SAFETYMANUAL

ISSUEDATE:DECEMBER,2008


DocumentControl
IssueApproval

Mr.VirenderGupta
SeniorAssociateDirector

23.08.2007

Date
Signature

Mr.T.R.PerumalChetty,
Dy.GeneralManager(Safety)

23.08.2007

Signature

Date

RegisterofAmendments
Thissummarytablewillaccompanyamendments.DiscardthepreviousTableandreplaceitwiththe
latestversion.
DateOfIssue

Section(s)

AmendmentNo.

Description

June,2007

Revision0

ApprovedbyAssociateDirector.

23Aug,2007

18&19

Revision1

ApprovedbySeniorAssociateDirector.

Dec,2008

9,13,14,15,16,17, Revision2

ApprovedbySeniorAssociateDirector.

Abbreviations
EHS

Environment,Health&Safety

OHS&EorHS&E

AlternativecommontermsforEnvironment,Health&Safety

PM

ProjectManager

AM

Asst.ManagerProjects

PC

ProjectCoordinator

CBRE

CBRichardEllis

IssueDate:December,2008 Rev:2
Page2of105


Contents

Documentcontrol

IssueApproval

RegisterofAmendments
Abbreviations

Page

2
2
2
2

6
7
9
9
11
12
12
12
13
16
19
19
20
20
21
21
21
21
21
21
23
24
24
24
24
24
25
25
26
26
27
27
28
28
28
29
29
30
30
31
31
31
32
33

1.Introduction

2.EHSPolicy

3.SafetyInstructionsandProcedures

4.RolesandResponsibilities

5.Communication

6.Monitoring

7.Documentation

8.ProjectSafetyCommittee

9.ApplicableStatutoryActs,Rules&ISCodes
9.1ProjectComplianceChecklist

10.NonComplianceofSafetyandHealthprovisions
11.DisciplinaryAction

12.Environment

12.1Noise

12.2MaterialSafetyDataSheets(MSDS)

12.3WasteDisposal

12.4HouseKeeping

12.5Publicprotection

13.Health

13.1Firstaid

13.2ContentsofFirstaidbox

13.3DrinkingWater

13.4LatrinesandUrinals

13.5AntiMalarialPrecaution

14.Safety

14.1Excavation

14.2Pilling

14.3MobilePlant

14.4ConcreteVibrators

14.5ConcreteMixture

14.6Hoists,Cranes

14.7MotorVehicles

14.8Trucks

14.9Traffic

14.10FireProtection

14.11Ladders

14.12Scaffolding/Staging

14.13FormWork

14.14ConcreteConstruction

14.15Barricades

14.16Demolition

14.17Painting

14.18WeldingandGascutting

14.19Grinding

IssueDate:December,2008 Rev:2
Page3of105


14.20WorkinRadiationArea

14.21WorkinandaroundWaterbodies

14.22GuidelinesandGeneralproceduresforuseofElectricityatsite
14.23Installation

14.24PortableElectricalEquipment

15.General

15.1EHSTrainings

15.1.1EHSInduction

15.1.2Periodicaltrainingprogrammes

15.2HazardIdentification&Controlmeasures

15.2.1EHSInspections

15.2.2EHSaudits

15.2.3RiskAssessment

15.3SafeWorkPermitSystem

15.4BlastingPermit

15.5ExcavationPermit

15.6WorkatheightPermit

15.7HotworkPermit

15.8ConfinedspacePermit

15.9IsolatedareaPermit

15.10Accidentreporting&Investigation

15.11EducatingLabour

15.12Reportingofaccidents

15.13EmergencyEvacuationPlan

15.14PersonalProtectiveEquipment

15.15ProjectEHSStatus

15.16SiteEntryprocess

16Formats

16.1SiteSafetyRules

16.2EHSResponsibility&AccountabilityforContractors

16.3EHSInduction

16.4SafetyPeptalk

16.5Incident/AccidentInvestigationReport

16.6EHSInspection

16.7OnthejobsafetyCommunications

16.8EHSStatusReport

16.9SafetyCommitteemeeting

16.10EHSPenality

17.SafetyCheckLists

17.1GeneralSafety

17.2DailyInspectionchecklistforSafetymeasuresatsite

17.3SiteLayout

17.4PersonalProtectiveEquipment

17.5MaterialHandling

17.6MaterialStorage

17.7FirePrevention&Control

17.8Excavation

17.9Demolition

17.10Scaffoldings

17.11ConfinedSpace

17.12Radiography

33
33
33
34
36
36
36
36
36
37
37
37
38
38
39
42
44
46
48
50
51
51
51
51
52
52
53
53
53
55
56
57
58
59
60
61
62
63
64
64
66
68
69
70
71
72
73
75
76
77
78

IssueDate:December,2008 Rev:2
Page4of105


17.13Painting

17.14WorkatHeight

17.15Electrical

17.16Hotwork

17.17Formwork

17.18FallPrevention&Protection

17.19Handtools

17.20Vehicles,Equipment&Eartmovingequipment

17.21Cranes

17.22TowerCranes

17.23BuildersHoist

17.24TransitMixer

17.25DieselGenerator

17.26MotorVehiclesandTraffic

17.27Plant&Mobileequipment

17.28HouseKeeping

18.ProjectSafetyDocuments

18.1ListofProjectSafetyDocumentstobemaintainedbyCBRE
18.2ListofWelfareDocumentsrequiredforInspection

79
80
82
83
85
86
87
89
90
92
96
98
99
100
101
103
104
104
105

IssueDate:December,2008 Rev:2
Page5of105

INTRODUCTION

The meaning of safety is Freedom from unacceptable risks or Freedom from danger. Safety in all
construction activities is a prime requisite, but is often neglected, ignored on work sites. With the
enormous growth of construction industry and the advancement of Construction Technology the
need for proper attention to Safety aspects has become essential for human, social, economic and
other considerations. The complex techniques with wide range of construction and other activities
haveleadtonewchallengesinSafety.

Thecontentaimsistoexplainthewaysandmeanstocreateasafeandhealthyworkenvironmentat
ourconstructionprojectsitesfortheprotectionofallpersonnelinvolvedintheprojectconstruction
activitiesfromassociatedrisks.

The EHS plan is structured for effective implementation of EHS standards as per the Factories Act
1948,Amendmentact1987,BuildingandOtherConstructionWorkersAct1996(BOCWAct1996)and
otherrelevantStateandcentralActsofGovt.,ofIndia.

ThepurposeoftheEHSPlanistomakeallouremployees,contractors,consultants,workmenawareof
minimumsafetystandardstobeadheredintheprocessofexecutionofconstructionactivitiesforthe
noblecauseofaccidentpreventionandtoprotectallfromassociatedrisks.

The overall objective of the plan is to ensure effective implementation of Company standards and
complywithallstatutoryprovisionsrelatedtoEnvironment,HealthandSafety(EHS)andalsotomeet
clientsspecificEHSrequirements

ProperprecautionsbasedonriskassessmentsshouldbetakentoimproveSafetyonconstructionsites
tomitigateandminimizelossoflimb,life,sufferinganddamageresultingfrompreventableincidents/
accidents.
CONTRACTUALRESPONSIBILITES&MANAGEMENTCOMMITMENT:
It is the prime responsibility of project management to prevent / control all risks involved in the
processofprojectconstruction.Allcontractors/Subcontractorsandtheirstaffandworkmenmustco
operateinimplementationofEHSrulesandregulationsmentionedinEHSplanwithoutanyexcusein
the interest of safe guarding Environment health and safety at protect site. It is of contractual
responsibility of all concerned to maintain clients reputation and to take care of workers safety &
welfare as a social obligation. The basic requirement of plan is to achieve EHS goals for successful
completionofproject.

IssueDate:December,2008 Rev:2
Page6of105

EHSPOLICY

Management of CB Richard Ellis South Asia Pvt Ltd is vitally interested in Safety and Health of its
employees and attaches utmost importance to safeguard the employees from injury, occupational
disease and environment. Management shall make every effort to provide a Safe, Healthy working
Environment. Ensures that the plant, machinery, equipment are safe for use in compliance with
establishedsafeworkingproceduresandpractices.

Thecompanyhasmadeitarequirementthatallwhoworkwithus,visitusordobusinesswithusmust
complywithCBRE EHSpolicy. Itis in the bestinterestof practices toconsider Environment, Health
and Safety in every activity. Commitment to Health and Safety forms an integral part of this
organizationfrommanagementtotheworkers.

WeshalloperateourprojectsinsuchawaythattheSafetyandHealthofouremployees,contractors,
visitors local residents and Environment, are ensured and they will not be exposed to unacceptable
risks.

2.1*CompanysHealth,SafetyandEnvironmentPolicyisEnclosed

IssueDate:December,2008 Rev:2
Page7of105

IssueDate:December,2008 Rev:2
Page8of105


SAFETYORGANISATION

*SafetyOrganizationchart.

SAFETYINSTRUCTIONSANDPROCEDURES
Clearsafetyinstructionsandproceduresarethebasisforfunctioningofallatsite.Thesesafety
instructionsandproceduresaretheminimumsafetyrequirementstobefollowedbyallalwaysat
site.

Every employee, contractor and visitor is responsible for fulfilling all safety instructions and
procedures.
Reportunsafeconditions,situationsandhandlingstotheProjectManager.
Safety instructions from Management, Safety team and site conditions, generated are to be
followed.
FirstAid,Firesection,concerningSafetyandHealthcarearetobefollowedalways.

ROLESANDRESPONSIBILITIES

The Project Manager CBRE shall be totally responsible for compliance, implementation of Health,
safetyandEnvironmentPolicy.
1. ProjectManager

Responsible for the overall management of safety, safety planning and organization on this
site.
The Project Manager is the team leader and should be the role model for all staff and
employeestofollow.
Prepareandinstigatesafetypolicyandprocedures onsite,delegateresponsibilitiestoother
competentpersons,thenchecktheserolesandresponsibilitiesarefulfilled.
Fixtherolesandresponsibilitiesinwritingandensuretheyarefulfilledforeachstaffmember
soaseachpersonisawareofandcomplyingwithhisrole.
Attendallsafetymeetings.
ReviewSafetyPlansandWorkplaceRiskAssessmentspreparedbythecontractorspriortothat
tradebeinggivencommitmentandstartingonsite.
ReviewpreliminarydesignanddrawingsforpotentialsafetyrisksandadvisetheConsultants
oftheseandremediesforsame.
Carry out informal and formal safety inspections when on site and report findings to the
Contractorforrectification.
SetapersonalexampleofimplementingtheProjectSafetyPolicy.
Educate contractors to be fully conversant with all CB Richard Ellis safety requirements and
incorporationofsafeworkpracticesintheiroperations.
EnsurecontractorSafetyPlansareimplementedandmodifiedasnecessaryonsite.
InconnectionwithIndianStandardsandRegulationsthetasksandresponsibilitiesofSafetyandHealth
ManageraswellastheDesignengineeraredefinedatthedesign&constructionphase:

IssueDate:December,2008 Rev:2
Page9of105


SafetyManagerAtDesignPhase:

CoordinationofgeneralaspectswithrespecttoSafety,HealthandWelfare.
Taking care of EHS plan setup in Draft. Putting together Safety Health &
Environmentfiles.
HandoverEHSplanindraftandfiledtotheclientfortheconstructionphase.

SafetyManagerAtConstructionPhase:

Organizing,coordinatingandCooperationbetweencontractors.
CocoordinatingSafety,Health,Welfaremeasuresbythecontractors.
CocoordinatingSupervision;tomeetthejointfacilities.

Consultants

To be briefed and educated by the Project team on their responsibilities with regards to
designinginsafety.
To be educated and shown safety problems with their design on site so as not to make the
samemistakesagain.
Tonominate,areasrequiringspecialproceduresorpracticestoreduceaccidentpotential.
To be briefed by the site team on the proposed construction methods and be subsequently
updated.
TotakeaproactiveroleinsafetyaspartoftheProjectTeam.

ContractorsandTheirEmployees

Safety representative from each company to be nominated to attend safety meetings on a


weeklybasis.ThedaysofthemeetingwillbenominatedbyCBRichardEllis.
Thenominatedpersonforthecompanywillberesponsibleforalldetailsandsafetyissuesof
themeetingandtoberelatedbacktofellowworkers.
Any chemicals, plant and equipment that are to be used on site the contractor must supply
Material Safety Data Sheet ( MSDS) and the Manager or Principal of the contractor is to
ensure his men who are using the chemical have been trained with the correct handling
procedurefortheuseofthischemical.
Maintainafullsafetykitonsiteatalltimes.
The Manager or Principal of the contractor is to provide evidence that the men he has
employed have had adequate training to be able to work safely with the duties that will be
performedonsite.
Any lost time injuries the contractor is to notify CB Richard Ellis and provide all necessary
details.
Contractorstosupplyriskanalysissheetsandsafetyplanforreviewbeforeworkcommences
onsiteforcriticalactivitiesidentified.
ContractortoinformCBRichardEllisofanyknownhazardsthatmayoccurduringtheirscope
ofworks.

IssueDate:December,2008 Rev:2
Page10of105

COMMUNICATION

KickoffMeeting:

Thekickoffmeetingshouldbeseenasastartmeeting,preliminarytothegeneralorproject
orientedactivities.
Prior to starting of project activities a meeting with all consultants, contractors will be organized in
ordertomakeallconcernedawareoftheEHSrules&procedurestobeadoptedbyteamduringthe
constructionofproject.
TheProjectManagerwhoisInchargeoftheprojectwillchairthemeetingandthefollowingtakepart
inthemeeting.
1) RegionalMangerEHS/ProjectEHSCoordinator
2) SiteInchargesofallContractors/Subcontractors
3) Consultants
4) EHScoordinatorsofContractors/Subcontractors
In the meeting the EHS plan meant for the project will be disclosed and discussed for effective
implementation.
Theclientsrepresentativemayalsopresentinthemeetingwhereverpossible
Thepointsdiscussedwillberecordedandminuteswillbedistributedtoallconcerned
The document which speaks the Responsibility and Accountability of Contractors/Sub contractors
wouldbeissuedandacceptancewouldbeobtainedbydulysignedandacknowledged.(Annexure1)
Inthekickoffmeetingbesidetechnicalrelevantinformation payattentiontotheaspectsof
Health,SafetyandEnvironmentingeneral.
SafetyMeeting:
Specificappointmente.g.Actionpointsasresultofconsultationbetweensafetytechnicalitiesrelated
totheprojectisdiscussed.
Weekly meeting shall be conducted by contractors for the entire work force with specific agenda
underobservationfromtheProjectManagerssafetyteam.
PreJobMeeting/PEPtalks:
ThePreJobMeetingismeantforconsultationbeforeactivitiesstart.Apartofthemeetingisareview
to make detail appointment for specific plan on location directed to Health and Safety matters and
actualdeviationofthenormalsituation.Atthismeetingtheprejobchecklistshallbehandedover
andworkedoutwithallpersonsinvolved.
This is to be conducted at once in week by respective EHS coordinators of contractors/Sub
contractors.
Thesearemeantfordevelopingsafetyawarenessandtoremindthevarioussafetymeasures
andrulestobefollowedbytheworkinggroup
During the talk the safety precautions for various activities and general EHS rules would be
highlighted.
Ensureactiveparticipation,interactionofworkmenandencouragethemtosharetheirsimilar
experiencesofothersites
TherecordsofPeptalksaretobemaintainedandacopyofthesameistobesenttoProject
EHScoordinator

IssueDate:December,2008 Rev:2
Page11of105


ToolBoxMeeting:
ToolboxmeetingsareCBREsinternalmatter.Withthiskindofconsultation,executingemployeeswill
beinformedabouttheactualwork.Thisinformationcanbeappointments,instructions,whicharethe
resultofabovementionedmeetings.Atoolboxmeetingisamediumtoinformexecutingemployees.
The meetings will be organized by Contractors/Subcontractors at their respective work
locationsdaily.
Themeetingwouldbeheldwiththeconcernedstaff/workmeninvolvedinthespecificjob.In
themeetingthesafetymeasuresandtheprocedurestobeadoptedwouldbeconveyedtoall
concernedafterdiscussing/assessingassociatedrisksprevailedintheworkactivity.
The meeting would be held on need basis and conducted by Site Engineer/Foremen/EHS
coordinatorasandwhenchangesofprocedure/machineryandfornewteams.
TherecordsofToolBoxesaretobemaintainedandacopyofthesameistobesenttoProject
EHScoordinator
ProgressMeeting:

Theprogressmeetingismeantforthedaily/weeklyconsultationbetweentheclientandthe
maincontractor
EHSpartinthismeeting,shouldbeafixeditemontheagendaandfollowingdiscussed.
Measures as a result of finding from risk analysis, which are related to interaction between
differentdisciplines.
Findingsasaresultofinspectionobservationonincident.
Explanationonprocedures,instructionandspecialmeasures.

MONITORING

Arrangement shall be made for Safety and Health monitoring of the site on a regular basis. For
example a few of this shall include ensuring safety of scaffoldings, excavations, plant, equipment
matterssuchashazardousdusts,fumes,noiseetc.ProjectManagershallensureperiodicalinspection
byvisitingthesitealongwithSafetyManager/OfficerandEngineers.

DOCUMENTATION

CBREshallensurethatallstatenotifications,examinationandinspectionsarecarriedout.Exceptfor
plant used exclusively by individual contractor, all record shall be kept and updated by Project
Manager.

