Other Prepking products A) Offline Testing engine Use the offline Testing engine product to practice the questions in an exam environment. B) Study Guide (not available for all exams) Build a foundation of knowledge which will be useful also after passing the exam. Latest Version We are constantly reviewing our products. New material is added and old material is updated. Free updates are available for 90 days after the purchase. You should check your member zone at Prepking and update 3-4 days before the scheduled exam date. Here is the procedure to get the latest version: 1.Go towww.Prepking.com 2.Click on Member zone/Log in (right side) 3. Then click My Account 4.The latest versions of all purchased products are downloadable from here. Just click the links. For most updates,it is enough just to print the new questions at the end of the new version, not the whole document. Feedback If you spot a possible improvement then please let us know. We always interested in improving product quality. Feedback should be send to feedback@Prepking.com. You should include the following: Exam number, version, page number, question number, and your login ID. Our experts will answer your mail promptly. Copyright Each PDF file contains a unique serial number associated with your particular name and contact information for security purposes. So if we find out that a particular PDF file is being distributed by you, Prepking reserves the right to take legal action against you according to the International Copyright Laws. Explanations This product does not include explanations at the moment. If you are interested in providing explanations for this exam, please contact feedback@Prepking.com.

www.prepking.com

1. A customer has a Multimedia Communication Server (MCS) 5100 Rls. 4.0 system installed in a four-server configuration. They want to provide database backups for their Database Manager. What is the recommended method for backing-up the database? A. backup to tape B. backup to client PC C. backup over the IP network D. backup to CD on the server CD-RW (Read-Write) drive Answer: C 2. The technician is viewing a command typed from a PuTTY terminal that verifies the IP addressing for the System/Accounting Manager. If the interface eth0 is not UP (it is unavailable), to which interface would the machine logically attach itself? A. lo0 B. eth1 C. dmfe0 D. dmfe0:2 Answer: B 3. A customer plans to implement a Multimedia Communication Server (MCS) 5100 Rls. 4.0 system and wants to ensure that the site has the necessary equipment to interconnect to their existing IP-based enterprise network. Which requirement must be provided before the system can be installed and connected to the enterprise network? A. two separate AC power sources B. optional Uninterruptible Power Supplies C. layer 1 switch with 1G Ethernet interfaces D. layer 2 switch with 10/100M Ethernet interfaces Answer: D 4. A service provider wants to use a console connection to configure a four-server Multimedia Communication Server (MCS) 5100 Rls. 4.0 system from a common platform. What hardware is required? A. a Layer 2 switch B. a Layer 3 switch C. a Terminal Server D. a System Management Console PC Answer: D 5. A customer has deployed a Multimedia Communication Server (MCS) 5100 Rls. 4.0 system with two
www.prepking.com

Database Managers to provide redundancy. Which statement describes how redundancy is implemented for the Database Managers? A. The secondary Database Manager will take over if the primary does not respond to a periodic ping message. B. If a problem occurs with the primary Database Manager, the secondary Database Manager takes over in read-only mode. C. Both Database Managers are active; there is neither a primary nor a secondary Database Manager. Either Database Manager can process all data. D. The System Manager will force a transfer to the secondary Database Manager, if the primary does not respond to a periodic ping message. Answer: B 6. In a Multimedia Communication Server (MCS) 5100 Rls. 4.0 four-server or eight-server configuration, which two roles does the Session Manager perform? (Choose two.) A. It serves as a SIP Proxy Server. B. It collects billing data for all SIP clients. C. It processes SIP requests and responses. D. It translates Unistim transactions to the SIP. Answer: AC 7. In a Multimedia Communication Server (MCS) 5100 Rls. 4.0 system, how does the Provisioning Manager component allow access clients to make configuration changes? A. The Provisioning Manager stores the configuration data and provides a GUI interface that allows access clients to manage this data. B. The Provisioning Manager provides a GUI interface that allows access clients to manage configuration data stored on the System Manager. C. The Provisioning Manager provides an interface between the access clients and the configuration data that is stored on the Session Manager. D. The Provisioning Manager provides an HTTP interface between the access clients and the configuration data that is stored on the Database Manager. Answer: D 8. A customer is deploying a Multimedia Communication Server (MCS) 5100 Rls. 4.0 four-server system with all users being assigned IP Phone 2004 telephones. The customer would like to ensure that all users are able to determine the current status of other users on the MCS 5100 system. How is this service provided by the SIP Presence Module in an MCS 5100 system? A. The SIP Presence Module running on the System Manager will provide this information. B. The SIP Presence Module running on the Session Manager will provide this information.
www.prepking.com

