the i of
Finith Jernigan
What is BIM?
BIM is a process that helps people make better decisions.
Current Manufacturing
Current Construction
HOUR
HOUR
HOUR
HOUR
O&M -V1
HOUR
10
HOUR 4D Time
12
HOUR
14
HOUR
16
HOUR
18
HOUR
20
HOUR
22
HOUR OPS
24
Automatic BIM
Reports
O&M -V2
3D Model
OPS to GIS
EarthQuake Scenario
IFC
Excel to OPS
Check
Cost Est.
IFC IFC
Cost Est.
Green Roof
BIM MAIL PDF Excel
4D GE
WFS
WFS
IFC OGC PDF Excel
PDF Excel
IFC
KML
BIM Blobs
IFC
Tenant
FFE
Energy
Adjust
GIS Standards
OPS
IFC
IFC
IFC
IFC
Structure End
IFC PDF
IFC
KML
BIM- V1
GIS
GBXML
Structure Start
GBXML PDF Ecotect
BIM- V2
GBXML
HVAC Adjust
Energy
420
Cost Est.
GBS
1st Physical Building of BIMStorm 10 Hours Construction
Construction
Construction Completed
US EST Europe
US PST
24 Hours of BIMStorm
12
BIM Leadership?
Chuck Eastman (Georgia Tech) and Jerry Laiserin Kimon Onuma, Finith Jernigan, Diane Davis...SHiP Group David Hammond (US Coast Guard) Richard See (Microsoft), Eurostep (Finland & Sweden) Founders of Graphisoft, Heikki Kulusjarvi (Solibri), Senat Properties (Finland) Founders of the International Alliance for Interoperability (now buildingSMART) CIFE (Stanford), Lawrence Berkely National Lab, US Corps of Engineers
misconceptions
1. 2. 3. 4. 5. 6. 7. Approaching as technology Lack of holistic thinking Projects as end-goal Wrong structures Whats in it for me? Confusing process with product Too complex, too finished and too difficult
10
CLOUD COMPUTING
ONUMA SYSTEM ENGINEERING BIM
ONUMA SYSTEM
FACILITY MANAGEMENT
MAINTENANCE OPERATIONS COMMISSIONING
Add/Renovate Retro-Commissioning
11
btw. anyone who says otherwise should be evaluated carefully! See BIM Washing.
12
13
14
btw. IPD relates mainly to design and construction and can enable BIG BIM. It is not BIG BIM itself!
15
They need to minimize the chances of being over budget, late or buried in problems
Is BIM Risky?
Used with understanding, BIM reduces risk for all. Used in isolation without sharing, BIM can increase the risk of those that withhold information. BIM saves time, money and reduces conict.
16
17
2007
2011