PROJECTSAFETYCOMMITTEE

AsprescribedbytheBuildingconstructionact,1996asitesafetycommitteehastobeconstituted.The
Committeeshallcompriseofclientrepresentatives,projectmanagementrepresentativesandequally
representedbycontractors.TheProjectManagershalltotallyberesponsibleforcompliancewiththis
EHSplanandcode.CBREshallappointaEHSManager/Officerandformasafetycommitteealongwith
operativesfromsubcontractors.ProjectManagershallchairsafetyCommitteeandreportonceina
monthtoProjectController.TheProjectManagershalltakesuitablemeasurestoensuretheeffective
IssueDate:December,2008 Rev:2
Page12of105


coordinationoftheworksfromallcontractorsatsite.Heshouldensurethatheiskeptinformedona
daytodaybasisofprogressandproblems.Clearlineofcommunicationshallbesetupbetweeneach
contractorandSafetyManager/OfficerofCBRE.Operativesshallknowtocontactoversafety,health
matters requiring action on a decision. Safety committee reports shall be submitted to Project
Controllerineveryprojectmeeting.
AProjectEHScommitteewillbeconstitutedfortheprojecttodiscuss,reviewandresolveall
EHSmattersoftheproject
The project Manger/In charge would be the Chairman of the committee and Project EHS
coordinatorwouldbeSecretaryofthecommittee.
TheSiteInchargesofcontractors/Subcontractorsandtheirsafetycoordinatorswouldbethe
membersofcommittee
Themeetingwouldbeheldonceinweek/fortnight.
In the meeting all EHS issues would be discussed and resolved for necessary measures. The
performanceandeffectivenessofEH&SPlanwouldbereviewedforachievingdesiredlevelof
performance.
The minutes of meeting would be circulated to all concerned and to Regional EHS
Manager/Coordinator.

APPLICABLESTATUORYACTS,RULES&ISCODES:

CBREandallcontactorsshallcomplywithclientrulesandprocedures,Nationallegislationcodesetc.
StatutoryProvisions

TheFactoriesAct1948,AmendmentAct1947
TheEnvironmentAct1986
WorkmensCompensationAct,1938

BuildingandOtherConstructionWorkers
(Regulationofemploymentandconditionofservice)Act,1996
BuildingsandOtherConstructionWorkersWelfareAct,1996
PaymentofwagesAct,1936
EqualremunerationAct,
MinimumwagesAct.1948
EmployersliabilityAct,1938
IndustrialdisputeAct,1947
MaternitybenefitAct,1961
ContractorlabourAct,1970
(Regulationandabolition)
ProvidentfundAct,1952
PaymentofgratuityAct,1972

IndianExplosivesActandtheexplosivesRules.
TheGasCylinderRules,1981
StaticandMobilePressureVessels(Unfired)Rules.
TheIndianElectricityAct1910andIndianElectricityRules1956
TheAtomicEnergyAct,
TheRadiationProtectionRules.
NFPA,
NationalBuildingCodeetc.

IssueDate:December,2008 Rev:2
Page13of105


IndianStandard(IS)CodesrelatedtoE&HS
Themaincontractorandallsubcontractorsaretocomplywithclientspecificriles
andprocedures,theNationallegislationsandcodesinparticularthefollowing:
IS:40811986

SafetycodeforBlastingandRelatedDrillingoperations

IS:37641992

Safetycodeforexcavationwork

IS:51211969

Safetycodeforpillingandotherdeepfoundations

IS:27501964

Specificationforsteelscaffoldings

IS:3696
(PartI)1987

SafetycodeforscaffoldsandLadders:PartIScaffolds

IS:3696
(PartII)1991

SafetycodeforscaffoldsandLadders:PartIILadders

IS:40821977

Recommendationsonstackingandstorageofconstructionmaterialsatsite(First
revision)

IS:41301976

Safetycodefordemolitionofbuilding(Firstrevision)

IS:49121978

Safetyrequirementsforfloorandwallopenings,railingsandtoeboards
(Firstrevision)

IS:59161970

Safetycodeforconstructionsinvolvinguseofhotbituminousmaterials

IS:72051974

Safetycodeforerectionofstructuralsteelwork

IS:79691975

Safetycodeforhandlingandstorageofbuildingmaterials

IS:89891978

Safetycodeforerectionofconcreteframedstructures

IS:72931974

Safetycodeforworkingwithconstructionmachinery

IS:22121991

PipelinesIdentificationColourcode

IS:52161982

Recommendationsonsafetyprocedures&practicesinElectricalworks
(PartI&II)

IS:8751964

Codeofpracticeforstructuralsafetyofbuildingsandloadingstandards

IS:103861983

GeneralaspectsPart11983,Part21982,Part61983,Part101983Amenities,
Protectiveclothingandequipment,construction,storage,handling,detectionand
Safetymeasuresforgases,chemicalsandflammableliquids

IS:105001991

Drinkingwater(Specification)

IS:102911982

Codeofdressincivilengineeringworks

IssueDate:December,2008 Rev:2
Page14of105


IS:29251984

Safetyhelmets

IS:11791967

Weldinghelmets

IS:75241979
(PartI)

Safetygoggles

IS:91671979

Earmuff/Earplugs

IS:69941973
(PartI)

Canvashandgloves,Cottonhandgloves,Chromeleathergloves

IS:47701991

Rubberhandglovestestedfor15,000volts

IS:35211999

Fullbodysafetyharness

IS:110571984

SpecificationforIndustrialsafetynets

IS:134151992

ProtectiveBarriersin&aroundbuildings(Codeofsafety)

IS:134161992

PreventivemeasuresagainstHazardsatworkplacesRecommendationspartI
FallingmaterialshazardsPreventionpartI

IS:134161992

PreventivemeasuresagainstHazardsatworkplacesRecommendationspartIIFall
Prevention

IS:59141970

Safetyshoes

IS:122541993

Polyvinylchloride(PVC)industrialboots

IS:5557:2004

IndustrialandProtectiveRubberkneeandAnkleboots

IS:28782004

Co2Typefireextinguisher

IS:21711999

Drychemicalpowderfireextinguisher

IS:138491993 FireextinguisherforABCfires
IS:102042001

MechanicalFoamtypeextinguisher(FoamusedshallconformtoIS:49891974
andCo2cartridgeshallconformtoIS:49471985)

IS:37861983

MethodsforcomputationofFrequencyrateandSeverityratesforIndustrial
injuriesandclassificationofIndustrialaccidents(Firstrevision)

IssueDate:December,2008 Rev:2
Page15of105


9.1PROJECTSTATUTORYCOMPLIANCECHECKLIST

S.No

DescriptionofApproval/Licence

YES/No

Remarks

Labourlicence/Registration(FormIV)byClient

FormVissuedtocontractors

LabourlicencebyContractor

Contractagreements(b/wClients&Contractors)

CARPolicytakenbyContractors

ProvidentFundCoverage

ESIforallvendors(whereeverisapplicable)

Noticeboardatprojectsite

Documentstobemaintainedbyallcontractors

DOCUMENTSTOBEMAINTAINEDBYALLCONTRACTORS

1. UndertheContractLabour(Regulation&Abolition)Act,1948

a) ObtainaLicenceundertheAct(ApplyinFormIValongwithacertificatefrominFormV)+
Requisitefeeandsecuritydeposit.Alicencetobeobtainedbythecontractorforeachandevery
establishmentandalsoforeachandeveryestablishmentandalsoforthebranchofficesofthe
sameestablishment,incaseifthebranchofficersareinmorethanoneaddress.
Applicableonlyifemployed20ormore(perbranchof)thecompany.Yes/No
b) Ensurethatthelicenceisrenewedatleast60daysbeforeexpiryoflicence.Yes/No
ThefollowingRegisters/Returnstobemaintainedandsubmittedforverification:
1

CombinedRegistersinFormT

Yes/No

WageslipsinFormXIX

Yes/No

IssueofemploymentcardinFormXIV

Yes/No

SendaNoticeofcommencement/completionofcontractworkinFormVIA

Yes/No

WhetherthehalfyearlyreturninFormXXIVisbeingsenteveryhalfyear?

Yes/No

Whethertheleavecard(inFormH)hasbeenissuedtotheemployees
deployed?

Yes/No

WhetherleavewithwagesregisterinFormFhasbeenmaintainedforthose
deployed?

Yes/No

IssueDate:December,2008 Rev:2
Page16of105


2. UnderPaymentofBonusActProducethefollowingforverification
1

Bonushastobepaidtoalltheemployeeswhoeverhascompletedatleast
30daysofservicewiththecontractorduringafinancialyear.

Yes/No

Whetherbonusispaidtoallthosedeployedinthecompanyinthepresence
ofcompanysrepresentative

Yes/No

WhetherBonusregisterinFormA&Bismaintained?

Yes/No

WhetherCregisterunderBonusActismaintainedforthethosedeployedin
thecompany?

Yes/No

AnnualreturninFormDhastobesentwithinamonthofpayingBonusto
all

Yes/No

WhethercopiesofCregister&annualreturnFormDhasbeensubmitted
forverification?

Yes/No

3. UnderEmployeesStateInsuranceAct,1948
1

Whetherallthecoverableemployeedeployedinthecompanyarecovered
underESI?

Yes/No

WhetherESIcardhasbeenobtainedforallthecoverableemployees?

Yes/No

WhetherESIchallanshaverealizedbefore21stofeverymonth?

Yes/No

WhetherForm6Halfyearlyreturnhasbeensubmittedintime
(12thMay/11thNov)

Yes/No

WhetherESIchallancopiesaregiveneverymonth?

Yes/No

Whetherthetotalgrosswagesshowninthesalaryregisteris60%ofthe
totalbillinglastmonthiftheservicesareonlylabouroriented?

Yes/No

Whetherthetotalgrosswagesshowninthesalaryregisteris25%ofthe
totalbillingiftheservicesarebothlabour&material?

Yes/No

4. UnderEmployeesProvidentFundAct
A

WhetherPFnumberhasbeenallottedtoallthosedeployedinthe
company?

Yes/No

WhetherPFchallanshaverealizedbefore15thofeverymonth?

Yes/No

WhethermonthlyreturnsinForm5,10&12Aarefilledbefore25thof
everymonth?

Yes/No

WhetherPFannualreturnswerefiledbyon30thAprilofeveryyear?

Yes/No

WhetherPFslipsinForm23areissuedtoalltheemployeestillthelast
year?

Yes/No

IssueDate:December,2008 Rev:2
Page17of105

LabourWelfareFundhasbeenpaidtoallthosedeployedinthecompany?

Yes/No

Minimumwagestobepaidtoalltheemployees

Yes/No

Leavewithwagestobeextendedtoalltheemployeesdeployed(AL15,CL
12Total=27

Yes/No

National&Festivalholidaystobegiventoallthosecontractemployees(Total
10dayswhichincludes5Nationalholidays&5Festivalholidays)

Yes/No

IncaseiftheemployeesarerequiredtoworkduringNational/Festival
holidays,theyshallbepaidindoubleforthosedays(or)shallbegiven
anothercompensatoryholiday.

10

Leavewithwages/NFH/Overtime/Com.holidayetctobementionedinthe
Musterroll

Yes/No

11

Overtimeregisterhastobedulyfilledupasandwhenaemployeeworks
morethan8hoursofwork.Theyshouldbepaiddoublethewages

Yes/No

12

OvertimehastobementionedonthesalaryregisterandESImustbepaid
onthesame.ThiswouldenablethecontractoremployeetogetESIbenefits
suchasESIleave/Maternityleaveandalsopensionbenefitsincaseoffatal
accidents

13

TheemployeeshavetobeissuedWageslipsatleast24hoursbeforethe
disbursementofpaymentinrespectivecompanies

Yes/No

14

Thesalaries/Bonus/Overtimetobepaidinthepresenceoftheemployer
representativeandthesameshallbecertifiedbytherepresentative.

Yes/No

15

Whetheremployeesaregivenweeklyoffonthe7thdayasperLaw?

Yes/No

16

Whetherappointmentordersaregiventoallemployees(informQunder
S&EAct?)

Yes/No

17

Whethertheemployeesworkmorethan10.5hrsincludingthebreakshift
timinginanyday?

Yes/No

18

PleasesubmitthefollowingalongwithXeroxcopyofthecurrentmonth
billstotheHR/Admin.departmenteverymonth

Yes/No

AttendanceregisterXeroxcopyofthecurrentmonthitwasbilled

Yes/No

Salaryregister(dulyauthorisedbyrepresentative)copyoftheprevious
monthofbilling

Yes/No

ESIchallanofthepreviousmonth

Yes/No

EPFchallanofthepreviousmonth

Yes/No

Professiontaxchallanofthepreviousmonth,ifanybodypaidmorethan
Rs3000/permonth

Yes/No

HalfyearlyreturnundertheESIActalongwiththeMay&November
monthbills

Yes/No

HalfyearlyreturnundertheContractLaborActalongwiththeJan.&July
monthbill

Yes/No

AnnualreturnundertheEPFActalongwiththeAprilmonthbill

Yes/No

Yes/No

Yes/No

IssueDate:December,2008 Rev:2
Page18of105

AcopyofBonusannualreturninFormDsubmittedtotheLabour
departmentonorbeforeNovembereveryyear.Acopyofthesametobe
giventothecompany

ProofofsendingLabourwelfarefundreturnbythecontractorcopyof

FormD

Yes/No

Yes/No

Alltheabovementioneddocumentsmustbeselfattested/certifiedbytheauthorised
signatory.

10 NONCOMPLIANCEOFSAFETYANDHEALTHPROVISIONS:
ThecomplianceoftheSafetyandHealthprovisionsareutmostimportanttoCBRE.Theprospective
contractors shall take note of statutory requirements. CBRE will take a serious view of any non
compliance report of Safety committee and EHS Manager/Officer. Based on the safety committee
reportorEHSManager/Officer,CBREhastherighttoorderstoppageofworktillrectificationiscarried
outtothesatisfactionoftheSafetycommitteeandEHSManager/Officer.Allstoppageonthisaccount
willbeattheentireriskcostandconsequenceoftheerringindividuals/contractors.

11 DISCIPLINARYACTION:
NoncomplianceofSafetyandHealthandEnvironmentalprovisionswillresultindisciplinarianaction.

Violations:

Firsttime
Secondtime
Thirdtime
Fourthtime

Oralwarning

Writtenwarning
Monetaryfine
Removalfromsite

Immediateremovalfromsitebyallviolationswhereintheoffenderbringshimselforothersin
directlifethreateningsituationsarewherehe/shecreatesalargematerialloss.
Thecontractorwhoregularly,repetitivelyviolatestheprovisionswillberemovedfromthe
site.

IssueDate:December,2008 Rev:2
Page19of105

12.ENVIRONMENT
12.1Noise
NOISE:
Noiseisdefinedasanyunwantedsoundproducedwhileworkingwithmachines,
tools(airoperated/fueloperated),vehiclesetc.
NoiseismeasuredwithSoundLevelMeterandtheunitofnoisemeasurementisdecibels(dB)
PermissibleExposureLimitValue(PEL)forcontinuousNoiseexposure:
(AsperBuildingandotherConstructionworkersAct,1996andRulesmadethereunderScheduleVI)
AveragesoundpressureleveldB(A)

Maximumexposure

90

8hours

92

6hours

95

4hours

97

3hours

100

2hours

105

1hour

110

30minutes

115

15minutes

Recommendedmeasurestocontrolnoise:
a) Enclosureofmachineryusingplywoodboardingorsteelsheets
b) Bysubstitutionofquietermachineryandequipment
c) Reducingnoiseatsourcee.g.Usingbearings,Lubricationetc
d) Staggeringtheworktoleanpartsofthedayi.e.whenworkmenareminimum
e) Regularandeffectivemaintenanceofplantandmachinery.
f)

Ultimately,usingearmuffsandearplugs.

IssueDate:December,2008 Rev:2
Page20of105

12.2MaterialSafetyDataSheets(MSDS)
CBREshallinformrisksanddangersinhandlingchemicalsandhazardoussubstancesbroughtonthe
site.MSDSshallbemadeavailablebyOEM/contractortotheEHSdepartment.
12.3WasteDisposal:
Arrangementsforpropercollectionanddisposalofwastessuchasfooddropouts,combustibleand
othermiscellaneousdebrisistobemadebyrespectivecompany/contractorsattheirworkarea.
Disposalofsuchwastesatperiodicalintervalsaretobeensured.
12.4HouseKeeping:

Generalhousekeepinginworkingplaces.
Regularcollectionanddisposalofwaste/trash.
Pathways/Walkwaysshallbeclearasfaraspossible.
Adequateilluminationprovided.
Allsanitaryfacilitiesshallbemaintainedandcleaned.
Waterleakagesandoverflowsshallbecontained.
Thecontractorshallatalltimekeephisworksite,siteofficeandsurroundingscleanandtidy
fromrubbish,scrap,surplusmaterialsandunwantedtoolsandequipment.
Weldingandotherelectricalcablesshallbesoroutedastoallowsafetrafficbyallconcerned.
Nomaterialsonanyofthesitesofworkshallbesostackedorplacedastocausedangeror
inconveniencetoanypersonorthepublic.
Atthecompletionofthework,thecontractorshallensureremovalfromtheworkpremisesall
scaffoldings,surplusmaterials,rubbishandallhutsandsanitaryarrangementsused/installed
forworkmenonthesite.
Thecontractorshallatalltimekeephisworksite,siteofficeandsurroundingscleanandtidy
fromrubbish,scrap,surplusmaterialsandunwantedtoolsandequipment.
Weldingandotherelectricalcablesshallbesoroutedastoallowsafetrafficbyallconcerned.

12.5PublicProtection
Thecontractorshallmakeallnecessaryprovisionstoprotectthepublic.Heshallbeheldresponsible
fordefenseofeveryactionofotherproceedingsatlawthatmaybebroughtbyanypersonforinjury
sustainedowingtoneglectofanyprecautionrequiredtobetakentoprotectthepublic.

13.HEALTH
13.1FirstAid
TrainedFirstAidperson
Maincontractorshallprovideappropriatenumberofsuitabletrainedpersonsinthecircumstancesfor
renderingFirstaidtotheirpeopleiftheyareinjuredorbecomeillatwork.Provisionsformedicalcare
IssueDate:December,2008 Rev:2
Page21of105


aremadeavailableforeveryemployeecoveredbytheregulation.Nearbydispensary,clinic/hospital
intheproximitytotheworksiteisprovident.
EmergencyVehiclefortransportationofinjuredpersonstoaphysicianorHospitalshallbeprovided.