C. The SIP Presence Module running on the IP Client Manager will provide this information. D. The MCS 5100 system will have to be upgraded to an eight-server system to support the SIP Presence Module. Answer: B 9. In a Multimedia Communication Server (MCS) 5100 Rls. 4.0 system, all access clients allow users to receive additional calls on the same line while they are on an active call. How does the Multimedia PC Client differ from the IP Phone 2002 and IP Phone 2004 telephones in how these additional calls are handled? A. Call waiting is not available on either of these clients; the additional calls will be routed to a busy signal. B. The additional incoming call is routed to voice mail, while the IP Phones alert the user with a flashing caller ID display. C. The additional incoming call opens a separate call conversation window with caller ID and call handling options, while the IP Phones produce an audible beep. D. The additional incoming call opens a separate call conversation window with caller ID and call handling options, while the IP Phones route the call to voice mail. Answer: C 10. In a Multimedia Communication Server (MCS) 5100 Rls. 4.0 system, which service allows an end-user to assign other MCS users to respond to, or screen, the end-user's calls? A. Call Forward B. Call Redirect C. Assistant Support D. Assistant Console Answer: C 11. A customer is deploying a Multimedia Communication Server (MCS) 5100 Rls. 4.0 system. The domain yournetwork.com has been added, and it is now necessary to add and provision the sub-domain sales.yournetwork.com. Which management tool must be used to add and configure the new sub-domain? A. IP Client Manager B. Provisioning Client C. SIP Personal Agent D. Web Client Manager Answer: B 12. An administrator has logged onto the System Management Console and is preparing to complete a number of administrative functions on a Multimedia Communication Server (MCS) 5100 Rls. 4.0 system. Which of the functions can you complete from the System Management Console?
www.prepking.com

A. View Media Application Server alarms. B. Start and stop a Media Application Server. C. Create a sub-domain to add an IPCM cluster. D. Add additional IP Phone 2004 telephones to the system. Answer: A 13. A customer has deployed a Multimedia Communication Server (MCS) 5100 Rls. 4.0 system at their site. An administrator needs to use the IP Client Manager (IPCM) device maintenance window to view and work with the IP Phones within the network. Which interface is used for performing this operation? A. Personal Agent B. Provisioning Client C. Web Client Manager D. System Management Console Answer: D 14. A customer is deploying a new Multimedia Communication Server (MCS) 5100 Rls. 4.0 system. While editing the installprops.txt file, what IP Address needs to be configured? A. the service logical IP address B. the floating service IP address C. the machine logical IP address D. the Dynamic Host Configuration Protocol (DHCP) server IP address Answer: C 15. Where is the Unified Network IP Stimulus (UNIStim) protocol used in a Multimedia Communication Server (MCS) 5100 Rls. 4.0 network? A. on ISDN PRI connections to the PSTN B. between IP Phones and the IP Client Manager (IPCM) C. between the Provisioning Client and an external SIP Gateway D. between the System Management Console and the Session Manager Answer: B 16. What is the purpose of the RTP protocol in a Multimedia Communication Server (MCS) 5100 Rls. 4.0 network? A. to transport real-time media streams across a packet network B. to provide a means of sharing session data between endpoints C. to provide a service-enabling protocol for real-time multimedia sessions D. to control signaling between the Session Manager and the RTP Media Portal Answer: A
www.prepking.com

17. A customer is setting up the baseline Multimedia Communication Server (MCS) 5100 Rls. 4.0 hardware platform, according to the MCS 5100 baseline checklist requirements. After physically installing the System/Accounting Manager, Database Manager, Session Manager and Prov/IP Client Manager servers, how should a server serial ports be connected for management purposes? A. Each server should have one serial port connected to the MRV Terminal Server. B. Each server should have one serial port connected to the Management Console. C. Each server should have two serial ports connected to the MRV Terminal Server. D. Each server should have one serial port connected to the Management Console, and one serial port connected to the MRV Terminal Server. Answer: A 18. A customer has purchased a four-server Multimedia Communication Server (MCS) 5100 Rls. 4.0 system. Which three additional hardware components will the customer have to provide to complete the installation? (Choose three.) A. a Layer 2 switch B. a Layer 3 switch C. one PC for the Management Console D. an additional hard drive for mirroring the Oracle database E. one additional cat-5 Ethernet cable to connect the MRV Terminal Server to the Layer 2 switch Answer: ACE 19. To ensure that the database backup is being scheduled on a daily basis, the backup status for the Database Manager must be verified. How can you verify that the database backups are scheduled properly for the coming evening? A. On the OEM Console, from the Network tree, select Jobs, and ensure that the backups are scheduled in the Active panel. B. On the OEM Console, from the Network tree, select Databases and ensure that the backups are scheduled in the Backup panel. C. On the System Management Console, from the hierarchy tree right-click on the Database Manager name, choose Query and select Backup Jobs to verify the jobs are scheduleD. D. On the System Management Console, from the hierarchy tree right-click on the Database Manager, choose OAM Configuration and select Jobs to verify that the jobs are scheduleD. Answer: A 20. A support engineer is in the process of executing the Multimedia Communication Server (MCS) 5100 Rls. 4.0 software load in a four-server installation. The ./mcpInstall.pl script is successfully installed. What is the next step in the software installation process?
www.prepking.com

