecycle Management for the consultant profile Project Management. This certificate proves that the candidate has a basic understanding within this consultant profile, and can implement this knowledge practically in projects. The certification test consists of questions from the areas specified below:

Topic Areas
1. Project Structuring (+++) Basic data in PS: work breakdown structure, network and activities, milestones, PS texts, documents Project Builder and project planning board Project simulation Standard work breakdown structure, standard network Assembly processing 2. Dates (+) Time scheduling and scheduling (network scheduling, project scheduling, overall network scheduling) Actual dates 3. Resources (+) Work center Capacity planning and capacity evaluation Workforce planning to HR resource Confirmation and working time sheet Internet scenarios Workflows in PS 4. Material (+) Work breakdown structure BOM BOM PS interface Component assignment in the network Material procurement through in-house production or external procurement Collective stock and project stock Requirements grouping Progress tracking ProMan Delivery from the project 5. Costs and Budget (++) Cost planning in the work breakdown structure Network costing Assigning orders to the project

Budgeting and availability control Commitment and actual costs through account assignment and order assignment 6. Revenue and Payments (+) Revenue and payment planning in the project Sales pricing and quotation creation Resource-related billing Milestone billing and down payment processing 7. Period-End Closing (+) Template allocation Application of overhead Interest calculation Progress analysis and Progress Analysis Workbench. Results analysis Incoming orders Settlement 8 Miscellaneous (+) External service and service activities Organizational units in SAP ERP Info systems in project management Field selection OpenPS Amount of questions by topic (as percentage of test): + ++ +++ = 1 - 10% = 11 - 20% = over 20%

No responsibility is taken for the correctness of this information. Copyright SAP AG 2006.

BASIC TRAINING as Solution Consultant PLM - Project Management (former module PS) (for new consultants)

Project Team Training Courses The following table shows you which topics from the Project Team Training are covered:
PLM200 (Project Management) PLM210 (Project Management - Structuring) PLM220 (Project Management in Logistics) PLM230 (Project Management - Controlling) PLM240 (Project Management Reporting)

DELTA TRAINING as Solution Consultant PLM - Project Management (former module PS) (for experienced consultants)

SAP Consultant Certification Solution Consultant SAP PLM - Project Management (2003)
Software components: SAP R/3 Enterprise (SAR R/3 Enterprise Core 4.70/SAP R/3 Enterprise Extension Set 1.10) Certification duration: 3 hours Number of certification questions: 80 multiple choice questions Required certifications for participation in this certification test: None Please note that you are not allowed to use any reference materials during the certification test (no access to online documentation or to any SAP system). The certification test Solution Consultant SAP PLM - Project Management (2003) verifies the knowledge in the area of the SAP Product Lifecycle Management solution for the consultant profile Project Management. This certificate proves that the candidate has a basic understanding within this consultant profile, and can implement this knowledge practically in projects. The certification test consists of questions from the areas specified below:

Topic Areas
1. Project Structures (+++) Basic Data in PS: Work breakdown structure, Network and Activities, Milestones, PS-Texts, Documents Project Builder and Project Planning Board Project Simulation Standard Work Break Down Structure, Standard Network Assembly Processing and Variant Configuration 2. Dates (+) Date planning and scheduling (Network scheduling, Project scheduling, Overall network scheduling) Actual dates 3. Capacities (+) Work center Capacity planning and control Workforce Planning Confirmation and Time Sheet Internet scenarios Workflows in PS 4. Material (+) Project BOM BOM-PS-Interface Assignment of Material to activities Material procurement Production or Purchasing Collective Stock or Project Stock Requirements grouping Progress Tracking ProMan Delivery form a project 5. Cost and Budget (++) Cost planning with work break down structures Network costing Assignment of orders to a project Budgeting and Availability control Commitment and actual costs by account assignment / order assignment

6.

Revenues and Payments (+) Revenue planning and payments planning in projects Sales Pricing and Quotation creation Resource-related billing Billing milestones and down payments processing

7.