Inordertoensure first aid tothepersonnel incaseof injury orsufferingthefirstAidkitsaremade


availableatdesignatedlocations

ItshouldbeensuredbytheallconcernedInchargesthatthetrainedFirstAiderisalwaysavailableat
theirrespectiveworkareatocareoffirstaidincaseofanyinjurytotheemployees

o ElectrocutionSwitchoffthemains/detachusingnonconductivemateriallikewoodenstick/
rubbermaterialifthevictimisstillstrucktotheelectricalsource.
o FireExtinguishthefirewiththehelpfireextinguisheravailablenearby.
o FallMakethevictimcomfortable;raisehislegstokeepthebloodcirculationtohead.
o ChemicalInjuryUselotsofwatertowashoff.
o TakethehelpoffirstAidersavailableatsite
o Maintainsilenceandarrangetosendthevictimtothehospitalforfurthertreatment.
FirstAidKit
Regardless of the number of people, firstaid center shall be provided on site by main contractor.
Everytrainedfirstaiderhaseasyaccesstofirstaidequipmentandprovisionmadeforeverypersonto
have reasonably rapid access to firstaid. Firstaid kit is checked regularly and contains sufficient
quantityofsuitablefirstaidmaterials.
FirstaidCentre
Suitablystaffedandequippedfirstaidcentershallbeorganizedneartheareaofwork.Thefirstaid
centreshallbeunderthechargeofanoccupationallytrainedfirstaider.

Readilyavailabletrainedfirstaidershallrenderfirstaid.Firstaidcentershallbesuitablyilluminated,
ventilatedandcleanedregularly.

IssueDate:December,2008 Rev:2
Page22of105


13.2ContentsofaFirstaidbox
(AsperTheBuilding&Contractors,Act1996)
1) Asufficientnumberofeyewashbottlesfilledwithdistilledwaterorsuitableliquidclearly
indicatedbyadistinctivesignwhichshallbevisibleatalltimes.
2) 4%xylocaineeyedrops,andboricacideyedropsandsodabicarbonateeyedrops.
3) 24Smallsterilizeddressings.
4) 12Mediumsizesterilizeddressings.
5) 12Largesizesterilizeddressings.
6) 12Largesizesterilizedburndressings.
7) 12(Fifteencms)packetsofsterilizedcottonwool.
8) (200ml)bottleofcentrimidesolution(1%)orsuitableantisepticsolution.
9) One(200ml)bottleofMercurochromesolution(2%)solutioninwater.
10) One(120ml)bottleofsalvolatilehavingthedosesandmodeofadministrationindicatedon
thelabel.
11) OnepairofScissors.
12) Onerollofadhesiveplaster(6cmx1metre).
13) Tworollsofadhesiveplaster(2cmx1metre).
14) 12piecesofsterilizedeyepadsinseparatesealedpackets.
15) Abottlecontaining100tablets(eachof325mg)ofaspirinoranyotheranalgesic.
16) 12rollerbandages10cmswide.
17) 12Rollerbandagesof5cmswide.
18) Onetourniquet.
19) Asupplyofsuitablesplints.
20) 3packetsofsafetypins.
21) Kidneytray.
22) Asnakebitelancet.
23) One(30ml)bottlecontainingpotassiumpermanganatecrystals.
24) CopyofFirstaidleafletissuedbyDirectorGeneral.
25) 6Triangularbandages.
26) 2pairsofsuitable,sterilized,latexhandgloves.

IssueDate:December,2008 Rev:2
Page23of105


13.3DrinkingWater
Ineveryworkplace,sufficientamountofpotabledrinkingwatershallbeprovided.

No drinking water supply points shall be situated within 6 meters of any washing place, urinal or
latrine.
13.4LatrinesandUrinals
LatrinesandUrinalsshallbeprovidedattheworkplaces.Shallbeunderacoverandportionedoffas
tosecureprivacyandshallhaveproperdoorsandfastenings.

Clearnoticesinregionallanguages/EnglishshallbedisplayedtounderstandForMenonlyandFor
Womenonlyasthecasemaybe.

These latrines and urinals shall be adequately illuminated and shall be maintained in a clean and
sanitarycondition.
13.5AntiMalarialPrecaution
CBRE shall conform to all antimalarial instructions given to by client including the filling up of any
narrowpitswhichmighthavebeendugbySafety.
14.Safety
14.1Excavation
Excavationistheessentialelementoftheconstructionprocessformakingfoundations,drainagework
andsiteregradingofallkinds.
Incarryingoutexcavationsthesoilconditioncanvarywidely,ofteninshortdistances.Nosoil
whateveritsnaturecanbereliedupontosupportitsownweightforanylengthoftime.Evenasmall
fallofearthiscapableofinflictingseriousinjuryevenifitdoesnotkill.Unlessanduntiltheexcavation
isbattered,thesidesneedsupportingtopreventthepossibilityofcollapse.
Thefollowingsafetymeasuresaretobeensuredbeforeandduringexcavation.

Checkforundergroundutilitieslikeelectrical/telephonecables,sewage,waterlinesand
propercarehastobeexercisedtoprotectandpreventdamagetoit
Properandadequateslopeismaintainedwhileexcavating
Adequateshoringorsheetingisdonewhereverrequiretopreventsoilsliding
Safeaccessthroughladderorstepsforexit&entrytoexcavation
Nomaterial/excavatedsoiliskeptwithinonemeterfromtheedge
SafewayisplannedandprovidedformovementofHEM/transportequipmentnear
excavation
Safetyhelmetandshoes/gumbootsareprovidedandwornbytheworkmenatexcavation
works
Barricadingisprovidedatexcavatedpits
Dangersigns/Cautionboardsaredisplayedatworkspot
Dewateringarrangementismadewherewaterseepageisprevailed.
Stopblocksareprovidedtoavoidvehiclesreversingintotheexcavatedtrenches

IssueDate:December,2008 Rev:2
Page24of105

14.2Piling
Itisthefirstandforemostactivityofconstructionwhereloadbearingcapacityofsoilisinadequatefor
foundation.Theworkingconditionofpilingrigandotherassociatedtacklesisasignificant
contributingfactorforpreventionofequipmentfailureduringoperation.
Ensurethefollowingprecautionarymeasuresbeforestartingpilingworks

Inspectionofpilingequipmentbyresponsiblepersonforitsconditionbeforeinitiatingpiling
operation.
Testinganditscertificationwireropes,slings,Dshackles,chainpulleyblocksusinginthe
processofpilingworkbycompetentperson
Adequatesupportandsecuredfoundationofthepilingequipmenttoavoidtoppling
Hosesshouldbelashedandadequatelysecured
Properworkplatformistobeprovidedonpilingframe
Safeworkproceduresandclosesupervisiontopreventunsafeactsofoperators/anyunsafe
conditionsthatmayarise
Onlyexperiencedandtrainedoperatorsareengagedforthepilingoperation
ProvisionofPersonalProtectiveEquipment(PPE)likesafetyshoes/gumshoes/safety
helmet/safetybeltetcanditsusebytheirworkmen.
SpecialcareandprecautionsIfworkisnearelectricallivecables/electricalequipments
Cordoningofworkareatopreventunauthorizedentry
Guardingofrevolvingparts
Specificmeasurestopreventoverturningofpiledriver/missingofhammer/hammer
movementoutofrange

14.3MobilePlant
Mobileplantincludingtractors,trailers,dumpers,excavators,bulldozers,roadrollersetc.for
earthmovingpurpose,concretemixers,concretetransitmixtures,concretepumpsetcforconcreting
purposeareextensivelyusedinconstructionIndustry.Duetotheverynatureoftheirfunctionand
movementindifficultterrains,congestedareas,workingintandemwithmanualworkandother
operationsthedangerisinherent.
Manypotentiallyhazardoussituationsandaccidentscouldbeavoidedbytheapplicationofknown
safetyprinciplesandprocedures
Safetymeasures:
1. Wheremovementaroundsiteisinvolved,routesshouldbeplanned,obstructionfreeandwell
maintained
2. Observespecifiedspeedlimits
3. Operatingpersonnelshouldbeawareofassociatedrisksanditspreventivemeasures
4. Only experienced, trained and authorized persons with valid license (wherever applicable )
shouldoperatethemobileequipments/vehicles
5. ProvideanduseWarninglightsandreversehornforcautioningthepeoplearound
6. Operationshouldbeonlevelandstablegroundwithadequateworkingclearance.
7. Loadingofoutriggers/stabilizersshouldbewellwithinsafegroundbearingcapacity
8. Nopersonshouldbeonequipmentorvehicleduringloadingandunloadingofmaterial
9. Operators should be protected by warning barriers or switching off power when working in
closeproximityofoverheadpowerlines
IssueDate:December,2008 Rev:2
Page25of105


10. Theequipment/vehiclesshouldbewellmaintainedandprovidedwitheffectivebrakesystem
andothersafetydevices(whereverrequire)
11. Rotatingpartsofequipmentshouldbeadequatelyguarded
12. Provide necessary personal protective appliances and ensure its use by the operating
personnel Ensure effective measures at source to control harmful emissions, dust, fumes
contaminating atmosphere and cause health hazards to the operators and people in the
vicinity.
13. Nooverloading/overstressingofvehicles/plantisallowed
14. Hoses, pipes, and receivers gauges and valves involved in carrying out hydraulic fluid/
compressedairshouldbecheckedforleaksandtestedpriortooperation.
15. Adequatesafeclearanceforswingandmovementistobejudgedduringoperation
16. Concretemixture:
17. Setting of machine on firm and level ground with wheel locked to prevent movement of
machine
18. Proper instructions and Special precautions are to be ensured to prevent entry in to the
dangerzoneofprojectileofbucketwhiledroppingbucket
19. Operator leaving work spot should ensure that the equipment/vehicle is kept in neutral
positionandplaceonfirmandlevelground.
20. Thehandbrakeshouldbekeptinpositionandblockroadwheelsasadditionalsafetymeasure
21. Blades/bucketsshouldbekeptlowwhilemoving
22. Thedozerbladesshouldnotbeusedasbrakesexceptinemergency
23. The ground should be examined for its bearing capacity and general safety especially when
operatingroadrollerattheedgesofslopes,embankments.
24. Therollershouldnotbemoveddownhillwiththeengineoutofgear
25. Ifoperatingnearexcavationsthefollowingprecautionarymeasuresaretobeensured
26. Barricading,edgeprotectiontopreventfallofpersons/vehiclesoverrunningwhilereversing
etc.
27. Suitablesupportsystemandadequateallowancetoavoidthedangerofsidecollapsing
28. Experienced signaler /attendant should be always accompanied with operator/driver for
proper direction /signaland also to cautionothersin theworkingZone during operation of
mobileplant
14.4ConcreteVibrators

Revolvingparts/beltdrivesshouldbeadequatelyguardedandVibratingunitshallbecompletely
enclosed
ElectricallyoperatedcompactVibratorsisofcompletelyenclosedtypehavingsuitableoverload
relaysandeffectivelyearthed
EnsuresufficientlengthofcabletotheVibrator.
Ensureelectricstartersandotheraccessoriesarefirmlyfixedadequatelysupported
Ensurelockingofneedleloadwhileinsertingneedleintothevibrator,
Ensureperiodicallubricationandmaintenance

14.5Concretemixture

Settingofmachineonfirmandlevelgroundwithwheellockedtopreventmovementof
machine
Proper instructions and Special precautions are to be ensured to prevent entry in to the
dangerzoneofprojectileofbucketwhiledroppingbucket

IssueDate:December,2008 Rev:2
Page26of105

SafetyduringmaterialTRANSPORTATION

Consider weight, dimension, capacity of the carrier, center of gravity of load, clearance required etc
whileloadingmaterialfortransporting
Loadisadequatelypackedandlashedbeforetransportation.
Thevehicle/trailersareingoodworkingconditionespeciallythebrakes/lights,Hornsandotherwarning
signals
Nooverloading/projectingofmaterialabovetheheightofsidepanelorbeyondthesidepanels.(May
beallowedmaximumprojectionof1to1.5mtsatthebackofdeck.Displayofredcautionflagorred
lampinthenightsontheprojectedend.
Observeprescribedspeedlimitsandroadsafetyrulesforrailwaylevelcrossing/turnings,overtakingetc..
Nogetinanddownfromamovingvehicle.
Nopersonshouldsitnearorovertheloadandonsidepanels/topofdriverscabin.

Ensuresurveyofroute,Ifmaterialsaretransportedinwagons/trailers,preventingpossiblefouling
withanyfixedstructure/object/OverheadelectricalCable/anotherwagonetc.
In case of transporting hazardous nature of materials like petroleum products/chemicals and
compressedgascylinderstheprescribedsafetymeasuresaretakenaspertherelevantActs.
Vehicleshouldbeoperatedbyonlyauthorizeddriverhavingvaliddrivinglicenseandthevehicle
shouldbeprovidedwithRCandotherrelevantprescribedcertificatesandinsurancecoverage

14.6Hoist,Cranes

Manufacturersrecommendationsonoperatingconditionsshallbefollowed.
Ratedloadcapacities,operatingspeedsshallbefollowed
Liftingstudiesshallbemadeinconcurrencewithclientiftheloadismorethan10tones.
Standardhandsignalsshallbefollowed.
Accessibleareaswithintheswingofrotatingsuperstructureofcraneshallbecordonedoff.
For tower crane, adequate clearance shall be maintained between the moving and rotating
structures,fixedobjects.
Employeesrequiretoperformdutiesonhorizontalboomsoftowercraneshallbeprotected
againstfallingbyguardrailsorfallprotection.
SafeWorkingLoad(SWL)fortowercraneshallbeconspicuouslydisplayedoneachside.
Onlytrainedandauthorizedoperatorshalloperatethetowercrane.

14.7MotorVehicles

Controlofalltrafficonthesiteandmovementofmaterials,parkingshallbeplannedand
executedaccordingtospaceavailability.
Motorequipmentleftunattendedatnightnearareaswhereworkisinprogressshallhave
appropriatelight,reflectorsorbarricadestoidentifytheequipment.
JCBsscrapperbladesorsimilarequipmentshallbeeitherfullyloweredorblockedwhilebeing
repairedorwhenitisnotinuse.
Allcontrolsshallbeinneutralpositionandmotorstoppedandbrakeset.
Otherstandardaccessoriesofvehicles,equipmentssuchasseatbelts,rearviewmirrorsand
safetylatchesandoperatingleversshallbeinaccordancewithstandardvehiclecodesand
stateinspectedwhereappropriate.

IssueDate:December,2008 Rev:2
Page27of105


14.8Trucks
Trucksusedonsite,trafficproceduresshallbetakencareof.Areasonablysmoothtrafficsurfaceshall
beprovided.Ifpracticablealooproadshallbeprovidedtopermitcontinuousoperationofvehiclesto
eliminatetheirbacking.Backingoperationshallbecontrolledbyabanksmanpositionedsoastohave
aclearviewoftheareabehindthetruck.Movementofworkmenandplantshallberoutedtoavoid
crossingsasmuchaspossible.
14.9Traffic
Thecontractorshallorganizeoperationsbytakingapprovaltousetheexistingroads,ifany,from
Client.

Thecontractorshallexercisefullcaretoensurethatnodamageiscausedbyhimorworkmen,during
theoperation,totheexistingwatersupply,sewerage,powerortelecommunicationlinesoranyother
servicesorworks.Thecontractorshallprovideanderectbeforeconstruction,substantialbarricades,
guardrails,andwarningsigns.Heshallfurnish,placeandmaintainadequatewarninglights,signages,
etc.,asrequiredbyProjectManagers.
14.10FirePrevention

Electricalwiringequipmentforheating,heightonpowershallbeinstalledincompliance
withstatutoryrequirements.
Internalcombustionenginepoweredequipmentshallbelocatedwithexhaustwellaway
fromcombustiblematerials.
Smokingisprohibitedonthesite.
Nosmokingsignboardsshallbepostedconsciouslyatappropriatelocations
Storageareasshallbefreefromaccumulationofunnecessarycombustiblematerials.
Sufficientnumberoffireextinguishersshallbeinstalledatalltemporarybuildingsand
storages.
Allflammableliquids,gascylindersandotherinflammablematerialsstoredproperlyand
separately.
Flamecuttingandweldingtakehotworkpermit.

Preventingthespreadoffire:

Wasteaccumulationinhoistshaftsetcwillberegularlyremoved.
Separate metal containers for oil rags, paint rags, paint scrapings, waste flammable liquids,
woodwarningsandoffcutsprovided.
Allwasteswillberegularlycleaned/cleared.

MeansofEscape:

Allgangways,stairs,platformsshallbefreefromobstructions.
Everyone on the site shall be trained and shown the way how to escape safely in an
emergency(Emergencydrills/Exerciseshallbeconductedperiodically).

FireFighting:

Allfireextinguishersarecheckedregularlyandrecharged.
Fireextinguishersshallbeprovidedatvintagepointsforeasyaccessibility.

IssueDate:December,2008 Rev:2
Page28of105

Firefightingtrainingshallbeimpartedtostaffandliteratecontractors.

ClassofFire

AFiresinordinarycombustible(wood,vegetable
fibers,paperandthelike)

BFiresinflammableliquids,paints,grease,
solventsandthelike.

SuitableTypeofAppliances
ChemicalextinguishersofSodaacidGas/
expelledwaterandantifreezetypes,and
waterbuckets.
Chemicalextinguishersoffoam,carbondioxide
anddrypowder
Types,andwaterbuckets.

CFiresingaseoussubstancesunderpressure

ChemicalextinguishersofDrypowder&
Carbondioxidetypes

DFiresinreactivechemicals,Activemetalsetc.

Specialtypeofdrypowderextinguishersand
sandbuckets

EFiresinElectricalEquipments

ChemicalExtinguishersofCarbonDioxide&Dry
ChemicalPowderSandbuckets

14.11Ladders
Workactivitiessituatedabove2.5metersfromgroundfloor:
Precautionshallbetakentoavoidfromfallingdown.Forworkabove2.5metersfromgroundfloor
levelproperscaffolding/stagingshallbeerected.
UseofLadders:

Laddershallbefixednearthetopifpracticableornearthebottomandsecured.
Laddershallbeplacedonafirmlevelbase.
Laddershallbeintermediatelysecuredtopreventswayingandsagging.
Whileworkingonladderabove2.5meters,fallprotectionshallbeused.
Ladders shall extend at least 1.05 meters, above any landing place beyond the highest rung
fromwhichapersonshallworkorhaveanearbyhandholdofequivalentheight.
Laddersshallbeplacedsothatthereisspacebehindeachrungforproperfoothold(Norung
shallcoincidewithscaffold/stagingtubes).

