Sei sulla pagina 1di 5

Rigger Trading OJT & Lab

Batch No./ ( - Yes/ ri No/


r|
Remarks/ l-i|
Description/ (ii
General/ i-
a) Identification of site with indoor and outdoor
snaps./ i:- dh igpku (ir ( ( li lrn

b) Identification of equipments./ ii | ri
c) Identification of Tools for installation./ -iiln
l iii | ri

d) Material receiving at site/ i:- i-i in|
Operational Health & Safety/ i -(i- i
ii

a) Use of Safety belt and Helmet at sites./ i:-
ii (~- i r- - i :-n-i

b) Other safety precautions (Nokia and
Ericsson)./ ii i(ili (ili i li)

Installation/ -iiln i l-
a) BTS and BTS parts/ (|.-|. i (|.-|.
1- Opening of cabinet from box./ l(- i (i
iii

2- Installation of cabinet/ l( - | -iii
3- Grounding of cabinet/ l( - | n iln
4- Installation of cards and distribution of
power/ i | -iii nii l(| ( | li

5- Power to BTS from SMPS/ ,.- |.. (|.-|.
i i( ( | li

6- Internal caballing between Duplexer and
TRX cards of BTS./ i (|.-|.. -|.
i. i (| inl (ln

7- Installation and routing of feeder jumpers
from BTS to feeder cable./ - | -iii i
(|.-|.. | ( nii

8- Installation of signal cables/ n ( |
-iii

b) GSM Antenna and Feeder Cable/ |..-
-|i i | (

1- Opening of GSM antenna box./ |..- -|i
(i i iii

2- Assembling of GSM antenna mounting kit./
|..- -|i iini l- i i | li

3- Pulling of GSM antenna up the tower and
hang on tower./ |..- -|i i -i( n i|i
i -i( -ii

4- Set the orientation tilt and mechanical tilt./
- lil(i l(n n ni( i ili ni(

5- Routing and connecting of feeder jumper at
antenna port on tower./ ,-|i i- |
i ii i i r| -in ii


6- Weather proofing of joint between antenna
port and jumper./ , -|i i- i (|
-i - ii i

7- Assembling and installation of feeder
clamps/ | i -iiln i i | l(li

8- Unwind the feeder role, cut the length as per
requirement and make the feeder
connector./ | i i iii i(nii
(i: i-i i | - (ii+

9- Pulling of feeder cable up the tower and
connect with jumper./ | ( i -i(
i|i i ii

10- Routing, bending, and pulling inside the
shelter and feeder earthing of feeder cable./
| ( i r| -in i|i li n i | i
-ii+

11- Weather proofing and labeling of GSM
antenna./ -i - ii i |..-. i ln i

c) Transmission/ Vkalfeku
1- Opening of MW antenna box. -|i (i i
iii

2- Assembling of MW antenna, As per
specification with the help of instruction
paper which is already attached in m/w
antenna box, ODU, alignment unit and
polarization/ -i:i(( -|i i l(ii ii
li | -iii i i(|i

3- Pulling of MW antenna up the tower, hang
on tower and set the orientation./ -i:i ((
-|i i -i( i|i -ini i (|i i

4- Assembling and installation of IF Clamps./
i: . - | i i i -iii

5- Unwind the IF cable, cut the IF cable as per
requirement and make the IF connector./
| i i iii i(nii (i: i-i
i | - (ii+

6- Pulling of IF cable and connect with ODU./
i: . ( -i( i|i i li ii

7- Routing, bending, pulling inside the shelter
and IF earthing of IF cable./ i: .. ( i
r| -in i|i -ii i i: . ( | li n
i

8- Assembling, installation and power to IDU
from SMPS./ i:.|.. i i i -iii i .-.
|. l(| ( i

9- Alignment of MW antenna./ -i:i(( -|i |
l-iln

10- Weather proofing and labeling of MW
antenna./ -i:i(( -|i | -i - ii i nii


d) Connectorization of,/ - (ii
1- Feeder connector (Nokia and Ericsson)/ |
- (ili i l)
2- IF connector (PDH and SDH)/ i: .. -
.|.|. i .|.


3- R J 45 connector as configuration./ i. r
- ( n i

4- BNC connector/ (|..| -
5- SMZ connector/ ,.-. -
6- 25 pin connector (D type)/ zr l -
(| i i)

7- 9 pin connector (D type)/ s l -
(| i i)


e) Earthing/ niln
1- Feeder earthing./ | n iln
2- IF earthing./ i:. niln
3- Equipments earthing./ ii | n iln


Precautions / i(iili
1. Do not Switch Off any MCB without tracing while removing any equipment.
i: i| i li l -(ln -.|.(|. i l(i (( i +
2. Do not remove M/W without tracing and without informing OMC Engineer.
-i:i (( l(i i ( l(i i .-.|. :|l i (ni li +
3. Do not Stand on feeder or IF cable while working
i- n - ( +
4. Do not approach site without permission from technician /Supervisor.
i: - -|li (i: | -n| l(i i: - i
5. Do not work without safety Eqpt. on tower more then 3 mtr High.
s -|. i(i i: (i -i( l(i ii i- +
6. Do not connect Jumper connection.
- i +
7. Do not fix moduler.
-i i +
8. Do not leave any tool at site.
i: - i: i i si +
9. Do not make site dirty.
i: - i n(i +
10. Do not connect Power connections.
i: i( i +
11. Do not step on any eqpt.
l| | i +
12. Cable crossing
( iln!
13. Poor IF cable routing of Nokia MW Hope
i:. ( nn nit nt!
14. DDF cable not Routed Property
|| ( nn nit nt!
15. Earth cable not routed properly
n iln ( nn nit nt!
16. Rear view of Nokia MW Hop
ili MW Hop i | ( !
17. RF Jumper labeling
RF ln i!
18. Feeder earth cable routing wrong
| n iln nn!
19. Earth cable not routed properly
n iln n r| l(si: n:!
20. Not Routed Properly
n r| l(si: n: !
21. Shelter Clean
- | i: !
22. Tape Putty done wrong
- ~| n r| nit nt!
23. Lugs not inserted properly
n n r| nit nt!
24. TIE not cut
-i: r| i-| nt!
25. Surge Arresters & Marking
-- i !