Period End Closing (+) Template allocation Overhead costing Interest calculation Cost forecast Results analysis Incoming orders Settlement Schedule Manager

Miscellaneous (+) External activities / Service activities Organizational units in SAP R/3 Info systems in Project Management Field selection OpenPS

Amount of questions by topic (as percentage of test): + = 1 - 10% ++ = 11 - 20% +++ = over 20% No responsibility is taken for the correctness of this information. Copyright SAP AG 2004.

SAP Product Lifecycle Management - Project Management Solution Consultant

Project Team Training Courses The following table shows you which topics from the Project Team Training are covered: TPLM20 & TPLM22
SAP01 (SAP Overview) PLM200 (Project Management) PLM210 (Project Management - Structuring) PLM220 (Project Management in Logistics) PLM230 (Project Management Network Controlled & Customer Driven Project Accounting) PLM235 (Project Management WBS Controlled Project Accounting) PLM240 (Project Management Reporting)

SAP Consultant Certification Solution Consultant SAP PLM - Quality Management (2005)
Software components: SAP ERP2005 (ECC 6.0)) Certification ID (Booking code): Certification duration: Number of certification questions: Required certificates for participation C_TPLM40_05 3 hours 80 Multiple-Choice-Questions in this certification test: None

Please note that you are not allowed to use any reference materials during the certification test (no access to online documentation or to any SAP system). The certification test Solution Consultant SAP PLM Quality Management (2005) verifies the knowledge in the area of the SAP Product Lifecycle Management for the consultant profile Quality Management. This certificate proves that the candidate has a basic understanding within this consultant profile, and can implement this knowledge practically in projects. The certification test consists of questions from the areas specified below: The certification test Solution Consultant SAP PLM Quality Management (2005) verifies the knowledge in the area of the SAP Product Lifecycle Management for the consultant profile Quality Management. This certificate proves that the candidate has a basic understanding within this consultant profile, and can implement this knowledge practically in projects. The certification test consists of questions from the areas specified below:

Topic Areas
1. Integration of QM and MM (+) Material master Quality info record procurement Source inspection, GR inspection Vendor evaluation, release, selection Manufacturer part number Handling unit management Warehouse management 2. QM in Discrete Manufacturing (++) Integrated inspection planning Routing, reference operation set, rate routing Inspection throughout production Inspection at end of production Inspection with external processing Inspection in repetitive manufacturing Statistical process control (SPC) 3. QM in Process Industries (+) Integrated inspection planning Master recipe Integrated inspection processing Inspection throughout production Inspection at end of production Batch evaluation Recurring inspections Statistical process control (SPC) Change management

Digital signature Batch record 4. Integration of QM with S&D and Service (+) Inspections for delivery Quality info records S&D Make-to-order production Make-to-stock production Repair and returns processing 5. Quality Planning (++) Basic data Inspection planning Logistics master data 6. Quality Inspection (++) Inspection lot Defects recording Results recording Usage decision 7. Quality Certificates (+) Certificate planning Certificate creation Quality certificates in the Web Quality data exchange 8. Quality Notifications (+) Notification systems Customer complaints Complaints against the vendor Internal problem message Simple message 9. Quality Control (++) Dynamic modification Statistical process control (SPC) Quality scores, results history Quality-related costs Standard analyses, flexible analyses, Early Warning System Business Information Warehouse Interfaces to subsystems (QM-STI) 10. Test Equipment Management (+) Test equipment Calibration planning Calibration inspection Test equipment tracing 11. Sample Management (+) Physical sample

Physical-sample category Confirmation requirement Sample drawing procedure 12. Stability Study (+) Create stability study Initial test Stability planning Stability tests Close stability study 13. Audit Management (+) Create question list Audit planning Audit execution Evaluations for audit 14. Configuration and Organization (+) Customizing Enhancements Archiving BAPIs BAdIs Field selection Lists Status management User roles Analysis tools Interfaces Follow-up actions SAPScript forms Authorization concept Amount of questions by topic (as percentage of test): + = 1 - 10% ++ = 11 - 20% +++ = over 20% No responsibility is taken for the correctness of this information. Copyright SAP AG 2006.

