Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
2 Concerned project
Mandatory attendees
FMEA Facilitator: Design Engineer: Test Engineer: Reliability/Quality Control Engineer: Environmentally competent person: If needed, other mandatory attendees Project Managers: Material Engineer: Mechanic: Process planning engineer: Feature responsible : Representative from supplier: Service technician: Purchasing: Other experts: Document jointly established with: CPM Quality PM
To be sent to attendees with documentation to prepare FMEA analysis at least two weeks before meeting
Date : yyyy-mm-dd
ct/system
ailure.
Phoenix reg.no.:
0
Main Function / Operation Date Performed Date Time Updated Status - Hardware/Digital modell Issued by Project Issue
6/30/2011 9:18
PART CHARACTERISTICS OF FAILURE Undesirable customer effects Effects of failure on syst. / part / operation 1st RATING ACTION-STATUS 2nd RATING
0 0
Verifications-Sign
No
Causes of failure
Testing - Simulation
Po
Pd
RPN
Recommended action
Planned action
Responsible
Follow up date
Po
Pd
RPN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1 (5)
61935280.xls
Data-Drawings-Pictures
PARK reg.no.:
Please enter drawings, technical descriptions and other documentation that can increase understanding of area which is analysed
Details as input for the analysis (data,hardware, picture etc.)
2 (5)
61935280.xls
Phoenix Reg.no:
RPN values
1 0.9 0.8 0.7
Quantity
0.6 0.5 0.4 0.3 0.2 0.1 0 0-36 37-64 65-125 126-250 251-500 501-750 751-1000
At analysis
After actions
Range
Severity values
7-10
Range
4-6 0-3 0
At analysis
0.1
After actions
0.2
0.3
0.4
3(5)
0.5
0.6
0.7
0.8
0.9
1
61935280.xls
Quantity