PROGRESS REPORT NO.

8 April 2001
CONSTRUCTION SUPERVISION OF RIZAL/ARGONAUT HIGHWAY WIDENING AND SBF EXPRESSWAY EXTENSION PROJECT

Cabunilas, Anfy M. Calivo, Chrislene D.

PROJECT DATA
Construction of Rizal / Argonaut Highway and SBF Expressway Extension Contract Package RB-01 Existing road consisted of asphalt paved road with some sections showing defects and a new construction (By-Pass section) approx. 1.22 km

PROJECT PROFILE

3 existing roads: from 2 to 4 lanes, aggre. length = 4.22 km improvement of 1.737 km existing road section new construction of 1.81 km by-pass road construction of:

relocation of affected existing public utilities signalized intersections on 6 major junctions

6 new concrete bridges, bored pile found., approx. total length = 415.60 m 6 utility bridges on 4 bridge locations

REASON FOR SLIPPAGE

Delay in the issuance of the Tree Cutting Permit


resolved only last February 15, 2001 4 month time extension subject for approval by FAPO-PMO

RECOMMENDATION

Mobilize more equipment

construction of bridges and by-pass section

PROJECT UPDATE

As of April 30, 2011:

slippage: -33.64% actual cum. accomplishment: 15.88% sched. accomplishment: 49.520% slippage: -2.259% actual accomplishment: 15.879% sched. accomplishment: 18.138% % time elapsed: 41.228%

Revised Bar Chart/S-Curve:

CONTRACTORS WORK ACCOMPLISHMENT

PART A. FACILITIES FOR THE ENGINEER


Operations and Maintenance of Field Office, Laboratory, and Staff Quarters Operation and Maintenance of Service Vehicles Furnishing of Progress Photographs

PART C. EARTHWORKS

Road Section A (Basin St. Binictican Br.)

clearing and grubbing, Sta. 0+340.00 Sta. 0+560.00

PART C. EARTHWORKS

Road Section C (Boton Br. By-Pass Rd.)

excavation, common materials (Sta. 0+595 Sta 0+770) rock embankment (Sta. 0+980 Sta. 1+280) granular materials formation (Sta. 1+586 Sta. 1+793) laying of RCPC, various diameters construction of RCBC, Sta. 1+300.00

PART C. EARTHWORKS

Road Section D (Boton Br. Tarlac Rd.)

removal of existing trees

PART F. BRIDGE CONSTRUCTION

Kalalake Bridge

bored pile construction at Abutment A Installation of reinforcing steel for pile cap at Pier 1 Removal of Structure/Obstruction

PART F. BRIDGE CONSTRUCTION

Malawaan Viaduct

bored pile construction at Pier 5, bore hole no. 2 installation of reinforcing steel and pouring of concrete for Prestressed Type V AASHTO Girders construction craneway

PART F. BRIDGE CONSTRUCTION

Boton 1 Bridge

bored pile construction, Abutment A casting of Prestressed concrete girder

Malawaan

2 Bridge

preparation works for pile bent driving the Detour Bridge

PART F. BRIDGE CONSTRUCTION

Binictican Bridge

construction of Abutments A & B of the Utility Bridge construction of Detour Bridge and Approaches

PART G. DRAINAGE AND SLOPE PROTECTION STRUCTURES


Construction of Type A Lined Canal at Basin St. Binictican Rd. Boton By-Pass Rd.:

excavation for pipe structural excavation for box laying of pipe culverts construction of RCBC, Sta. 1+300.00

PART I. SPECIAL PROVISIONS

Installation of concrete pedestal for street lighting

PART K. RELOCATION AND INCLUSION OF PUBLIC UTILITIES

Telecom

excavation for conduits and manhole


provision and erection of concrete electric poles construction of sewage lift station

Electrical

Water Line

OTHER ACTIVITIES
Cutting and bending of reinforcing bars for bridges, culverts, and manholes Pre-casting of street lights and street pedestals Pre-casting of concrete sheet piles

PROJECT DESCRIPTION

A. ROADWORKS

3 existing road sections: from 2 to 4 lanes const. of a by-pass road that runs on a new alignment SECTIONS:

Basin St. Binictican Bridge(Rizal Hway, ~2.26 km) George Dewey St. Causeway St. (Argonaut Hway, ~1.19 km) Boton Tarlac Section (Argonaut Hway extension, ~2.34 km) Binictican Boton Section (By-Pass Rd., ~1.22 km)

B. BRIDGES

Kalalake Bridge (along Argonaut Hway)

47.74 m, three-span superstructure resting on 2 bored piles (1200mm dm. by 44 m, 1500mm dm. by 49 m resp.) span 1: 16.00m RDG girder; span 2: 18.40 steel girder; span 3: 12.50m RCDG existing will be removed and replaced

B. BRIDGES

Binictican Bridge (along Rizal Hway)

30.80 m, 3-span bored piles: 1000mm by 40.0m, at piers and 400mm by 400mm precast piles, ~30.0 m long abutments deck is flat slab

B. BRIDGES

Malawaan Bridge (along Argonaut Hway)


25.80 m, 3-span bored piles: 1000mm by 40.0m, at piers and precast piles, 30.0 m long at abutments deck is flat slab

B. BRIDGES

Boton II Bridge (along Argonaut Hway)

40.80 m, 5-span bored piles: 900mm by 47.0 m, at piers and precast piles, 47.0 long at abutments deck is flat slab

B. BRIDGES

Malawaan Viaduct (along the By-Pass Rd.)


240 m, 7-span bored piles: 1800mm by 43.0 m prestressed concrete girders, 32 m long

B. BRIDGES

Boton I Bridge (Along the By-Pass Rd.)

singe-span, 32.90m bored piles: 1800mm by 44 m prestressed concrete girders 32.0 m long

C. CRANEWAY
made of coco logs Malawaan Viaduct, Kalalake Bridge (made of steel sheet piles) Boton I Bridge (using Steel H-Piles)

D. DETOUR ROADS AND BRIDGES

locations:

Boton II Malawaan II Binictican

E. UTILITY BRIDGES

Along:

Binictican Boton II Malawaan II Kalalake

F. UTULITIES

Water and Sewer Pipelines Fuel Pipelines Elecrical Poles and Cables Telecom Cable CATV Cables