BASIC TRAINING as Solution Consultant SAP PLM Quality Management (former QM module) (for new consultants)

Alternative Project Team Training Courses The following table shows you which topics from the Project Team Training are covered:
PLM400 (Quality Management) PLM412 (Quality Planning and Inspections) PLM415 (Quality Management in Logistics) PLM420 (QM in Production) Participants who have already attended the prerequisite training courses in SAP R/3 4.6C can familiarize themselves with the new features for SAP ERP2005 by way of the delta training courses TPLM40 Quality Management (Case Study)

DELTA TRAINING as Solution Consultant PLM - Quality Management (former module QM) and EH&S

SAP Consultant Certification Solution Consultant SAP PLM Quality Management (2003)
Software components: R/3 Enterprise (SAR R/3 Enterprise Core 4.70/SAP R/3 Enterprise Extension Set 1.10) Certification duration: 3 hours Number of certification questions: 80 multiple choice questions Required certificates for participation in this certification test: None Please note that you are not allowed to use any reference materials during the certification test (no access to online documentation or to any SAP system). The certification test Solution Consultant SAP PLM Quality Management (2003) verifies the knowledge in the area of the SAP Product Lifecycle Management for the consultant profile Quality Management. This certificate proves that the candidate has a basic understanding within this consultant profile, and can implement this knowledge practically in projects. The certification test consists of questions from the areas specified below:

Topic Areas
1. Integration of QM and MM (++) Material master Quality info record: Procurement Source inspection, GR inspection Vendor evaluation, vendor release, vendor selection Manufacturer part number Handling Unit Management Warehouse Management 2. QM in Discrete Manufacturing (++) Integrated inspection planning Routing, reference operation set, rate routing Inspection during production Inspection at end of production Inspection for external processing Inspection during repetitive manufacturing Statistical Process Control (SPC) 3. QM in the Process Industry (+) Integrated inspection planning Master recipe Integrated inspection processing Inspection during production Inspection at end of production Batch valuation Recurring inspections Statistical process control (SPC) Engineering change management Digital signature Batch record 4. Integration of QM in the areas Service and Sales and Distribution (+) Inspections for delivery Quality info. record: Sales and Distribution Make-to-order production Make-to-stock production Repairs and returns processing

5.

Quality Planning (++) Basic data Inspection planning Logistics master data

6.

Quality Inspections (++) Inspection lot Defects recording Results recording Usage decision

7.

Quality Certificates (+) Certificate planning Certificate creation Quality certificates on the Web Quality data interchange

8.

Quality Notifications (+) Notification systems Customer complaint Complaints against vendors Internal problem notification Simplified notification ISR SAP Support Desk Solution database

9.

Quality Control (++) Dynamic modification Statistical Process Control (SPC) Quality key figures, results history Quality-related costs Standard analyses, flexible analyses, early warning system Business Information Warehouse Interfaces to subsystems (QM-STI)

10. Test Equipment Management (+) Test equipment Calibration planning Calibration inspection Test equipment tracking 11. Sample Management (+) Physical samples Physical-sample categories Confirmation requirement Sample-drawing procedure 12. Stability Studies (+) Creating a stability study Initial test

Stability planning Stability tests Completing a stability study 13. Configuration and Organization (+) Customizing Enhancements BAPIs BAdIs Field selection Lists Status management User roles Analysis tools Interfaces Follow-up actions SAPScript Forms Authorization concept Amount of questions by topic (as percentage of test): + ++ +++ = 1 - 10% = 11 - 20% = over 20%

No responsibility is taken for the correctness of this information. Copyright SAP AG 2004.

BASIC TRAINING as Solution Consultant SAP PLM Quality Management (former QM module) (for new consultants)

DELTA TRAINING as Solution Consultant PLM - Quality Management (former module QM) and EH&S

Alternative Project Team Training Courses The following table shows you which topics from the Project Team Training are covered: PLM400 (Quality Management) or LO170 (Quality Management) PLM405 (Quality Inspections) or LO705 (Quality Inspections) PLM410 (Quality Notifications) or LO710 (Quality Notifications) PLM415 (QM in Procurement) or LO715 (QM in Procurement) PLM420 (QM in Discrete Manufacturing) or LO720 (QM in Discrete and Repetitive Manufacturing) PLM421 (QM in the Process Industry) or LO721 (QM in the Process Industry) PLM425 (QM in Sales and Distribution/Quality Certificates) or LO725 (QM in Sales and Distribution/Quality Certificates) Participants who have attended the prerequisite courses in SAP R/3 4.6C can learn about the new developments for SAP R/3 Enterprise by attending the delta course D47QM. TPLM40 Quality Management (Case Study)

