ABBREVIATIONS Hold Point (HP) ITP Inspection and Test Plan QC J.V. QC Inspectors LT J.V. Laboratory Technician FPM J.V. Facilities Project Management SUR J.V. Surveyor CS J.V. Civil Superintendent WF- J.V. Works Foreman JV Spie Capag Petrofac International Ltd. CO Company (BTC) Proc J.V. Procedure Spec Company (BTC) Specification RESP Responsibility FREQ Frequency HP Hold Point R Review IS Inspection MS Method Statement SPP Spie Petrofac Standard Forms GOC Guidance on Certification FDT Field Density Test Const. Construction Dept HS Health and Safety Dept TE Test Engineer Witness Point (WP) Inspection (IS) Review (R)
DEFINITIONS
Verification of compliance with specification by full witness of activities and providing an inspection record. The activity cannot proceed without witness.
Company to be notified 24 hrs prior to start of the activity. If Company does not attend activity can proceed.
Page 2 of 4
Select personnel for supervision of cleaning and gauging activities. Review of materials and equipment required for cleaning and gauging activity Review Cleaning and Gauging Section Dossier Issue Authorization to Carry out Cleaning and Gauging form Inform COMPANY of intention to clean and gauge section Prepare Test Equipment
410088/L/PL/SP/023 Sect 5.1 410088/L/PL/SP/023 Sect 5.1 410088/L/PL/SP/023 Sect 5.2.5.5 SCP004-MS30-CM-PRO-00026 Sect 6.2 SCP004-MS30-CM-PRO-00026 Sect 6.2 SCP004-MS30-CM-PRO-00026 Sect 6.2 410088/L/PL/SP/023 Sect 5.2.4 SCP004-MS30-CM-PRO-00026 Sect 6.2 SCP004-MS30-CM-PRO-00026 Sect 6.2 410088/L/PL/SP/023 Sect 5.2.3 and 5.2.4
Qualified and Experienced Complete list of all equipment, equipment is correct rating, size and quantity. Review of dossier for section is acceptable Form signed off by Test Engineer and Construction Manager Issue Application for Inspection to COMPANY Equipment is fit for purpose and calibrated where necessary Pigs are of correct type, good condition. Gauge Plate is correct diameter and thickness with no damage. Pigs are installed correctly with no damage Welders are qualified and NDT accepted Equipment is located and positioned correctly in accordance with MS
CV Material Requisition
CM CM
QCM QCM
HP HP
HP HP
Review Review
Approved Dossier Authorization to Carry out Cleaning and Gauging Form (Appendix C) Application for Inspection Equipment Certificates, Calibration Certificates Cleaning and Gauging Report with pre and post inspection / check of gauge plate
QCM QCM
HP HP
R R
Review Witness / Review Measure Gauge Plate and Photograph plate for Record of condition, unique marking of plate Visual
QCM QC
HP HP
R HP
6
Assemble Brush Pigs and Gauge Plate
QC
HP
HP
8
Weld Pig Launcher and Receiver onto section to be cleaned and gauged Set up compressors and equipment as described in Method Statement. Witness Welding Visual
TE
QC
HP
HP
TE
QC
HP
HP
TE
QC
HP
IS
10
Page 3 of 4
Acceptance Criteria
Quality Record
RESP Const.
11
Establish Valve Status for both ends of the section Commence Pig Launching Procedure as per MS Record Details of Pig Launching and Progress of Pigs to Receiver Upon receiving pigs into Pig Receiver, commence depressurisation as per MS Inform COMPANY that Pigs have arrived, witness removal. Witness Removal of Pigs and Gauge Plate
All Pre Start Checks are acceptable and signed off. Valve Status is agreed and accepted In accordance with Launching Procedure
TE
12 13 14 15 16
SCP004-MS30-CM-PRO-00026 Sect 6.3 SCP004-MS30-CM-PRO-00026 Sect 6.3 SCP004-MS30-CM-PRO-00026 Sect 6.3 SCP004-MS30-CM-PRO-00026 Sect 6.3 SCP004-MS30-CM-PRO-00026 Sect 6.3 410088/L/PL/SP/023 Sect 5.2.4 SCP004-MS30-CM-PRO-00026 Sect 6.3 410088/L/PL/SP/023 Sect 5.2.4 and 5.4
Pre Start Form (Appendix C) Cleaning and Gauging Report Detailed Record of events
TE
QC
HP
IS
TE TE TE TE
QC QC QC QC QC
HP HP HP HP HP
HP HP HP HP WP
All Pigs Arrived COMPANY informed Photographic Evidence, Visually Accept with no deformation or damage to gauge and pigs are clean and magnets show only small debris.
TE
17
18
If clean and gauge is accepted, remove launcher and receiver, seal off open end. If the clean and gauging run is rejected, repeat cleaning and gauging run until acceptable.