the i of
Finith Jernigan

What is BIM?
BIM is a process that helps people make better decisions.

System First Principles


1. Collaborate not just cooperate 2. Progress = Simple 3. Georeference 4. Assets NOT projects 5. Levels of Detail 6. Link EVERYTHING connect to ALL 7. Systems thinking non-linear processes

Why Use BIM?


Learned of need and possibilities in university. Learned of tool that could deliver in 1988.

Current Manufacturing

Current Construction

Construction industry opportunity

Worldwide Construction Industry = $4.8 trillion


(Source ENR 2008)

57% less 12% = 45% potential savings


(Source CII & LCI 2004)

45% of $4.8 trillion > $2 trillion


Saved annually by reducing construction waste to manufacturing levels (worldwide)

Start Virtual Design & Construction?


Built rst model in 1991. Fully implemented in rm by 1993. New rm to fully embrace BIM in 1996.

Effective BIM Tools?


Onuma System, supplemented by ArchiCad and MANY other tools. No desktop tool can effectively do BIG BIM. Most effective approach is to embrace sharing, open standards and cloud computing.

real time BIM

One Tool or Many?


The technology will continue to evolve...so, no tool is best. Many tools, working at many levels of detail simultaneously are necessary.

PRE Master Plan

HOUR

HOUR

HOUR

HOUR
O&M -V1

HOUR

10

HOUR 4D Time

12

HOUR

14

HOUR

16

HOUR

18

HOUR

20

HOUR

22

HOUR OPS

24

Automatic BIM

Reports
O&M -V2

3D Model

OPS to GIS
EarthQuake Scenario
IFC

Excel to OPS

Check

Cost Est.
IFC IFC

Cost Est.
Green Roof
BIM MAIL PDF Excel

Shelter Sites Identied CALC

4D GE

WFS

WFS
IFC OGC PDF Excel

OSCRE IFC PDF

PDF Excel

IFC

KML

BIM Blobs

IFC

Tenant

FFE

Energy

Adjust

GIS Standards

GSA BIM Guide IFC Files

11 Countries 133 Players Zero Miles

OPS

IFC

IFC

IFC

IFC PDF RVT

IFC

PDF

Structure End
IFC PDF

IFC

IFC PDF Ecotect

KML

HVAC End 1124 Buildings Equipment Congure and Bid.

BIM- V1
GIS
GBXML

Structure Start
GBXML PDF Ecotect

BIM- V2
GBXML

Fire Stations Located Exist Air Flow Exist Thermal Analysis


IFC

Prop. Air Flow HVAC Start GIS Watershed & Catchbasins

HVAC Adjust

+2 Mil Parcel Shapes and Data Linked Zoning Tax Data

Energy

IFC KML CSV GBXML Files One Physical Building

420

Cost Est.

GBS
1st Physical Building of BIMStorm 10 Hours Construction

LEED Goals Corazon Home


Mexico US PST US EST Europe Hawaii US Night Shift Europe Night Shift Manila, Tokyo, HK

Construction

Construction Completed
US EST Europe

US PST

24 Hours of BIMStorm
12

Training for BIM?


Time to competence in BIM can be very short...rst must understand. Software training is dependent on level of mashable software intelligence. Onuma System requires as little as one hour. ArchiCad requires from one to three days. Revit requires from one to three weeks. Others vary from three days to six weeks.

BIM Leadership?
Chuck Eastman (Georgia Tech) and Jerry Laiserin Kimon Onuma, Finith Jernigan, Diane Davis...SHiP Group David Hammond (US Coast Guard) Richard See (Microsoft), Eurostep (Finland & Sweden) Founders of Graphisoft, Heikki Kulusjarvi (Solibri), Senat Properties (Finland) Founders of the International Alliance for Interoperability (now buildingSMART) CIFE (Stanford), Lawrence Berkely National Lab, US Corps of Engineers

Where is BIM Now?


Much BIM Washing. Concepts poorly understood. Idea past tipping point. Tools are available to do BIG BIM and BIG Data. Much inertia to overcome from those that do not fully understand.

misconceptions
1. 2. 3. 4. 5. 6. 7. Approaching as technology Lack of holistic thinking Projects as end-goal Wrong structures Whats in it for me? Confusing process with product Too complex, too finished and too difficult

BIG BIM & little bim?


3 Categories...No. BIM is more holistic than that. Highest level is generally considered to be Enterprise BIM. Some refer to Lonely BIM (which is little bim). Many think Integrated Project Delivery is end goal...not so. BIG BIM is about whole world...built environment...not design and construction.

btw. Tekla is a company with software tools, not a bim category!

You have to walk the walk...not just talk the talk

Are There Lifecycle Tools?


Onuma System is closest to goal of managing data for life. Mainly due to systems model server capability and ability to interconnect. Higher level model servers must become ubiquitous to fully achieve.

10

CLOUD COMPUTING
ONUMA SYSTEM ENGINEERING BIM
ONUMA SYSTEM

FACILITY MANAGEMENT
MAINTENANCE OPERATIONS COMMISSIONING

CONSTRUCTION FINAL DESIGN DESIGN EARLY PLANNING

Add/Renovate Retro-Commissioning

BIM for Existing?


YES...YES...YES...YES...YES...YES...YES...YES...YES...YES...YES...YES...YES Most building stock across entire planet is, and will be existing 95% of my work is for existing buildings. Have built millions of SM of existing condition models Cost is similar to as-exists survey in traditional projects...not an extra

11

btw. anyone who says otherwise should be evaluated carefully! See BIM Washing.

Have Relationships Changed?


Cooperation vs Collaboration. Architects learning to become conductors. Working together, sharing and networks critical. Silos and holding information close is formula for disaster.

12

Embrace real collaboration

What Started BIM?


Early adopters used ArchiCad without clients knowledge...schools, government, housing. Groups such as SHiP and IAI members convinced government agencies of need and opportunity...Senate Properties, US Coast Guard, GSA, Smithsonian, US Corps of Engineers. Large owners demanded change...Construction Users Roundtable

13

BIM & IPD?


BIM is a process enabled by software tools and the internet. Integrated Project Delivery is a method for delivery for a small subset of BIM...similar to Design/Build, Construction Management, et.al.

14

btw. IPD relates mainly to design and construction and can enable BIG BIM. It is not BIG BIM itself!

BIM from the Beginning?


BIM can be used at any phase of anything in the build environment. BIM can be as simple as a spreadsheet or as complex as a virtual model of the world. Parametric design tools can be little bim. So is Revit, ArchiCad, Tekla, et.al. Use of BIM should start at the absolute beginning and continue cradle-tocradle.

15

Owners need to make go/no-go decisions very early in the process

They need to minimize the chances of being over budget, late or buried in problems

Is BIM Risky?
Used with understanding, BIM reduces risk for all. Used in isolation without sharing, BIM can increase the risk of those that withhold information. BIM saves time, money and reduces conict.

16

Validate to Manage D/B


High level bridging D/B Scoping
Station2 Validation
https://www.onuma.com/plan/OPS/ viewSite.php?sysID=115&ID=26

The Future of BIM?


Distributed ModelServers will become standard. BIM development and most transactions will occur transparently. Just the data needed for a specic task will be made available...the complexity will occur in the background. People and individual mastery will be more important than linear workows.

17

2007

2011