14.12Scaffolding/Staging
Workactivitiesabove2.5Metersfromgroundfloorlevel:

Properscaffolding/stagingshallbeerectedforworksabove2.5mts.highabovethefloorlevel.
Ladderproperlysecuredshallbeused.

IssueDate:December,2008 Rev:2
Page29of105


Supervisionofworkandinspectionofmaterial:

Scaffolding/Stagingshallbeerected,alteredordismantledonlyunderacompetentsupervisor
asfaraspossible.
Allscaffolding/stagingmaterialsshallbeinspectedbeforeuse.
Allinspectedscaffolding/stagingshallbearasignReadyforUse.

Materialandconstruction:

Sufficientsoundmaterialshallbeprovidedforascaffold/stagingstrongenoughforthejob.
Scaffolding/stagingtubesandfittingsshallnotbebent,distortedandundulyrusted.

DefectiveMaterial:

Scaffolding/Staging tubes, couplers, fittings bent or unduly rusted or distorted shall be


rejected.
All scaffolding/staging components shall be properly stored when not in use and kept
separatelyfromotherbuildingmaterials.

MaintenanceofScaffolding/Staging:

Scaffolding/Staging shall be kept in good condition and every effort made to prevent the
accidentaldisplacementofanyparts.

Partlyerectedordismantledscaffolding/Staging:

If any scaffolding/staging is partly erected or partly dismantled and is still capable of being
used to some extent, shall have a warning notice fixed and all access blocked/barred at the
pointbeyondwhichitcannotbesafelyused.

MobileScaffolding/Staging:

Shallbestable,weightedatthebase.
Usedonlyonflatandleveledsurface.
Havethewheelslockedtopreventmovementwhileinuse.
Pushed/Pulledonlyatthebasewhenmoved.

14.13FormWork

Formworkshallbedesignedtakingintoconsideringspans,settlingtemperaturesofconcrete,
deadloadandworkingloadsupportedbysafetyfactorforthematerialused.
All timber formwork shall be carefully inspected before use and member having cracks,
excessiveknotsshallbediscarded.
Verticalsupportsshallbeadequatelybracedorsecurednottoallowfalling.
Allcenteringworksshallbefinallyinspectedforitssoundness.

14.14ConcreteConstruction
HandlingofPlant:

Allgears,chainsandrollerofmixershallbeproperlyguarded.

IssueDate:December,2008 Rev:2
Page30of105

Railingsshallbeprovidedonthegroundtopreventanyonewalkingundertheskipwhileitis
beinglowered.
Allcables,clamps,hooks,wireropes,gears,clutchesetc.ofmixer,shallbechecked,cleaned,
oiled,greasedandservicesonceinaweek.
Whilecleaningtheinsideofdrumsandoperatingpowershallbedeenergized,lockedoffand
fusesremoved.Asuitablenoticeshallbehungattheplace.

14.15Barricades

Barricades shall be erected, maintained required in connection with concerned Engineers in


ordertoprotectpeopleathoistingareas.
Contractors Supervisors shall become acquainted with Project Manager and EHS
Manager/Officerandbarricadingpracticesandshallrespecttheprovisionsthereof.

GuardingofFloorOpenings:

Floor openings shall have railings or constantly attended by supervisors, appointed by


contractor/concernedsiteEngineer.
Flooropeningcoversofadequatestrengthshallbeinplace.Whenthecoverisnotinplace,
the floor opening shall be constantly attended by someone or shall be protected by a
reasonablerailing.
Arailingshallguardeveryfloorholeintowhichapersoncanaccidentallyfall.
Everyladderway,flooropeningorplatformshallbeguardedbyguardrailingonallexposed
sides.
Every open sided floor or platform level shall be guarded by120 Cms high railings. All open
sideswherethereisentrancetoramp,stairwayshallbeprovidedwithfixedladder.Therailing
shallbeprovidedbeneaththeopensideswherever.

14.16Demolition
Beforeanydemolitionworkiscommencedandalsoduringtheprogressofthework:
Allroadsandopenareaadjacenttotheworksiteshalleitherbeclosedorsuitablyprotected.
Appropriatewarningsignsshallbedisplayedforcautioningapproachingpersons.
Beforedemolitionoperationsbegin,thecontractorshallensurethatthepoweronallelectric
servicelinesisshutoffandthelinescutordisconnectedatoroutsidethedemolitionsite.Ifit
isnecessarytomaintainelectricpowerduringdemolitionoperation,therequiredservicelines
shallbeadequatelyprotectedagainstdamage.Personshandlingheavymaterials/equipment
shallwearsafetyshoes.
Nofloor,rooforotherpartofthebuildingshallbeoverloadedwithdebrisormaterialsasto
renderitunsafe.
Entriestothedemolitionareashallberestrictedtoauthorizedpersonsonly.
14.17Painting
TheContractorshallnotemploywomenontheworkofpaintingwithproductscontainingleadinany
form. Only men above the age of 18 years shall be employed on the work with lead paint. The
followingprecautionsshallbetakenduringthework:
Supplyairrespiratorsforusebytheworkerswhenpaintisappliedintheformofspray,ora
surfacehavingleadpaintisscraped.
Theworkmenshalluseoverallsandadequatefacilitiesshallbeprovidedtoenablethepainters
towashatthecessationofwork.
IssueDate:December,2008 Rev:2
Page31of105

Allpaintingjobs,especiallythoseinwhichleadpaintsareusedshallbekeptunderindustrial
hygienesurveillance.
Smoking, open flames or sources of ignition shall not be allowed in places where paints and other
flammable substances are stored, mixed or used. A caution board, with the instructions written in
national/regionallanguage,SMOKINGSTRICTLYPROHIBITEDshallbedisplayedinthevicinitywhere
paintingisinprogressorwherepaintsarestored.Symbolsshallalsobeusedforcautionboards.
Suitablefireextinguishers/sandbucketsshallbekeptavailableatplaceswhereflammablepaintsare
stored,handledorused.
When painting work is done in a closed room or in a confined space, adequate ventilation shall be
provided.Ifadequateventilationcannotbeprovided,workersshallwearsuitablerespirators.
Epoxyresinsandtheirformulationsusedforpaintingshallnotbeallowedtocomeincontactwiththe
skin.Theworkersshalluseplasticglovesorsuitablebarriercreams.
Adequateventilationshallbeprovidedespeciallywhenworkingwithhotresinmixes.
Increased personal hygiene shall be practiced to control inadvertent contact with the resin and
eliminateitseffects.
Workers shall thoroughly wash hands and feet before leaving the work. Work clothes shall be
changedandlaunderedfrequently.
14.18WeldingAndGasCutting

Weldingandgascuttingoperationsshallbedonebyqualifiedandauthorizedpersonsandas
perISspecificationsandcodeofpractice.
Welding and gas cutting shall not be carried out in places where flammable or combustible
materials are kept and where there is danger of explosion due to presence of gaseous
mixtures.
Welding and gas cutting equipment including hoses and cables shall be maintained in good
condition.
Barriers shall be erected to protect other persons from harmful rays from the work. When
welding or gas cutting is done in elevated positions, precautions shall be taken to prevent
sparksorhotmetalfallingonpersonsorflammablematerials.
Suitabletypeofprotectiveclothingconsistingoffireresistantgauntletgloves,leggings,boots
and aprons shall be provided to workers as protection from heat and hot metal splashes.
Weldingshieldswithfilterglassesofappropriateshadeshallbewornasfaceprotection.
Adequate ventilation shall be provided while welding in confined space or while brazing,
cuttingorweldingzinc,brass,bronze,galvanizedorleadcoatedmaterials.
Weldingandgascuttingshallnotbedoneondrums,barrels,tanksorothercontainersunless
they have been emptied, cleaned thoroughly and it is made certain that no flammable
materialispresent.
Fireextinguishershallbeavailablenearthelocationofweldingoperations.Firesafetypermit
shall be obtained for working at vulnerable areas and operating areas before flame
cutting/weldingistakenup.
Forelectric(Arc)weldingthefollowingadditionalsafetyprecautionsshallbetaken:
1. When electrical welding is undertaken near pipelines carrying flammables, such
pipelinesshallnotbeusedaspartofearthconductor,butaseparateearthconductor
shallbeconnectedtothemachinedirectlyfromthejob.
2. Personnelcontactwiththeelectrodeorotherlivepartsofelectricweldingequipment
shallbeavoided.
3. Extreme caution shall be exercised to prevent accidental contact of electrodes with
ground.
4. Theweldingcableshallnotbeallowedtogetentangledwithpowercables.Itshallbe
ensuredthatmovementofmaterialsdoesnotdamagethecables.

IssueDate:December,2008 Rev:2
Page32of105


14.19Grinding

Allportablegrindersshallbeusedonlywiththeirwheelguardsinpositiontoreducethe
dangerfromflyingfragmentsshouldthewheelbreakduringtheuse.
Grindingwheelsofspecifieddiameteronlyshallbeusedonagrinderportableorpedestal
inordernottoexceedtheprescribedperipheralspeed.
Gogglesshallbeusedduringgrindingoperation.

14.20WorkInRadiationArea
The contractor shall follow the stipulated procedure regarding work in the radiation are and other
worksrelatedwithradiography.
14.21WorkInandAroundWaterBodies
When the work is done near any places where there is risk of drowning, all necessary rescue
equipmentsuchalifebuoysandlifejacketsshallbeprovidedandkeptreadyforuseandallnecessary
steps taken for prompt rescue of any person in danger and adequate provision shall be made for
promptfirstaidtreatmentofallinjurieslikelytobesustainedduringthecourseofthework.Persons
whodonotknowswimmingshallnotbeengagedaloneforanyworkwhereriskofdrowningexists.
Sufficientnumberoflifebuoysorlifejacketsshallbeprovided.
14.22GuidelinesandGeneralProceduresforUseofElectricityAtSite
GENERAL
Followingsafetyrequirementsshallbecompliedwithbeforethecontractorusesthepowersupply.
ThecontractorshallsubmitalistoflicensedelectricalstafftobepostedatSite.
Itshallbetheresponsibilityofthecontractortoprovideandmaintaincompleteinstallationon
theloadsideofthesupplypointwithregardtothesafetyrequirementsatSite.Allcablingand
installationshallcomply withtheappropriatelateststatutoryrequirementsgivenbelowand
shallbesubjecttoapprovaloftheEngineerinCharge:
o IndianElectricityAct.
o Electricity(Supply)Act.
o IndianElectricityRules.
o NationalElectricityCode.
o OtherrelevantrulesofLocalBodiesandElectricityBoards.
Thepowersupplyshallberegulatedasperthetermsandconditionsofthesupplyoftherespective
electricityboards.
Where distribution boards are located at different places the contractor shall submit
schematic drawing indicating all details like size of wires, Over head and Cable feeders,
earthingetc.Thepositionandlocationofallequipmentandswitchesshallbegiven.
Thecontractorshallmakehisownarrangementformainearthelectrodeandtapingsthereof.
The existing earth points available at site can be used at the discretion of Client with prior
permission. Method of earthing, installation and earth testing results shall conform to
relevantI.S.Specifications(IS3043).
All three phases equipment shall be provided with double earthing. All light fixtures and
portableequipmentshallbeeffectivelyearthedtomainearthing.
All earth terminals shall be visible. No gas pipes and water pipes shall be used for earth
connection.Neutralconductorshallnotbetreatedasearthwire.
ThecontractorshallnotconnectanyadditionalloadwithoutpriorpermissionofClient.
IssueDate:December,2008 Rev:2
Page33of105

Joints in earthing conductors shall be avoided. Loop earthing of equipment shall not be
allowed.However,tapingsfromanearthbusmaybedone.
The entire installation shall be subjected to the following tests before energisation of
installationincludingportableequipment:
o Insulationresistancetest.
o Polaritytestofswitches.
o Earthcontinuitytest.
o Earthelectroderesistance.
Thetestproceduresandtheirresultsshallconformtorelevantstandards.
ElectricalShock:
Flow of electric current through human body is the cause of electrical shock. On receiving electrical
shockapersonmaybebodilyinjuredbeingthrownawayonthesamelevelorduetofallfromheight
ashelosehisbalancewhenworkingatheight.Ifelectricalpathisthroughheart,theaccidentcanbe
fatal
Burns:

Burns are caused by electrical flashes if a body part comes with in flashing distance of high
voltagecurrent.
Burnsmaybecausedduetoshortcircuitalso.
Shortcircuitmayleadtoelectricalflashescausingburns

ItisthereforeimportanttoadheretoallsafetymeasuresforpreventionofElectricalhazards.
Onlyauthorizedandqualifiedpersonsshouldundertakeelectricalrepairsandotherelectrical
works.
TreatallcircuitsareliveunlessensuredaftertestingtobeDEAD
UseStandardswitchessocketsandotherfittingsofadequateratingrequiredfortheoperation
Usedoubleinsulated3corecablesandensurescablesarefreefrominsulationfailure
Allelectricalsupplyiscontrolledthroughcircuitbreakersandthesameisperiodicallychecked
bycompetentpersonforitseffectiveoperation.
EnsureallelectricalappliancesandElectricalportabletoolsareeffectivelyearthed.
Donotallowunsafetemporaryconnections,nakedjoints/wiring
Dontworkonelectricalequipmentsinwetenvironment/onwetfloors
Dontoverloadelectricalpoint/equipment
Dontcrowdthingsnearelectricalmains/switchesandkeepaccessfreefromobstructions.
Dontmaketrail&errorsandshortcuts.Followsafeprocedures
14.23Installation
Followingguidelinesareprovidedforgeneralobservations:
Only persons having valid wiremans license/competency certificate shall be employed for
carryingoutelectricalworkandrepairofelectricalequipment,installationandmaintenanceat
site.AqualifiedlicensedSupervisorshallsupervisethejob.
Electricalequipmentandinstallationsshallbeinstalledandmaintainedastopreventdanger
from contact with liveconductorsand to prevent firesoriginatingfrom electrical causes like
shortcircuits,overheatingetc.Installationshallnotcauseanyhindrancetomovementofmen
andmaterials.
Materials for all electrical equipment shall be selected with regard to working voltage, load
andworkingenvironment.Suchequipmentshallconformtotherelevantstandards.

IssueDate:December,2008 Rev:2
Page34of105

Theminimumclearancetobemaintainedforalloverheadlinesalongroadsandacrossroads
shallbeasperthestatutoryrequirements.
Groundingconductorofwiringsystemshallbeofcopperorothercorrosionresistantmaterial.
An extra grounding connection shall be made in appliances/equipment where chances of
electricshockarehigh.
Electricfusesand/orcircuitbreakersinstalledinequipmentcircuitsforshortcircuitprotection
shallbeofproperrating.Itisalsorecommendedthathighrupturingcapacity(HRC)fusesare
usedinallcircuits.Forloadof5kWormoreearthleakagecircuitbreakershallbeprovidedin
thecircuits.
Wherevercablesorwiresarelaidonpoles,aguardwireofadequatesizeshallberunalong
thecables/wiresandeartheneffectively.Metallicpolesasageneralrule,shallbeavoidedand
ifusedshallbeearthenindividually.Anticlimbingguardsanddangernoticesshallbeprovided
onpoles.Eachequipmentshallbeanindividualisolatingswitch.
Wires and cables shall be properly supported and an approved method of fixing shall be
adopted.Loosehangingofwiresandcablesshallbeavoided.Lightingandpowercircuitsshall
bekeptdistinctandseparate.
Reinforcementrodsoranymetallicpartofstructureshallnotbeusedforsupportingwiresand
cables,fixtures,equipment,earthingetc.
Allcablesandwiresshallbeadequatelyprotectedmechanicallyagainstdamages.Incasethe
cable is required to be laid under ground, it shall be adequately protected by covering the
samewithbricks,PlainCementConcrete(PCC)tileoranyotherapprovedmeans.
Using suitable cable glands shall properly terminate all armored cables. Using cable
lugs/sockets shall connect multistranded conductor cables. Cable lugs shall preferably be
crimped.Theyshallbeofpropersizeandshallcorrespondtothecurrentratingandsizeofthe
cable.Twistedconnectionswillnotbeallowed.
All cable glands, armoring and sheathing of electric cable, metal circuits and their fittings,
metallic fittings and other noncurrent carrying parts of electrical equipment and apparatus
shallbeeffectivelygrounded.
AlltheDistributionBoards,SwitchFuseUnits,Busbarchambers,ducts,cubiclesetc.shallhave
MS enclosures and shall be dust, vermin and waterproof. The Distribution Boards, switches
etc.shallbesofixedthattheyshallbeeasilyaccessible.Changesshallbedoneonlyafterthe
approvaloftheProjectManager.
The contractor shall provide proper enclosures/covers for protection of the entire
switchboard, equipment etc. against rain. Exposed live parts of all electrical circuits and
equipment shall be enclosed permanently. Crane trolley wires and other conductor which
cannotbecompletelyinsulatedshallbeplacedsuchthattheyareinaccessibleundernormal
workingconditions.
Ironcladindustrialtypeplugoutletsarepreferredforadditionalsafety.
Opentypedistributionboardsshallbeplacedonlyindryandventilatedrooms;theyshallnot
beplacedinthevicinityofstoragebatteriesorotherwiseexposedtochemicalfumes.
Isolating switches shall be provided close to equipment for easy disconnection of electrical
equipmentorconductorsfromthesourceofsupplywhenrepairormaintenanceworkhasto
bedoneonthem.
Infrontofdistributionboardsaclearspaceof90cmshallbemaintainedinordertohaveeasy
accessduringanemergency.
Adequate working space shall be provided around electrical equipment, which requires
adjustmentorexaminationduringoperation.
Asfaraspossibleelectricalswitchesshallbeexcludedfromaplacewherethereisdangerof
explosion. All electricalequipmentsuch as motors, switchesand lighting fittings installed in
workroomwherethereispossibilityofexplosionhazardshallbeexplosionproof.