A. Add and configure the Accounting Module. B. Install and launch the IPCM on the System Manager. C. Deploy the initial database load on the Database Manager. D. Launch the Management Console on the management PC. Answer: D 21. A support engineer is preparing to install a Multimedia Communication Server (MCS) 5100 Rls. 4.0 system. The MCS 5100 servers have all been physically installed and cabled to the In-Reach Terminal Server. Which information should you configure on the In-Reach Terminal Server to allow access to the MCS 5100 servers through it? A. Define the IP address for each MCS 5100 server. B. Define the IP address for the Management Console PC. C. Define the port speed for each MCS 5100 server connection. D. Define the IP Address port number to which the MCS 5100 server is connected. Answer: C 22. An administrator is in the process of installing the Multimedia Communication Server (MCS) 5100 Rls. 4.0 software. The Management Console Graphical User Interface (GUI) has successfully launched. What is the next step in the installation process for a four-server system? A. Deploy the Session Manager. B. Deploy the Accounting Manager. C. Deploy the Provisioning Manager. D. Verify the deployment of the System Manager. Answer: B 23. An administrator is installing a four-server Multimedia Communication Server (MCS) 5100 Rls. 4.0 system, and is in the process of deploying the Network Elements from the System Management Console. The Provisioning Manager component needs to be added. Onto which server is the Provisioning Manager component added? A. the Database server B. the server running Session Manager C. the server running IP Client Manager D. the server running System/Accounting Manager Answer: C 24. An administrator has completed the hardware installation of a four-server Multimedia Communication Server (MCS) 5100 Rls. 4.0 system, as well as the MCS Base Platform System Software DVD. The Management Console has been launched.
www.prepking.com

At the System Management Console, the latest load from the Load List window has been selected. Which action must be performed first for deployment of the Accounting Manager Network Element? A. QUERY B. MODIFY C. DEPLOY D. UPGRADE Answer: C 25. A customer wants to deploy the IP Client Manager using the System Management Console during the installation of a new Multimedia Communication Server (MCS) 5100 Rls. 4.0 four-server system. The following steps have been completed.

What is the next step in this procedure? A. Deploy the Provisioning Manager, and then the IP Client Manager. B. Deploy the IP Client Manager, and then the Provisioning Manager. C. Stop the Session Manager, and then deploy the IP Client Manager. D. Delete the Accounting Manager and then deploy the IP Client Manager. Answer: A 26. During the process of deploying the Session Manager Network Element through the Management Console GUI, how must the parameters be applied? A. Click PATCH; wait for ONLINE message; click START. B. Click DEPLOY; wait for OFFLINE message; click START. C. Click START; wait for OFFLINE message; click DEPLOY. D. Click UPGRADE; wait for ONLINE message; click START. Answer: B 27. An administrator is installing and configuring an Multimedia Communication Server (MCS) 5100 Rls. 4.0 eight-server system. From the System Management Console hierarchy tree, the standby accounting component needs to be added. To which server will you add the standby Accounting component? A. the server running the active SesMgr B. the server running the active SysMgr
www.prepking.com

C. the server running the primary DBMgr D. the server running the standby SysMgr Answer: B 28. The technician has just installed the Media Application Server (MAS) and connected the cables to the Multimedia Communication Server (MCS) 5100 Rls. 4.0 network. The base software and Meet Me application have also been installed and configured on this server, and the server has been restarted. What is the next step in this process? A. Configure the MAS IP address in the Personal Agent using the Multimedia PC Client. B. Configure the MAS IP address in the Provisioning Manager using the Provisioning Client. C. Configure the MAS IP address in the Network Elements using the System Management Console. D. Configure the MAS IP address in the Database Manager using the System Management Console. Answer: C 29. During the deployment of a four-server Multimedia Communication Server (MCS) 5100 Rls. 4.0 system, the System Management Console application has been launched. Before uploading the license key, which components are deployed and running by default? A. the System Manager and a Database instance B. the Session Manager and the Accounting Manager C. the System Manager and the Provisioning Manager D. the Database Manager and the Accounting Manager Answer: A 30. After completing the Linux installation onto the Session Manager, the following command is issued:

During the deployment of a four-server Multimedia Communication Server (MCS) 5100 Rls. 4.0 system, what will this command verify? A. the hosts file of the Session Manager B. the IP addressing of the Session Manager C. the default route file of the Session Manager D. the IP addressing of the IPCM/Prov Manager Answer: B 31. A customer is verifying the availability of the Ethernet interface on the Prov / IP Client Manager server during the installation of a new Multimedia Communication Server (MCS) 5100 Rls. 4.0 four-server system. An issue is encountered, and the documentation states to use the ifconfig -a command. How will this command help to determine the cause and help resolve it? A. It will restart all active Ethernet interfaces. If an interface has failed, it will re-activate all Ethernet interfaces.