SAP Consultant Certification Solution Consultant PLM - Maintenance & Repair with SAP ERP 2005
Software components: SAP ECC 5.0 (SAR R/3 Enterprise Central Component 5.0) Certification exam is included in course TPLM30 and is also offered in separate certification events at many SAP locations. Certification ID (Booking code): C_TPLM30_05 Certification duration: 3 hours Number of certification questions: 80 multiple choice questions Required certificates for participation in this certification test: none Please note that you are not allowed to use any reference materials during the certification test (no access to online documentation or to any SAP system). The certification test Solution Consultant PLM - Maintenance & Repair with SAP ERP 2005 verifies the knowledge in the area of solution SAP Product Lifecycle Management for the consultant profile Asset Life-Cycle Management - Plant Maintenance. This certificate proves that the candidate has a basic understanding within this consultant profile, and can implement this knowledge practically in projects. The certification test consists of questions from the areas specified below:

Topic Areas
1. Organizational Units and Master Data in Plant Maintenance (++) Organizational Units Maintenance Plant and Planning Plant Work Centers Functional Locations Structure Indicator Reference Location and Functional Location Creation Options Data Transfer Equipment Installation/Dismantling at Functional Locations Equipment Hierarchy Change Documentation Equipment Category Synchronization of material/construction type Synchronization of equipment/serial number Material and Serial Numbers Serial Number Profile Goods Movement and Warehouse Stock Valuation Batches Bills of Material (BOM) Assemblies BOM Categories Item Categories Change Documentation Additional Functions Configuration Classification Measuring Points and Counters Partners and Addresses Document Link Status Management Permits and Warranties

Data Transfer 2. Maintenance Processing (+++) Corrective Maintenance Notification Types Objects and Object Information Catalogs and Catalog Profiles Integration Notification/Order List Viewer for Notifications and Orders Order Type Object List Operation List Relationships Material List Availability Check Order Release and Printing Material Withdrawal Completion Confirmation in Time Technical Completion Confirmation Technical Completion Action Log and Document Flow Work Clearance Management Processing External Services External Services as Individual Purchase Order External Services with External Work Centers External Services with Service Entry Sheets Processing Refurbishment Tasks Valuation Type and Valuation Category in the Material Master Refurbishment Without Serial Numbers Refurbishment with Serial Numbers Inventory Management and Controlling Processing Maintenance Projects Planning and Executing Maintenance Projects Completion, Settlement, and Monitoring of Maintenance Projects Capacity Planning Scheduling Work Center and Available Capacity Capacity Leveling Employee Assignment 3. Controlling Functions in Plant Maintenance (++) Plant Maintenance in the Organizational Structures of Accounting Budget Planning and Monitoring Cost Estimation Planned/Actual Cost Determination Order Settlement Logistics Information System (LIS) Plant Maintenance Information System (PMIS) Enhancement Options

4.

Preventive Maintenance (+++) Task List Management Task List Types Profile and User Fields Component Assignment Task List and Order Single Cycle Plan Structure Scheduling Indicator Deadline Monitoring Change Documentation Strategy Plan Maintenance Strategy Task List and Maintenance Strategy Change Documentation Performance-Based Maintenance Planning Counters and Measurement Documents Maintenance Plan Scheduling Deadline Monitoring Maintenance Planning with Multi-Counter Plans Cycle Sets Link Type

Weighting Key in the Test: + ++ +++ = 1 - 10% = 11 - 20% = over 20%

No responsibility is taken for the correctness of this information. Copyright SAP AG 2006

BASIC TRAINING as Solution Consultant PLM - Maintenance & Repair (former module PM) (for new consultants