IssueDate:December,2008 Rev:2
Page35of105

Allconnectionstolightingfixtures,startersorotherpowersuppliesshallbeprovidedwithPVC
insulate, PVC sheathed twin/three/four core wires to have better mechanical protection for
preventing possible damage to equipment or injury to personnel. Taped joints shall not be
allowed and the connections may be made in looping system. Electric starter of motors,
Switches shall not be mounted on wooden boards. Only sheet steel mounting or iron
frameworkshallbeused.
Allthelightingfixturesandlapholdersshallbeofgoodqualityandingoodcondition.Badly
repairedorbrokenholders,etc.shallnotbeused.
Only PVC insulated and PVC sheathed wires or armored PVC insulated and sheathed cables
shall be used for external power supply connections of temporary nature. Weatherproof
rubberwiresshallnotbeusedforanytemporarypowersupplyconnections.Tapedjointsin
thewiresshallnotbeused.
Thebulbs/lampsusedforilluminationandtestingpurposeshallhavecoverorguardtoprotect
them from accidental breakage. Only 24 V supply system shall be used for hand lamps etc.
whileworkinginsidemetallictanksorconductingvessels.

14.24PortableElectricalEquipment

Portable electrical equipment shall be regularly examined, tested and maintained to ensure
that the equipment and its leads are in good order. Register shall be maintained for
inspection,recordingthetestingdatesandresultsoftheequipment.
Allportableappliancesshallbeprovidedwiththreecorecableandthreepinplug.Thethird
pin of the plug shall invariably be earthen. It shall be ensured that the metal part of the
equipmentshallbeeffectivelyearthen.
All connections to portable equipment or machines from the panel/distribution
board/extensionboardshallbetakenusing3coredoubleinsulatedPVCflexiblecopperwires
inonelength.Nojointsshallbeallowedinthisflexiblewire.Incasesinglelengthofwireis
not sufficient for a particular location then the supply can be tapped by providing another
extensionboardcomprisingofswitchandsocket.
Flexible cables for portable lamps, tools and apparatus shall be regularly examined, tested
periodicallyandmaintainedtoensuresafety.

15. GENERAL
15.1EHSTrainings:
15.1.2EHSinduction:
It is mandatory to provide Induction training to each and every person working inside the project
irrespectiveofcadreandtrade.
During induction training the project EHS rules and regulations would be highlighted and Dos and
DontsofEHSwouldbeexplainedandmadethemunderstoodthegeneralrisksandmeasurestobe
takenbyeachandeveryone.
15.1.2.Periodicaltrainingprogrammes:
Specific training programmes for the following activities will also be organized to promote EHS
educationforrespectivetrades/supervisors/technicians
1.SafetyinWeldingandgascuttingoperation
IssueDate:December,2008 Rev:2
Page36of105


2.Workingatheight(Staging/ladders0E
3.SafetyinoperationofPowerandhandtools
4.Firehazardsandcontrol
5.FirstAid
6.Electricalsafety
7.PersonalprotectiveEquipment

Alltheabovespecifictrainingswouldbeorganizedandscheduledonanaverageoneprogrammein
amonth
15.2HazardIdentification&ControlMeasures
TheHazardidentificationisbasicrequirementfortheAccidentPrevention.
ThetechniqueswhichareincludeInspections,AuditsandRiskassessmentetc.
15.2.1EHSinspections:
TheSitesafetyinspectionduringworkbyEHSCoordinatorandalsobyprojectcoordinatorsinthesite
playakeyroleineliminatingunsafeconditionsandunsafeacts/unsafepracticesbytheworkmen.Any
EHSviolationsduringinspectionshouldbeimmediatelybroughttothenoticeofconcernedsitein
chargeforimmediatecorrectivemeasurestoensuresafeworking.Untilandunlessprevailedunsafe
conditionordeviationiscorrectedtheworkactivityshouldnotbeallowedtocontinue.
EHSinspectionchecks(General)istobekeptinmindduringinspectionforhazardidentificationisin
Annexure
15.2.2EHSaudits:
ApartfromregularsiteinspectionbyEHScoordinator,periodicalEHSAuditwillbedonebyRegional
EHS Coordinator or Project EHS personnel to assess the EHS performance and to suggest for
improvement.
Thetechniquesappliedforthesafetyinspection/Auditcanbeasfollows.
Preparation
Selectareasofgreatesthazardoractivitytoaudit
Usetoolboxtalkstosetobjective/standardsfortheworkforce
Setagoodpersonalexample.
Observations
Taketimetowatchanactivityorsituation.
Concentrateonpeople.
Lookforunsafeacts,violationofsafetyrulesorunsafeconditions.
Recognizegoodaswellasbadpractices.
Discussion
Discusswiththeworkforcehowthejobcouldbedonemoresafely
Encouragethemtoidentifyhazards&tosuggestimprovements
Ensurethatallunsafeacts&conditionsarediscussed
Honourthegoodsafetypractices.
Followup
Checkatrandomforrepetitionofsafetyviolations
Giveformalwrittenwarningsforrepeatedviolationsbyindividuals
Contractor/Subcontractorsauditorsaretoreporttheirfindingsonaweeklybasisto
principalclienttogetherwithaction.

IssueDate:December,2008 Rev:2
Page37of105


15.2.3Riskassessment:
RiskAssessmentisanongoingactivitythroughoutthelifeoftheproject.Itisusedindevelopingthe
SafeWorkMethodStatementSWMS(oralsocalledJobSafetyAnalysis).
The SWMS requires the work method to be presented in a logical sequence. The hazards / dangers
associated with each process are to be identified and person who is responsible to take remedial
measuresshallbespecifiedforcontrollingthesehazards.
Safeworkmethodstatementsmustincludethefollowingprovisionsasaminimum.
Thesequenceofactivitiesorworktaskstobecarriedout(ie.Jobstepsinvolvedindoingthe
work)
Identification&assessmentoftheriskarisingfromthoseactivitiesortasksinrelationtothe
site and any person likely to be affected by them (ie. Identify & assess potential hazards
associatedwitheachjobstep).
The way(s) in which the identified risks will be reduced to an acceptable level ie. The
controlsthatwillbeputinplacetoeliminateorminimizethepotentialhazardsidentified).
Themanagementsystemusedtomonitorcompliancewiththeagreedsafesystemofwork.
ThewayinwhichtheprogressoftheworkwillbereviewedforthepurposeofEHSinorder
thatanynecessarymodificationsandimprovementstothesystemofworkcanbeidentified
andintroduced.
15.3SafeWorkPermitsSystem:
A Work permit system is used to ensure safe working by eliminating possible associated high risks
such as blasting, excavation, working at height, hot works(welding, gas cutting),confined space
,workingisolatedareas,electricalshock,chemicalexposure,firehazardduringtheprocessofwork.
SafeworkPermitisrequiredtobeobtainedforthefollowingworks
1. Blastingworks
2. Excavation
3. Hotwork(weldingandgascuttingoperations)wheretheriskoffireisinvolved
4. Heightwork(fortheworksabove2mtsheight)
5. Confinedspace
6. Electricalworks(whenworkingonoverheadline/transformersormajorelectricalworks)
7. AnyHazardousnatureofjobinisolatedareaswherehighriskisprevailed
Workpermitshouldbeobtainedbeforestartingoftheactivitybythedesignatedissuingauthorityof
theProjectafterinspectionandensuringrecommendedsafetymeasuresgivenbyEHSCoordinators.

IssueDate:December,2008 Rev:2
Page38of105


15.4BLASTINGPERMIT

Project:Date:
No.oftheBlasting:
LocationoftheBlasting:
NameoftheLicencedBlaster/ShotFierier:
NameoftheContractor:
Startingtimeofdrillingoperation:

ISSUINGAUTHORITY:
Theprecautions&safeconditionsmentionedbelowhavebeenverifiedandblastcanbecarried
out.Peopleshallbeevacuatedfromdangerzoneandwarningsirensshallbeblownbeforetheblast.

PERMITISVALIDfromhrstohrs
Name&Signatureofissuingauthority:..

IssueDate:December,2008 Rev:2
Page39of105


BlastingChecklist:
S.No

Description

Yes No

Remarks

1 Whetherthedetonatorsarecheckedindividuallyfor
continuityandresistance

2 Doallthedetonatorsbelongtothesamemanufacturer

3 Whethertheexplosivesandcartridgesselectedforuseare
ofcorrectsize

4 Whethertheexplosivesandcartridgesareofapproved
quality

5 Whethertheconditionoflead/legwiresarechecked?

6 Whethersocketsintheblastedareaareflushedwithair&
waterandplugged

7 Whethertheboreholesareclearedofallthedebrisbefore
explosivesareinserted

8 Whetheralltheexcessivecartridgesareremovedfrom
workspot

9 Whetherithasbeencountedthatthenumberofpersons
involvedintheoperationhavecomeoutofthespotafter
loading?

11 Areelectronicitems/radios/mobilephones/pagers
prohibitedinthelocation?

12 Whetherthedangerzoneissuitablycordonedandflagmen
postedatimportantpoints

13 Whethersuitablewarningboardsaredisplayedatsite?

14 Whethernoofentrypointsidentifiedandaccesscontrolis
established

15 Whetherblastersshelterisavailableingoodcondition?

16 Whetherpropersignalingsystemisestablishedtoprevent
trespassersenteringtheblastingzone,sirenorhooteris
available.

17 Whetherallthedrillershavebeenprovidedwithearplugs,
helmets.gogglesandgumboots?

18 Whetherarecordhasbeenmaintainedinseparateregister
indicating
a) Date&Timeofblast
b) Numberofholescharged
c) Typeofexplosiveused
d) Amountofchargeperhole
e) Firingpattern&sequence

10 Whethertheenvironmentalconditionsareconsidered?
(Rain/Sunny/Wind/Thunders/Lightning)

IssueDate:December,2008 Rev:2
Page40of105


19 Record
a) Quantityofexplosivebroughtfrommagazine
b) Quantityofexplosiveused
c) Quantityofexplosivereturnedtomagazine

20 AnyElectrical/TelecomlineorCablesnearby?

Ifso,specifythedistance&Voltage
21 Whetherthecircuithasbeenchecked
Specifytheresistance..

Ihavecheckedtheabovepointsandfoundconditionssuitabletoundertaketheblast.
Name&SignatureofthePermittee:

Checkpointsafterblasting:
S.No

Description

1 Whetheranymisfiredetected,Ifyes

Yes

No

Remarks

Givetheno.ofholes:..
Briefofactiontaken:

2 WhetherALLCLEARsirenisblown&mentionthetime
ofALLCLEARsiren.
Time:

Name&SignatureofPermitee:
Name&SignatureofIssuingAuthority:

PermitClosure:
Permitisclosedon:
Date&Time:
Name&SignatureofIssuingAuthority:

IssueDate:December,2008 Rev:2
Page41of105


15.5EXCAVATIONPERMIT

PermitNo:Date:
ProjectName:
Contractorsname:
Subcontractorsname:

Excavationdetails:
Purpose:
Area/Location:
Proposeddateandtime:
Proposeddate&timeofcompletion:
EquipmentandToolsused:
Excavationlength..inm
Excavationwidthinm
Excavationdepth..inm

Preparations:
S.No

Description

Yes/No

Undergroundcables,pipelines,electricallinesetcchecked

PersonalProtectiveEquipmentstobeused:
a) Safetyshoes
b) Safetyhelmets
c) Gloves
d) D0Eyeprotection
e) Earprotection
f) Dustmask

IssueDate:December,2008 Rev:2
Page42of105

Safetyprecautions:
S.No

Description

Yes/No

Properaccessmadewithrequiredno.ofexits

ProvideanduseproperPPE

Barricadethearea,displaycautionboards

Ensuregoodhousekeeping

Usecertifiedequipmentandmachinery

Checkforundergroundservices

Checkoperatorslicence

Checkforreversehornfortheequipment

Ensureconstantsupervision

Checkedby:
ContractorsSafetyOfficer:
Name&Signature:
Date:

PERMITISSUINGAUTHORITY:
PERMITISISSUED&VALIDUPTO:

PermitisRevalidatedforaperiodof:

PMGSafetyOfficer:
Name&Signature:
Date:

IssueDate:December,2008 Rev:2
Page43of105


15.6WORKINGATHEIGHTPERMIT
Permitno:
Jobdescription:
Location:
Tobecarriedoutby:
SafetyPrecautions:
S.No

Description

Yes/No

Scaffolding:

Scaffoldingsofgoodconstruction,adequatewith600mmwidth
walkways,toeboards

Scaffoldsecuredwithstairways,wideenoughtopass2persons
atatime,handrails,(shouldbeofmetalscaffolding)

Maintaingoodhousekeepingatworklocations

Safetynets:

Safetynetsfixedatthebottomofscaffoldtopreventbodily
injuriesincaseoffall

Ladders:

Strongmaterialsusedandwellmaintained

Laddernotplacedagainstlooseboxes,roundmaterials.objects,
nearelectricalinstallation

Ladderofsufficientheightused,ontoptiedandpositionedat
thefootofladder

Safetyfootwareprovidedatbase

Ladderplacedatanangleof7075degrees

Areaoftheworkbarricadedsothatnopersoncanwalkunder
theladder

PersonalProtectiveEquipment:

Safetyharnessprovidedandworn

Abovesafetyprecautionshavebeentaken.

Name&Signatureofpermittee:
Date:

IssueDate:December,2008 Rev:2
Page44of105

Permissionissuedfrom..hrsto.hrs
Date:
Name&Signatureofissuingauthority:

Permitclosure:
Thispermitisclosedonhrs.
Name&Signatureofpermittee:
Date:
Name&Signatureofissuingauthority:

IssueDate:December,2008 Rev:2
Page45of105


15.7HOTWORKPERMIT

PermitNo:Date:
Location:

Natureofthejob:
Theareaofworkhasbeenexamined,precautionscheckedmentionedbelowhavebeentakento
preventfire.
Safetyprecautions:
a) Thetechnicianmustinspecttheproposedprecautionstakentopreventfire.
ElectricalIsolations:
a) Electricalisolationrequiredforequipmentsisolated.
b) Electricalcablescovered.
GeneralPrecautions:
a) Fireextinguishersareinservice.
b) Cuttingandweldingmachinesareingoodcondition.
c) Areatechniciannotified.
Precautionsnearareaofwork:
a) Nearbyareasweptclearofcombustibles.
b) Nocombustible,flammableliquidsarenearby.
Firewatch:
a) Tobeprovidedduringoperation.
b) Suppliedwithfireextinguishers.
c) Trainedinuseofequipmentforfirefighting.
I,havepersonallyexaminedtheareaandcertify,precautionshavebeentakenfortheabove
mentionedarea.

Name&Signatureofthetechnician:

IssueDate:December,2008 Rev:2
Page46of105


PERMISSIONISSUINGAUTHORITY:
Permissionissuedforthisworkfrom.hrstohrs.
Permitexpirydate:

Name&Signatureofissuingauthority:

Name&Signatureofthepermittee:

PermitClosure:
Date&Time..thispermitisclosed.

Name&SignatureofPermittee.
Name&Signatureofissuingauthority:

IssueDate:December,2008 Rev:2
Page47of105


15.8CONFINEDSPACEPERMIT
(Topreparesafeworkingpracticesrelatedtoworkinginsideaconfinedspace/
vessel/plant/equipment)

A.Permitee(Thepersontakingthepermit)tofill:
1.Locationoftheconfinedspace:
2.Identityoftheconfinedspace:
3.Purposeofenteringtheconfinedspace:
4.Date&Time:

5.Checklist:
a)

HastheVessel/Equipment/Spacehasbeencleaned,purged,isolated

Yes/No

b)

Haveallelectrical/air/hydraulicequipment/drivesbeendisconnected

Yes/No

c)

Arethepersonsrequiredtoentertheconfinedspacearetrainedindealing
withthespecifiedhazards

Yes/No

d)

Personalprotectiveequipmentprovided

Yes/No

e)

Istherescueteamequippedwithemergencyrescuedevicesputonasstand
by

Yes/No

f)

Is24Vhandlampprovidedforuseinside?

Yes/No

g)

Isforcedventilationprovided?(Exhaust/Freshairflowfan)

Yes/No

6.Testsrequired:
1)
2)
3)
4)
5)
6)
7)

Oxygenlevel(19.5%to23.5%)
Explosivity(0%)
Carbonmonoxidelevel(50ppmmax.)
Carbondioxidelevel(1200ppmmax.)
Temperature
Airflow
Others

7.Listofauthorisedpersonstoworkinsidetheconfinedspace&therescueteam.
(Listtobeenclosed)

IssueDate:December,2008 Rev:2
Page48of105


Ihavecheckedtheabovepointsandfoundtheconditionsaresuitabletoundertakethework.

Name&signatureofthePermitee:
(SiteEngineer)
Designation:
A. Permitissuingauthority(Thepersongivingpermit)tofill:

Thesafetyprecautionsandsafeconditionsmentionedabovehavebeenverifiedandwork
canbestarted.

Name&signatureofSafetyOfficer:
Name&signatureofissuingauthority:
(Sectionincharge)

B. Permitclosure:

Date&Time.thispermitisclosed.

Name&signatureofSafetyOfficer:
Name&signatureofissuingauthority:

Note:Thescopeofthispermitislimitedtoenteringintoconfinedspace.Relevantwork
permitsshallbeobtainedforcarryingoutactivitiesinsidetheconfinedspacealongwiththis
permit.

IssueDate:December,2008 Rev:2
Page49of105


15.9PERMITFORWORKINGINISOLATEDAREAS
PermitNo:
Date:
Location:
Time:

ISSUE:
Natureofjobsidentified:
1)
2)
3)
4)

..
..
..

A. Safetymeasurestobeprovidedandfollowed:
a) ..
b) ..
c) ..
d)

IherebyauthorizeMr.:.tocarryouttheabovework.

Name&signatureofSiteEngineer:.
B. Acceptance:
Ihaveunderstoodthehazardsandsafetyprecautions/requirementstocarryouttheabove
mentionedworkandIaccepttoundertakethework.

Name&signatureofContractorsEngineer:

C. Name&signatureofissuingauthority:
Date&Time:

IssueDate:December,2008 Rev:2
Page50of105


15.10AccidentReporting&Investigation
Recording&Reporting:
Allincidentsoraccidentsshallberecorded,investigatedandreportedtoProjectmanager.
Occupation illness and all incidents of fire, explosion, implosion, release of hazardous substance or
other nearmiss incidents, which have potential to cause harm to environment, shall also to be
reportedwithinfollowingshift/day.
The first hand information of Accident/Incident should be sent in writing to EHS coordinator for his
investigationandfurtheraction
15.11EducatingLabour:

SafetyPosters/signboardstobeinstalledatsiteatdifferentlocations.
SafetyOfficertoconductsafetymeetperiodicallyandholdpeptalkswithworkmen.

