JOB SAFETY ANALYSIS

Site : QP Dukhan Location : Dukhan KAHS Depot: DOHA QATAR

Assessment No. JSA/Standard injection quills installation/002

Contract: QP-IMCO Equipment Replacement Activity

Rev.0 Control Measures / Recovery Measures Action/ Responsib le Party

Step Description of Task No. Step 1 Standard injection quills installation

Hazards Cause of shutdown in the plant area.The work force doesnot understand the pre task briefing therefore does not understand the potential dangers and control measures to be implemented. Some of the workers could be lacking PPE or using defective PPE.

Who or what Might be Harmed IMCO employees other contractors on site

Prior to mobilization; conduct the Safety tool box talk to the workers to be aware Imco/Client on the possible cause of hazards in the working area. Hold pre job meeting with all crew, explain hazardous and necessary precautions. Inspect the worksite and equipment with permit issuer Establish precautions and receive permit. Ensure proper drawing in hands during site survey. Ensure that the pre task briefing is given out in a language understood by the work force, have it translated. Ask question regarding the briefing to get feed back from the staff, this ensures full comprehension. Issue any required PPE and replace PPE that has signs of defect. PPE must include both hearing protection as well as dust inhalation protection. Ensure that the pre task briefing is given out in a language understood by the Imco/Client work force, have it translated. Ask question regarding the briefing to get feed back from the staff, this ensures full comprehension. Issue required appropriate PPE and replace PPE that has signs of defect. PPE must include both hearing protection as well as dust inhalation protection. Imco/Client Handle material carefully to prevent trapping of hand fingers & fall of material on foot. Use required PPEs (Safety Shoes, Hand gloves, spectacles). Follow safe material handling practices. Handle material carefully to prevent trapping of hand fingers & fall of material on Imco/Client foot. Use required PPEs (safety shoes, hand gloves, spectacles).

Pre-task briefing (Toolbox Talks) and inspection

The work force does not understand the pre task briefing therefore does not understand the potential dangers and control measures to be implemented. Some of the workers could be lacking PPE or using defective PPE. Trapping hazardsImproper manual handling cause of back injury.

IMCO employees other contractors on site IMCO employees other contractors on site IMCO employees other contractors on site IMCO employees other contractors on IMCO site employees other contractors on site

Arrangement of material to be inspected

Inspection

Trapping hazards

Positioning using crane

Loss of stability due to ground condition & wind.


Injury to person Loading hitting any existing structures

Ensure the working area checked and inspected the stability of ground level that be secured to the position of crane. Ensure that the outrigger is fully extent and use a proper mat. Checked wind and speed direction Depute experienced and trained by 3rd party as a crane operator and riggers Arrange and prepare lifting plan
Take required work permit .
Make

Imco/Client

Lifting, placing of

Use certified crane with 3rd party test certificate and 3rd party tested lifting equipments.Imco/Client

pipe spool& pwht equipment Shackle / belts failure (material falling)

sure that the sling or ropes are in proper location.

Do not exceed to the safe working loads. Barricade the area and display caution boards. . Use required PPEs . .

Isolate of the line with spade

IMCO employees other contractors on site IMCO employees other contractors on site

Review work scope & lockout & tag out of valves Use correct tools & safer position when closing valves
Ensure

Imco/Client

Depressurizing & Draining of line Toxic Chemical Exposure Water spillage Driving hazard Fire from sparking tools.

that all workers are trained by 3rd party in H2S awareness

Imco/Client

& ... /
Use

a non sparking tools & fire extinguisher.

Cold cutting of Line

Toxic Chemical Exposure (H2S) Oil Spillage Access to work location Fire from sparking tools Improper tools Tools slipping & hand injuries

IMCO employees other contractors on site

Continuous gas monitor & provide a standby S.C.B.A Proper set up of scaffolding with inspection Fire watch, fire extinguisher & use non sparking tools & & Use correct tools, gloves, & safe body position.

Imco/Client

10

Cutting, Grinding Bevelling & fit Cuts, bruises, eye injury up Fire Fall from heights

IMCO employees other contractors on site

Obtain hot work permit . Ensure that machine guard is in place and in good condition. . Remove combustible material from the work area . Ensure that qualified and trained fire watchers are available on site during the activity. Ensure required PPEs are used.
For

Imco/Client

working at height provide safe access and use 100% fall protection Imco/Client

Use hand gloves and safety glass. 11 Welding Eye injury, burns Welding fumes cause of health hazards
Fire

IMCO employees other contractors on site

Obtain hot work permit . Cover the work area by suitable sheets to prevent flying of sparks. Check welding machine and cables that are in good condition and ensure earthling is in place. Do not pass cables on the hot surfaces and sharp objects. Remove combustible material from the work area Deploy trained and experienced personnel. Ensure that qualified and trained fire watchers are available on site during the activity. Ensure required PPEs are used. For working at height provide safe access and use 100% fall protection Use hand gloves and safety

Fall from heights

12

X-Ray

Harmful effects to persons involved in the work and other persons in the vicinity

IMCO employees other contractors on site

Prior to start x-ray work, a hot work permit must be submitted to gain client end user approval. X-ray activity must be carried out in the fixed area. . .(..) X-ray devices must be approved by Client or end user before use. The x-ray activity must be carried out during the night or other restricted working hours as agreed. Alarm signal/flashing lights must be installed including barricading of exposure areas.

Imco/Client

13

Hydro test of pipe spool

Equipment failure. Under rated, Damage fitting. Over Pressured. Moving on platform. Failure in temporary connection. Hose failure. Pinch Point Failure / reforming of gauges / recording devices & test accessories

IMCO employees other contractors on site

Pump using must have third party inspection certificate. All fitting must be proper rated and inspected before using. operate only with the same limit of pressure chart Move or stand on platform only there is enough space. . All ways uses high pressure with proper connection and wipe check should be used. Clear of hands and figures from getting trapped in between. Make sure, gauges / recording devices & test accessories are tested, calibrated and having valid calibration certificates. Follow approved test procedure and use trained personnel to operate and monitor the activity.

Imco/Client

0 Rev.

21/05/2011 Date

Approved for Construction Status

AMS Prepared By.

FET Checked By.

SDM Approved By.