Alternative Project Team Training Courses The following table shows you which topics from the Project Team Training are covered: PLM300 (Plant Maintenance) PLM305 (Structuring and Managing Technical Objects) PLM310 (Preventive Maintenance and Service) PLM315 (Maintenance Processing: Operational Functions) PLM318 (Analytics in Enterprise Asset Management) TPLM30 (Asset Life-Cycle Management - Plant Maintenance (Case Study)) DELTA TRAINING as Solution Consultant PLM - Maintenance & Repair (former module PM) (for experienced consultants)

SAP Consultant Certification Solution Consultant SAP PLM - Asset LifeCycle Management - Plant Maintenance (2003)
Software components: SAP R/3 Enterprise (SAR R/3 Enterprise Core 4.70/SAP R/3 Enterprise Extension Set 1.10) Certification duration: 3 hours Number of certification questions: 80 multiple choice questions Required certificates for participation in this certification test: none Please note that you are not allowed to use any reference materials during the certification test (no access to online documentation or to any SAP system). The certification test Solution Consultant SAP PLM - Asset Life-Cycle Management - Plant Maintenance (2003) verifies the knowledge in the area of solution SAP Product Lifecycle Management for the consultant profile Asset Life-Cycle Management - Plant Maintenance. This certificate proves that the candidate has a basic understanding within this consultant profile, and can implement this knowledge practically in projects. The certification test consists of questions from the areas specified below: Topic Areas 1. Organizational Units and Master Data in Plant Maintenance (++) Organizational Units Maintenance Plant and Planning Plant Work Centers Storage Locations Functional Locations Structure Indicator Reference Location and Functional Location Creation Options Data Transfer Equipment Installation/Dismantling at Functional Locations Equipment Hierarchy Change Documentation Equipment Category Synchronization of material/construction type Synchronization of equipment/serial number Material and Serial Numbers Serial Number Profile Goods Movement and Warehouse Stock Valuation Batches Bills of Material (BOM) Assemblies BOM Categories Item Categories Change Documentation Additional Functions Configuration Classification

Measuring Points and Counters Partners and Addresses Document Link Status Management Permits and Warranties Data Transfer 2. Maintenance Processing (+++) Breakdown Maintenance Corrective Maintenance Notification Types Objects and Object Information Catalogs and Catalog Profiles Integration Notification/Order List Viewer for Notifications and Orders Order Type Object List Operation List Relationships Material List Availability Check Order Release and Printing Material Withdrawal Completion Confirmation in Time Technical Completion Confirmation Technical Completion Action Log and Document Flow Processing External Services External Services as Individual Purchase Order External Services with External Work Centers External Services with Service Entry Sheets Processing Refurbishment Tasks Valuation Type and Valuation Category in the Material Master Refurbishment Without Serial Numbers Refurbishment with Serial Numbers Inventory Management and Controlling Processing Maintenance Projects Planning and Executing Maintenance Projects Completion, Settlement, and Monitoring of Maintenance Projects Capacity Planning Scheduling Work Center and Available Capacity Capacity Leveling Employee Assignment 3. Controlling Functions in Plant Maintenance (++) Plant Maintenance in the Organizational Structures of Accounting Budget Planning and Monitoring Cost Estimation

Planned/Actual Cost Determination Order Settlement Logistics Information System (LIS) Plant Maintenance Information System (PMIS) Enhancement Options 4. Preventive Maintenance (+++) Task List Management Task List Types Profile and User Fields Component Assignment Task List and Order Single Cycle Plan Structure Scheduling Indicator Deadline Monitoring Change Documentation Strategy Plan Maintenance Strategy Task List and Maintenance Strategy Change Documentation Performance-Based Maintenance Planning Counters and Measurement Documents Maintenance Plan Scheduling Maintenance Planning with Several Counters Cycle Sets Link Type Weighting Key in the Test: + = 1 - 10% ++ = 11 - 20% +++ = over 20%

BASIC TRAINING as Solution Consultant PLM - Maintenance & Repair (former module PM) (for new consultants