Nomaterialsonanyofthesitesofworkshallbesostackedorplacedastocausedangeror
inconveniencetoanypersonorthepublic.
Atthecompletionofthework,thecontractorshallensureremovalfromtheworkpremisesall
scaffoldings,surplusmaterials,rubbishandallhutsandsanitaryarrangementsused/installed
forworkmenonthesite.

15.12 ReportingOfAccidents:

All accidents leading to personal injuries or property damage shall be reported to the
concernedauthoritiese.g.,Client,RegionalOffice,HeadOffice,PoliceandInsuranceCompany.
MonthlySafetystatisticsshallbesubmitteddetailingtheaccidents,natureofinjuryincluding
disability,numberofmandays lost,andmedicaltreatmentprovided andextentofproperty
damaged.
15.13 EmergencyEvacuationPlan

Removetheinjuredpersonfromthedisasterareaiftheyareinfurtherdanger.
Donotmovetheinjuredpersonoraskhimtostandifthereisnofurtherdanger.
Adviseallunaffectedpersonstomoveoutofthesite.
Escape through Fire Exit routes to the Designated Assembly Points e.g.: Security gate or
TerraceoranyotherlocationindicatedinEmergencyPlan)forfurtherAction
o Maintainsilenceandquicklymoveoutbutdonotrun.
o Designated In charge as indicated in emergency plan would be the chief of emergency
operationsincaseoftheevacuationandinhisabsenceSecurityGuardwouldberesponsible
forevacuation.
o RenderFirstAidtothevictimsthroughtrainedfirstAiderandthenshiftthemtothenearest
hospitalfortreatment
InformationofKeypersonnel:
Inorderkeepinformedallconcernedthefollowinginformationistobeprominentlydisplayedat
mainEntranceofproject
NameandContactNumberofProjectIncharge
NameandcontactNumberofNearestPolicestation
NameandcontactNumberofNearestFireStation
NameandcontactNumberofNearestHospital
NameandcontactNumberofnearestambulancecenter
NameandcontactNumberofFirstAideravailableatsite
o
o
o
o

IssueDate:December,2008 Rev:2
Page51of105

NameandcontactNumberofSecurityIncharge
NameandcontactNumberofEHSIncharge

15.14 PersonalProtectiveEquipment(PPE)
Personal protective equipment play significant role in reducing the intensity and preventing injury
incase of any accident during the course of construction activities. The PPE should be of standard
makeandconfirmtoISspecifications.

ThePPEshouldbecheckedandensureitsgoodconditionbeforeuse

Thefollowinggeneralpersonalprotectiveequipment/Safetyappliancesaretobeprovidedwherever
requiredandshouldusedreligiously

1.Safetyhelmets:Allpersonsatsite
2Safetyshoes:Allpersonsatsite
3Safetybelt:Menworkingatheightandlifelineshouldbeanchoredtoafixed
pointatabovechestlevel.Thelifelineshouldnotbelessthan
diaand2Mlong.
3.Handgloves:Personsdoingmaterialhandlingjobs,gascutting,electricalworks,
weldingoroperatingpavingbreakers,vibrators,handlingconcrete
mixingofasphalticmaterials,limemortar,cementetc.
Itshouldofcorrecttypeforspecificactivity.
4.Safetygoggles:Personsinvolvedintheactivityofgascutting,brickdressing,
welding,grinding,operatingpavementbreakers,
mixingofasphalticmaterials,limemortar,cementetc,
5.Safetynets,canvasssheets:Protectpeoplefallingfromheight,andthematerialfallingonpeople
6.EarplugorEarmuffs:workmenwhereexposedtonoiselevelabove90dB.
.7Face/Nosemasks.:Personsengagedforspraypaintingorrubbing/scrappingofdry
leadpaint,cementanddustemissionduringchippingand
breakinganddemolishingactivitiesinworkarea
.
In order identify the employees of different categories and department it is common practice to
providedifferentcolourcodingtosafetyhelmetsasgivenbelow:

WorkmenYellow.
ElectricalstaffRed
SafetyofficerorstaffofsafetydeptGreen.orWhitewithgreencolourband
Rigger/foreman/SupervisorBlue
Projectcoordinators/Engineers/MangersWhite.
VisitorsWhite
15.15 ProjectEHSStatus

Followinginformationtobedisplayedattheentrance

ProjectName
Statusdate
NumberofManhoursasondate
CumulativeManhourscompletedasondate
IssueDate:December,2008 Rev:2
Page52of105

Numberofreportableaccidents
LossofManhoursduetoaccidents
TotalnumberofSafeManhoursclocked

15.16 SiteEntryProcess

All those involved in project activities would be allowed only through valid ENTRY PASS which
shouldbethepersonalidentificationoftheindividual.

The passes are issued by the respective company/contractor. The Entry pass is only valid if, the
individualhasundergoneEHSInductionandearmarkedonPassasEHSINDUCTED.

TheCompany/Contractorengagingmanpowerforworkinginsideprojecthastoseekpermissionin
prescribedrequisitionformfromSecurityInchargeoftheproject.Aftercheckingthepassesandduly
entered the information in security register the security allows personnel to enter the project
premises

TheENTRYPASSESpossesthefollowinggeneralinformation.

PROJECT:
PassNumber:
DateofIssue:
NAME:
Designation:
EHSInductiongivenon:

SignatureofIssuingAuthority:
NameofCompany/contractor:
PrescribedrequisitionformatforseekingpermissiontoenterprojectisinAnnexure
SimilarlyVisitorsPassandMaterialGatepasswouldbeintroducedforsecuritycontrol.

16. FORMATS
16.1

SiteSafetyRules

YouareadvisedtofollowallthetimetheDOsandDONTsgivenbelowforthesafetyofeveryone
workinginproject.
Warning:Deliberateignoranceofthesesafetyruleswillbeviewedseriouslyandliableforpenalty/
removalfromsite.
DOs
1. UndergoEHSinductionTrainingbeforeenteringintoprojectsite/ensureallyouremployees
receivedEHSinductionTraining
2. ProvideandensureproperuseofPPEsuchasSafetyshoe,Safetyhelmet,Safetyshoes,Safety
gloves,Safetybelt(whenworkingatheight)etcbyalltheemployeesintheproject
3. Complywithmethodstatementwhereverapplicable
4. Ensure Work Permit prior to start of activities such as work at height, Hot work, Deep
excavationetc.,

IssueDate:December,2008 Rev:2
Page53of105


5. Ensure all activities related to Electrical energy is handled by competent person/authorized
electricianonly
6. Ensurethatproperlugsareprovidedtoweldingcables
7. Ensure that proper wedging/locking of wheels is done for mobile scaffold/Concrete Mixer /
Transportvehiclesbeforestartingtheworkactivity
8. Ensureproperbarricading/coveringwherethereisadangeroffallofpersons/fallofmaterial
fromtop.
9. Checkfront,backandbottomofthevehiclebeforestartingtomovethevehicle
10. Watchvehiclemovementandcautionswhilewalkingintheprojectarea.
11. Clean and kept workplace neat and tidy and remove all wastage/scrap from the work spot
aftercompletionofeachworkwithoutdelay.
DONTs
1. Smokeintheprojectpremises
2. Drinkliquorintheprojectpremises
3. UseopenplaceforToilets(UseToiletsprovidedintheprojectsite)
4. Runthevehiclebeyond10Kmphspeed
5. PlaywithHazardouschemicals
6. Interfereinotherswork
7. Enterareasnotofyourconcernwithoutpermission
8. WorkatheightandunderHTlinesduringraining,lighteningandheavywind
9. DressLungi/halfpantduringworkingatproject(Wearfullpantandshirt).

IhavereadandIabidewiththerules

Name:Signature

IssueDate:December,2008 Rev:2
Page54of105

16.2

EHSResponsibility&AccountabilityforContractors

(ThisdocumentwillbeissuedwithTenderdocuments)
The following specific responsibilities are assigned to you with respect to Environment, Health and
Safety(EHS)
Youshallensurethat
1. Inspectionofyourareaandcorrectiveactionsagainstdeviationsimmediately
2. Goodhousekeepingofyourareaandatworkspot
3. Workpermitsystem(whereverapplicable)isfollowedbyallyourworkmen/supervisors/Sub
contractors.
4. Allyouremployees/supervisors/Managersaretrainedinsafety,firstAidandsupervisors.
5. All portable tools are double insulated /properly earthed/adequately guarded as per
standardsandingoodworkingorder
6. The concerned employees /trainees/managers receive EHS Induction as well as on the job
training as and when require (if new machines are installed or working procedures are
changed)
7. Safeworkpracticesareadoptedbyallyouremployeesatprojectsite
8. AllemployeesareprovidedwithrequiredPersonalProtectiveEquipment(PPE)anditsproper
usageandadheredtootherEHSrulesatprojectsite.
9. Inspection/checkingofallToolsandtacklesbeingusedbyyourpersonnelandensuresafety
measuresduringoperationofthesame
10. TheAuthorizedTestcertificatefromcompetentpersoninrespectofcrane,chainpulleyblocks
and Lifting tackles such as wire ropes, chains, slings etc being used by you in the work
activities.
11. All electrical operated equipment/tools/appliances are drawn supply through ELCB (Earth
LeakageCircuitBreaker)topreventElectricShockhazard
12. Investigation of Incidents/Accidents and implementation of remedial measures and its
record.
13. Rendering of First Aid and reporting of Accident to Project Manager/EHS coordinator
immediately.
14. Allyouremployeesarecoveredwithvalidinsurance.
15. Your drivers/operators posses Valid driving License/Experience Certificate (wherever
applicable).
16. Allvehicles/motorizedequipmenthavevalidCbookandinsurancecoverage.
17. The effective supervision throughoutthework activitytoensuresafe practices in order to
preventUnsafeconditions/UnsafeActsofworkmen
Please acknowledge the receipt of this document by signing on duplicate copy as a token of
acceptanceofthesaidresponsibilitiesassignedandreturnthesameforrecord

Date;ProjectManger/EHSCoordinator
To
M/s

ReceivedthecopyofEHSResponsibilityandAccountabilityforContractorsandIherebyacceptand
acknowledgethesame.

NameandSignatureofContractorsProjectIncharge

Date:
IssueDate:December,2008 Rev:2
Page55of105

16.3

EHSInduction

PROJECT:DATE:TIME:

ThefollowingsafetytopicshavebeenmadeunderstoodbyusinrespectofSafetyatproject
1 EHSrulesatprojectsite
2 Housekeeping
3 ReportingofHazards
4 Electricalsafety
5 Safetywhileworkatheight
6 Ladder&scaffoldsafety
7 ImportanceofPPE&itsuse
8 FirstAid&Fireprevention
9 Welding&Gascutting

SNO

NAME

DESIGNATION

COMPANY/CONTRACTOR

SIGNATURE

CONDUCTEDBY:
NAME:

DESIGNATION:SIGNATURE:

IssueDate:December,2008 Rev:2
Page56of105


16.4

SafetyPepTalk

PROJECT:DATE:TIME:
Topicshighlightedinthepeptalk:
14
25
36

S.no.

Name

Designation

Company/Contractor

Signature

CONDUCTEDBY:

NAME:
DESIGNATION:SIGNATURE

IssueDate:December,2008 Rev:2
Page57of105


16.5

Incident/AccidentInvestigationReport

NameofContractor/Subcontractor:
NameofAccidenteeorPersonInvolved:
DATE&TIME:
Location:
DescriptionofIncident/Accident
(Briefnarrationhowitoccurred):
NatureofDamage/Injury:
Witness(ifany):
Observation:

CAUSEOFACCIDENT/INCIDENT:

Correctiveactiontaken/suggestedfor:
Preventionofrecurrence

Signature:
Date:Name:
Designation:

IssueDate:December,2008 Rev:2
Page58of105

16.6

EHSInspection

To:

Date:
Observedthefollowingunsafeconditions/Unsafeactsduringsiteinspectiontoday

Findings:

Actionrequired:

Kindlyarrangeforcorrectiveactiononpriority.

Thankingyou,
EHSManager/Coordinator

IssueDate:December,2008 Rev:2
Page59of105

16.7

OnTheJobSafetyCommunications

Project:

Date:Time:

:
NameOfcontractor/Subcontractor:

Location:

BriefdescriptionofSafetyviolation:

Safetyadvice/InstructionGiven:

InstructionGivenby

Signature:

Name:

InstructionReceivedby

Name:

Signature:

IssueDate:December,2008 Rev:2
Page60of105

16.8

EHSStatusReport

Date:
PROJECT:Month:
Observations/CorrectiveActions:(NCR)
SNO
NatureofViolation
Forthemonth
Cumulativeasondate:

Observed

Corrected

Observed

Corrected

NonUseofPPE

UnsafeActs

UnsafeConditions

Unsafepractice

Housekeeping

SafetyEducation&AwarenessProgrammes:

No.of
No.of
SNo
Deatailsofprogramme
DATE participants
programme
duringmonth
Staff Workers

1
Safetycommitteemeeting

2
Trainingon
a)
b)
c)
3
SafetyPeptalkon

a)
b)
c)
4
Demonstrationon
a)
b)
c)

REMARKS

EHSINCHARGEPROJECTINCHARGE

Cumulati
veasonDate

IssueDate:December,2008 Rev:2
Page61of105

16.9

SafetyCommitteeMeeting

PROJECT:

DATE:TIME:VENUE:

SNO

NAME

Organization/contractor

Signature

IssueDate:December,2008 Rev:2
Page62of105

16.10 EHSPenalty
Project:Date:
To
M/s

Through:TheProjectManger

Sub:PenaltytowardsViolationofEHSrulesatProjectsite
ApenaltyofRs.(Rupees)isimposedonyouforviolationofEHSrulesby
yourstaff/workmenatProjectsite.
DetailsofViolation:
NameofPerson:

Date:Time:AM/PM
Location:

EHSViolation:

ProjectEHScoordinator

CCtoProjectCoordinator(concernedforthelocation)

IssueDate:December,2008 Rev:2
Page63of105

17 SAFETYCHECKLISTS
17.1

Generalsafety
GeneralConstructionSafetyChecklistcumAuditReport

PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.N
O

GeneralConstructionSafetyChecklistcumAudit
Report

YES

NO

REMARKS

MANAGEMENTCOMMITMENT

Isthereasafetypolicy?

Isthesafetypolicydisplayedatsite?

Iseveryoneawareofthecontentsofthesafety
policy?

Aretheresafetyplansandsafetyprocedures?

Aretheemployeesawareofthesafetyplans?

Isthereasafetyorganisation?

Isthereacompetentsafetyprofessionalavailableat
site?

Isthereasafetycommittee?

IsprojectmanagementactivelyparticipatinginHSE
Programs?

SAFETYTRAINING&AWARENESSPROGRAMS

Areemployeesgivensafetyorientation?

Areemployeesgivenspecialisedtrainingwhere
needed?

Aretoolboxtalksregularlyconducted?

Arethebulletinboardsatsite?

Aresafetymaterialdisplayedatsite?

Aretheresitesafetyinstructionstovarioustrades?

Aremethodstatementsmadeforcriticalactivities?

IssueDate:December,2008 Rev:2
Page64of105

IsSPAmadeforroutineandnewactivities?

AreworkersparticipatingisformulatingSPA?

EMERGENCYRESPONSE

Isthereafirstaidcentreatsite?

IstheFirstAidCentreequippedwiththerequired
medicinesandaccessories?

Isthereaqualifieddoctor/nurseavailableatsite?

Isthereanyarrangementwithhospitalfor
emergencytreatment?

Isthereanemergencyresponseteam?

Istheteamtrainedonemergencyresponse
procedures?

Areworkersawareoftheemergencyprocedures?

Areemployeesawareoftheactionstobetakenin
caseof:

Accidents

Fire

GasLeakage

GasCylindersonfire

Snake/Scorpionbites

SunStroke

Electricshock

Areemergencytelephonenumbersdisplayed?

10

Isemergencyvehicle/ambulanceavailableatsite?

11

Aretrainedfirstaidsavailableatsite?

12

Arethereassemblypointsavailable?

13

Isthereaneffectivecommunicationsystem?

14

Aremockdrillsconductedatregularintervals?

IssueDate:December,2008 Rev:2
Page65of105


17.2DAILYINSPECTIONCHECKLISTFORSAFETYMEASURESATSITE
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.No

Description

Yes

No

Remarks

1 AreallpersonsenteringsitewearingSafety
helmetsandSafetyshoes?

2 Arepersonsworkingabove2meters,wearing
safetyharnesswithlifelineanchoredtoarigid
support?Allworksover2metersmustbe
carriedoutongoodworkingplatformswhich
arebuiltacceptabletosafetystandards.

3 Arespecialelectricalequipmentrequiredfor
electricalworksavailable?

4 Aresafetyguardsformovingpartsof
machinesinposition?

5 Areopenings/pitscovered,barricadedand
warningsignsdisplayed?

6 Ishousekeepinginorder,materialsare
stackedproperlyinmarkedareas?

7 Istheworkareapollutedwithdust,fumes,
gasesetcforwhichsafetyappliancesare
providedornot?

8 Arefireextinguishersavailableatsite?

9 Arefireextinguishershangedonwallwith
properclampsorplacedonground?

10

Isvalidityofrefillingextinguishersdisplayed
onthebodyofextinguisher?

11

Arefirebucketsavailableatsite?

12

Arefirebucketsfilledwithwaterandsand?

13

Isearthingprovidedtoallequipments?

14

Doestheearthconductorcontinueduptothe
distributionboard?

15

isELCBprovidedtoallelectricalcircuits?

16

Istheaccessandworkingplatformsproperly
illuminated?

17

Isinsertionofloosewiresinsocketswithout
plugsocketspresent?

18

Isimproperjoiningofcablesandwires
prevailingatsite?

IssueDate:December,2008 Rev:2
Page66of105


19

IspropercoverforDB,PDBetcprovidedwith
lockingarrangement?

