POSITION: Electrician PERSONAL DATA NAME I/C NO DATE OF BIRTH PLACE OF BIRTH SEX MARITAL STATUS RELIGION SPOKEN LANGUAGE NATIONALITY PASSPORT NO E-MAIL : Mohd Azhar Bin Abd Samad : 851201-12-5789 : 01 Dec 1985 : Sabah : Male : Married : Islam : Malay, English : Malaysian : H19787669 :Abanz_85@yahoo.com.my

TRAINING ATTENDED Course: Basic Offshore Safety Induction & Emergency Training. Offshore Orientation. First Aid / CPR / EAR and AED. Basic Fire Fighting and Sea Survival. Helicopter Underwater Escape Training (HUET) With EBS Conducted By: SEQU OFFSHORE SAFETY SDN BHD

SYPNOSIS OF EXPERIENCE I have more than 8 years experience in the line of Heavy Industrial Project in peninsular Malaysia and other country. Being of my experience, I involved in Electrical and Instrumentation work in Refinery Plant, Power Plant, , Drilling Rig, FSO and FPSO, Oil and Gas Processing Module (Onshore & Offshore). Familiar in Hook Up and Commissioning of Electrical and Instrument devices, follow company rules and regulation. And coordinate with client / company supervisor / foreman to complete and finish the work in very efficient and safe manner & to carry out the project with Zero Lost Time Injury (LTI) & Zero Lost Time Accident (LTA). 1|Page

EMPLOYMENT RECORD
COMPANY : ROTARY PROJECT : Gumusut kakap at MMHE DURATION : 13 Dec 2010 to 17 March 2011 POSITION : Electrician. Duty & Responsibility Fabrication and Installation of E & I support, cable ladder and cable tray for Laying of Instrument, control and telecommunication cables. Glanding and Termination of all types of cables. Perform loop check and Insulation test on new and existing E & I cables.

COMPANY : PFCE-CG PROJECT : CHILI PADI at sime darby DURATION : 15 May 2010 to 08 Ogost 2010 POSITION : Electrical Duty & Responsibility Removing old cables of motor and change with new cables Removing old motors and change with new motors Prepare cable schedule and location drawing for pulling the E & I cables. Prepare P & ID drawing for complete installation of electrical and instrument devices. Monitoring co-workers and preparing termination drawing for glanding and termination of E & I cables. Perform insulation and megger test on power cables. Prepare and record of E & I daily progress report.

COMPANY : SINBERY SDN BHD PROJECT : BIODIESEL at Kemaman Terangganu DURATION : 02 Feb 2009 to 21 July 2009 POSITION : Electrician Duty & Responsibility Continuity check and insulation Test of E & I cables. Installation of Electrical Equipment. Glanding and termination of power cables at MCC Control Board Panel. Testing and Energizing of 110V DB Lighting panel Assisting vendor on Testing and Functioning of Motor, From MCC to Field.

2|Page

COMPANY PROJECT

: MEGAWATTS ENGINEERING SERVICES PTE. LTD : GSF KEY GIBRALTAR DRILLING RIG (GLOBAL SANTA FE) At SONGKHLA, THAILAND (OFFSHORE) DURATION : 15 April 2008 till 10, June 2008 POSITION : Electrician. Duty & Responsibility Removal of power and control cables on VFD house, Top Drive & Accommodation room Removal of Electrical and Instrument junction box and devices on Rig floor. Pulling new Electrical and Instrument cables on new accommodation room. Glanding and Termination of all types of cables. Perform continuity check and megger test on new and existing power cables.

COMPANY PROJECT

: KENCANA HL SDN. BHD : CAKEWARALA CKR COMPRESSION MODULE (CM3) PROJECT At CARIGALI HESS (OFFSHORE) DURATION : August 2007 till February 2008 POSITION : Electrician. Duty & Responsibility Fabrication and Installation of E & I support, cable ladder and cable tray for Laying of Power, Instrument, control cables. Glanding and Termination of all types of cables. Perform loop check and Insulation test on new and existing E & I cables. Assist Rolls Royce vendor on pre-commissioning & commissioning of turbine compressor.

COMPANY PROJECT

: NSF ENGINEERING SDN. BHD : F-6 SHELL REJUVENATION PROJECT At SHELL, SARAWAK (OFFSHORE) DURATION : 27, June 2007 till 08, September 2007 POSITION : Electrician. Duty & Responsibility Fabrication and Installation of E & I support, cable ladder and cable tray for Laying of Instrument, control and telecommunication cables. Glanding and Termination of all types of cables. Perform loop check and Insulation test on new and existing E & I cables.

3|Page

COMPANY PROJECT

: INTERGLEN ENGINEERING SDN. BHD : ABU CLUSTERS DEVELOPMENT PROJECT, (PCSB) At TERRENGGANU (OFFSHORE) DURATION : 25, January 2007 till 15, May 2007 POSITION : Electrician. Duty & Responsibility Laying of Instrument and Signal cables from Marshalling Cabinet Panel, Fire & Gas Control Panel, Telecommunication Panel.(control room) to junction box and field. Complete Installation of Instrument devices such as Pressure, Temperature, Flow, Level Xmtr, Thermocouple, smoke, heat, gas, flame detector and etc. Glanding and Termination of all types of cables. Packing MCT for E & I cables at Gas & Diesel Generator. Doing core marker for complete Termination of power, instrument, control, signal cables. Perform Loop Check and Insulation test on E & I Cables.

COMPANY PROJECT

: INCOME ENGINEERING SDN. BHD : KIKEH, MURPHY OIL FPSO PROJECT At MMHE SHIPYARD SDN.BHD DURATION : 25 October 2006 till 25 November 2006 POSITION : E & I Lead man. Duty & Responsibility Monitoring co-workers on installation of electrical and instrument devices. Monitoring co-workers and preparing termination drawing for glanding and termination of E & I cables. Prepare and record of E & I daily progress report.

COMPANY PROJECT

: INTERGLEN ENGINEERING SDN. BHD : ABU CLUSTERS DEVELOPMENT PROJECT, (PCSB) AT RAMUNIA FABRICATORS SDN BHD. YARD DURATION : 28, August 2006 11, October 2006 POSITION : Electrician Duty & Responsibility Fabrication and Installation of E & I support, cable ladder and cable tray. Pulling of Instruments, Control and Signal cables. Installation of Electrical and Instrument Devices. Glanding and Termination of all types of cables.

4|Page

COMPANY PROJECT

: ESMALTECH ENGINEERING SDN. BHD : SMITH BORNEO (BARGE) AT SMIT SINGAPORE SHIPYARD SINGAPORE. DURATION : February 2006 till August 2006 POSITION : Electrician Duty & Responsibility Continuity check and insulation Test of E & I cables. Installation of Electrical Equipment. Glanding and termination of power cables at MCC Control Board Panel. Testing and Energizing of 110V DB Lighting panel Assisting vendor on Testing and Functioning of Motor, From MCC to Field.

COMPANY : INCOME EGINEERING SDN. BHD PROJECT : YOHO DEVELOPMENT PROJECT (FSO) DURATION : May 2004 till August 2004 POSITION : E & I Foreman. Duty & Responsibility Monitoring co-workers on E & I activity checking correct cables drum no., type, size, and correct cores as per cable schedule, before pulling of E & I cables at the following area and system: Switch gear control room, Mcc control board panel, compressor motor system, junction box and lighting for electrical System. Dcs control panel, Fire and Gas control panel, instrument junction box, and field devices. Monitoring and preparing termination drawing for glanding and termination of E & I cables. Prepare and record E & I daily progress report.