Project Team Training Courses The following table shows you which topics from the Project Team Training are covered: PLM300 (Plant Maintenance) PLM305 (Structuring and Managing Technical Objects) PLM310 (Preventive Maintenance and Service) PLM315 (Maintenance Processing: Operational Functions) PLM316 (Maintenance Processing Controlling & Reporting) TPLM30 (Asset Life-Cycle Management - Plant Maintenance (Case Study)) DELTA TRAINING as Solution Consultant PLM - Maintenance & Repair (former module PM) (for experienced consultants)

SAP Consultant Certification Solution Consultant SAP PLM - Asset Life-Cycle Management - Customer Service (2003)
Software components: SAP R/3 Enterprise (SAR R/3 Enterprise Core 4.70/SAP R/3 Enterprise Extension Set 1.10) Certification duration: 3 hours Number of certification questions: 80 multiple choice questions Required certificates for participation in this certification test: none Please note that you are not allowed to use any reference materials during the certification test (no access to online documentation or to any SAP system). The certification test Solution Consultant SAP PLM - Asset Life-Cycle Management - Customer Service (2003) verifies the knowledge in the area of solution SAP Product Lifecycle Management for the consultant profile Asset Life-Cycle Management - Customer Service. This certificate proves that the candidate has a basic understanding within this consultant profile, and can implement this knowledge practically in projects. The certification test consists of questions from the areas specified below: Topic Areas 1. Organizational Units and Master Data in Customer Service (++) Organizational Units Plants Storage Locations Sales Areas Master Data Work Centers Functional Locations Structure Indicator Reference Location and Functional Location Creation Options Data Transfer Equipment Installation/Dismantling at Functional Locations Equipment Hierarchy Change Documentation Equipment Category Serial Numbers Serial Number Profile Goods Movement and Warehouse Stock Bills of material (BOM) Assemblies BOM Categories Item Categories Additional Functions Configuration Classification Measuring Points and Counters Partners and Addresses Status Management

Warranties 2. Service Processing (+++) Documents in Service Processing Service Notification Service Order Sales Order Help Desk Notification Processing Notification Types Partner Determination Procedure and Partner Functions Object Information Catalogs and Catalog Profiles Response Time Monitoring Solution Database Customer Interaction Center Field Services Planning Order Processing Order Types Scheduling and Capacity Planning External Services Material Planning Printing and Paging Completion Confirmation Billing Settlement and Completion Returns and Repairs Sales Document Types and Item Categories for Repairs Processing Order Entry and Returns Delivery Technical Check and Repairs Processing Delivery and Billing 3. Service Contracts (++) Definition of Service Products Fixed Service Product Configurable Service Product Configured Service Product Service Contracts Definition and Customizing of Service Contracts Hotline Service Contract Maintenance and Repairs Contract Value Contract Price Determination Overview and Concepts Variant Conditions Price Agreements in Contracts

Billing Billing Plan Periodic Contract Billing Contract Settlement 4. Controlling Functions in Customer Service (+) Customer Service in the Organizational Structures of Accounting Planned/Actual Cost Determination Order Settlement Budgeting and Commitments Management Service Information System 5. Preventive Service (+) Task List Management Task List Types Profile and User Fields Component Assignment Task List and Order Single Cycle Plan Structure Scheduling Indicator Deadline Monitoring Strategy Plan Maintenance Strategy Task List and Maintenance Strategy Performance-Based Maintenance Planning Counters and Measurement Documents Maintenance Plan Scheduling Maintenance Planning with Several Counters Cycle Sets Link Type Weighting Key in the Test: + = 1 - 10% ++ = 11 - 20% +++ = over 20%

SAP Product Lifecycle Management Customer Service Solution Consultant


BASIC TRAINING as Solution Consultant PLM - Maintenance & Repair (former module PM) (for new consultants
Attend Project Team Training PLM301, PLM305, PLM310, PLM330, PLM335. LO836

Project Team Training Courses The following table shows you which topics from the Project Team Training are covered: PLM301 (Customer Service) PLM305 (Structuring and Managing Technical Objects) PLM310 (Preventive Maintenance and Service) PLM330 (Service Contracts) PLM335 (Service Processing) LO836 (Service Processing ; Controlling Functions) TPLM30 (Asset Life-Cycle Management - Plant Maintenance (Case Study))

Potrebbero piacerti anche