20

Areliftingequipmentsandtacklesingood
workingconditionandrecentlyloadtested?

IssueDate:December,2008 Rev:2
Page67of105


17.3Sitelayout

SiteLayoutPlan
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.NO

SiteLayoutPlan

YES

NO

REMARKS

Isperimeterfencingarranged?

Istheaccessatthesiteentrancesclearlyvisible?

Istheaccesswideenoughtoallowplantand
personnel?

Isthereaproperaccesscontrolsystem?

Istheresufficientlightingattheentrance?

Arethereproperarrangementforstorageofplant
andmaterial?

Arethereoffloadingfacilities?

Aretherescrapdumpareas?

Aretherespecialstorageareasforpetrol,
flammablematerials,explosivesetc?

10

Areaccessroadssuitableforthemovementofplant
andvehicles?

11

Iscarparkingareaadequate?

12

Aresanitaryfacilitiessuitablylocated?

13

Arewelfarefacilitieslikecanteens,restroomsetc..
Areprovided?

14

IstheAmbulanceroom/emergencyvehiclesuitable
located?

IssueDate:December,2008 Rev:2
Page68of105

17.4PersonalProtectiveEquipment(PPE)

PersonalProtectiveEquipments
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:

S.NO

PersonalProtectiveEquipments

YES

NO

REMARKS

Areallpersonswearingsafetyhelmetswhileonsite?

Aretheworkersusingthechinstrapoftheirsafety
helmets?

Iseveryonewearingsafetyshoeswhileonsite?

Iseveryonewearingsafetygoggleswhereneeded?

Aretheworkerswearingsuitablehandgloveswhile
handlingroughobjects,chemicalsetc..?

Areworkerswearingfullbodysafetyharnesswhile
workingatheights?

Aretheworkersanchoringtheirsafetyharnesses?

Areworkerswearingrespiratorswhenexposedtodust,
harmfulchemicalsandpoisonousgasesetc..?

AreworkersusingsuitablePPEasperthehazards?

10

AretheresufficientstocksofPPE?

11

ArethePPEregularlyinspectedfortheregood
condition?

12

ArePPEproperlyhandledandstored?

IssueDate:December,2008 Rev:2
Page69of105

17.5Materialhandling

MaterialHandling
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.NO

MaterialHandling

YES

NO

REMARKS

Issafemethodofliftingmanuallybeingfollowedby
theworkmen?

Areproperliftingaccessoriesformanualhandling
provided?

Arepersonnelusingbodymechanicswhenlifting
andcarrying?

Aretheworkersliftingexcessloads?

Aretheworkmenusingpersonalprotective
equipmentswhilehandlingmaterials?

Areworkmentrainedinmaterialhandling?

Areliftingandcarryingaccessoriesprovidedfor
manualhandling?

Areworkmenmovingnearmovingmachinery,pinch
pointsetc..Wheretheymaygetinjured?

Aretheworkmenliftingexcessweights?

IssueDate:December,2008 Rev:2
Page70of105

17.6

Materialstorage

MaterialStorage
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.NO

MaterialStorage

YES

NO

REMARKS

Arematerialsstoredinanorderlymanner?

Isproperflooringdonewithadequateloadbearing
capacity?

Isthereadequateplaceforbulkstorageof
constructionmaterials?

Isthereproperaccessprovidedforremoving/storing
material?

Arethestacksprotectedfromcollapse?

Arestackingproperlydonewithcrosslayersforbricks,
concreteblocks,cementbagsetc..?

Ismaterialprotectedfromweatherandrain?

Areadequateprecautionstakenagainstfirehazard?

Aretheprojectedendsproperlyprotected?

10

Arethecontentsofthecontainersproperlyidentified
andlabelled?

11

Isthereadequateventilation?

12

Arefireprecautionstkaenwhereflammablematerials
stored?

IssueDate:December,2008 Rev:2
Page71of105

17.7

Fireprevention&control

FirePrevention&Control
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.NO
1
2

FirePrevention&Control
Iswasteaccumulatinginhoistshafts,corners
etc?
Arewastebinsprovidedatappropriate
locations?

YES

NO

REMARKS

Aresafeashtraysprovidedwheresmokingis
allowed?

Arewetclotheskeptnearheatersfordrying?

Areanyelectricalcircuitsoverloaded?

Areflammablematerialsstoredseparately?

Aretherefireextinguishersavailableatsite?

Arethefireextinguisherssuitableforthenature
offire?

Arethefireextinguishersplacednearthesource
offireandareeasilyaccessible?

10

Isrubbishburntincontrolledmanner?

11

Isflamecuttingandweldingtakingplacewith
properfireprecautions?

12

Areallblowlampsandheatingappliancesbeing
usedcorrectly?

13

Isthesiteentrancealwaysclearforfireengines
togetin?

14

Aretheretrainedpersonstofightfire?

15

Aretherefirewaterandfirehosesatsite?

IssueDate:December,2008 Rev:2
Page72of105

17.8

Excavation

Excavation&Trenching
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.NO

Excavation&Trenching

YES

NO

REMARKS

Ismethodstatementmadeforexcavation?

Aretheposition,depthandsizeofunderground
structuresandservicelinesclearlybeenidentified?

Isexcavationpermittakenwhereneeded?

Aretheexcavationssloped/stepbackorshored
properly?

Aretheaccess/egressladders/ramps/steps
properlyprovided?

Isthereasafeaccessprovidedforvehicles?

Istheexcavatedmaterialkept1mawayfromthe
edgeofexcavation?

Istheexcavationedgefreefromfallingmaterial?

Aretheexcavationsproperlybarricaded?

10

Isheavyequipmentoperatedonlyonstable
ground?

11

Isdewateringdonewhereneeded?

12
13
14
15
16
17
18
19

Aretheexcavationmachineriesidentifiedand
inspectedforproperworkingcondition?
Isthereanaccumulationofpoisonousgasesinthe
pit?
Isgastestdonebeforeallowingpersonstoenter
thepits?
Areprecautionstakenagainsttippingofvehicles
intothepits?
Areprecautionstakenagainstmaterialfallingon
thepersonsworkinginthepits?
Areadequateprecautionstakentoprevent
workmenhittingagainstthevehicles?
Arecrossoverbridgesprovidedforevery20ft
intervalincaseoflongtrenches?
Areadequateprecautionstakenagainstelectrical
hazards?

IssueDate:December,2008 Rev:2
Page73of105


20

Isthereadequatelightingincaseofnightwork?

21

Arewarninglightsprovidedwherenecessary?

22

Aretheadjacentstructuresprotectedwhere
needed?

23

Isthemovementofvehiclescontrolledtoprevent
earthcollapseduetovibration?

24

Isthereanyundercutsonthesidesofexcavation?

25
26
27

Aretheexcavationsfrequentlyinspectedforcracks
particularlyafterrains?
Istheentryofwaterintothepitscheckedand
controlled?
Areadequateprecautionstakenwhileremovingthe
timber,supportsetc..?

IssueDate:December,2008 Rev:2
Page74of105


17.9SAFETYMEASURESFORDEMOLITIONOFSTRUCTURES

PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:

S.No

Description

Yes

No

Remarks

1 Aredangersignsdisplayedallroundthestructure?

2 Arebarricadesprovidedaroundthestructure?

3 Aretwo(2)existsprovidedforworkmentoescape?

4 Checkwhetherredlightsareprovidedaroundthe
barricades?

5 Makesurethereisnoentryfortrespassers

6 Switchoffelectricpoweranddisconnectlines

7 Preventuncontrolledcollapseofstructure

8 Nodemolitionworkaftersunset

9 Issufficientplaceavailableforworkerforcarrying
outdemolitionworks?

10 Aresufficientpersonalprotectiveequipmentused
byworker.e.g.Safetyharnesses?

11 Aresufficientfirefightingequipmentavailableat
siteduringgascutting?

12 Anyothersafetyissues:

IssueDate:December,2008 Rev:2
Page75of105


17.10SAFETYCHECKLISTFORSCAFFOLDINGS/LADDERS

PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:

S.No

Description

Yes

No

Remarks

Designtallscaffold

Providescaffoldofsoundmaterial

Fortubularscaffold,diametershouldnotbeless
than48mmandwallthicknesslessthan2.3mm

Checkwhethereachscaffoldissecurelysupported
orsuspendedandproperlystruttedorbraced

Checkwhetherallscaffoldsandworkingplatforms
aresecurelyfastenedtothebuildingorstructure
andbracedorguyedproperly

Providearegularplankstairwaywideenoughfor2
personstopassandprovidehandrailsonboth
sides

Thelengthoftheladdersshouldnotbemorethan
4meters

Checkforfallofloosematerials,bracingsandother
partsoffscaffold

Checkwhetheruninsulatedelectricwiresexist
nearworkingplatforms,gangwayetcofascaffold

10 Anyothersafetyissues:

IssueDate:December,2008 Rev:2
Page76of105


17.11 Confinedspaces

CONFINEDSPACE
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.NO
CONFINEDSPACE
YES
NO
1
2

Istheconfinedspacefreefromtoxicgases
andoxygendeficiency?
Istheconfinedspaceclearofcontentsand
wellventilated?

REMARKS

Isthereproperaccessforentryandexit?

Isthereanypossibilityoftoxicgases/
chemicalsenteringtheconfinedspace?

Isgastestconducted?

6
7
8
9
10
11
12
13
14

Istheresufficientoxygen(i.e.20%)inthe
atmosphere?
Areconfinedspaceentryprocedures
followed?
Istheconfinedspaceentrypermitsystem
inplace?
Isthejobdoneunderthesupervisionofa
competentperson?
Aretheworkmentrainedtoworkinside
confinedspace?
Aretheyphysicallyfittoworkinside
confinedspace?
Isthereaproperrescuearrangement?
Aretherequiredrescueequipments
available?
Isaregistermaintainedtoenterthenames
whileenteringandleavingtheconfined
space?

15

Aretrainedpersonnelwaitingoutsideto
rescuethepersonsincaseofemergency?

16

Istherepropercommunicationsystemfor
thepersonworkinginside?

IssueDate:December,2008 Rev:2
Page77of105

17.12 Radiography

Radiography
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.NO

Radiography

YES

NO

REMARKS

Arethererequiredpermitsfromthe
authorizedperson?

Istheradiographerawareofthesafety
precautionstobetaken?

Istheeffectiveareacordonedofftoa
particulardistance?

Istheradiographerusingthefollowing:

Collimeter

Radiationsurveymeter

Filmbadge

PocketDosimeter

Istheradiographerhavingavalidlicense
fromBARC?

Istherevaliddocumentsforthemovement
ofthesource?

Isnoticeissuedinadvancetootheragencies
workinginthenearbyareas?

Isproperaccessprovidedforthelocation
whereradiographybeingdone?

IsthesourcepitapprovedbyBARC?

IssueDate:December,2008 Rev:2
Page78of105

17.13 Painting

Painting
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.NO

Painting

YES

NO

REMARKS

ArethepaintersusingrequiredPPEslikechemical
cartridgetypemask,handglovesetc..?

Aretheresufficientventilationsinthepaintingarea?

Arethefumesandgasesaffectingtheotherworkers
inthesurroundingarea?

4
5
6

Arethepaintingareasproperlybarricadedand
marked?
Arethematerialslikethinnersandpaintsstoredina
safearea?
Istheareaclearfromsparkingproducing
equipments?

IssueDate:December,2008 Rev:2
Page79of105

17.14 Workatheight

WorkatHeight
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.NO

WorkatHeights

Ladders:

YES NO

REMARKS

Aretheladderscheckedandinspectedbeforeuseandatregular
intervals?

Arethedefectiveladdersremovedfromsite?

Aretheladdersplacedaspersafetyrequirementie.Atanangleof
75degreeswiththehorizontal?

Aretheladderssecuredproperly?

Istheladderextending1mabovethelandingstep?

Aretheladdersproperlystored?

Arepersonsascendinganddescendingtheladderinasafemanner?

Aretheladdersobstructingthepassages?

Aretheladderslikelytobehitbymovementofpersons/vehicles?

Scaffoldsandworkingplatforms:

Arethescaffoldsdesignedaspertheloadrequirement?

Arescaffoldserectedunderthesupervisionofatrainedperson?

Arethescaffoldingmaterialsuitableforthepurpose?

Arethescaffoldserectedonlevelgroundwithpropersoleboards
andbaseplates?

Arethescaffoldsplumbwithadequatecrossbracings?

Aresufficienttieinsprovidedforthetowerscaffolds?

Areplatformboardsinspectedandareingoodcondition?

IssueDate:December,2008 Rev:2
Page80of105

Aretheplatformsfullyboardedwithoutopenings?

Arehandrails,midrailsandtoeboardsfixedfortheplatforms?

10

Isthereaproperaccesstoreachtheplatforms?

11

Areworkersprotectedfromfallingobjects?

12

Isthebasetoheightratiomaintainedat1:4?

13

Aretheyinspectedandtaggedbycompetentperson?

14

Isthescaffoldpermittakenbeforeusing?

15

Arered/greentagsattachedaspertheconditionsofthescaffolds?

16

Arethecastorwheelsofmobilescaffoldsproperlylocked?

17

Arethemobilescaffoldsstable?

IssueDate:December,2008 Rev:2
Page81of105

17.15 Electrical

Electrical
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.NO

Electrical

YES

NO

REMARKS

Iselectricalinstallationmadeaspertheload
requirement?

Aretheinstallationsmadeofindustrialtypefittings?

Istheinstallationsuitablefortheweather
conditions?

Istheinstallationcertifiedbylicensedsupervisor?

AreELCBs/MCBsprovidedinthecircuit?

Arethedistributionboardsprotectedfromrainand
water?

Arethecablesprotectedfrommechanicaldamages?

Arecableslocatedatoverheadpositionswith
sufficientheadclearance?

Arethejointsonthecableslyingontheground?

10
11

Arethecableslyingonthegroundcausingtrip
hazard?
Areelectricalequipmentprovidedwithproper
earthing?

12

AreELCBsandMCBstestedperiodically?

13

Aretheresingleinsulatedelectricalwiresinsteadof
doubleinsulatedPVCcables?

14

Aretheinsulationsregularlyinspectedandrecords
maintained?

15

Arelockout/tagoutproceduresfollowed?

16
17
18

Aretheaccessestothepanelsfreefrom
obstructions?
Arerequiredfireextinguishersprovidednearthe
electricalpanels?
Isthereanyartificialresuscitationchartsdisplayed
nearelectricalpanels?

IssueDate:December,2008 Rev:2
Page82of105


17.16 Hotwork

Hotwork(Welding,GascuttingandGrinding)
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.NO

Hotwork(Welding,GascuttingandGrinding)

YES NO

REMARKS

Aretheredamagedweldingcables?

Arelugsusedforcableconnection?

Arecablesgettingoverheated,damaged?

Arethecablescreatingtrippinghazard?

Areweldingtransformersproperlyearthed?

Arepowercablesandweldingcablesprotectedfrom
mechanicaldamage?

Areweldersusingweldinghoodsattachedtosafety
helmets?

AreweldersusingrequiredPPE?

Aretemporaryscreensprovidedtoprotectothersfrom
weldingrays,grindingsparks?

10

Arefireprecautionstakenagainstfallingofwelding
sparksandspatters?

11

Aregascylindersstoredproperlyinverticalpositionand
secured?

12

Istheresafedistancebetweenandoxygenand
acetylenecylinders?

13

Aregascylindersprovidedwithwallprotectioncaps
whennotinuse?

14

Arethegascylindersprovidedwithflashbackarresters
whileusing?

15

Isgasstarchwithflashbackarresters?

IssueDate:December,2008 Rev:2
Page83of105

16

Istheareaclearofcombustiblematerialsaroundgas
cylinderstorage?

17

Arefireextinguishersprovidedwherewelding,gas
cuttingisinprogress?

SHOTBLASTING

Istheaircompressortestedandtestcertificate
available?

Arethehighpressurehosesingoodcondition?

Arechainsprovidedacrossthecouplingsofthehigh
pressurehosestopreventwhipingaction?

Isshotblasterusingsandblastershood?

Isemergencystopvalveprovided?

Arethereanyopeningsintheshotblastersshed?

Aretheworkersprovidedwithdustrespiratorswhen
theyareexposed?

IssueDate:December,2008 Rev:2
Page84of105

17.17Formwork

PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.NO

Formwork/Falsework&Concreting

YES

NO

REMARKS

Hasthefalseworkbeendesignedbyacompetentperson?

Hasthedesignbeenrecheckedbytheengineerconcerned?

Isthereanychangeintheloadingprogramafterthedesign
approval?

Isthehorizontallackinganddiagonalbracingadequatetoresist
lateralloading?

Willtherebeanyadditionalloadonthefalseworkduetoplant
andstorageofmaterials?

Isthedesigncapableofwithstandingdynamicloadduetodumping
loads,shockloads,surgeloads,vibrationsetc..?

Arethefoundationsdesignedaccordingtosoilconditions,point
loadsofverticals,waterfloodingetc..?

Istheconsiderationgiventohorizontalforcesfromsurgeloads,
concretedischargefromskips,expansionofconcrete,non
verticalityofsupports,deflectionsofhorizontalmembers,
settlementoffoundationsetc?

Isthereadequateaccessforthevehicles?

10

Isthereaproperelectricalconnectionforthevibrators?

11

AretheworkersusingPPE?

12

AretheyusingGumbootswhileworkingonwetconcrete?

13

Isthereaproperaccessforconcretecutting?

14

Aretheworkersusingsafetyharnesswhilestrippingtheforms?

15

Isthereaproperwalkwayprovidedoverthereinforcementbars?

16

Aretheopenedgesproperlybarricaded?

IssueDate:December,2008 Rev:2
Page85of105


17.18Fallprevention&protection

FallPrevention&Protection
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.NO

FallPrevention&Protection

YES

NO

REMARKS

Isthereasitespecificfallprotectionplanin
place?

Areworkerstrainedinthefallprotection
procedures?

Areopenedgesandfloorcutoutsproperly
barricaded?

Arestaircasesprovidedwithtemporaryrailings?

Arecautionboardsfixedatdangerpoints?

Areworkersusingfullbodyharness?

Havetheworkersanchoredsafetyharnesstoa
stronganchoringpoint?

