8 April 2001
CONSTRUCTION SUPERVISION OF RIZAL/ARGONAUT HIGHWAY WIDENING AND SBF EXPRESSWAY EXTENSION PROJECT
PROJECT DATA
Construction of Rizal / Argonaut Highway and SBF Expressway Extension Contract Package RB-01 Existing road consisted of asphalt paved road with some sections showing defects and a new construction (By-Pass section) approx. 1.22 km
PROJECT PROFILE
3 existing roads: from 2 to 4 lanes, aggre. length = 4.22 km improvement of 1.737 km existing road section new construction of 1.81 km by-pass road construction of:
6 new concrete bridges, bored pile found., approx. total length = 415.60 m 6 utility bridges on 4 bridge locations
resolved only last February 15, 2001 4 month time extension subject for approval by FAPO-PMO
RECOMMENDATION
PROJECT UPDATE
slippage: -33.64% actual cum. accomplishment: 15.88% sched. accomplishment: 49.520% slippage: -2.259% actual accomplishment: 15.879% sched. accomplishment: 18.138% % time elapsed: 41.228%
PART C. EARTHWORKS
PART C. EARTHWORKS
excavation, common materials (Sta. 0+595 Sta 0+770) rock embankment (Sta. 0+980 Sta. 1+280) granular materials formation (Sta. 1+586 Sta. 1+793) laying of RCPC, various diameters construction of RCBC, Sta. 1+300.00
PART C. EARTHWORKS
Kalalake Bridge
bored pile construction at Abutment A Installation of reinforcing steel for pile cap at Pier 1 Removal of Structure/Obstruction
Malawaan Viaduct
bored pile construction at Pier 5, bore hole no. 2 installation of reinforcing steel and pouring of concrete for Prestressed Type V AASHTO Girders construction craneway
Boton 1 Bridge
Malawaan
2 Bridge
Binictican Bridge
construction of Abutments A & B of the Utility Bridge construction of Detour Bridge and Approaches
excavation for pipe structural excavation for box laying of pipe culverts construction of RCBC, Sta. 1+300.00
Telecom
Electrical
Water Line
OTHER ACTIVITIES
Cutting and bending of reinforcing bars for bridges, culverts, and manholes Pre-casting of street lights and street pedestals Pre-casting of concrete sheet piles
PROJECT DESCRIPTION
A. ROADWORKS
3 existing road sections: from 2 to 4 lanes const. of a by-pass road that runs on a new alignment SECTIONS:
Basin St. Binictican Bridge(Rizal Hway, ~2.26 km) George Dewey St. Causeway St. (Argonaut Hway, ~1.19 km) Boton Tarlac Section (Argonaut Hway extension, ~2.34 km) Binictican Boton Section (By-Pass Rd., ~1.22 km)
B. BRIDGES
47.74 m, three-span superstructure resting on 2 bored piles (1200mm dm. by 44 m, 1500mm dm. by 49 m resp.) span 1: 16.00m RDG girder; span 2: 18.40 steel girder; span 3: 12.50m RCDG existing will be removed and replaced
B. BRIDGES
30.80 m, 3-span bored piles: 1000mm by 40.0m, at piers and 400mm by 400mm precast piles, ~30.0 m long abutments deck is flat slab
B. BRIDGES
25.80 m, 3-span bored piles: 1000mm by 40.0m, at piers and precast piles, 30.0 m long at abutments deck is flat slab
B. BRIDGES
40.80 m, 5-span bored piles: 900mm by 47.0 m, at piers and precast piles, 47.0 long at abutments deck is flat slab
B. BRIDGES
240 m, 7-span bored piles: 1800mm by 43.0 m prestressed concrete girders, 32 m long
B. BRIDGES
singe-span, 32.90m bored piles: 1800mm by 44 m prestressed concrete girders 32.0 m long
C. CRANEWAY
made of coco logs Malawaan Viaduct, Kalalake Bridge (made of steel sheet piles) Boton I Bridge (using Steel H-Piles)
locations:
E. UTILITY BRIDGES
Along:
F. UTULITIES
Water and Sewer Pipelines Fuel Pipelines Elecrical Poles and Cables Telecom Cable CATV Cables