Arelifelinesprovidedwhereanchoringpointsare
notavailable?

Arefallarrestersprovidedwhileclimbingrope
ladders?

10

Aresafetynetsfixedwhereneeded?

11

Aresfetynetssecurelyfixed?

12

Aredebrisonthesafetynetsregularycleaned?

13

Aresafetynetssubjectedtofirehazards?

IssueDate:December,2008 Rev:2
Page86of105


17.19Handtools

HandTools&PowerTools
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.NO

HandTools&PowerTools

YES

NO

REMARKS

Arethehandtoolsingoodworking
condition?

Aretheystoredinapropermanner?

Aredamagedtoolsremovedfromuse?

Areappropriatetoolsavailableforthejob?

Aretoolsbeingusedonlyfortheirproper
intendeduse?

Aregrindingmachinesprovidedwithguards
overthewheels?

Arethegrindingwheelsinspectedforthe
expirydate?

Isringtestdoneforabrasivewheelsbefore
fixing?

Arethewheelssuitableforthespeedofthe
machine?

10

Arethepowertoolsprovidedwithearth
connection?

11

Arethepowertoolshandledproperly?

12

Arethehandlesofthetoolsfreefromsplits
andcracks?

13

Aretheremushroomedheadsoverthe
hammers,chiselsandotherimpacttools?

14

Aretheedgesfortoothofcuttingtoolskept
sharp?

IssueDate:December,2008 Rev:2
Page87of105

PNEUMATICTOOLS

Istheremisuseofcompressedair?

Ishorseplaywithcompressedairforbidden?

Arepersonsdustingtheirclotheswith
compressedair?

Arethejointsintheairlinesmadewith
purposemadeconnections?

Arethepneumatictoolscheckedforfaulty
governorswhichmayresultinover
speeding?

Isairsupplytothetooldisconnectedwhen
thetoolisleftunattended?

IssueDate:December,2008 Rev:2
Page88of105


17.20EquipmentfitnessreportforVehicleandEquipment&EarthmovingEquipment
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:

Nameofthesite:Make/Model:
Job.No:IdentificationNo:/Reg.No:
Date:AssetcodeNo(Ifapplicable)
InspectedbyOwnedby:
S.No:

Checkpoints

Observation

Remarks

1.

Enginecondition

2.

Clutch/Brake

3.

Hydraulicsystem

4.

Guards/Covers/Doors

5.

Fastenerlockpins/Keys

6.

Horn/Reversehorns/Lights

7.

Indicators/Wiperblades

8.

Operatorsfitness

9.

Tyrepressure

10.

Conditionofbattery/Lamps

11.

Operatinglevers/Steering

12.

Gauges&Warningdevices

13.

Swingalarmprovided

14.

Firstaidboxprovided

15.

Fireextinguisherprovided

TheVehicle/Earthmovingequipmenthasbeencheckedforabovepointsand
FoundfitfordeploymentFoundUNFITfordeployment

(P&MEngineer)(SiteSafetyOfficer)

IssueDate:December,2008 Rev:2
Page89of105


17.21Cranechecklist
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
DescriptioofCrane:Make:

RegistrationNo:

S.No.

Checkpoints

Observation

Remarks

1 HookandHookLatch

2 OverHoistLimitSwitch

3 BoomLimitSwitch

4 BoomangleIndicator

5 BoomLimitCutoffSwitch

6 ConditionofBoom

7 ConditionofRopes

8 No.ofLoadLines

9 SizeandConditionofthesling

10 Swingbrake&lock

11 Propelbrake&lock

12 HoistbrakeandLock

13 Boombrakeandlock

14 Mainclutch

15 Leakageinhydrauliccylinders

16 Outtriggersfullyextendable

17 TyrePressure

18 ConditionofBatteryandLamps

19 Guardsofmovingandrotatingparts

20 LoadChartProvided

21 No.andpositionofpendantropes

22 ReverseHorn

23 LoadTestDetails

24 Swingalarmprovided

25 OperatorFitness

26 FirstAidbox

IssueDate:December,2008 Rev:2
Page90of105


27 FireExtinguisherinoperatorcabin

ThisCranehasbeenCheckedfortheabovepointsand,
FoundFITfordeploymentFoundUNFITfordeployment

(CheckedbyP&MEngineer)(SiteSafetyOfficer)

IssueDate:December,2008 Rev:2
Page91of105


17.22SAFETYCHECKLISTFORTOWERCRANES

PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:TypeofMaintenance:Weekly

Description:TowerCrane:CraneNo:

S.No

Checkpoints

Inspectionresult
(Y/N)

Remarks

OK/YES

Not
OK/NO

Ropes:

Ropecondition

Ropelubrication

Trolley:

Trolleycondition

Trolleylubrication

Counterweight:

Counterweightpincondition

Counterweightstability

Pins:

Pinscorrectlylocated

Splitpins

Checkplates

wear

Boompins

Cranestructure(Deformation,

Rust,Damageetc):
1

Tower

Boom

Frame

RopeSheavesandWearpads:

Condition

Sheavesrotate

IssueDate:December,2008 Rev:2
Page92of105

Wearpads/Rollers(Boom/Jib

Protection)
4

Ropekeeperbar/Plateon

sheaves

Barclearancecorrect

Bolts:

Towerbolts:

Boltstightened

Boltsofcorrecttype

SlewRing:

Boltstightened

Boltsofsametype

Washers

CounterWeight:

Fixedwillnotsway

MovingConnectingbolts

OtherStructural/Mech:

Fluidleaks

Hooklatch

Fixingangledeformation

Guarding(Accessibleareas):

Guardsprovided

Guardsfixed

LoadIndicator&RatedCapacity
Limiter:

Loadindicatoroperational

Loadindicatorcalibrated

CutOffoperates

SWLdisplayedatmainjib

OtherIndicators:

RadiusIndicator

WindIndicator

LimitSwitches:

Hoistlimitswitch

Trolleylimitswitch

IssueDate:December,2008 Rev:2
Page93of105

Slewinglimitswitch

Loadlimitswitch

Emergencystopswitch

Cranecabin:

Seating

Visibility

Noise

Fireextinguisher

Loadcharts:

Loadchartprovided

Loadchartdisplayed

TowerAccess:

Ladders

Platformsforguardrail

Handrailpins

Boom/Jibaccess:

Walkway

Trolleyplatform

Communication:

LightningArrestor:

Conditionofearthcable

Conditionofearthresistance

Brakes:

Trolleybrake

Hoistbrake

Swingbrake

Brakelinercondition

Airgap

GearBox:

Trolleygearbox

Abnormalnoise

Oillevel

10

Anyoilleakages

IssueDate:December,2008 Rev:2
Page94of105

SpecificPointsnoticed:

(P&MEngineer)(PlantManager)(SafetyOfficer)

Note:
1) Inremarkscolumndetailsofactivitiescarriedoutagainsteachtaskwithobservationstobe
mentioned.Forex:
MaintenancetaskGreasewaterpumpRemarksGreased
MaintenancetaskCleanaircleanerelementRemarksCleaned
MaintenancetaskCheckbatteryRemarksChecked,electrolyteleveltoppedup,
Sp.gravityis
2) InSpecificpointsnoticedmentionanyspecificdefect/damage/problemnoticedduringthe
maintenance,whichneedsactionforrepair/rectification/replacementofparts.

IssueDate:December,2008 Rev:2
Page95of105


17.23BUILDERSHOISTCHECKLIST
PROJECT:
LOCATION:
DATE:
RegistrationNo:Make:
INSPECTIONCONDUCTEDBY:

S.No

Description

Yes/No

Remarks

Checkforverticalityofthehoistmast

Isanchorageforthemastandsupporting
structureadequate?

Isendmastpieceisprovided?

Isoverhoistlimitswitchworking?

Conditionofropesanddiversionpulleys

Ishoistpositionsafe,freefromfallingmaterial
hazard?

IsWinchplatformstrong,providedwithhandrail
&toeboard?

Ishoistbreakchecked?

Operatorsvisibilitytoallunloadingplatforms
andviceverse

10 Arewarningsignalsestablished&used?

11 Ishoistprotectedfromunauthorisedoperations?

12 Isearthingprovided?

13 Arerotatingpartsofhoistadequatelyguarded
includingfingerguardforbucketmovement?

14 Isgroundlevelentrytowinchareaisrestricted
withwicketgate?

15 Isprotectionagainsttrippinghazardsdueto
railingofropesprovided?

16 Aresignalingsystemfunctioning(Light&Bell)?

17 Aredailycheckprocedurefollowed?

18 Checkoperatorsfitness

19 Areauthorisedoperatorsareallowedallthe
time?

20 SWLdisplaysintermsofload,materialsetc

21 Restrictiononthesize&loadinginthebucket

IssueDate:December,2008 Rev:2
Page96of105


22 Anyothersafetyissues:

P&MEngineerSignatureofSafetyOfficer

IssueDate:December,2008 Rev:2
Page97of105


17.24CHECKLISTFORTRANSITMIXER
Description:TransitmixerTypeofMaintenance:Weekly
TransitmixerNo:Manufacturername:
TransitmixerModel:Date:
Description:Transitmixer(AL/TATA/STETTERAM6SH)
S.No

MaintenanceTasks

Remarks

Checkandadjustthevalvetappetclearance

Cleanthecompletefuellineanddieseltank

TightalltheUclampboltsofleafsprings

Checkairintakeline&gaskettoturbocharger
forleaksandrectifyifanyleakfound

Cleanthebreatherofdifferentialhousing,gear
boxandengine

Checkthetyresforuniformwear&dowheel
alignmentifwearisunevenfronttyres

Checksteeringmountingbolts/nutsandgear
boxmountingbolts

Checkthechassiscrossmembers&side
membersforloosebolts

Specificpointsnoticed:

(P&MMechanic/Technician)(P&MEngineer)
Note:
1) InRemarkscolumndetailsofactivitiescarriedoutagainsteachtaskswithobservationstobe
mentionedforex:
MaintenancetaskGreasewaterpumpRemarksGreased
MaintenancetaskCleanaircleanerelementRemarksCleaned
MaintenancetaskCheckbatteryRemarksChecked,electrolyteleveltoppedup,
Sp.gravityis

2) InSpecificpointsnoticedmentionaboutanyspecificdefect/damage/problemnoticed
duringthemaintenancewhichneedsactionforrepair/rectification/replacementofparts.

IssueDate:December,2008 Rev:2
Page98of105


17.25DIESELGENERATOR(DG)INSPECTIONCHECKLIST
Project/Sitename:Inspectedby:
Assetcode:Date:
S.No.

Checkpoints

Yes

No

Remarks

Whethercontinuityandtightnessofearth
conductorarechecked?

Mentionthegaugeofearthconductorused

Whetherearthresistanceismeasured?

Mentiontheearthresistance

IsDGprovidedundershed/cover?

WhetherentryisrestrictedintotheDG
room?

Arecabletrenchescovered?

Isinsulationprovidedonthebattery
terminals?

IsthermalinsulationprovidedtotheDG
exhaust?

10. Whetherstackheightismaintainedasper
Environmentrequirementsgivenin
proceduremanual?

11 WhetherDGexhaustisdivertedoutsidethe
shed?

12 AreallrotatingpartsofDGguarded
(Coupling,Radiatorfan)?

13 Whetheranyleakageoffuel/oilbeneathand
aroundtheDG?

14 WhetherDGsurroundingareaisfreefrom
flammablematerial?

15 Whetherfireextinguisher/firebucketswith
drysandareprovided?

16 WhetherDGisfittedwithacousticsand
silencerinsulations?

(DGOperator)(P&MEngineer)(SafetyOfficer)

IssueDate:December,2008 Rev:2
Page99of105

17.26MotorVehiclesandTraffic

MotorVehiclesandTraffic
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.NO

MotorVehiclesandTraffic

YES

NO

REMARKS

Arevehiclesinspectedandthelicenseiscurrent?

Aretherebrokenwindshieldsorlights?

Areseatbeltsprovidedandareinusebytheusers?

Dobrakes,reversealarmsandhornsetcareingood
workingcondition?

Arealloperatorsanddrivershavevalidlicenses?

Arespeedlimitboardsdisplayedatsite?

Arethemovementsofvehiclescontrolled?

Areworkerstravellingonthebodyofthevehiclesor
passengerstravellingindriverscabinisnotallowed?

Areworkersridingonloadedtrucks?

10

Arepersonsboardingoralightingmovingvehicles?

11

Areparkingbrakesappliedwhenvehiclesnotinuse?

12

Arewheelschockedwhenparkedoninclinedgrounds?

13

Arethevehiclesproperlycoveredwhilecarryingloose
materials/

TYRES

1
2
3

Areadequateprecautionstakenwhileremovingdamaged
wheelsanddetachableflangesetc?
Istheinflationoftyresdonebytrainedpersonsandthe
tyresarekeptintyrecages?
Isthetyrepressuremaintainedatmanufacturers
recommendations?

Aretheservicingrampsproperlydesignedforthepurpose?

Istheresuitableaccesstogetinandgetoutofthepits?

Arethepitsproperlybarricadedwhennotinuse?

IssueDate:December,2008 Rev:2
Page100of105

17.27Plant&Mobileequipment

Plant&MobileEquipment
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.NO

Plant&MobileEquipment

YES

NO

REMARKS

Arethemovingpartsguarded?

Aretheoperatorstrained?

3
4
5
6
7

Arethemachineriesmaintainedingood
condition?
Aretheworkersprotectedfromnoiseand
fumes?
Areconcretemixerssetonfirmground?
Isthereadequatespacearoundthe
machinery?
Arethebulldozerblades,scraperblades,
endloadbucketsetcloweredwhen
repaired?

OTHERMACHINERIES

COMPRESSORSANDAIRRECEIVERS

Aretheyexaminedandtestedbya
competentperson?

2
3
4

AretheVbeltsandpulleydriveswell
guarded?
Aretheairreceiversmarkedwithsafe
workingpressure?
Aretheyfittedwithsafetyvalve,pressure
gaugeanddraincock?

DRILLINGMACHINES

Arethebenchmounteddrillingmachines
firmlysecuredtoastrongandstable
bench?

Isthebenchfirmlyfixedtothefloor?

Iscorrectchuckkeyusedandnotleftin
thechuck?

Issmallworkpieceheldinviceorclamp?

IssueDate:December,2008 Rev:2
Page101of105

Areoperatorswearinglooseclothingand
glovesetc..whileoperatingthemachine?

Aretheoperatorscontainedtheirlong
hairinanetorcaptoeliminatetheriskof
entanglement?

GRINDINGMACHINES

Arethewheelsadequatelyguarded?

Areprecautionstakenagainstflying
fragmentsofdisintegratedwheel?
Arethewheelsfittedasperthedesigned
speedandcorrectlyfittedonthespring
wheel?
Istherpmclearlymarkedonthe
machine?
Isthesurroundingareakeptneatandtidy
andfreeofobstructions?

2
3
4
5
6

AretheoperatorsusingPPEtoprotect
againstflyingparticles?

Isthegapbetweenthewheelandthejob
restproperlyadjusted?

WOODWORKINGMACHINES

Isthereguardoverthecircularsaw?

Istheguardinplacewhileworking?

Isarivingknifeprovidedtopreventkick
back?

Istheoperatorusingapuststick?

Istheareaaroundthemachineneatand
tidy?
Arethewoodenshavings,dustandchips
regularlycleared?

5
6
7

Istheregoodventilation?

IstheoperatorusingrequiredPPE?

IssueDate:December,2008 Rev:2
Page102of105

17.28Housekeeping

HOUSEKEEPING
PROJECT:
LOCATION:DATE:
INSPECTIONCONDUCTEDBY:
S.NO

HouseKeeping

YES

NO

REMARKS

Isthesitekeptneatandtidy?

Isthereaproperarrangementforregularcollection
anddisposalofwastematerials?

Arewalkwaysclearlydefinedandunobstructed?

Arematerialsandequipmentsstoredproperly?

Islocalscrapyardprovided?

Arethereanyprojectingnailsonthetimbers?

Isadequatelightingsprovidedforworkareasand
passages?

Arethetoiletsregularlycleaned?

Isthereadequatewatersupplyforsanitation?

10

Aretheupstandingrebar,pegsprotectedfromfall
hazard?

11

IsthereaneasyaccesstoElectricalcontrolpanels,
Fireextinguishers,FirstAidboxesetc?

IssueDate:December,2008 Rev:2
Page103of105

18.ProjectSafetyDocuments
18.1ListofProjectSafetyDocumentsmaintainedbyCBRE

SafetyDocuments

Dailyinspections
Checklist
Intimationcards
Incidentrecordsandinvestigationregister
Accidentrecordandinvestigationrecord
SafetycommitteeAgendas&MOM
PPEregister(CBREindents,consumptions&rejection)
Testcertificatesoftoolsandtackles
Inspection&maintenanceregisterfortools&tackles
Training
Workpermits
ELCBtestrecordregister
Electricalhandtoolsinspection&maintenanceregister
Dieselgenerator/substationlogbook
SafetyAudits
Authorizedpersonnel
Methodstatementsincludingriskassessment
Equipmentcommissioningrecord
Firefightingequipmentrecord
Firstaidregisters.

Generated Maintained

Checked
(document)&
Permitted

CBRE
CBRE
CBRE
CBRE
CBRE
CBRE
Contractor
Contractor
CBRE
Contractor
Contractor
Contractor
Contractor
CBRE
Contractor
Contractor
Contractor
Contractor
Contractor

CBRE
CBRE
CBRE
CBRE

CBRE
CBRE
CBRE
CBRE
CBRE

CBRE
CBRE
CBRE
CBRE
CBRE
CBRE
CBRE
CBRE
CBRE
CBRE
Contractor
Contractor

CBRE
CBRE
CBRE
Contractor
Contractor
Contractor

IssueDate:December,2008 Rev:2
Page104of105

18.2ListofWelfareDocumentsrequiredforInspection

Copiesofrelevantlicenses

Wageregister

Musterroll

Overtimeregister

Paymentregister

Advanceregister(Clienttocontractortosubcontractor)

Finesregister

Inspectionbookcontainingissueofemploymentcardswagesslips

Copiesofabstractofrelevantstatutes

IssueDate:December,2008 Rev:2
Page105of105